ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP
| ML20149K710 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 01/31/1996 |
| From: | Bergandahl D, Myers L HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ST-HL-AE-005301, ST-HL-AE-5301, NUDOCS 9602220096 | |
| Download: ML20149K710 (14) | |
Text
I
.. o The Light c o mp a ny South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power February 15,1996 ST-HL-AE-005301 File No. G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operatina Reports for January 1996 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January 1996.
If you should have any questions on this matter, please contact D. M. Bergendahl at (512) 972-7688.
Sincerely, M4472u
"~
M. A. McBurnett Manager, Nuclear Licensing RLH/sl Attachments:1) STPEGS Unit 1 Monthly Operating Report - January 1996
~
h..
Houston Lighting & Power Company ST-HL-AE-5301 South Texas Project Electric Generating Station File No.: G02 Page 2 c:
Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067
. Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Operations - Records Center Project Manager _
700 Galleria Parkway U. S. Nuclear Regulatory Commission
' Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie l
Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm.
Bellport, NY l1713 P. O. Box 910 l
Bay City, TX 77404-0910 Richard A. Ratliff Bureau of Radiation Control 4
J. R. Newman, Esquire Texas Department of Health Morgan, Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W.
Austin, TX 78756-3189 4
3 Washington, DC 20036-5869 U. S. Nuclear Regulatory Comm.
K. J. Fiedler/M. T. Hardt Attn: Document Control Desk i
City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 San Antonio, TX '78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.
Electric Utility Department 2300 N Street, N.W.
721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 Central Power and Light Company J. W. Beck ATTN: G. E. Vaughn/C. A. Johnson Little Harbor Consultants, Inc.
P. O. Box 289, Mail Code: N5012 44 Nichols Road Wadsworth, TX 77483 Cohassett, MA 02025-1166 3
a t
4 l
i
)
J SOUTH TEXAS PROJECT
-ELECTRIC GENERATING STATION 4
UNIT 1 MONTHLY OPERATING REPORT JANUARY 1996 HOUSTON LIGHTING AND PONER CO.
NRC DOCKET NO. 50-498 4
LICENSE NO. NPF-76 i
Reviewed By:
OM b
]
D. M.'
RGENDhML Dkte 2 16 l # b l
Approved B LO M
1
- f. W. MYERS P'
bate i
i I
J I
e Monthly sn-=ry STPEGS Unit 1 operated during the reporting period with no unit shutdowns or significant power reductions.
i 4
OPERATING DATA REPORT DOCKET NO.
50-498 UNIT 1 DATE Feb. 12, 1995 COMPLETED BY R.L.
Mill TELEPHONE 512/972-7667 OPERATING STATUS 1.
REPORTING PERIOD: 01/01/96-01/31/96 GROSS HOURS IN REPORTING PERIOD: 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt) :
3800 MAX. DEPEND. CAPACITY (MWe-Net) :
1250.6 DESIGN ELECTRICAL RATING (MWe-Net) :
1250.6 3.
POWER LEVEL TO~WHICH RESTRICTED (IF ANY) (MWe-Net) : None
[
4.
REASONS FOR RESTRICTION (IF ANY) : N/A THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL.....
744.0 744.0 42381.3 6.
REACTOR RESERVE SHUTDOWN HOURS.......,...
0 0
0 7.
HOURS' GENERATOR ON LINE..................
744.0 744.0 410B3.3 8.
UNIT RESERVE SHITI'DOWN HOURS.........
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWt ).... 2 7 9 5 6 9 3 2795693 150952028 4
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH).. 963000 963000 51344670 1
j 11.
NET ELECTRICAL ENERGY GENERATED (MWH).... 922960 922960 49735580 1
i 12.
REACTOR SERVICE FACTOR...................
100.0%
100.0%
65.0k 13.
REACTOR AVAILABILITY FACTOR..............
100.0%
100.0%
65.0%
14.
UNIT SERVICE FACTOR......................
100.0%
100.0%
63.0%
15.
UNIT AVAILABILITY FACTOR.................
100.0%
100.0%
63.0%
16.
UNIT CAPACITY FACTOR (Using MDC),,.......
99.2%
99.2%
59.Ot 17.
UNIT CAPACITY FACTOR (Using Design MWe)..
99.2%
99.2%
59.8%
18.
UNIT FORCED OUTAGE RATE..................
0.0%
0.0%
26.0%
I 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Scheduled 35 day refueling outage to begin on May 18, 1996.
20.
IF SH'JT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
i
i 6
I I
l f
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-498 i
UNIT 1 DATE Feb. 12. 19 96 COMPLETED BY R.L.
Hill l
i.
TELEPHONE 512/972-7667 e
i a
MONTH JANUARY i
I DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net)
{
i 1
1267 1/
1258 i
2.
1139 18 1259 i
3 1122 19 1259 I
4 1122 20 125B i
4 5
1138 21 1259 6
1173 22 1250 7
1267 23 1250 8
1266 24 1259 9
1263 25 1255 10 1263 26 1263 11 1263 27 1258 12 1263 28 1263 13 1263 29 1250 14 1263 30 1259 15 1250 31 1257 16 1258 t
?
t i
e I
i l
I
+
t 7
i i
_y.-
.. g
.m s
UNIT SEUTDCNNS AED POWEP REDUCTIOMB.
