ONS-2018-032, Ufsar/Selected Licensee Commitment Changes

From kanterella
Jump to navigation Jump to search
Ufsar/Selected Licensee Commitment Changes
ML18115A107
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/17/2018
From: Burchfield J
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2018-032
Download: ML18115A107 (15)


Text

~"-)DUKE .

~ ENERGY J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station Duke Energy ON01VP J 7800 Rochester Hwy ONS-2018-032 10 CFR 50.71(e) Seneca, SC 29672 o: 864.873.3478

f. 864.873.4208 Ed.Burchfield@duke-energy.com AprH 17, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Renewed License Nos. DPR-38, DPR-47, and DPR-55 UFSAR/Selected Licensee Commitment Changes Pursuant to 10 CFR 50.71 (e), please find attached the latest revisions to the Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual. The SLC Manual constitutes Chapter 16 of the Updated Final Safety Analysis Report (UFSAR).

Any questions regarding this information should be directed to Chris Wasik, Regulatory Affairs Manager, at (864) 873-5789.

I certify that I am a duly authorized officer of Duke Energy Carolinas, LLC, and that the information contained herein accurately represents changes made to Chapter 16 of the UFSAR since the previous submittal. I declare under penalty of perjury that the foregoing is true and correct. Executed on April 17, 2018.

Sincerely,

)SJ~

J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station Attachments www.duke-energy.com

ONS-2018-032 April 17, 2018 Page 2 cc: Ms. Catherine Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett, Project Manager (ONS)

(by electronic mail only)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-0881 A Rockville, MD 20852-2738 Mr. Eddy L. Crowe Senior Resident' Inspector Oconee Nuclear Station

Attachments Revised Oconee Nuclear Station SLC Manual Pages SLC List of Effective Pages (LOEPs), Rev. 024 LOEP 1- 4 SLC Table of Contents, Rev. 007 TOG 1- 7 SLC 16.5.4 Reactor Coolant System (RCS)

Boron Sampling *DELETED* 16.5.4 1-1

Oconee Nuclear Station Selected Licensee Commitments Revised 03/28/18 List of Effective Pages Page Revision Number Implementation Date 16.0 005 08/16/17 16.1 000 10/15/07 16.2 000 08/25/14 16.3 001 06/29/15 16.4 PENDING 16.5.1 000 11/26/12 16.5.2 000 11/15/12 16.5.3 000 02/21/07 16.5.4 Deleted 03/28/18 16.5.5 Deleted 05/16/09 16.5.6 Deleted 02/10/14 16.5.7 000 12/13/06 16.5.8 000 01/31/07 16.5.8a Deleted 05/19/05 16.5.9 000 11/15/12 16.5.10 000 10/08/03 16.5.11 000 01/31/00 16.5.12 000 03/27/99 16.5.13 000 03/27/99 16.6.1 000 07/23/12 16.6.2 000 01/31/07 16.6.3 000 11/15/12 16.6.4 000 11/15/12 16.6.5 000 12/14/00 16.6.6 000 11/15/12 16.6.7 000 03/27/99 16.6.8 000 03/27/99 16.6.9 000 11/15/12 16.6.10 000 11/15/12 16.6.11 000 11/15/12 16.6.12 000 11/15/12 16.6.13 000 03/31/08 16.6.14 000 04/21/14 16.6.15 000 11/15/12 16.7.1 000 11/15/12 Oconee Nuclear Station LOEP 1 Revision 024

Oconee Nuclear Station Selected Licensee Commitments Revised 03/28/18 List of Effective Pages Page Revision Number Implementation Date 16.7.2 000 11/15/12 16.7.3 000 11/15/12 16.7.4 000 07/14/05 16.7.5 000 11/15/12 16.7.6 000 04/08/14 16.7.7 000 11/15/12 16.7.8 000 03/27/99 16.7.9 000 10/23/03 16.7.10 000 11/15/12 16.7.11 000 11/15/12 16.7.12 000 06/30/04 16.7.13 000 12/05/12 16.7.14 000 11/15/12 16.7.15 000 04/08/14 16.7.16 000 10/14/15 16.7.17 000 07/14/16 16.8.1 000 08/09/01 16.8.2 000 02/10/05 16.8.3 001 01/26/16 16.8.4 000 02/10/05 16.8.5 000 05/21/15 16.8.6 000 01/04/07 16.8.7 000 01/31/00 16.8.8 000 01/31/00 16.8.9 000 06/21/05 16.9.1 001 08/16/16 16.9.2 002 08/16/16 16.9.3 Deleted 01/08/18 16.9.4 001 08/16/16 16.9.5 002 08/16/16 16.9.6 005 12/19/17 16.9.7 001 08/16/16 16.9.8 000 02/15/06 16.9.8a 000 02/07/05 16.9.9 002 08/16/17 Oconee Nuclear Station LOEP2 Revision 024

