ONS-2014-032, Ufsar/Selected Licensee Commitments Change

From kanterella
Jump to navigation Jump to search
Ufsar/Selected Licensee Commitments Change
ML14066A105
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/04/2014
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2014-032
Download: ML14066A105 (36)


Text

edm DUKE Scott L. Batson ENERGY. Vice Presiden Oconee NuclearStation Duke Energy ONOIVP I 7800 Rochester H" Seneca, SC 29672 ONS-2014-032 o: 864.873.3274 f 864.873.4208 Scott.Batson@duke-energy.com March 4, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 UFSAR/Selected Licensee Commitments Change Pursuant to 10CFR 50.71(e), please find attached the latest revision to the Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual. This document constitutes Chapter 16 of the Updated Final Safety Analysis Report (UFSAR).

Any questions regarding this information should be directed to Sandra N. Severance, Regulatory Affairs, at (864) 873-3466.

I certify that I am a duly authorized officer of Duke Energy Carolinas, LLC, and that the information contained herein accurately represents changes made to Chapter 16 of the UFSAR since the previous submittal. I declare under penalty of perjury that the foregoing is true and correct. Executed on March 4, 2014.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachment www.duke-energy.com

U. S. Nuclear Regulatory Commission March 4, 2014 Page 2 cc: Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Richard Guzman, Senior Project Manager (by electronic mail only)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8C2 Rockville, MD 20852-2746 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station

Nuclear Station DUKE ENERGY Oonee.

Duke Energy 780(0Rochester Hyv Sej'neca, SC 29672 Re: Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual Change Revision Date: 2/10/14 Please replace the corresponding pages in your copy of the Oconee SLC Manual as follows:

REMOVE THESE PAGES INSERT THESE PAGES List of Effective Pages (LOEP) 1- 13 List of Effective Pages (LOEP) 1- 13 SLC Table of Contents 16.0-1 thru 16.0-7 SLC Table of Contents 16.0-1 thru 16.0-7 SLC Pages 16.5.6-1 thru 2 SLC Page 16.5.6-1 SLC Pages 16.9.6-1 thru 11 SLC Pages 16.9.6-1 thru 11 If you have any questions concerning the contents of this SLC Manual update, contact Sandra Severance at (864) 873-3466.

hris Wasik Regulatory Affairs Manager www.duke-energy.com

Attachment Oconee Nuclear Station Revised Selected Licensee Commitments Manual Pages

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe Revision Date LOEP 1 02/10/14 LOEP 2 02/10/14 LOEP 3 11/15/12 LOEP 4 12/05/12 LOEP 5 12/31/12 LOEP 6 02/10/14 LOEP 7 11/08/13 LOEP 8 11/08/13 LOEP 9 11/14/13 LOEP 10 11/14/13 LOEP 11 11/08/13 LOEP 12 11/08/13 LOEP 13 11/08/13 16.0-1 02/10/14 16.0-2 02/10/14 16.0-3 02/10/14 16.0-4 02/10/14 16.0-5 02/10/14 16.0-6 02/10/14 16.1-1 10/15/07 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 11/26/12 16.5.1-2 11/26/12 16.5.1-3 11/26/12 16.5.2-1 11/15/12 16.5.2-2 11/15/12 16.5.2-3 11/15/12 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 02/21/07 16.5.3-2 02/21/07 16.5.3-3 02/21/07 16.5.4-1 11/15/12 16.5.4-2 11/15/12 16.5.5-1 Delete 5/16/09 16.5.5-2 Delete 5/16/09 16.5.5-3 Delete 5/16/09 16.5.5-4 Delete 5/16/09 LOEP 1

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe Revision Date 16.5.5-5 Delete 5/16/09 16.5.6-1 Delete 02/10/14 16.5.6-2 Delete 02/10/14 16.5.7-1 12/13/06 16.5.7-2 12/13/06 16.5.7-3 12/13/06 16.5.7-4 12/13/06 16.5.7-5 12/13/06 16.5.7-6 12/13/06 16.5.8-1 01/31/07 16.5.8-2 01/31/07 16.5.8-3 01/31/07 16.5.8-4 01/31/07 16.5.8-5 01/31/07 16.5.8a-1 5/19/05 16.5.8a-2 5/19/05 (Delete) 16.5.8a-3 5/19/05 (Delete) 16.5.9-1 11/15/12 16.5.9-2 11/15/12 16.5.10-1 10/8/03 16.5.10-2 10/8/03 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 07/23/12 16.6.1-2 07/23/12 16.6.1-3 07/23/12 16.6.1-4 07/23/12 16.6.1-5 Delete 16.6.2-1 01/31/07 16.6.2-2 01/31/07 16.6.2-3 01/31/07 16.6.2-4 01/31/07 16.6.2-5 01/31/07 16.6.2-6 01/31/07 16.6.2-7 01/31/07 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete LOEP 2

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe. Revision Date 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 11/15/12 16.6.4-1 11/15/12 16.6.4-2 11/15/12 16.6.4-3 11/15/12 16.6.4-4 11/15/12 16.6.4-5 11/15/12 16.6.4-6 11/15/12 16.6.5-1 12/14/00 16.6.6-1 11/15/12 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 11/15/12 16.6.9-2 11/15/12 16.6.10-1 11/15/12 16.6.10-2 11/15/12 16.6.10-3 11/15/12 16.6.11-1 11/15/12 16.6.11-2 11/15/12 16.6.12-1 11/15/12 16.6.12-2 11/15/12 16.6.12-3 11/15/12 16.6.12-4 5/17/05 (Delete) 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 03/31/08 16.6.13-2 03/31/08 16.6.13-3 03/31/08 16.6.14-1 8/15/02 16.6.14-2. 8/15/02 16.6.14-3 8/15/02 16.6.14-4 8/15/02 16.6.15-1 11/15/12 16.6.15-2 11/15/12 16.7.1-1 11/15/12 16.7.1-2 11/15/12 16.7.2-1 11/15/12 16.7.2-2 11/15/12 16.7.2-3 11/15/12 LOEP 3

