Selected Licensee Commitments Manual (SLC)
ML12349A211
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/12/2012
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12349A211 (18)


Text

Duke T. PRESTON Vice GILLESPIE, Jr.

President Energy. Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.corn December 12, 2012 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Selected Licensee Commitments Manual (SLC)

Pursuant to 10CFR 50.4 and 50.71, please find attached the latest revision to the Oconee Selected Licensee Commitments (SLC) Manual. SLC Change 2012-18 revised SLC 16.5.1, RCS Vents, to extend the Completion Time for restoring the pressurizer steam space vent path from 30 days to 60 days.

Sincerely, T. Preston, Gillespie, Jr.

Vice President Oconee Nuclear Station Attachment www. duke-energy.com

U.S. Nuclear Regulatory Commission December 12, 2012 Page 2 xc:

Mr. Victor M. McCree, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John P. Boska, Project Manager (By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation One White Flint North, M/S O-8G9A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Oconee Nuclear Station

December 12, 2012

Subject:

Oconee Selected Licensee Commitments Manual (SLC) Revision On November 6, 2012, Station Management approved the following Oconee Selected Licensee Commitments. SLC Change 2012-18 revised SLC 16.5.1, RCS Vents, to extend the Completion Time for restoring the pressurizer steam space vent path from 30 days to 60 days.

Please revise your manual as instructed below.

Remove these pages Insert these pagqes SLC LOEP Pages 1-12 SLC LOEP Pages 1-12 SLC Page 16.5.1-1 thru 3 SLC Page 16.5.1-1 thru 3 Any questions concerning these revisions may be directed to Kent Alter at 864-873-3255.

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date LOEP 1 11/26/12 LOEP 2 11/15/12 LOEP 3 11/15/12 LOEP 4 11/15/12 LOEP 5 11/15/12 LOEP 6 11/15/12 LOEP 7 11/15/12 LOEP 8 11/15/12 LOEP 9 11/15/12 LOEP 10 05/31/12 LOEP 11 05/31/12 LOEP 12 11/15/12 16.0-1 3/15/11 16.0-2 6/03/11 16.0-3 6/03/11 16.0-4 3/15/11 16.0-5 3/15/11 16.0-6 3/15/11 16.1-1 10/15/07 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 11/26/12 16.5.1-2 11/26/12 16.5.1-3 11/26/12 16.5.2-1 11/15/12 16.5.2-2 11/15/12 16.5.2-3 11/15/12 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 02/21/07 16.5.3-2 02/21/07 16.5.3-3 02/21/07 16.5.4-1 11/15/12 16.5.4-2 11/15/12 16.5.5-1 Delete 5/16/09 16.5.5-2 Delete 5/16/09 16.5.5-3 Delete 5/16/09 16.5.5-4 Delete 5/16/09 16.5.5-5 Delete 5/16/09 LOEP 1

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.5.6-1 02/05/08 16.5.6-2 02/05/08 16.5.7-1 12/13/06 16.5.7-2 12/13/06 16.5.7-3 12/13/06 16.5.7-4 12/13/06 16.5.7-5 12/13/06 16.5.7-6 12/13/06 16.5.8-1 01/31/07 16.5.8-2 01/31/07 16.5.8-3 01/31/07 16.5.8-4 01/31/07 16.5.8-5 01/31/07 16.5.8a-1 5/19/05 16.5.8a-2 5/19/05 (Delete) 16.5.8a-3 5/19/05 (Delete) 16.5.9-1 11/15/12 16.5.9-2 11/15/12 16.5.10-1 10/8/03 16.5.10-2 10/8/03 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 07/23/12 16.6.1-2 07/23/12 16.6.1-3 07/23/12 16.6.1-4 07/23/12 16.6.1-5 Delete 16.6.2-1 01/31/07 16.6.2-2 01/31/07 16.6.2-3 01/31/07 16.6.2-4 01/31/07 16.6.2-5 01/31/07 16.6.2-6 01/31/07 16.6.2-7 01/31/07 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete 16.6.2-11 Delete LOEP 2