- ----------~

Oconee Nuclear Station Selected Licensee Commitments Revised 03/28/18 List of Effective Pages Page Revision Number Implementation Date*

16.9.10 000 01/12/04 16.9.11 001 06/29/15 16.9.11a 001 06/06/17 16.9.12 001 09/21/15 16.9.13 000 01/31/07 16.9.14 000 10/28/04 16.9.15 000 03/27/99 16.9.16 000 10/15/14 16.9.17 000 05/23/01 16.9.18 000 07/15/14 16.9.19 000 03/31/05 16.9.20 001 12/14/16 16.9.21 000 07/09/09 16.9.22 Deleted 08/16/17 16.9.23 001 08/16/17 16.9.24 003 11 /18/16 16.9.25 001 08/16/17 16.10.1 000 11/15/12 16.10.2 000 12/02/03 16.10.3 000 03/27/99 16.10.4 000 11/15/12 16.10.5 Deleted 08/24/04 16.10.6 000 03/27/99 16.10.7 001 09/21/15 16.10.8 000 11/27/06 16.10.9 000 11/25/09 16.11.1 000 03/15/11 16.11.2 000 01/31/00 16.11.3 000 11/20/08 16.11.4 000 06/30/14 16.11.5 000 10/30/02 16.11.6 000 11/08/13 16.11.7 000 01/31/00 16.11.8 000 12/21/09 16.11.9 000 . 03/22/10 Oconee Nuclear Station LOEP 3 Revision 024

Oconee Nuclear Station Selected Licensee Commitments Revised 03/28/18 List of Effective Pages Page Revision Number Implementation Date 16.11.10 000 05/14/14 16.11.11 000 03/27/99 16.11.12 000 04/10/03 16.11.13 000 03/27/99 16.11.14 000 03/27/99 16.12.1 000 03/27/99 16.12.2 000 05/03/07 16.12.3 000 05/01/03 16.12.4 000 03/27/99 16.12.5 000 03/27/99 16.12.6 000 11/08/07 16.13.1 001 12/22/15 16.13.2 000 12/15/04 16.13.3 000 12/15/04 16.13.4 000 03/27/99 16.13.5 Deleted 11/30/99 16.13.6 000 03/27/99 16.13.7 000 12/15/04 16.13.8 000 03/27/99 16.13.9 000 03/27/99 16.13.10 000 03/27/99 16.13.11 000 03/27/99 16.14.1 000 11/15/12 16.14.2 000 07/23/12 16.14.3 000 03/27/99 16.14.4 Deleted 03/15/11 16.14.4.a 000 03/15/11 16.15.1 000 04/12/06 16.15.2 000 11/15/12 16.15.3 000 11/15/12 Note: With the introduction of Fusion in June 2015, all controlled documents require a three-digit revision number. Thus, the revision numbers were set to "000" in the summer of 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.

Oconee Nuclear Station , LOEP4 Revision 024

TABLE OF CONTENTS SECTION TITLE NO 16.0 SELECTED LICENSEE COMMITMENTS 16.1-1

16.1 INTRODUCTION

16.1-1 16.2 APPLICABILITY 16.2-1 16.3 DEFINITIONS 16.3-1 16.4 COMMITMENTS RELATED TO REACTOR COMPONENTS Pending 16.5 REACTOR COOLANT SYSTEM 16.5.1-1 16.5.1 Reactor Coolant System Vents 16.5.1-1 16.5.2 Low Temperature Overpressure Protection (LTOP) System 16.5.2.1 16.5.3 Loss of Decay Heat Removal 16.5.3-1 16.5.4 [DELETED] 16.5.4-1 16.5.5 [DELETED] 16.5.5-1 16.5.6 [DELETED] 16.5.6-1 16.5.7 Chemistry Requirements 16.5.7-1 16.5.8 Pressurizer 16.5.8-1 16.5.8a [DELETED] 16.5.8a-1 16.5.9 Testing Following Opening of System (Core Barrel Bolt Inspections) 16.5.9.1 16.5.10 Loss of Reactor Coolant 16.5.10-1 16.5.11 Subcriticality 16.5.11-1 16.5.12 RCS Leakage Testing Following Opening of System 16.5.12-1 16.5.13 High Pressure Injection and the Chemical Addition Systems 16.5.13-1 16.6 COMMITMENTS RELATED TO ENGINEERED SAFETY FEATURES 16.6.1-1 (NON-ESF SYSTEMS) 16.6.1 Containment Leakage Tests 16.6.1-1 16.6.2 Reactor Building Post-Tensioning System 16.6.2-1 16.6.3 Containment Heat Removal Verification Frequency 16.6.3-1 16.0-1 Rev.007 I