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Page Revision Date 16.7.3-1 11/15/12 16.7.3-2 11/15/12 16.7.4-1 7/14/05 16.7.4-2 7/14/05 16.7.4-3 7/14/05 16.7.5-1 11/15/12 16.7.5-2 11/15/12 16.7.5-3 11/15/12 16.7.5-4 11/15/12 16.7.6-1 11/15/12 16.7.6-2 11/15/12 16.7.6-3 11/15/12 16.7.6-4 11/15/12 16.7.7-1 11/15/12 16.7.7-2 11/15/12 16.7.8-1 3/27/99 16.7.8-2 3/27/99 16.7.9-1 10/23/03 16.7.10-1 11/15/12 16.7.10-2 11/15/12 16.7.11-1 11/15/12 16.7.11-2 11/15/12 16.7.11-3 11/15/12 16.7.12-1 6/30/04 16.7.12-2 6/30/04 16.7.13-1 12/05/12 16.7.13-2 12/05/12 16.7.13-3 12/05/12 16.7.14-1 11/15/12 16.7.14-2 11/15/12 16.7.14-3 11/15/12

.16.7.14-4 11/15/12 16.7.15-1 6/03/11 16.7.15-2 6/03/11 16.7.15-3 6/03/11 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 2/10/05 16.8.2-2 2/10/05 LOEP 4

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe Revision Date 16.8.3-1 10/20/09 16.8.3-2 10/20/09 16.8.3-3 10/20/09 16.8.3-4 10/20/09 16.8.3-5 10/20/09 16.8.3-6 10/20/09 16.8.3-7 10/20/09 16.8.4-1 2/10/05 16.8.4-2 2/10/05 16.8.4-3 2/10/05 16.8.4-4 2/10/05 16.8.4-5 Delete 2/10/05 16.8.4-6 Delete 2/10/05 16.8.4-7 Delete 2/10/05 16.8.4-8 Delete 2/10/05 16.8.4-9 Delete 9/25/04 16.8.5-1 07/23/12 16.8.5-2 07/23/12 16.8.5-3 07/23/12 16.8.5-4 Delete 12/21/04 16.8.5-5 Delete 12/21/04 16.8.6-1 01/04/07 16.8.6-2 01/04/07 16.8.6-3 01/04/07 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.8.9-1 6/21/05 16.8.9-2 6/21/05 16.8.9-3 6/21/05 16.8.9-4 6/21/05 16.9.1-1 12/05/12 16.9.1-2 12/05/12 16.9.1-3 12/05/12 16.9.1-4 12/05/12 16.9.1-5 12/05/12 16.9.1-6 12/05/12 16.9.2-1 12/31/12 16.9.2-2 12/31/12 16.9.2-3 12/31/12 16.9.2-4 12/31/12 16.9.2-5 12/31/12 LOEP 5

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages PaQe Revision Date 16.9.2-6 12/31/12 16.9.3-1 12/31/12 16.9.3-2 12/31/12 16.9.4-1 11/11/13 16.9.4-2 11/11/13 16.9.4-3 11/11/13 16.9.4-4 11/11/13 16.9.4-5 11/11/13 16.9.4-6 11/11/13 16.9.4-7 11/11/13 16.9.4-8 11/11/13 16.9.4-9 11/11/13 16.9.5-1 12/31/12 16.9.5-2 12/31/12 16.9.5-3 12/31/12 16.9.5-4 12/31/12 16.9.5-5 12/31/12 16.9.6-1 02/10/14 16.9.6-2 02/10/14 16.9.6-3 02/10/14 16.9.6-4 02/10/14 16.9.6-5 02/10/14 16.9.6-6 02/10/14 16.9.6-7 02/10/14 16.9.6-8 02/10/14 16.9.6-9 02/10/14 16.9.6-10 02/10/14 16.9.6-11 02/10/14 16.9.7-1 07/23/12 16.9.7-2 07/23/12 16.9.7-3 07/23/12 16.9.7-4 07/23/12 16.9.7-5 07/23/12 16.9.7-6 07/23/12 16.9.7-7 07/23/12 16.9.7-8 07/23/12 16.9.7-9 Delete 16.9.8-1 2/15/06 16.9.8-2 2/15/06 16.9.8-3 Delete 2/15/06 16.9.8-4 Delete LOEP 6

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Page Revision Date 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 2/7/05 16.9.8a-2 2/7/05 16.9.8a-3 2/7/05 16.9.9-1 11/15/12 16.9.9-2 11/15/12 16.9.9-3 11/15/12 16.9.9-4 11/15/12 16.9.10-1 1/12/04 16.9.10-2 1/12/04 16.9.11-1 11/15/12 16.9.11-2 11/15/12 16.9.11-3 11/15/12 16.9.11-4 11/15/12 16.9.11-5 11/15/12 16.9.11-6 11/15/12 16.9.11-7 11/15/12 16.9.11-8 11/15/12 16.9.11a-1 11/15/12 16.9.11a-2 11/15/12 16.9.11 a-3 11/15/12 16.9.11a-4 11/15/12 16.9.11a-5 11/15/12 16.9.11a-6 11/15/12 16.9.11a-7 11/15/12 16.9.11a-8 11/15/12 16.9.11a-9 11/15/12 16.9.11a-10 11/15/12 16.9.11a-11 11/15/12 16.9.11a-12 11/15/12 16.9.11a-13 11/15/12 16.9.11 a-14 11/15/12 16.9.11a-15 11/15/12 16.9.11 a-16 Deleted 3/10/08 16.9.12-1 12/01/13 16.9.12-2 12/01/13 16.9.12-3 12/01/13 16.9.12-4 12/01/13 16.9.12-5 12/01/13 LOEP 7

