RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error

From kanterella
Jump to navigation Jump to search
Fitness for Duty Blind Quality Assurance Specimen Testing Error
ML21181A337
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/30/2021
From: Schenk T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-48104
Download: ML21181A337 (3)


Text

Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 Tel 225-381-4374 Timothy Schenk Manager - Regulatory Assurance 10 CFR 26.719(c)(1)

RBG-48104 JXne , 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Reference:

Fitness For Duty Blind Quality Assurance Specimen Testing Error River Bend Station - Unit 1 NRC Docket Nos. 50-458 Renewed Facility Operating License No. NPF-47 Quest Diagnostics letter to Entergy Operations, Inc., River Bend Station,"

dated June 14, 2021 On April 27, 2021 a blind quality assurance specimen was submitted to a Health and Human Services (HHS) certified laboratory. The test results returned from the HHS lab on May 2, 2021 were inconsistent with the expected results. The specimen correctly identified positive results for two drugs, but incorrectly identified a negative result for one other drug. This was not considered to be a false positive test nor a false negative test. The NRC Resident Inspector was briefed on the potential blind sample error.

The investigation results were returned to River Bend Station on June 14, 2021. The investigation revealed that laboratory personnel error was the root cause of the inconsistent test results. Investigation results are documented in the enclosure attached to this letter.

There are no new regulatory commitments contained in this submittal. If you require additional information, please contact Mr. Matthew J. Deignan, Supervisor - Access Authorization / FFD at 225-381-4141.

TS/md/dw

Enclosure:

cc:

Quest Diagnostics letter to Entergy Operations, Inc., River Bend Station," dated June 14, 2021 NRC Regional Administrator - Region IV NRC Senior Resident Inspector - River Bend Station Digitally signed by Tim Schenk DN: cn=Tim Schenk, c=US, o=River Bend Station, ou=Manager Regulatory Assurance, email=tschenk@entergy.com Date: 2021.06.30 12:07:43 -05'00' Tim Schenk

Enclosure RBG-48104 Fitness For Duty Blind Quality Assurance Specimen Testing Error