ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.

From kanterella
Jump to navigation Jump to search
Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.
ML17037C995
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/01/2017
From: Wasik C
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17037D009 List:
References
EA-12-049, ONS-2017-009, ONS-2017-013
Download: ML17037C995 (2)


Text

~~DUKE Duke Energy

~ ENERGY Regulatory Affairs ON03RC I 7800 Rochester Hwy Seneca, SC 29672 ONS-2017-013 February 1, 2017 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 .

Duke Energy Carolina, LLC (Duke Energy)

Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, OPR-47, and DPR-55

Subject:

Duke letter ONS-2017-009, Oconee Notification of Compliance with Order EA-12*049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events" for Oconee Nuclear Station, Unit 1 and FLEX Final Integrated Plan (FIP) for Oconee Nuclear Station, Units 1, 2, and 3, dated January 26, 2017.

Enclosed you will find a signed copy of the subject transmittal that was previously sent to the Document Control Desk.. It has come to our attention that the previously transmitted package included an unsigned version of the cover letter.. Please replace the previous transmittal with the enclosed verskm.. Apart from the signature, there are no differences in the two transmittals ..

I apologize for any inconvenience this may have caused.. Please do not hesitate to contact me if you have any questions .

Sincerely, vJ~

E pher J . Wasik er, Regulatory Affairs onee Nuclear Station (864) Bi3-5789

February 1, 2017 Page 2 cc:

Ms. Catherine Haney, Regional Administrator U.S. Nuclear Regulatory Commission -Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. William Dean, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall. Project Manager (ONS)

(by electronic mail only)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike, MIS 0-8G9A Rockville, MD 20852-27 46 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station