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe Revision Date 16.9.12-6 12/01/13 16.9.12-7 12/01/13 16.9.12-8 12/01/13 16.9.12-9 12/01/13 16.9.12-10 12/01/13 16.9.12-11 12/01/13 16.9.12-12 12/01/13 16.9.12-13 12/01/13 16.9.12-14 12/01/13 16.9.12-15 12/01/13 16.9.12-16 12/01/13 16.9.12-17 12/01/13 16.9.12-18 12/01/13 16.9.12-19 Deleted 12/01/13 16.9.12-20 Deleted 12/01/13 16.9.12-21 Deleted 12/01/13 16.9.12-22 Deleted 12/01/13 16.9.13-1 01/31/07 16.9.13-2 01/31/07 16.9.13-3 01/31/07 16.9.13-4 01/31/07 16.9.14-1 10/28/04 16.9.14-2 10/28/04 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 4/01/08 16.9.16-2 4/01/08 16.9.16-3 4/01/08 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 11/15/12 16.9.18-2 11/15/12 16.9.18-3 11/15/12 16.9.18-4 11/15/12 16.9.18-5 11/15/12 16.9.18-6 11/15/12 16.9.18-7 11/15/12 16.9.18-8 11/15/12 16.9.18-9 11/15/12 16.9.18-10 11/15/12 LOEP 8

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Page Revision Date 16.9.18-11 11/15/12 16.9.18-12 11/15/12 16.9.18-13 11/15/12 16.9.18-14 11/15/12 16.9.18-15 11/15/12 16.9.18-16 11/16/12 16.9.19-1 3/31/05 16.9.19-2 3/31/05 16.9.20-1 12/21/09 16.9.20-2 12/21/09 16.9.20-3 12/21/09 16.9.20-4 12/21/09 16.9.20-5 12/21/09 16.9.21-1 07/09/09 16.9.21-2 07/09/09 16.9.21-3 07/09/09 16.9.21-4 07/09/09 16.9.22-1 11/14/13 16.9.22-2 11/14/13 16.9.22-3 11/14/13 16.9.22-4 11/14/13 16.10.1-1 11/15/12 16.10.1-2 11/15/12 16.10.1-3 Deleted 9/18/03 16.10.2-1 12/2/03 16.10.2-2 12/2/03 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 11/15/12 16.10.5-1 Deleted 8/24/04 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.10.8-1 11/27/06 LOEP 9

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Paqe Revision Date 16.10.8-2 11/27/06 16.10.8-3 11/27/06 16.10.8-4 11/27/06 16.10.8-5 11/27/06 16.10.9-1 11/25/09 16.10.9-2 11/25/09 16.10.9-3 11/25/09 16.10.9-4 11/25/09 16.10.9-5 11/25/09 16.11.1-1 3/15/11 16.11.1-2 3/15/11 16.11.1-3 3/15/11 16.11.1-4 3/15/11 16.11.1-5 3/15/11 16.11.1-6 3/15/11 16.11.1-7 3/15/11 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 11/20/08 16.11.3-2 11/20/08 16.11.3-3 11/20/08 16.11.3-4 11/20/08 16.11.3-5 11/20/08 16.11.3-6 11/20/08 16.11.3-7 11/20/08 16.11.3-8 11/20/08 16.11.3-9 11/20/08 16.11.3-10 11/20/08 16.11.3-11 11/20/08 16.11.3-12 11/20/08 16.11.3-13 11/20/08 16.11.3-14 11/20/08 16.11.3-15 11/20/08 16.11.3-16 11/20/08 16.11.3-17 11/20/08 16.11.3-18 11/20/08 16.11.3-19 11/10/04 (Deleted)

LOEP 10

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Page Revision Date 16.11.4-1 11/08/13 16.11.4-2 11/08/13 16.11.4-3 11/08/13 16.11.4-4 11/08/13 16.11.4-5 11/08/13 16.11.4-6 11/08/13 16.11.4-7 11/08/13 16.11.4-8 11/10/04 (Delete) 16.11.5-1 10/30/02 16.11.5-2 10/30/02 16.11.5-3 10/30/02 16.11.5-4 10/30/02 16.11.6-1 11/08/13 16.11.6-2 11/08/13 16.11.6-3 11/08/13 16.11.6-4 11/08/13 16.11.6-5 11/08/13 16.11.6-6 11/08/13 16.11.6-7 11/08/13 16.11.6-8 11/08/13 16.11.6-9 11/08/13 16.11.6-10 11/08/13 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 12/21/09 16.11.8-2 12/21/09 16.11.9-1 03/22/10 16.11.9-2 03/22/10 16.11.9-3 03/22/10 16.11.10-1 2/25/03 16.11.10-2 2/25/03 16.11.11-1 3/27/99 16.11.12-1 4/10/03 16.11.12-2 4/10/03 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 LOEP 11

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Pa e Revision Date 16.12.1-1 3/27/99 16.12.2-1 5/3/07 16.12.2-2 5/3/07 16.12.3-1 5/1/03 16.12.3-2 5/1/03 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.12.6-1 11/08/07 16.13.1-1 5/13/04 16.13.1-2 5/13/04 16.13.1-3 5/13/04 16.13.1-4 5/13/04 16.13.1-5 5/13/04 16.13.1-6 5/13/04 16.13.1-7 5/13/04 16.13.1-8 5/13/04 16.13.1-9 5/13/04 16.13.2-1 12/15/04 16.13.2-2 Delete 12/15/04 16.13.2-3 Delete 12/15/04 16.13.2-4 Delete 12/15/04 16.13.3-1 12/15/04 16.13.3-2 Delete 12/15/04 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 12/15/04 16.13.7-2 12/15/04 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 11/15/12 16.14.2-1 07/23/12 16.14.2-2 07/23/12 16.14.3-1 3/27/99 16.14.4-1 Deleted 3/15/11 16.14.4.a-1 3/15/11 16.15.1-1 4/12/06 LOEP 12