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Page Revision Date 16.6.2-12 Delete 16.6.3-1 11/15/12 16.6.4-1 11/15/12 16.6.4-2 11/15/12 16.6.4-3 11/15/12 16.6.4-4 11/15/12 16.6.4-5 11/15/12 16.6.4-6 11/15/12 16.6.5-1 12/14/00 16.6.6-1 11/15/12 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 11/15/12 16.6.9-2 11/15/12 16.6.10-1 11/15/12 16.6.10-2 11/15/12 16.6.10-3 11/15/12 16.6.11-1 11/15/12 16.6.11-2 11/15/12 16.6.12-1 11/15/12 16.6.12-2 11/15/12 16.6.12-3 11/15/12 16.6.12-4 5/17/05 (Delete) 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 03/31/08 16.6.13-2 03/31/08 16.6.13-3 03/31/08 16.6.14-1 8/15/02 16.6.14-2 8/15/02 16.6.14-3 8/15/02 16.6.14-4 8/15/02 16.6.15-1 11/15/12 16.6.15-2 11/15/12 16.7.1-1 11/15/12 16.7.1-2 11/15/12 16.7.2-1 11/15/12 16.7.2-2 11/15/12 16.7.2-3 11/15/12 16.7.3-1 11/15/12 LOEP 3

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Page Revision Date 16.7.3-2 11/15/12 16.7.4-1 7/14/05 16.7.4-2 7/14/05 16.7.4-3 7/14/05 16.7.5-1 11/15/12 16.7.5-2 11/15/12 16.7.5-3 11/15/12 16.7.5-4 11/15/12 16.7.6-1 11/15/12 16.7.6-2 11/15/12 16.7.6-3 11/15/12 16.7.6-4 11/15/12 16.7.7-1 11/15/12 16.7.7-2 11/15/12 16.7.8-1 3/27/99 16.7.8-2 3/27/99 16.7.9-1 10/23/03 16.7.10-1 11/15/12 16.7.10-2 11/15/12 16.7.11-1 11/15/12 16.7.11-2 11/15/12 16.7.11-3 11/15/12 16.7.12-1 6/30/04 16.7.12-2 6/30/04 16.7.13-1 11/15/12 16.7.13-2 11/15/12 16.7.13-3 11/15/12 16.7.14-1 11/15/12 16.7.14-2 11/15/12 16.7.14-3 11/15/12 16.7.14-4 11/15/12 16.7.15-1 6/03/11 16.7.15-2 6/03/11 16.7.15-3 6/03/11 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 2/10/05 16.8.2-2 2/10/05 16.8.3-1 10/20/09 16.8.3-2 10/20/09 16.8.3-3 10/20/09 LOEP 4

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Pa~qe Revision Date 16.8.3-4 10/20/09 16.8.3-5 10/20/09 16.8.3-6 10/20/09 16.8.3-7 10/20/09 16.8.4-1 2/10/05 16.8.4-2 2/10/05 16.8.4-3 2/10/05 16.8.4-4 2/10/05 16.8.4-5 Delete 2/10/05 16.8.4-6 Delete 2/10/05 16.8.4-7 Delete 2/10/05 16.8.4-8 Delete 2/10/05 16.8.4-9 Delete 9/25/04 16.8.5-1 07/23/12 16.8.5-2 07/23/12 16.8.5-3 07/23/12 16.8.5-4 Delete 12/21/04 16.8.5-5 Delete 12/21/04 16.8.6-1 01/04/07 16.8.6-2 01/04/07 16.8.6-3 01/04/07 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.8.9-1 6/21/05 16.8.9-2 6/21/05 16.8.9-3 6/21/05 16.8.9-4 6/21/05 16.9.1-1 1/31/00-16.9.1-2 3/27/99 16.9.1-3 3/27/99 16.9.1-4 3/27/99 16.9.1-5 6/12/01 16.9.2-1 11/15/12 16.9.2-2 11/15/12 16.9.2-3 11/15/12 16.9.2-4 11/15/12 16.9.2-5 11/15/12 16.9.3-1 11/15/12 16.9.3-2 11/15/12 16.9.4-1 11/15/12 16.9.4-2 11/15/12 LOEP 5

