NSD-NRC-97-5296, Forwards Draft RCS PIV Integrity Ts,For Review.W Status Open Item Tracking Sys Item 5527 Is Changed to Action N for NRC to Provide Feedback Re Acceptability of New TS

From kanterella
Jump to navigation Jump to search
Forwards Draft RCS PIV Integrity Ts,For Review.W Status Open Item Tracking Sys Item 5527 Is Changed to Action N for NRC to Provide Feedback Re Acceptability of New TS
ML20216D225
Person / Time
Site: 05200003
Issue date: 08/29/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216D229 List:
References
NSD-NRC-97-5296, NUDOCS 9709090256
Download: ML20216D225 (2)


Text

.

2 (m

(

, G Westinghouse Energy Systems km355

"'"sbu@ Pennsylvania 15230-0355 Electric Corporation DCP/NRC1009 NSD-NRC 97-5296 Docket No.: 52-003

. August 29,1997 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: T,R. QUAY

SUBJECT:

RESPONSE TO NRC COhth1ENT ON PRESSURE ISOLATION VALVE 5 AND A RELATED TECllNICAL SPECIFICATION

References:

1. Letter from NRC to Westinghouse, " Comment on the AP600 Technical Specification (TS) Related Pressure isolation Valves", dated May 28,1997.

Dear Mr. Quay:

The referenced letter presents NRC concerns related to revision 6 of the AP600 Technical SpeciGcations (TS) not having a Pressure Isolation Valve (P!V) TS. A telecon was held on July 1, 1997, and invoived Messrs. Wong, lisii, and lluffman of the NRC and Messrs. Corletti and Suggs and Ms. Nydes of Westinghouse, During that telecon, Westinghouse explained that, given the NUREG.

1431 Bases for a PlV TS, the AP600 dia not have any valves meeting that criteria and therefore a PlV TS was not included in Revision 6. In addition, Westinghouse explained that the AP600 TS used the same Bases as the CE System 80+ in creating TS Revision 6 and it resulted in no PlV TS for the AP600. Ilowever, the NRC stated they are no longer satisGed with the CE System 80+ Bases and, therefore will not permit Westinghouse to use the same criteria. Further, the NRC expressed concern with the 10 CFR 50.2 deGnition of a PlV and its application to the AP600. Westinghouse took the action to develop a new criteria for creation of a PlV 1S for the AP600 that the NRC would find acceptable.

Attached for NRC review is a dran RCS PIV Integrity TS. The Bases provide the new PlV TS inclusion criteria developed at NRC request. With this submittal, the Westinghouse status for Open item Tracking System item 5527 is changed to Action-N for NRC to provide feedback regarding acceptability of this new TS.

If you have any questions regarding this transmittal or the AP600 Technical SpeciGcations. please contact Robin K. Nydes at 412 374-4125.

[

/1 1 A [

Brian A. iclntyre, Managt , , j')

Advanced Plant Safety and Licensing g(/ -

b m ., ,

Jml ,;

~

9709090256 970829 PDR ADOCK 05200003 A PDR

DCI'/NRC1009 NSD,NRC.97 5296 2 August 29,1997 cc: W. C. Iluflinan, NRC (w/ Attachment)

A. T. Chu. NRC (w/Attacionent) ,

J. Wong, NRC (w/ Attachment)

O. lisil. NRC (w/ Attachment)

N. J. Liparulo, Westinghouse (w/o Attachment) 4 4

i 9

4 e

t 111% wpf

. - - - - . - . , _ - , . - , . . , _ - , . , ., - - . - - - _ . _ - - . _ - - _ . . , - , - , . . , - . - - - . . . . - - , , - - - - - _ _ - -