Oconee Nuclear Station Selected Licensee Commitments Revised 02/10/14 List of Effective Pages Page Revision Date 16.15.1-2 Deleted 4/12/06 16.15.1-3 Deleted 4/12/06 16.15.1-4 Deleted 4/12/06 16.15.1-5 Deleted 4/12/06 16.15.2-1 11/15/12 16.15.2-2 11/15/12 16.15.2-3 11/15/12 16.15.2-4 11/15/12 16.15.2-5 11/15/12 16.15.3-1 11/15/12 16.15.3-2 11/15/12 16.15.3-3 11/15/12 16.15.3-4 11/15/12 16.15.3-5 11/15/12 LOEP 13

TABLE OF CONTENTS SECTION TITLE PAGE NO 16.0 SELECTED LICENSEE COMMITMENTS 16.1-1

16.1 INTRODUCTION

16.1-1 16.2 APPLICABILITY 16.2-1 16.3 DEFINITIONS 16.3-1 16.4 COMMITMENTS RELATED TO REACTOR COMPONENTS Pending 16.5 REACTOR COOLANT SYSTEM 16.5.1-1 16.5.1 Reactor Coolant System Vents 16.5.1-1 16.5.2 Low Temperature Overpressure Protection (LTOP) System 16.5.2.1 16.5.3 Loss of Decay Heat Removal 16.5.3-1 16.5.4 Reactor Coolant System (RCS) Boron Sampling 16.5.4-1 16.5.5 [DELETED] 16.5.5-1 16.5.6 [DELETED] 16.5.6-1 16.5.7 Chemistry Requirements 16.5.7-1 16.5.8 Pressurizer 16.5.8-1 16.5.8a [DELETED] 16.5.8a-1 16.5.9 Testing Following Opening of System (Core Barrel Bolt Inspections) 16.5.9.1 16.5.10 Loss of Reactor Coolant 16.5.10-1 16.5.11 Subcriticality 16.5.11-1 16.5.12 RCS Leakage Testing Following Opening of System 16.5.12-1 16.5.13 High Pressure Injection and the Chemical Addition Systems 16.5.13-1 16.6 COMMITMENTS RELATED TO ENGINEERED SAFETY FEATURES 16.6.1-1 (NON-ESF SYSTEMS) 16.6.1 Containment Leakage Tests 16.6.1-1 16.6.2 Reactor Building Post-Tensioning System 16.6.2-1 16.6.3 Containment Heat Removal Verification Frequency 16.6.3-1 16.0-1 02/10/14 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.6.4 Low Pressure Injection System Leakage 16.6.4-1 16.6.5 Core Flood Tank Discharge Valve Breakers 16.6.5-1 16.6.6 Core Flooding System Test 16.6.6-1 16.6.7 BWST Outlet Valve Control 16.6.7-1 16.6.8 LPI System Valve Test Restrictions 16.6.8-1 16.6.9 Containment Purge Valve Testing 16.6.9-1 16.6.10 Trisodium Phosphate (TSP) 16.6.10-1 16.6.11 Containment Debris Sources 16.6.11-1 16.6.12 Additional High Pressure Injection (HPI) Requirements 16.6.12-1 16.6.13 Additional Requirements to Support Low Pressure Injection (LPI) 16.6.13-1 Operability 16.6.14 Control of HPI and LPI/RBS Pump Room Temperatures 16.6.14-1 16.6.15 High Pressure Injection (HPI) and Liquid Waste Disposal (LWD) 16.6.15-1 Leakage 16.7 INSTRUMENTATION 16.7.1-1 16.7.1 Accident Monitoring Instrumentation 16.7.1-1 16.7.2 Anticipated Transient Without Scram 16.7.2-1 16.7.3 Emergency Feedwater System 16.7.3-1 16.7.4 Hydrogen Analyzers 16.7.4-1 16.7.5 Steam Generator Overfill Protection 16.7.5-1 16.7.6 Diverse Actuation Systems 16.7.6-1 16.7.7 Position Indicator Channels 16.7.7-1 16.7.8 Incore Instrumentation 16.7.8-1 16.7.9 RCP Monitor 16.7.9-1 16.7.10 Core Flood Tank Instrumentation 16.7.10-1 16.7.11 Display Instrumentation 16.7.11-1 16.0-2 02/10/14 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.7.12 SSF Diesel Generator (DG) Air Start System Pressure 16.7.12-1 Instrumentation 16.7.13 SSF Instrumentation 16.7.13-1 16.7.14 Rod Withdrawal Alarm Limit 16.7.14-1 16.7.15 Engineered Safeguards Protective System (ESPS) Voter Trouble Alarm 16.7.15-1 16.8 ELECTRIC POWER SYSTEMS 16.8.1-1 16.8.1 Control of Room Temperatures for Station Blackout 16.8.1-1 16.8.2 Additional Requirements to Support Keowee Hydro Unit (KHU) 16.8.2-1 OPERABILITY 16.8.3 Power Battery Parameters 16.8.3-1 16.8.4 Keowee Operational Restrictions 16.8.4-1 16.8.5 Keowee Hydro Unit Steady State Frequency 16.8.5-1 16.8.6 Lee/Central Alternate Power System 16.8.6-1 16.8.7 Auctioneering Diodes 16.8.7-1 16.8.8 External Grid Trouble Protection 16.8.8-1 16.8.9 Keowee Governor Speed Out Of Tolerance (OOT) Alarm 16.8.9-1 16.9 AUXILIARY SYSTEMS 16.9.1-1 16.9.1 Fire Suppression Water System 16.9.1-1 16.9.2 Sprinkler and Spray Systems 16.9.2-1 16.9.3 Keowee CO 2 Systems 16.9.3-1 16.9.4 Fire Hose Stations 16.9.4-1 16.9.5 Fire Barriers 16.9.5-1 16.9.6 Fire Detection Instrumentation 16.9.6-1 16.9.7 Keowee Lake Level 16.9.7-1 16.9.8 Control Room Ventilation System (CRVS) Booster Fans 16.9.8-1 16.9.8a HPSW System Requirements to Support Loss of LPSW 16.9.8a-1 16.0-3 02/10/14 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.9.9 Auxiliary Service Water System and Main Steam Dump Valve 16.9.9-1 Operability requirements 16.9.10 Component Cooling and HPI Seal Injection to Reactor 16.9.10-1 Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.9.11-1 16.9.11 a Auxiliary Building Flood Protection Measures 16.9.11a-1 16.9.12 Additional Low Pressure Service Water (LPSW) And 16.9.12-1 Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.13-1 16.9.14 SSF Diesel Generator (DG) Inspection Requirements 16.9.14-1 16.9.15 Radioactive Material Sources 16.9.15-1 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist 16.9.16-1 (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated 16.9.17-1 temperature and pressure) 16.9.18 Snubbers 16.9.18-1 16.9.19 Gravity Induced Reverse Flow to Standby Shutdown Facility (SSF) 16.9.19-1 Through a Unit 2 Condensate Cooler 16.9.20 Diesel Driven Service Air Compressors 16.9.20-1 16.9.21 Standby Shutdown Facility External Flood Protection 16.9.21-1 16.9.22 Protected Service Water System Unavailability 16.9.22-1 16.10 COMMITMENTS RELATED TO STEAM & POWER CONVERSION 16.10.1-1 SYSTEMS 16.10.1 Local Start of Turbine Driven Emergency Feedwater (EFW) Pump 16.10.1-1 16.10.2 Steam Generator Secondary Side Pressure and 16.10.2-1 Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.3-1 16.10.4 Low Presssure Service Water System Testing 16.10.4-1 16.0-4 02/10/14 1