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.9.4-3 11/15/12 16.9.4-4 11/15/12 16.9.4-5 6/12/01 16.9.5-1 11/15/12 16.9.5-2 11/15/12 16.9.5-3 11/15/12 16.9.5-4 11/15/12 16.9.6-1 11/15/12 16.9.6-2 11/15/12 16.9.6-3 11/15/12 16.9.6-4 11/15/12 16.9.6-5 11/15/12 16.9.6-6 11/15/12 16.9.6-7 11/15/12 16.9.6-8 11/15/12 16.9.6-9 11/15/12 16.9.7-1 07/23/12 16.9.7-2 07/23/12 16.9.7-3 07/23/12 16.9.7-4 07/23/12 16.9.7-5 07/23/12 16.9.7-6 07/23/12 16.9.7-7 07/23/12 16.9.7-8 07/23/12 16.9.7-9 Delete 16.9.8-1 2/15/06 16.9.8-2 2/15/06 16.9.8-3 Delete 2/15/06 16.9.8-4 Delete 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 2/7/05 16.9.8a-2 2/7/05 16.9.8a-3 2/7/05 16.9.9-1 11/15/12 16.9.9-2 11/15/12 16.9.9-3 11/15/12 16.9.9-4 11/15/12 16.9.10-1 1/12/04 16.9.10-2 1/12/04 LOEP 6

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.9.11-1 11/15/12 16.9.11-2 11/15/12 16.9,11-3 11/15/12 16.9.11-4 11/15/12 16.9.11-5 11/15/12 16.9.11-6 11/15/12 16.9.11-7 11/15/12 16.9.11-8 11/15/12 16.9.11a-1 11/15/12 16.9.11 a-2 11/15/12 16.9.11a-3 11/15/12 16.9.1la-4 11/15/12 16.9.11a-5 11/15/12 16.9.1 la-6 11/15/12 16.9.11a-7 11/15/12 16.9.11a-8 11/15/12 16.9.11a-9 11/15/12 16.9.11 a-1 0 11/15/12 16.9.1la-11 11/15/12 16.9.11 a-1 2 11/15/12 16.9.11 a-13 11/15/12 16.9.11a-14 11/15/12 16.9.1 la-15 11/15/12 16.9.11 a-1 6 Deleted 3/10/08 16.9.12-1 11/15/12 16.9.12-2 11/15/12 16.9.12-3 11/15/12 16.9.12-4 11/15/12 16.9.12-5 11/15/12 16.9.12-6 11/15/12 16.9.12-7 11/15/12 16.9.12-8 11/15/12 16.9.12-9 11/15/12 16.9,12-10 11/15/12 16.9.12-11 11/15/12 16.9.12-12 11/15/12 16.9.12-13 11/15/12 16.9.12-14 11/15/12 16.9.12-15 11/15/12 16.9.12-16 11/15/12 16.9.12-17 11/15/12 LOEP 7

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.9.12-18 11/15/12 16.9.12-19 11/15/12 16.9.12-20 11/15/12 16.9.12-21 11/15/12 16.9.12-22 11/15/12 16.9.13-1 01/31/07 16.9.13-2 01/31/07 16.9.13-3 01/31/07 16.9.13-4 01/31/07 16.9.14-1 10/28/04 16.9.14-2 10/28/04 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 4/01/08 16.9.16-2 4/01/08 16.9.16-3 4/01/08 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 5/02/07 16.9.18-2 5/02/07 16.9.18-3 5/02/07 16.9.18-4 5/02/07 16.9.18-5 5/02/07 16.9.18-6 5/02/07 16.9.18-7 5/02/07 16.9.18-8 5/02/07 16.9.18-9 5/02/07 16.9.18-10 5/02/07 16.9.18-11 5/02/07 16.9.18-12 5/02/07 16.9.18-13 5/02/07 16.9.18-14 5/02/07 16.9.18-15 5/02/07 16.9.18-16 5/02/07 16.9.19-1 3/31/05 16.9.19-2 3/31/05 16.9.20-1 12/21/09 16.9.20-2 12/21/09 16.9.20-3 12/21/09 16.9.20-4 12/21/09 LOEP 8

