ML20134M743
| ML20134M743 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/31/1996 |
| From: | Bergendahl D, Hill R, Mallen F HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ST-HL-AE-005513, ST-HL-AE-5513, NUDOCS 9611260027 | |
| Download: ML20134M743 (14) | |
Text
.
.The Light c o mp a nys uth Texas Project Electric Generating station P. O. Box 289 Wadsworth, Texas 77483 Ilouston Lighting & Power November 13,1996 ST-HL-AE-005513 File No. G02 3
10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for October 1996 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports 4
for October 1996.
If you should have any questions on this matter, please contact D. M. Bergendahl at (512) 972-7688.
Sincerely,
/v n1 A F. H. Mallen
~
Manager, Planning & Controls RLH/sl Attachments: 1) STPEGS Unit 1 Monthly Operating Repon - October 1996
- 2) STPEGS Unit 2 Monthly Operating Report - October 1996
>h "I
9611260027 961031 PDR ADOCK 05000498 R
PDR Project Manager on Behalf of the Participants in the South Texas Project
1 l
Houston Lighting & Power Company ST-HL-AE-5513 l
South Texas Project Electric Generating Station File No.: G02 Page 2 Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61%7 Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Dr. Bertram Wolfe Sr. Resident Inspector 15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.
Monte Sereno, CA 95030 P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff Bureau of Radiation Control J. R. Newman, Esquire Texas Department of Health Morgan, Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W.
Austin, TX '/8756-3189 Washington, DC 20036-5869 J. R. Egan, Esquire M. T. Hardt/W. C. Gunst Egan & Associates, P.C.
l City Public Service 2300 N Street, N.W.
j P. O. Box 1771 Washington, D.C. 20037 San Antonio, TX 78296 l
J. C. Lanier/M. B. Lee U. S. Nuclear Regulatory Commission City of Austin Attention: Document Control Desk Electric Utility Department Washington, D.C. 20555-0001 721'Barton Springs Road I
Austin, TX 78704 Central Power and Light Company J. W. Beck ATTN: G. E. Vaughn/C. A. Johnson Little Harbor Consultants, Inc.
P. O. Box 289, Mail Code: N5012 44 Nichols Road
. Wadsworth, TX 77483 Cohassett, MA 02025-1166 l
~
SOLTniTEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT OCTOBER 1996 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO 50-498 LICENSE NO. NPF-76 Resiewed By:
AOA A
N lb MM. BKGEMMHL' Date/
I Approved By:
/
///4/f/
G.L.PARKEY
(
Datd '
I i
4 l
MONTHLY
SUMMARY
l STPEGS Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
l i
i
)
l OPERATING DATA REPORT J
DOCKETNO. 50-498 UNIT 1 l
DATE Nov. 6.1996 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS 1.
REPORTING PERIOD: 10/1/96-10/31/96 GROSS HOURS IN REPORTING PERIOD: 241 2.
CURREN'ILY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 12_5_04 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None j
4.
REASONSFORRESTRICTION(IF ANY) N/A THIS MONTH YRTO DATE CUMULATIVE a
5.
NUMBER OF HOURS REACTOR CRITICAL 745.0 6.778.2 48.415.5 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON LINE 745.0 6.751.0 47.090.3 8.
. UNTT RESERVE SHUTDOWN HOURS Q
Q 9
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.843.6 %
25.492.399 173.648.734
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 979.000 8.755.540 59.137.210
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 937 580 8.380.420 56.193.140
- 12. REACTOR SERVICE FACTOR 100.0 %
22 4 %
6_71%
- 13. REACTOR AVAILABILITY FACTOR 100.0 %
2.26%
!!7_,5%
5
- 14. UNIT SERVICE FACTOR 100.0 %
2L2%
6._54%
5
- 15. UNIT AVAILABILITY FACTOR 100.0y, 22 %
!!14%
2
- 16. UNIT CAPACITY FACTOR (Using MDC) 100.6 %
21.1%
62.6 %
1
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 100.6y, 21 1 %
624 %
- 18. UNIT FORCED OUTAGE RATE OE 93 %
2_35.5
- 19. SHUIDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-498 l
UNIT 1 l
DATE Nov. 6.19%
COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 MONTil OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) i 1
1261 17 1258 2
1212 18 1252 2
3-1212 19 126J 4
1262 20 1260 j
5 1260 21 1217 6
12M 22 1251 7
1252 23 12_53 5
i 8
12212 24 1?_61 6
9 1252 25 1217 5
10 1261 26 1260 l
i 11 1218 27 1216 12 1261 28 1261 l
13 1212 29 1256 i
14 1260 30 125_1
)
l I
l 15 12 3 31 1260 16 126.1 4
4
4
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50 498 UNIT 1 DATE Nov. 6.1996 l
COMPLETED BY R.L. Hill TELEPHONE 512 972-7667
- L REPORTMONTH OCTOBER 1
2 3
4 5
i No.