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.10.5 [DELETED] 16.10.5-1 16.10.6 Emergency Feedwater Controls 16.10.6-1 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.10.7-1 16.10.8 Upper Surge Tank (UST) Riser Branch Line Automatic Isolation Valves 16.10.8-1 16.10.9 Air Operated Valves (AOVs) Required to Support Standby Shutdown 16.10.9-1 Facility (SSF) During Station Blackout (SBO) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1-1 16.11.1 Radioactive Liquid effluents 16.11.1-1 16.11.2 Radioactive Gaseous Effluents 16.11.2-1 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.3-1 16.11.4 Operational Safety Review 16.11.4-1 16.11.5 Solid Radioactive Waste 16.11.5-1 16.11.6 Radiological Environmental Monitoring 16.11.6-1 16.11.7 Dose calculations 16.11.7-1 16.11.8 Reports 16.11.8-1 16.11.9 Radioactive effluent release report 16.11.9-1 16.11.10 Radiological Environmental Operating Reports 16.11.10-1 16.11.11 Iodine Radiation Monitoring Filters 16.11.11-1 16.11.12 Radioactive Material in Outside Temporary 16.11.12-1 Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup 16.11.13-1 Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.11.14-1 16.12 REFUELING OPERATIONS 16.12.1-1 16.12.1 Decay Time for Movement of Irradiated Fuel 16.12.1-1 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling 16.12.2-1 16.0-5 02/10/14 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.3-1 16.12.4 Handling of Irradiated Fuel Assemblies 16.12.4-1 16.12.5 Loads Suspended over Spent Fuel in Spent Fuel Pool 16.12.5-1 16.12.6 Fuel Damage During Fuel Handling Operations in Containment 16.12.6-1 16.13 CONDUCT OF OPERATION 16.13.1-1 16.13.1 Minimum Station Staffing Requirements 16.13.1-1 16.13.2 [DELETED] 16.13.2-1 16.13.3 [DELETED] 16.13.3-1 16.13.4 Reactivity Anomaly 16.13.4-1 16.13.5 Deleted 16.13.5-1 16.13.6 Retraining and Replacement of Station Personnel 16.13.6-1 16.13.7 Procedures for Control of Ph in Recirculated 16.13.7-1 Coolant after Loss-of-coolant Accident & Long-term Emergency Core Cooling Systems 16.13.8 Respiratory Protective Program 16.13.8-1 16.13.9 Startup Report 16.13.9-1 16.13.10 Core Operating Limits Reports 16.13.10-1 16.13.11 Procedure for Station Survey Following an Earthquake 16.13.11-1 16.14 CONTROL RODS AND POWER DISTRIBUTION 16.14.1-1 16.14.1 APSR Movement 16.14.1-1 16.14.2 Control Rod Program Verification 16.14.2-1 16.14.3 Power Mapping 16.14.3-1 16.14.4 [DELETED] 16.14.4-1 16.14.4.a Engineering Work Station 16.14.4.a-1 16.0-6 02/10/14 I

TABLE OF CONTENTS (continued)

SECTION TITLE PAGE NO 16.15 VENTILATION FILTER TESTING PROGRAM 16.15.1-1 16.15.1 [DELETED] 16.15.1-1 16.15.2 Control Room Pressurization and Filtering System 16.15.2-1 16.15.3 Spent Fuel Pool Ventilation System 16.15.3-1 16.0-7 02/10/14 I

[DELETED]

16.5.6 16.5 REACTOR COOLANT SYSTEM 16.5.6 [DELETED]

16.5.6-1 02/10/14 1

Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT The provided Fire Detection Instrumentation for each equipment/location shall be OPERABLE as listed in Table 16.9.6-1.


NOTE --------------------------

Fire Detection Instrumentation located within containment is not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

APPLICABILITY: At all times.

16.9.6-1 02/10/14 1

Fire Detection Instrumentation 16.9.6 ACTIONS


NOTE- -------------------------------

OPERABILITY of fire detection instrumentation for adequate equipment/location coverage may also be determined by the Site Fire Protection Engineer or designee, based on performance based assessment risk.

CONDITION REQUIRED ACTION COMPLETION TIME A. All fire detection A.1 ---------- NOTE-------

instruments in all fire An hourly firewatch is not zones inoperable due to required for inaccessible fire detection system equipment/locations such failure. as the Reactor Building at power operation. Periodic inspections using a TV camera (if available) are permitted, or, the inaccessible equipment condition may be monitored by remote indications which would provide early warning of a fire.