TABLE OF CONTENTS (continued)

SECTION TITLE NO 16.6.4 Low Pressure Injection System Leakage 16.6.4-1 16.6.5 Core Flood Tank Discharge Valve Breakers 16.6.5-1 16.6.6 Core Flooding System Test 16.6.6-1 16.6.7 BWST Outlet Valve Control 16.6.7-1 16.6.8 LPI System Valve Test Restrictions 16.6.8-1 16.6.9 Containment Purge Valve Testing 16.6.9-1 16.6.10 Trisodium Phosphate (TSP) 16.6.10-1 16.6.11 Containment Debris Sources 16.6.11-1 16.6.12 Additional High Pressure Injection (HPI) Requirements 16.6.12-1 16.6.13 Additional Requirements to Support Low Pressure Injection (LPI) 16.6.13-1 Operability 16.6.14 Control of HPI and LPI/RBS Pump Room Temperatures 16.6.14-1 16.6.15 High Pressure Injection (HPI) and Liquid Waste Disposal (LWD) 16.6.15-1 Leakage 16.7 INSTRUMENTATION 16.7.1-1 16.7.1 Accident Monitoring Instrumentation 16.7.1-1 16.7.2 Anticipated Transient Without Scram 16.7.2-1 16.7.3 Emergency Feedwater System 16.7.3-1 16.7.4 Hydrogen Analyzers 16.7.4-1 16.7.5 Steam Generator Overfill Protection 16.7.5-1 16.7.6 Diverse Actuation Systems 16.7.6-1 16.7.7 Position Indicator Channels 16.7.7-1 16.7.8 lncore Instrumentation 16.7.8-1 16.7.9 RCP Monitor 16.7.9-1 16.7.10 Core Flood Tank Instrumentation 16.7.10-1 16.7.11 Display Instrumentation 16.7.11-1 16.0-2 Rev. 007

TABLE OFCONTENTS (continued)

