PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2

From kanterella
(Redirected from PLA-0000)
Jump to navigation Jump to search
June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2
ML052080146
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/13/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-00005927
Download: ML052080146 (7)


Text

- -

I I I

% I -F

% 16S a 0 Robert A. Saccone PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem /Boulevard Berwick, PA 18603 *a*TM Tel. 570.542.3959 Fax 570.542.1504 RASaccone pplweb.com July 13, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-00005927 The June 2005 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Rob accone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman

< e2 q

OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 07/13/2005 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susguehanna Steam Elclctric Station (Ul)
2. Reporting Period: June 2005
3. Design Electrical Rating (Net MWe): 1177
4. Maximum Dependable Capacity (Net MWe): 1135 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 720 4343.0 193,416.0
6. Number of Hours Reactor Was Critical 720 4343.0 162,331.0
7. Hours Generator On-Line 720 4343.0 159,943.0
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 801.574 4,972,171 165,612,613

.'NOTFS:

Page I of I

UNIT SHUTDOWNS DOCKET NO. 50-387 UNIT One DATE 07/13/2005 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH June 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action

' (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary: There were Two planned power changes that were greater than 20%. The first one was on 6/3/05 for control rod stroking and timing, and the second on 6/24/05 for control rod timing and a sequence exchange.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A- Equipment Failure (Explain) I - Manual B- Maintenance or Test 2 - Manual Scram C- Refueling 3-Automatic Scram D- Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION k..

Docket Number: 50-387 Date: 07/13/05 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 07/13/05 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

5. Unit Name: Susquehanna Steam Electric Station (U2)
6. Reporting Period: June 2005
7. Design Electrical Rating (Net MWe): 1182
8. Maximum Dependable Capacity (Net MWe): 1140 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 720 4,343 178,656
6. Number of Hours Reactor Was Critical 632.28 = 3574.9 = 156,254.7 =
7. Hours Generator On-Line 611.58 3483.8 154,176.5
8. Unit Reserve Shutdown Hours 0 = 0 = = 0 =
9. Net Electrical Energy Generated (MWH) 673,473 3,843,902 162,659,042 NOTES:

Page 1 of I

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 07/13/05 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

5. Unit Name: Susguehanna Steam Electric Station (U2)
6. Reporting Period: June 2005
7. Design Electrical Rating (Net MWe): 1182
8. Maximum Dependable Capacity (Net MWe): 1140 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 720 4,343 178,656
6. Number of Hours Reactor Was Critical 632.28 3574.9 156,254.7
7. Hours Generator On-Line 611.58 3483.8 154,176.5
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 673,473 - 3,843,902 162,659,042 NOTES:

Page I of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 07/131/05 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves SRVs G and K lifted due to high pressure (as expected) during the June 6 scram.