ML20189A094

From kanterella
Jump to navigation Jump to search
8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B. Figures, (Redacted Version)
ML20189A094
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/29/2020
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20189A066 List:
References
RA-20-0136
Download: ML20189A094 (48)


Text

Oconee Nuclear Station UFSAR Appendix 9B. Figures Appendix 9B. Figures

Oconee Nuclear Station UFSAR Figure 9-1 (Page 1 of 1)

Figure 9-1. Fuel Storage Rack (Module)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-2 (Page 1 of 1)

Figure 9-2. Fuel Storage Rack (Assembly)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-3 (Page 1 of 1)

Figure 9-3. Spent Fuel Pool Outline Oconee 1, 2 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-4 (Page 1 of 1)

Figure 9-4. Spent Fuel Pool Outline Oconee 3 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-5 (Page 1 of 1)

Figure 9-5. Spent Fuel Cooling System (31 DEC 2019)

Oconee Nuclear Station UFSAR Figure 9-6 (Page 1 of 1)

Figure 9-6. Deleted per 1990 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-7 (Page 1 of 2)

Figure 9-7. Fuel Handling System (Units 1&2 Page 1 and Unit 3 Page 2)

(31 DEC 2017)

Oconee Nuclear Station UFSAR Figure 9-7 (Page 2 of 2)

(31 DEC 2017)

Oconee Nuclear Station UFSAR Figure 9-8 (Page 1 of 1)

Figure 9-8. Component Cooling System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-9 (Page 1 of 1)

Figure 9-9. Condenser Circulating Water System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-10 (Page 1 of 1)

Figure 9-10. High Pressure Service Water System (31 DEC 2016)

Oconee Nuclear Station UFSAR Figure 9-11 (Page 1 of 1)

Figure 9-11. Low Pressure Service Water System (31 DEC 2017)

Oconee Nuclear Station UFSAR Figure 9-12 (Page 1 of 1)

Figure 9-12. Low Pressure Service Water System (31 DEC 2015)

Oconee Nuclear Station UFSAR Figure 9-13 (Page 1 of 1)

Figure 9-13. Recirculated Cooling Water System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-14 (Page 1 of 1)

Figure 9-14. Deleted Per 1997 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-15 (Page 1 of 1)

Figure 9-15. Chemical Addition and Sampling System (31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 9-16 (Page 1 of 1)

Figure 9-16. Chemical Addition and Sampling System (31 DEC 2007)

Oconee Nuclear Station UFSAR Figure 9-17 (Page 1 of 1)

Figure 9-17. High Pressure Injection System (31 DEC 2015)

Oconee Nuclear Station UFSAR Figure 9-18 (Page 1 of 1)

Figure 9-18. High Pressure Injection System (31 DEC 2017)

Oconee Nuclear Station UFSAR Figure 9-19 (Page 1 of 1)

Figure 9-19. Low Pressure Injection System (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 9-20 (Page 1 of 1)

Figure 9-20. Coolant Storage System (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 9-21 (Page 1 of 1)

Figure 9-21. Coolant Treatment System (31 DEC 2001)

Oconee Nuclear Station UFSAR Figure 9-22 (Page 1 of 1)

Figure 9-22. Post-Accident Liquid Sample System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-23 (Page 1 of 1)

Figure 9-23. Post-Accident Containment Air Sample System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-24 (Page 1 of 1)

Figure 9-24. Control Room Area Ventilation and Air Conditioning System (31 DEC 2019)

Oconee Nuclear Station UFSAR Figure 9-25 (Page 1 of 1)

Figure 9-25. Spent Fuel Pool Ventilation System Unit 1 and 2 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-26 (Page 1 of 1)

Figure 9-26. Spent Fuel Pool Ventilation System Unit 3 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-27 (Page 1 of 1)

Figure 9-27. Auxiliary Building Ventilation System Unit 1 and 2 (31 DEC 2011)

Oconee Nuclear Station UFSAR Figure 9-28 (Page 1 of 1)

Figure 9-28. Auxiliary Building Ventilation System Unit 3 (31 DEC 2001)

Oconee Nuclear Station UFSAR Figure 9-29 (Page 1 of 1)

Figure 9-29. Deleted Per 1998 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-30 (Page 1 of 1)

Figure 9-30. SSF General Arrangements Longitudinal Section Security-Related Withheld Under 10 CFR 2.390 (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-31 (Page 1 of 1)

Figure 9-31. SSF General Arrangements Plan Elevation 777' and 754' Security-Related Withheld Under 10 CFR 2.390 (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-32 (Page 1 of 1)

Figure 9-32. SSF General Arrangements Plan Elevation 797+0 Security-Related Withheld Under 10 CFR 2.390 (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-33 (Page 1 of 1)

Figure 9-33. SSF General Arrangements Plan Elevation 817+0 Security-Related Withheld Under 10 CFR 2.390 (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-34 (Page 1 of 1)

Figure 9-34. SSF General Arrangements Transverse Section Security-Related Withheld Under 10 CFR 2.390 (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-35 (Page 1 of 1)

Figure 9-35. SSF RC Makeup System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-36 (Page 1 of 1)

Figure 9-36. SSF Auxiliary Service Water System (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-37 (Page 1 of 1)

Figure 9-37. SSF HVAC Service Water System & SSF Diesel Cooling Water System (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-38 (Page 1 of 1)

Figure 9-38. SSF Diesel Air Starting System (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-39 (Page 1 of 1)

Figure 9-39. SSF Sump System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-40 (Page 1 of 1)

Figure 9-40. SSF 4160V/600V/208V Electrical Distribution (31 DEC 2013)

Oconee Nuclear Station UFSAR Figure 9-41 (Page 1 of 1)

Figure 9-41. SSF 125 VDC Auxiliary Power Systems (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-42 (Page 1 of 1)

Figure 9-42. Essential Siphon Vacuum System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-43 (Page 1 of 1)

Figure 9-43. Siphon Seal Water System (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 9-44 (Page 1 of 1)

Figure 9-44. Protected Service Water (31 DEC 2015)

Oconee Nuclear Station UFSAR Figure 9-45 (Page 1 of 1)

Figure 9-45. PSW AC Electrical Distribution (31 DEC 2015)

Oconee Nuclear Station UFSAR Figure 9-46 (Page 1 of 1)

Figure 9-46. PSW DC Electrical Distribution (31 DEC 2015)