Date Type Duration Reason Method of Licensec System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code i
Down Report #
[
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE RETORTING PERIOD 1
1 2
3 4
5 F: Forced Reason:
Method:
IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage l
F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain) r 5
--.--.,,n.n--
-.+
+ - - -..
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
l b
i SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT OCTOBER 1996 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 l
-l Resiewed By:
db
/
DM. BIQbGENDDIL Dale Approved By:
//77 R.E. MASSE
/
Date i
u l
MONTIILY
SUMMARY
STPEGS Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
l I
. - -.. ~...
~ -.
OPERATING DATA REPORT a
DOCKETNO 50-499 UNIT 2 DATE Nov. 6.1996 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667
{
OPERATING STATUS
{
l.
REPORTING PERIOD: 10/1/96-10/31/96 GROSS HOURS IN REPORTING PERIOD: 241 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 3.
POWER LEVEL TO WHICH RES'IRICTED (IF ANY) (MWe-Net): None 4.
REASONS FORRESTRICTION(IF ANY) N/A THIS MONTH YRTO DATE CUMULATIVE 5.
NUMBEROF HOURS REACTOR CRITICAL 745.0 6.989.7 45.090.4 6.
REALTOR RESERVE SHUTDOWN HOURS 9
9 Q
7.
HOURS GENERATOR ON LINE 745.0 6.910.0 43,728.5 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.843.054 26.257.601 161.232.278
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 978.100 9.002.400 54.830.781
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 936.490 8.616.390 52.265.736
- 12. REACTOR SERVICE FACTOR 100,Q%
95.5 %
69.8*/.
- 13. REALTOR AVAILABILITY FACTOR 1QOg/3 25 5_%
69.8 %
- 14. UNIT SERVICE FACTOR 100.0 %
94.4 %
67.7 %
- 15. UNIT AVAILABILITY FACTOR
'100.0 %
94.4 %
627,2%
- 16. UNIT CAPACITY FACTOR (Using MDC) 100.5 %
24d%
64.7 %
i
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 100.5 %
24d%
64_,2%
- 18. UNIT FORCED OUTAGE RATE Q 0*Q%
Q 8.%
22 8 %
8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTTIS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 35 day refueling outage to begin on February 8,1997.
l
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
=
_ =. -
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov. 6.19%
COMPLETED BY R.L. Hill TELEPHONE __ 512 972-7667 MON'I11 OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) 1 1255 17 1256 2
J_2_51 18 1257 25 1
3 1211 19 VII 4
1255 20 J261 5
12 21 1255 ) 6 1255 22 1263 I i 7 1256 23 1258 8 1255 24 1218 9 1256 25 12_58 10 1256 26 1258 11 1256 27 1261 12 J15_6 28 1258 13 1256 29 1211 14 1261 30 12352 15 1257 31 1258 I 16 1218 i f i i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-499 UNIT 2 DATE Nov. 6.1996 COMPLETED BY R.L. Hill TELEPHONE $12 972-7667 REPORTMONTH OCTOBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prennt Recurrence (Hours) Shutting Event Code Code Down Report # Reactor i THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCrlONS DURING THE REPORTING PERIOD 1 2 3 4 5 t F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing t E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain) h
PORYS AND SAFETY VALVE
SUMMARY
ere um no PORV or Safety Valves challenged during the reponing perid e f f}}