DOCKET NO.
50-498 UNIT
-1 DATE 'Feb. 12. 1996 COMPLETED BY R L.
Mill
^
TELEPHONE. 512/972-7667 REPORT MONTH JANUARY 1
2
'3 4
5 No.~; Date' Type Duration Reason Method of Licensee System Component Cause & Corrective Action to' (Hours)
Shutting Event Code Code Prevent Recurrence Down '
Report #
Reactor t
Y I
THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING.THE REPORTING PERIOD I
1 2
3 4
.5
)
F: Forced Reason:
Method:
IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Gcram D-Regulatory Restriction 4-Cont, of Existing E-Operator Training & License Exam Outage
[
F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
__-._._..-_-,.m.__.
...m.
--...-.-m.-.
PORVs and Safety Valves B"= =gy There were no PORV or Safety Valves challenged during the reporting period.
I l
l
r l
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 NONTHLY OPERATING REPORT JANUARY 1996 HOUSTON LIGHTING AND PONER CO.
NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewed By:
D. M.
ENb%L D e O N ELUS MN f
Approved By:
I at'e R. E. MASSE W
D d8\\
.h N Asst
i l
Monthly Summary STPEGS Unit 2 began the reporting period operating at 100% reactor power.
On January 10, at 0001 the. unit was removed from service to allow main
' generator inspections and repairs.
Following. corrective maintenance, the unit was' returned to service on January 24, at 1633. The unit achieved full power on January 25 and. operated for.the remainder of the reporting period with no unit shutdowns ~or significant power reductions.
t I
e r
--~.e-n
,n e
e-
.. ~
6.e.
rw--
_ ~
~
l t
OPERATING DATA REPORT DOCKET NO.
50-499 UNIT 2 DATE Feb. 12. 1996 COMPLETED BY R.L.
Hill TELEPHONE 512/972-7667
' OPERATING STATUS
'1.
REPORTING PERIOD: 01/01/96-01/31/96 GROSS HOURS IN REPORTING PERIOD: 744 I
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):._1800 MAX. DEPEND. CAPACITY (MWe-Net) :
1250.6 DESIGN ELECTRICAL RATING (MWe-Net) :
12 5 0. fL.
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) : None 4.
REASONS FOR RESTRICTION (IF ANY) : N/A
-}
THIS MONTH YR TO DATE CUMULATIVE s
5.
NUMBER OF HOURS REACTOR WAS CRITICAL.....
413.7 413 7 38514.4 6.
REACTOR RESERVE SHUTDOWN HOURS...........
0 0
0 7.
HOURS GENERATOR ON LINE............-......
391.5 391.5 37210.0 8.
UNIT RESERVE SHUTDOWN HOURS..............
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWt).... 1434490 1434490 136409166
- 10.
GROSS ELECTRICAL ENERGY. GENERATED (MWH).. 490900 490900 46319291 11.
NET ELECTRICAL ENERGY GENERATED'(MWH).... 468980 468980 44118326 i
12.
REACTOR SERVICE FACTOR...................
55.6%
55.6%
66.4%
r 13.
REACTOR AVAILABILITY FACTOR..............
55.6%
55.6%
66.4%
1 14.
UNIT SERVICE FACTOR......................
52.6%
52.6%
64.1%
15.
UNIT AVAILABILITY FACTOR.................
52.6%
52.6%
64.1%
j
' 16.
UNIT CAPACITY FACTOR (Using MDC)........
50.4%
50.4%
60.8%
17.
-UNIT CAPACITY FACTOR - (Using Design MWe)..
50.4%
50.4%
60.8%
i 18.
UNIT FORCED OUTAGE RATE..................
0.0%
0.0%
25.7%
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH) :
N/A 1
' 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A I
s e
9
e ao
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-499 UNIT 2 DATE Emb. 12. 1996 COMPLETED BY R.L.
Hill 2
TELEPHONE 512/972-7667.
i MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net)
'1 1263 17 0
2 1263 18 0
'3 1263 19 0
P 4
1250 20 0
5 1243 21 0
4 6
1242 22 0
l 7
1234 23 0
8 1234 24 12 9
1076 25 893 10 0
26 1262 11 0
27 1263 12 0
28 1262 l
13 0
29 1263 14 0
30 1261 15 0
31 1258 16 0
J t
4 t
a
' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-499
- . c.
UNIT 2
'DATE. Feb. 12.-1996-COMPLETED BY-R_L_
Hil1 TELEPHONE 512/972-7667 REPORT MONTH JANUARY 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System. Component Cause & Corrective Action to (Hours)
Shutting Event Code
. Code Prevent-Recurrence
~
Down Report #
Reactor 96-01 960110 S
352.5
'B 1
N/A TB TG The unit was removed from service to allow main generator inspections and repairs.
P
+
- i t
E
?
E 1
2 3
4 5
F: Forced Reason:
Method:
IEEE 805-1983 IEEE 803A-1983 i
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other i
H-Other (Explain)
[
. i t
u..
... ~.,
.,y r
~
.wn.
e e
j PORVs and Safety Valves Su==ry There were no PORV or Safety Valves challenged during the reporting period.
l i