Establish hourly fire watch 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> patrol in all affected fire zones.

16.9.6-2 02/10/14 I

Fire Detection Instrumentation 16.9.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more Fire B.1 ---------- NOTE-------

Detection An hourly firewatch is not Instrument(s) in any required for inaccessible fire zone inoperable, equipment/locations such as the Reactor Building at power operation. Periodic inspections using a TV camera (if available) are permitted, or, the inaccessible equipment condition may be monitored by remote indications which would provide early warning of a fire.

Establish hourly fire watch 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> patrol for the affected fire detection instruments or zones.

16.9.6-3 02/10/14 I

Fire Detection Instrumentation 16.9.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 16.9.6.1 Perform CHANNEL FUNCTIONAL TEST of 31 days Oconee Fire Detection Instruments using Fire Detection Instrumentation Control Board Panel Test Switch.

SR 16.9.6.2 Visually inspect Oconee Fire Detection 184 days Instruments accessible during power operation.

SR 16.9.6,3 Test each Oconee fire detector for sensitivity. 12 months SR 16.9.6,4 Visually inspect Oconee Fire Detection 24 months Instruments not accessible during power operation.

SR 16.9.6&5 Test each Oconee fire detector not accessible 24 months during power operation for sensitivity.

16.9.6-4 02/10/14 I

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 Fire Detection Instrumentation OCONEE NUCLEAR STATION Fire Fire Detectors Area Zone Location Description Details Provided AB Auxiliary Buildingl El. 758 - Col.

AB 48 S-T/45-47 Unit 3 LPI & RB Spray Pumps LPI/HPI areas 2 El. 758 - Col.

AB 49 S-T/42-44 Unit 3 LPI & RB Spray Pumps LPI/HPI areas 2 El. 758 - Col.

AB 50 R-S/42-44 Unit 3 HPI Pump Area LPI/HPI areas 1 El. 758 - Col. Unit 3 HPI Pump. Spent Resin Xfr Pump Waste AB 50A R-S/45-47 Tank, Waste & CT Dm Pumps LPI/HPI areas 1 El. 758 - Col. Unit 2 LPI Pumps & Valve Room (Inside Room AB 52 S-T/29-31 63) LPI/HPI areas 2 El. 758 - Col.

AB 53 S-T/26-29 Units 1 & 2 LPI & RB Spray Pumps LPI/HPI areas 2 El. 758 - Col. Unit 1 LPI Pumps & Valve Room (Inside Room AB 54 S-T/24-26 61) LPI/HPI areas 2 El. 758 - Col. Unit 1 RB Sump & Cmp Dm Pump, HPI Pump, AB 55 R-S/24-26 Spent resin Xfer Pump LPI/HPI areas 1 El. 758 - Col.

AB 55A R-S/26-27 Unit 1 & 2 HPI Pump Area LPI/HPI areas 1 El. 758 - Col. Unit 2 Spent Resin Xfer Pump, HPI Pump, RB AB 56 R-S/28-30 Sump & Comp Brn Pump, Wt LPI/HPI areas 1 Unit 3 BA Mix, Spt Res Storage, RC Bid HUT, AB 58 Rms. 100, 261 CBAST, Misc WHUT 1st floor hallway 7 AB 60 Rm. 159 Unit 3 LPI Room Hatch Area LPI hatch 3 AB 61 Rm. 158 Unit 3 HPI Room Hatch Area all 3 AB 62 Rm. 157 Unit 3 Operators Panel/Chem Sample Hood Waste Control 1 ASW SWGR area/

AB 64 Rm. 128 Unit 2 Emerg Aux Service Water Pump PSW pump area 1 Unit 2 MWHT, Misc Wst Exp, CBAST, RC Bid AB 65 Rm. 100 Xfer Pmp, RC Bid HT 1st floor hallway 5 AB 67 Rm. 119 Unit 2 LPI Room Hatch Area LPI hatch 3 AB 69 Rm. 117 Unit 2 Operators Panel/Chem Sample Hood Waste Control 1 AB 70 Rm. 119 Unit 1 LPI Room Hatch Area LPI hatch 1 Unit 1 RC HU Tnks, CBAST, RC Bid Xfr Pmp, AB 76 Rm. 100 Wst Dmg, Fltr Room SRST 1st floor hallway 6 AB 77 Rms. 200, 264 Unit 3 Storage, Chemistry Storage all 14 AB 79 Rm. 252 Unit 3 RB Component Coolers Component Coolers I Rms. 200, 220, Unit 2 I&E Hot shop, Misc Evap Fd Tk, Chem AB 81 224 Storage, Laund, RC EFT 2nd floor hallway 9 AB 83 Rm. 216 Unit 1 & 2 RB Component Coolers Component Coolers 1 AB 85 Rms. 200, 204 Unit 1 Chemistry Storage, High Level Storage 2nd floor hallway 11 Unit 3 Hatch Area Chemistry Labs & Change AB 86 Rms. 356, 368 Room 3rd floor hallway 32 16.9.6-5 02/10/14 1

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 Fire Detection Instrumentation Fire Fire Detectors Area Zone Location Description Details Provided AB Auxiliary Building (cont'd)