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.9.20-5 12/21/09 16.9.21-1 07/09/09 16.9.21-2 07/09/09 16.9.21-3 07/09/09 16.9.21-4 07/09/09 16.10.1-1 11/15/12 16.10.1-2 11/15/12 16.10.1-3 Deleted 9/18/03 16.10.2-1 12/2/03 16.10.2-2 12/2/03 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 11/15/12 16.10.5-1 Deleted 8/24/04 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.10.8-1 11/27/06 16.10.8-2 11/27/06 16.10.8-3 11/27/06 16.10.8-4 11/27/06 16.10.8-5 11/27/06 16.10.9-1 11/25/09 16.10.9-2 11/25/09 16.10.9-3 11/25/09 16.10.9-4 11/25/09 16.10.9-5 11/25/09 16.11.1-1 3/15/11 16.11.1-2 3/15/11 16.11.1-3 3/15/11 16.11.1-4 3/15/11 16.11.1-5 3/15/11 16.11.1-6 3/15/11 16.11.1-7 3/15/11 LOEP 9

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Page Revision Date 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 11/20/08 16.11.3-2 11/20/08 16.11.3-3 11/20/08 16.11.3-4 11/20/08 16.11.3-5 11/20/08 16.113-6 11/20/08 16.11.3-7 11/20/08 16.11.3-8 11/20/08 16.11.3-9 11/20/08 16.11.3-10 11/20/08 16.11.3-11 11/20/08 16.11.3-12 11/20/08 16.11.3-13 11/20/08 16.11.3-14 11/20/08 16.11.3-15 11/20/08 16.11.3-16 11/20/08 16.11.3-17 11/20/08 16.11.3-18 11/20/08 16.11.3-19 11/10/04 (Deleted) 16.11.4-1 09/30/09 16.11.4-2 09/30/09 16.11.4-3 09/30/09 16.11.4-4 09/30/09 16.11.4-5 09/30/09 16.11.4-6 09/30/09 16.11.4-7 09/30/09 16.11.4-8 11/10/04 (Delete) 16.11.5-1 10/30/02 16.11.5-2 10/30/02 16.11.5-3 10/30/02 16.11.5-4 10/30/02 16.11.6-1 05/31/12 16.11.6-2 05/31/12 16.11.6-3 05/31/12 16.11.6-4 05/31/12 LOEP 10

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Paqe Revision Date 16.11.6-5 05/31/12 16.11.6-6 05/31/12 16.11.6-7 05/31/12 16.11.6-8 05/31/12 16.11.6-9 05/31/12 16.11.6-10 05/31/12 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 12/21/09 16.11.8-2 12/21/09 16.11.9-1 03/22/10 16.11.9-2 03/22/10 16.11.9-3 03/22/10 16.11.10-1 2/25/03 16.11.10-2 2/25/03 16.11.11-1 3/27/99 16.11.12-1 4/10/03 16.11.12-2 4/10/03 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 16.12.1-1 3/27/99 16.12.2-1 5/3/07 16.12.2-2 5/3/07 16.12.3-1 5/1/03 16.12.3-2 5/1/03 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.12.6-1 11/08/07 16.13.1-1 5/13/04 16.13.1-2 5/13/04 16.13.1-3 5/13/04 16.13.1-4 5/13/04 16.13.1-5 5/13/04 16.13.1-6 5/13/04 16.13.1-7 5/13/04 16.13.1-8 5/13/04 16.13.1-9 5/13/04 LOEP 11

