Forwards Sixth ISI Summary for Pnpp,Documenting ISI Exam Activities Conducted from Return to Commercial Operation from Fifth Refueling Outage Until Completion of Sixth Refueling Outage
ML20198P088
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/15/1998
From: Myers L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P093 List:
References
PY-CEI-NRR-2248, NUDOCS 9801220004
Download: ML20198P088 (1)


Text

-

5. s Perry k: lear Power Piant E=* - n m** 10 Center Road gg?V PO. Box 97 m Perry Cho44081

' LowW.Nyere : 440 280691S

' Mce Presiderte far 440-2808029 4 .

s

--January 15,1998 PY-CEl/NRR-2248L United States Nuc' ear Regulatory Commission

' Document Control Desk Washington,DC 20555 Petty Nuclear Power Plant Docket No. 50-440 Inservice inspection Summary Report IMies and Gentlemen:

In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI," Inservice Inspection",1983 Edition, Summer 1983 Addenda, Article IWA 6000, the sixth Inservice inspection sui.: mary Report for 'he Perry Nuclear Power Plant (PNPP) is attached. This report documents the inservice inspection examination activities conducted from return to commercial operation from the fifth refueling outage until the completion of the sixth refueling outage.

Ifyou have questions or require additional information, please contact M. n"y L. Hegrat, Manager - Regulatory Affairs, at (440) 280-5606.

Very truly yours, f

GGR:

Attachment hj cc: NRC Project Manager

- NRC Resident inspector NRQ Region Ill Authorized Nuclear Inservice Inspector (ANii)