NSD-NRC-97-5055, Forwards Rev 9 of AP600 PRA Rept,List of Sections & Replacement Pp & Chapters/Appendices to Be Added to Existing PRA Rept

From kanterella
(Redirected from NSD-NRC-97-5055)
Jump to navigation Jump to search
Forwards Rev 9 of AP600 PRA Rept,List of Sections & Replacement Pp & Chapters/Appendices to Be Added to Existing PRA Rept
ML20137W457
Person / Time
Site: 05200003
Issue date: 04/11/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137W464 List:
References
NSD-NRC-97-5055, NUDOCS 9704180108
Download: ML20137W457 (3)


Text

bb -

(k.-)

3 Westinghouse Energy Systems

$345 _ , g ,g9,9$,,

Electric Corporation NSD-NRC-97-5055 "

DCP/NRC0808 Docket No.: STN-52-003 April 11,1997 l Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: T.R. QUAY

SUBJECT:

AP600 PROBABILISTIC RISK ASSESSMENT, REVISION 9

Dear Mr. Quay:

Enclosed is Revision 9 of the AP600 Probabilistic Risk rasessment (PRA) Report. A list of the sections included in PRA Revision 9 is provided in Enclosure 1. Revision 9 of the PRA is provided as Enclosure 2. The PRA sections have been revised to incorporate commitments Westinghouse made in responses to numerous RAls, correct typographical errors, incorporate material that has previously been provided to the NRC as draft material for inclusion in the next PRA revision, and incorporate  ;

additional information to resolve open items. The additional information incorporated in PRA Revision 9 that the NRC has not previously seen includes PRA Sections 59.6.3 and 59.9, Table 59-29 (external event insights only), and Appendix C.

Enclosure 2 is in the form of replacement pages rad chapters / appendices to be added ta te existing PRA report. Included with each set are the change page instructions. Thirty-seven sets of Revision U to the PRA have been sent to Mr. Joe Sebrosky for distribution within NRC, to NRC subcontractors, i and to the ACRS.

Westinghouse considers the AP600 PRA report to be final, except for Appendix A, which will follow )

once the M AAP4/NOTRUMP Benchmarking report is completed, i 1

This revision to the PRA is sufficient to allow the NRC to continue to write Chapter 19 of the Final Safety Evaluation Report.

1 i Please contact Cynthia L. Ilaag on (412) 3744277 if you have any questions concerning this /

/

tiansmittal.

-Q f

BassR Brian A. McIntyre, Manager Advanced Plant Safety and Licensing

mi EEN%,E!M p# 4A 1700gn

- Enclosures

,s' }f (d\ (_

cc: J. Sebrosky, NRC (1 copy Enclosure 1. / copies Enclosure 2) # *

  1. (t I

N. J. Liparulo, Westinghouse (w/o Enclosures) , p[ "g 1 l

1 9704190108 970411 PDie ADOCK 05200003 4' p'E t D V T 1 A PDR a pfibp q w, g,V

Enclosure 1 to Westinghouse Letter NSD-NRC-97-5055 April 11,1997 List of chapters and appendices revised in Revision 9 of the AP600 PRA Chapter Title Reason for Revision

  • 3 MODELING OF SPECIAL INITIATORS 2, 3 6 SUCCESS CRITERIA ANALYSIS 2, 3 26 PROTECTION AND SAFETY MONITORING SYSTEM 1 32 DATA ANALYSIS AND MASTER DATA BANK 1 36 RCS DEPRESSURIZTION 2,3 44 MAAP 4.0 CODE DESCRIPTION AND AP600 MODELING 2,3 45 FISSION PRODUCT SOURCE TERMS 2,3 49 OFFSITE DOSE EVALUATION 2,3 52 RTNSS-FOCUSED PRA SENSITIVITY STUDY 2,3 54 LOW POWER AND SIIUTDOWN PRA ASSESSMENT 1 54A DESIGN CIIANGE IMPACT ON LOW-POWER & 3 SilUTDOWN RISK ASSESSMENT 55 SEISMIC MARGIN ANALYSIS 3 57 INTERNAL FIRE ANALYSIS 1 59 PRA RESULTS AND INSIGilTS 3,4 Appendix B EX-VESSEL SEVERE ACCIDENT PHENOMENA 3 Appendix C DESIGN CilANGES TilAT OCCURRED AFTER THE PRA 4 ANALYSIS WERE COMPLETED
  • 1 = incorporate commitments form RAI responses 2 = correct typographical errors 3 = incorporate material previously provided to NRC as draft 4 = incorporate material not previously issued to NRC 34444

f r

i Enclosure 2 to Westinghouse Letter NSD-NRC-97-5055 April 11,' 1997 B

4 r

i t

i

-hl4Yk i

l l

i