SECTION TITLE PAGE NO 16.7.12 SSF Diesel Generator (DG) Air Start System Pressure 16.7.12-1 Instrumentation 16.7.13 SSF Instrumentation 16.7.13-1 16.7.14 Rod Withdrawal Alarm Limit 16.7.14-1 16.7.15 Engineered Safeguards Protective System (ESPS) Voter Trouble Alarm 16.7.15-1 16.7.16 Spent Fuel Pool - Wide Range Level Instrumentation 16.7.16-1 16.7.17 Reactor Protective System Instrumentation Setpoints 16.7.17-1 16.8 ELECTRIC POWER SYSTEMS 16.8.1-1 16.8.1 Control of Room Temperatures for Station Blackout 16.8.1-1 16.8.2 Additional Requirements to Support Keowee Hydro Unit (KHU) 16.8.2-1 OPERABILITY 16.8.3 Power Battery Parameters 16.8.3-1 16.8.4 Keowee Operational Restrictions 16.8.4-1 16.8.5 [DELETED] 16.8.5-1 16.8.6 Lee/Central Alternate Power System 16.8.6-1 16.8.7 Auctioneering Diodes 16.8.7-1 16.8.8 External Grid Trouble Protection 16.8.8-1 16.8.9 Keowee Governor Speed Out Of Tolerance (OOT) Alarm 16.8.9-1 16.9 AUXILIARY SYSTEMS 16.9.1-1 16.9.1 Fire Suppression Water System 16.9.1-1 16.9.2 Sprinkler and Spray Systems 16.9.2-1 16.9.3 [DELETED] 16.9.3-1 16.9.4 Fire Hose Stations 16.9.4-1 16.9.5 Fire Barriers 16.9.5-1 16.9.6 Fire Detection Instrumentation 16.9.6-1 16.9.7 Keowee Lake Level 16.9.7-1 16.0-3 Rev. 007 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.9.8 Control Room Ventilation System (CRVS) Booster Fans 16.9.8-1 16.9.8a HPSW System Requirements to Support Loss of LPSW 16.9.8a-1 16.9.9 Additional Protected Service Water (PSW) System Commitments 16.9.9-1 16.9.10 Component Cooling and HPI Seal Injection to Reactor 16.9.10-1 Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.9.11-1 16.9.11 a Auxiliary Building Flood Protection Measures 16.9.11a-1 16.9.12 Additional Low Pressure Service Water (LPSW) And 16.9.12-1 Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.13-1 16.9.14 SSF Diesel Generator (DG) Inspection Requirements 16.9.14-1 16.9.15 Radioactive Material Sources 16.9.15-1 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist 16.9.16-1 (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated 16.9.17-1 temperature and pressure) 16.9.18 Snubbers 16.9.18-1 16.9.19 Gravity Induced Reverse Flow to Standby Shutdown Facility (SSF) 16.9.19-1 Through a Unit 2 Condensate Cooler 16.9.20 Diesel Driven Service Air Compressors 16.9.20-1 16.9.21 Standby Shutdown Facility External Flood Protection 16.9.21-1 16.9.22 [DELETED] 16.9.22-1 16.9.23 Alternate Chilled Water (AWC) and Alternate Reactor Building Cooling 16.9.23-1 (RBC) Systems 16.9.24 FLEX - Equipment and Connections 16.9.24-1 16.9.25 Spent Fuel Pool Area Isolation 16.9.25-1 16.0-4 Rev. 007 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.10 COMMITMENTS RELATED TO STEAM & POWER CONVERSION 16.10.1-1 SYSTEMS 16.10.1 Local Start of Turbine Driven Emergency Feedwater (EFW) Pump 16.10.1-1 16.10.2 Steam Generator Secondary Side Pressure and 16.10.2-1 Temperature (PIT) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.3-1 16.10.4 Low Presssure Service Water System Testing 16.10.4-1 16.10.5 [DELETED] 16.10.5-1 16.10.6 Emergency Feedwater Controls 16.10.6-1 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.10.7-1 16.10.8 Upper Surge Tank (UST) Riser Branch Line Automatic Isolation Valves 16.10.8-1 16.10.9 Air Operated Valves (AOVs) Required to Support Standby Shutdown 16.10.9-1 Facility (SSF) During Station Blackout (SBO) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1-1 16.11.1 Radioactive Liquid effluents 16.11.1-1 16.11.2 Radioactive Gaseous Effluents 16.11.2-1 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.3-1 16.11.4 Operational Safety Review 16.11.4-1 16.11.5 Solid Radioactive Waste 16.11.5-1 16.11.6 Radiological Environmental Monitoring 16.11.6-1 16.11.7 Dose calculations 16.11.7-1 16.11.8 Reports 16.11.8-1 16.11.9 Radioactive effluent release report 16.11.9-1 16.11.10 Radiological Environmental Operating Reports 16.11.10-1 16.11.11 Iodine Radiation Monitoring Filters 16.11.11-1 16.0-5 Rev. 007 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.11.12 Radioactive Material in Outside Temporary 16.11.12-1 Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup 16.11.13-1 Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.11.14-1 16.12 REFUELING OPERATIONS 16.12.1-1 16.12.1 De~ay Time for Movement of Irradiated Fuel 16.12.1-1 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling 16.12.2-1 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.3-1 16.12.4 Handling of Irradiated Fuel Assemblies 16.12.4-1 16.12.5 Loads Suspended over Spent Fuel in Spent Fuel Pool 16.12.5-1 16.12.6 Fuel Damage During Fuel Handling Operations in Containment 16.12.6-1 16.13 CONDUCT OF OPERATION 16.13.1-1 16.13.1 Minimum Station Staffing Requirements 16.13.1-1 16.13.2 [DELETED] 16.13.2-1 16.13.3 [DELETED] 16.13.3-1 16.13.4 Reactivity Anomaly 16.13.4-1 16.13.5 Deleted 16.13.5-1 16.13.6 Retraining and Replacement of Station Personnel 16'.13.6-1 16.13.7 Procedures for Control of Ph in Recirculated 16.13.7-1 Coolant after Loss-of-coolant Accident & Long-term Emergency Core Cooling Systems 16.13.8 Respiratory Protective Program 16.13.8-1 16.13.9 Startup Report 16.13.9-1 16.13.10 Core Operating Limits Reports 16.13.10-1 16.13.11 Procedure for Station Survey Following an Earthquake 16.13.11-1 16.0-6 Rev. 007 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.14 CONTROL RODS AND POWER DISTRIBUTION 16.14.1-1 16.14.1 APSR Movement 16.14.1-1 16.14.2 Control Rod Program Verification 16.14.2-1 16.14.3 Power Mapping 16.14.3-1 16.14.4 [DELETED] 16.14.4-1 16.14.4.a Engineering _Work Station 16.14.4.a-1 16.15 VENTILATION FILTER TESTING PROGRAM 16.15.1-1 16.15.1 [DELETED] 16.15.1-1 16.15.2 Control Room Pressurization and Filtering System 16.15.2-1 16.15.3 Spent Fuel Pool Ventilation System 16.15.3-1 16.0-7 ) Rev. 007 I

[DELETED]

16.5.4 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.4 [DELETED]

16.5.4-1 Rev. 001 I