Rms. 354, all; including cable AB 89 354A Unit 3 Equipment Room shaft 20 Unit 2 Hallway, Change Room, Laundry Room, RP Lab, Chemistry Lab, Medical Room, and AB 90 Rms, 312,328 Decon Room 3rd hallway 33 all; including cable AB 92 Rm. 311 Unit 2 Equipment Room shaft 13 Unit I Hallway, Hatch Area, Change Room, and AB 94 Rm. 300 Tool Storage all 20 all; including cable AB 95 Rm. 310 Unit 1 Equipment Room shaft 12 AB 99 Rm. 452 Unit 3 East Penetration Room all 20 AB 100 Rms. 455, 458 Unit 3 Control Battery Room all 4 Rms. 450, 450B, Cable all; including cable AB 101 Shaft Unit 3 Cable Room shaft 29 AB 103 Rm. 407 Unit 2 East Penetration Room all 17 AB 104 Rm. 408 Unit 2 Control Battery Room all 5 all; including cable AB 105 Rm. 404 Unit 2 Cable Room shaft 21 all; including cable AB 106 Rm. 403 Unit 1 Cable Room shaft 21 AB 108 Rms. 402 Unit I East Penetration Room all 12 AB 109 Rm. 400 Unit 1 Control Battery Room all 5 Rms. 504, 505, 506, 507, 508, 509, 510, 511, 512, 513, 515, AB 110 516, 516A Unit 1 & 2 Control Room all 27 Rms. 552, 553, AB 112 554, 556, 557 Unit 3 Control Room all 29 AB 114 Rm. 669 Unit 3 Purge Inlet Equipment Room all 5 AB 115 Rm. 666 Unit 3 Purge Exhaust Equipment Room all 10 Rms. 650, 651, AB 116 653, 657 Unit 3 AHU Room all 6 AB 119 Rm. 603 Unit 1 & 2 AHU Room all 8 BH Blockhouse Unit 1 & 2 BH12 45 Block House Unit 1 & 2 Block House all 3 Unit 3 Block BH3 47 House Unit 3 Block House all 3 16.9.6-6 02/10/14 1

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 Fire Detection Instrumentation Fire Fire Detectors Area Zone Location Description Details Provided BH Blockhouse (cont'd)

CT-4 Block Ionization smoke CT4 46 House CT-4 Block House detection 2 PSW PSW Building_

photoelectric smoke PSW PS101 Cable Vault detectors only 2 photoelectric smoke PSW PS102 PSW Main Floor (transformer space) detectors only 6 photoelectric smoke PSW PS103 Battery Room 2 detectors only 2 photoelectric smoke PSW PS104 Battery Room 1 detectors only 2 photoelectric smoke PSW PS105 Mezzanine Area detectors only 4 RB Reactor Building_

EL. 796+6 and Unit 1 Reactor Building - Basement thru 4th all (both ionization RB1 122 797+6 Floor and heat) 22 EL. 796+6 and Unit 2 Reactor Building - Basement thru 4th all (both ionization RB2 123 797+6 Floor and heat) 22 EL. 796+6 and Unit 3 Reactor Building - Basement thru 4th all (both ionization RB3 124 797+6 Floor and heat) 22 SSF Standby Shutdown Facility all (Honeywell panel SSF SSF SF104 Standby Shutdown Facility detection) 67 TB Turbine Building_

Ele. 775 - Col.

TB 2 E-F/54-55 Unit 3 EHC Area all 1 Ele. 775 - Col. all (both ionization TB 3 H-N/48-56 Unit 3 Heater Drain Pumps 301 & 3D2 and beam) 15 Ele. 775 - Col.

TB 4 E-F/54-55 Unit 3 Turbine Driven EFDW Pump Area all 1 Ele. 775 - Col.

TB 6 B-E/42-46 Unit 3 Main Feedwater Pump Area all 4 Ele. 775 - Col.

TB 7 E-F/43-44 Unit 3 Motor Driven EDFW Pump Area all 1 Ele. 775 - Col.

TB 8 F-G/43-44 Unit 3 Hotwell Pump & TB Sump Area all 1 Ele. 775 - Col.

TB 9 J-M/43-44 Unit 3 Powdex/LPSW Pump Area all 2 Ele. 775 - Col.

TB 11 E-F/40-41 Unit 2 EHC Area all 1 Ele. 775 - Col.

TB 13 B-D/32-38 Unit 2 Turbine Driven EFDW Pump Area all 2 Ele. 775 - Col.

TB 15 B-E/27-32 Unit 2 Main Feedwater Pump Area all 4 16.9.6-7 02/10/14 1

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 Fire Detection Instrumentation Fire Fire Detectors Area Zone Location Description Details Provided TB Turbine Building (cont'd)

Ele. 775 - Col.

TB 17 F-J/28-29 Unit 2 HW Pump, LPSW Pump - B Area all 3 Ele. 775 - Col.

TB 18 L-M/30-31 Unit 2 Powex, Backup IA Compressors all 1 Ele. 775 -

TB 19 CoI.B-F/23-27 Unit 1 Main Feedwater Pump Area all 5 Ele. 775 - Col.

TB 21 F-J/27-28 Unit 1 HW Pump, LPSW Pump - A Area all 2 Ele. 775 - Col.

TB 22 L-M/22-23 Unit 1 Powdex Area all 1 Ele. 775 - Col.

TB 24 B-F/13-21 Unit 1 TDEFDW Pump, EHC all 2 Ele. 796 - Col.

TB 27 E-G/53-55 Unit 3 MT Oil Tank, MS & Control Valves all 2 Ele. 796 - Col.

TB 28 L-M/52-53 Unit 3 Heater Bay Area, MSRH Al & A2 all 3 Ele. 796 - Col.

TB 29 J-M/43-46 Unit 3 4160 Volt Switchgear all 37 Ele. 796 - Col.

TB 31 D-G/39-41 Unit 2 MT Oil Tank, MS & Control Valves all 2 Ele. 796 - Col. Unit 2 Heater Bay Area, MSRH Al & A2, 3XS6, TB 32 L-M/39-40 3X10 all 3 Ele. 796 - Col.

TB 33 J-L/28-32 Unit 2 6900/4160 Volt Switchgear all 17 Ele. 796 - Col.

B-N/23-28 (not including FZ TB 34 34A) Unit 1 6900/4160 Volt Switchgear all 16 Ele. 796 - Col.

TB 35 L-M/15-16 Unit 1 Heater Bay Area, MSRH Al & A2 all 2 Ele. 796 - Col.

