Forwards non-proprietary & Proprietary Responses to Address Requests Made in NRC Response to W Re Insp Rept 99900404/97-01.Application for Withholding Proprietary Info Encl.Proprietary Response Withheld
ML20217N133
Person / Time
Site: 05200003
Issue date: 08/21/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Roe J
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19317C666 List:
References
99900404-97-01, 99900404-97-1, NSD-NRC-97-5269, NUDOCS 9708260039
Download: ML20217N133 (3)


Text

_ - _ _ _ _ _ _ _ .. .. -

[

'5508""'""$'' '5230 0355 Ufco"[ oration DCP/NRC0985 NSD NRC 97 5269 Docket No.: $2 003 August 21,1997 Document Control Desk U.S. Nuclear Regulatory Conunission Washington, DC 20555 ATIENTION: J. W. RCE

SUBJECT:

- RESPONSE TO NRC CONCERNS WITil WESTINGilOUSE QA PROGRAM

Reference:

Letter, M. M. Slosson to N. J. Liparuto," Response To Westinghouse Letter Dated June 9,1997. Regarding inspection No. 99900404/97 01,"

Dear Mr. Roe:

The purpose of this letter is to address the requests made in the reference letter for additional information, items requiring additional clarification can be addressed and Westinghouse management will welcome the opportunity to meet with NRC. The documentation required in the seven areas listed on the second and third page of the reference is enclosed with this transmittal. These documents are Westinghouse internal documents and correspondence between Westinghouse and its subcontractors, consequently we request this information be considered proprietary in nature and treated accordingly. Documents included in attachment, are as follows:

NRC Request: FOK/HPC0562 Dated November 3,1997 Nov.1994 letter to vendors W. E. Cummins to AP600 Project NRC Request: INI/FOK 0608 Dated June 6,1997 INITEC Response 6/6/97 A. Ilolgado to P. R. Mandava NRC Request; QS 97 0914 Dated June 16,1997; Supplier Quality May '97 INITEC Audit Program Audit Report ofINITEC INI/QLA Dated July 17,1997;INITEC Response to Westinghouse Audit WES 97171

~

$ 90'[ / , _

^

9708260039 PDR ADOCK 0597 g 3: j m ,. . h!ElElkE,Illllll a

ODOiY Gz , }\Q, p3 va a l lwhQG2

9 i

i DCP/NRC098$ 2- August 21,1997 l NSD NRC 97 5269 NitC Request: DCI'/APD0211 Dated hiny 20,1997; independent independent Audit Repori Assessment of AP600 Control of Contractors. Audit Plan DCP/DCP0322 dated August 4,1997 Audit Report CCI QA 97.5 June 4,1997 4

l'OK/ Sell 1450, dated June 2,1997. Design Calculation Subrnittal 1 OK/I)PC1540, dated June 9,1997, SS AR Internal References FOK/IIPC1534, dated June 5,1997, Verification Documentation for Design Deliverables INI/FOK0616, dated June 19,1997 Verincation Documentation for INITEC Design Deliverables NRC Request: DCP/DCP0321 dated August 4,1997, l.ist of Subcontractors Suppliers and Participants in the AP600 Project NRC Request: FOK/FOK0887 dated July 2,1997; hianagement Management Review Summary Review oflNITEC Perfonnance NRC Request: FOK/FOK0865 dated June 9,1997; AP600 FOAKE Design assurance review information Design Assurance Review Plan The Westinghouse Electric Corporation copyright notice, proprietary information notice, application for withholding and af0 davit are also attached.

This submittal contains Westinghouse proprietary information consisting of trade secrets, con,,nercial infonnation or Gnancial information which we consider privileged or con 0dential pursuant to 10CFR2.790. Therefore, it is requested that the Westinghouse proprietary information attached hereto be handled on a conndential basis and be withheld from public disclosures, Attachment 2 is the nonproprietary version of Attachment 1.

mn

.j

l l DCP/NRC0985 I

NRC NSD 97.$269 3 August 21,1997

'this material is for your internal use only and inny be used for the purpose for u hich it is submitted, it should not be otherwise used, disclosed, duplicated, or disseminated, in w hole or in part, to any other person or organization outside the Conunission, the OfUce of Nuclear Reactor Regulation, the Omce of Nuclear 1(egulatory Research and the necessary schcontractors that have signed a proprietary non-disclosure agreement uith Westinghouse without the express written approval of Westinghouse, Correspondence with respect to the application for withholding should reference AW.971152 and should be addressed to lirlan A. hiclntyre, Manager of Advanced Plant Safety and Licensing, Westinghouse lilectric Corporation, P.O. Ilox 355, Pittsburgh, Pennsylvania, 15230 0355.

Please contact me on (412) 374 4334 or llob Vijuk on (412) 374 5390 if you have any questions concerning this transmittal.

fs & f.fI lirian A. iclntyre, Manager

/

/ l Advanced Plant Safety and 1.icensing l jml

!!nclosures cc: T. R. Quay, NRC/NRIUDRPM (w/linclosures)

R. P. McIntyre, NRC/NRIUPSill/ DISP (w/I!nclosures)

H. A. Gramm, NRC/NRIUDRCil/llQMil(w/linclosures)

S. C. tilack, NRC/NRR/DRCil/llOMil (w/linclosures)

N. J. Liparulo, Westinghouse (w/o linclosures)