Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)
ML17334A030
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/15/2017
From: Teresa Ray
Duke Energy Carolinas
To: Hackett E
NRC/CRGR, Office of Nuclear Regulatory Research
References
ONS-2017-085
Download: ML17334A030 (2)


Text

I I e{~DUKE

~ ENERGY Thomas D. Ray Vice President Oconee Nuclear Station Duke Energy ON01VP I 7800 Rochester Hwy Seneca, SC 29672 o 864.873.3274 f 864.873.4208 Tom.Ray@duke-energy.com ONS-2017-085 November 15, 2017 Dr. Edwin M. Hackett Chairman, Committee to Review Generic Requirements U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Comments on the October 24, 2017 Public Meeting with NRC Committee to Review Generic Requirements (CRGR)

Dr. Hackett, I want to thank you for allowing Duke Energy the opportunity to present our understanding of NRR's draft response to TIA 2014-05 and to discuss what we believe represent changes to the licensing basis of the Oconee Nuclear Station. We appreciate the chance to have a meaningful dialog on the issues and it is our hope that the CRGR was able to gain a better understanding of Duke Energy's concerns.

During the meeting, Mr. McDermott referred to slide #20 of the Duke Energy presentation (related to single failure considerations) and asked about licensing basis documentation associated with the statement made in the second major bullet on the slide ("The ONS Single Failure Criterion ... "). The Duke Energy response correctly stated that the subject is not clear in the licensing documentation. A subsequent comment made by Duke Energy said the statement on the slide was a direct quote from the NRC's safety evaluation. The subsequent comment was referring to the second minor bullet on the slide ("ONS is an early nuclear plant design ... ") and not the second major bullet.

Duke Energy wants to make sure the CRGR clearly understands the context of these statements.

Inquiries concerning this matter should be directed to Chris Wasik, Oconee Regulatory Affairs Manager, at (864) 873-5789.

Sincerely,

~J>-~

Vice President Oconee Nuclear Station ~

Aool

/J rc_t/ cf. GI<

N{( t/ t,G s

I I

ONS-2017-085

    • Page 2 cc:

USNRC Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Catherine Haney, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett, Project Manager (ONS)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Eddy Crowe ,

NRC Senior Resident Inspector Oconee Nuclear Statio