TB 36 F-G/14-15 Unit 1 MT Oil Tank, MS & Control Valves all 1 Ele. 822 - Col.

TB 38 D-G/45-54 Unit 3 Main Turbine, Turbine Fir, Offices all 6 Ele. 822 - Col.

TB 39 J-N/43-56 Unit 3 Auxiliary Shutdown Panel all 1 Ele. 822 - Col.

TB 39A L-M/45-47 Unit 3 Power Battery Room all 2 Ele. 822 - Col.

TB 40 D-G/28-40 Unit 2 Main Turbine, Turbine Fir, Offices all 6 Ele. 822 - Col.

TB 42 E-G/15-27 Unit 1 Main Turbine, Turbine Fir, Offices all 6 Ele. 796 - Col.

TB 44 C-F/12-14 Unit 1 MCC 1XA & 1XA-A all 2 WPI Unit I West Penetration Room WP1 97 Rm. 348 Unit 1 Cask Decon Tank Room all 4 WP1 107 Rm. 409 Unit I West Penetration Room all 5 16.9.6-8 02/10/14 1

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 Fire Detection Instrumentation Fire Fire Detectors Area Zone Location Description Details Provided WP2 Unit 2 West Penetration Room WP2 91 Rm. 349 Unit 2 Cask Decon Tank Room all 4 WP2 102 Rm. 410 Unit 2 West Penetration Room all 5 WP3 Unit 3 West Penetration Room WP3 87 Rm. 376 Unit 3 Cask Decon Tank Room all 4 WP3 98 Rm. 455 Unit 3 West Penetration Room all 7 YARD Yard YARD- U3 RCP YARD EAST SWGR Yard Area - East U3 RCP SWGR 2 16.9.6-9 02/10/14 1

Fire Detection Instrumentation 16.9.6 BASES On June 16, 2004, the NRC revised its regulation Title 10 of the Code of FederalRegulations (10 CFR), Part50, Section 50.48 to include a new paragraph 50.48(c) that incorporates by reference National Fire Protection Association 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants 2001 Edition," hereafter referred to as NFPA 805. On December 29, 2010, the NRC issued Oconee's Safety Evaluation Report (SER) approving adoption of a performance-based (PB) fire protection program (FPP) as an alternative to the existing, deterministic fire protection regulations. Specifically, NFPA 805 allows the use of PB methods, such as fire modeling, and risk-informed (RI) methods, such as fire probabilistic risk assessment (PRA), to demonstrate compliance with the nuclear safety performance criteria. As a result of transitioning to the NFPA 805 Licensing Basis, certain Fire Protection Systems and Features are "required" to satisfy either the NFPA 805 Chapter 3 fundamental fire protection program safety goals or the NFPA 805 Chapter 4 performance based/risk informed safety goals. These "required" Fire Protection Systems and Features are being placed into SLCs since they comprise the safety basis of the new fire protection program.

Allowed out of service times and action statements along with some surveillance requirements are being revised to be consistent with the new NFPA 805 licensing basis and safety goals.

The documentation of these "required" fire protection systems and features is provided in the SER Attachments A and D.

The equipment contained in this SLC is considered part of the NFPA 805 Power Block. Power Block structures, systems, and components (SSCs) include all safety-related and balance-of-plant systems and components required for operation, including radioactive waste processing and storage, the 230 kV switchyard, and Keowee Dam and associated structures. Power Block SSCs are required for the safe and reliable operation of the plant. Calculation OSC-1 0650, Oconee NFPA 805 Power Block, defines the Power Block for Oconee.

DPC-1435.00-00-0002, Technical Basis for Roving Continuous Fire Watches, justifies the following allowances for continuous and hourly fire watches:

"...continuous fire watches consist of a roving patrol that can observe multiple locations during a tour, conducted at a moderate pace, in a 10 minute timeframe. Using a 10-minute time for the tour provide a 5 minutes margin in case of a distraction or need for the fire watch individual to attend to an interruption."

"The normal interval between inspections during an hourly fire watch is sixty (60) minutes.

The maximum allowable interval between inspection due to unforeseen circumstances or delays is seventy-five (75) minutes. However, the combined time interval for any three (3) consecutive inspections shall not exceed one hundred eighty (180) minutes."

OPERABILITY of the NRC committed Fire Detection Instrumentation ensures that adequate warning capability is available for the prompt detection of fires in areas containing safety related and important to safety equipment at Oconee Facilities. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program. The regulatory requirement is to have NFPA 805 required Fire Detection Instrumentation OPERABLE at all times.

16.9.6-10 02/10/14 I

Fire Detection Instrumentation 16.9.6 In the event that a portion of the Fire Detection Instrumentation is inoperable, the establishment of compensatory actions in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to operability.

This Selected Licensee Commitment is part of the Oconee Fire Protection Program and therefore subject to the provisions of Oconee Facility Operating License Conditions.

REFERENCES:

1. Oconee UFSAR, Chapter 9.5-1 and UFSAR, Chapter 18, Table 18-1 (Portions of this SLC are credited in the Fire Protection Program for License Renewal).
2. Oconee License Renewal Commitments, OSS-0274.00-00-0016.
3. Oconee Fire Protection Safety Evaluation dated December 29, 2010.
4. Oconee License Amendment Request dated April 14, 2010.
5. Oconee Fire Protection Design Basis Specification for Fire Protection Program, (currently contained in the Fire Protection DBD), as revised.
6. Oconee Plant Design Basis Specification for Fire Detection, as revised.
7. Drawing Series O-0310-K, Fire Protection Plans.
8. Drawing Series O-0310-L, Fire Protection Plans.
9. OSC-10650, Oconee NFPA 805 Power Block.
10. DPC-1435.00-00-0002, Technical Basis for Roving Continuous Fire Watches.
11. O-0756-J, Location Diagram Fire Detection System (FD) Standby Shutdown Facility Detector Locations.

16.9.6-11 02/10/14 I