Oconee Nuclear Station Selected Licensee Commitments Revised 11/26/12 List of Effective Pages Parle Revision Date 16.13.2-1 12/15/04 16.13.2-2 Delete 12/15/04 16.13.2-3 Delete 12/15/04 16.13.2-4 Delete 12/15/04 16.13.3-1 12/15/04 16.13.3-2 Delete 12/15/04 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 12/15/04 16.13.7-2 12/15/04 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 11/15/12 16.14.2-1 07/23/12 16.14.2-2 07/23/12 16.14.3-1 3/27/99 16.14.4-1 Deleted 3/15/11 16.14.4.a-1 3/15/11 16.15.1-1 4/12/06 16.15.1-2 Deleted 4/12/06 16.15.1-3 Deleted 4/12/06 16.15.1-4 Deleted 4/12/06 16.15.1-5 Deleted 4/12/06 16.15.2-1 11/15/12 16.15.2-2 11/15/12 16.15.2-3 11/15/12 16.15.2-4 11/15/12 16.15.2-5 11/15/12 16.15.3-1 11/15/12 16.15.3-2 11/15/12 16.15.3-3 11/15/12 16.15.3-4 11/15/12 16.15.3-5 11/15/12 LOEP 12

Reactor Coolant System Vents 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Reactor Coolant System Vents COMMITMENT The following reactor coolant system vent paths shall be OPERABLE:

1) Reactor Vessel Head Vent
2) Pressurizer Steam Space Vent (through PORV)
3) RCS Loop A High Point Vent
4) RCS Loop B High Point Vent APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer Steam A.1 Restore to OPERABLE 60 days Space Vent path status.

inoperable.

B. One RCS vent path B.1 Restore to OPERABLE 30 days inoperable other than status.

Pressurizer Steam Space Vent path.

C. Two or more RCS vent C.1 Restore to OPERABLE 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> paths inoperable, status.

D. The Required Actions D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and associated Completion Times of AND Condition A, B, or C not met. D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 16.5.1-1 11/26/12 I

Reactor Coolant System Vents 16.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 16.5.1.1 Verify an open flow path for each RCS vent 24 months path by testing the head vent, loop high point vents and Pressurizer vent.

SR 16.5.1.2 Perform high point vent valve testing. In accordance with ASME Section XI BASES The reactor vessel head vent should be capable of venting noncondensible gas from the reactor vessel hot legs (to the elevation of the top of the outlet nozzle) and cold legs.

Additional venting capability is required for those portions of each hot leg that cannot be vented through the reactor vessel head vent or Pressurizer. Venting of the Pressurizer is required to assure its availability for system pressure and volume control. These are important considerations, especially during natural circulation.

For the Hot Leg Loop "A" Vent Valves, Hot Leg Loop "B" Vent Valves, Reactor Vessel Head Vent Valves:

The RCS vents have two valves in series, which are capable of being powered from emergency buses. The valves are normally closed with power removed to prevent inadvertent opening of the valves. In order for a vent path to perform its intended safety function of venting, the two electrically operated valves in the flow path must be capable of being opened, and all manual valves must be open.

For the "Pressurizer Vent Valves Power Operated Relief Valve (PORV) and Block Valve:

The block valve is a normally open motor operated valve. The PORV is normally closed and is automatically operated in response to RCS system pressure signals. In order for the vent path to perform its intended safety function of venting, the PORV block valve in the flow path must be open or capable of being opened and the PORV must be capable of being opened.

16.5.1-2 11/26/12 1

Reactor Coolant System Vents 16.

5.1 REFERENCES

1. NUREG 0737, "Clarification of TMI Action Plan Requirements," November 1980.
2. Generic Letter 83-37, "NUREG-0737 Technical Specifications (Generic Letter No. 83-37)," dated November 1, 1983.
3. Letter, John F. Stolz (NRC) to H. B. Tucker (Duke Power Company) "NUREG-0737, Item ll.B.1, Reactor Coolant System Vents," dated November 2, 1983.

16.5.1-3 11/26/12 I