- UBat2 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Friday, April 30, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
S. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
Items Included In Daily Package:
Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule litani in s record was detd in accordance Wth fi Freedom of Ilorma6on Act exempfior_
1
^
Conwiitted to Nucdcar EOcFIlnce UUU1flEY UF POlI BERMN
- 91R21 Point Beach Nuclear Plant U1R28 Refueling Outage
..Safety Topicseforweekof April 25-May I-Theme for the week This week's theme is Teamwork & Attitude. Good teamwork and attitude will help us complete this outage successfullyI Daily Safety Snippets Sunday TSure safety. cn get old, but so do safe workers' A part of having a good safety attitude is never letting your guard down. Even when you are just walking around the plant, an injury is just a door slam away.
Monday "When we're all on the same team problems aren't as big as they seem" Is your job going to be delayed by 30 minutes? Who are you going to call for help? The OCC.
They can help you solve issues.
Tuesday "Surprises belong at birthday parties not in the shop."
OE17571 Braidwood It was discovered that shop personnel were grinding aluminum stock on the shop bench grinder. What's wrong with that? Aluminum flakes can adhere to the wheel, causing it to become unbalanced. Also the flakes thermally expand faster than the rest of the wheel. The potential result? A wheel fracture and that is a surprise you don't need!
Wednesday "Teamwork by all, helps make accident rates fall" Over the last few weeks we have added many new team members to our staff. It is each of our responsibility's to coach them on the way we do business around here... SAFELYI Nothing can stop the entire organization faster than a serious injury.
Thursday "No matter what the season, covers are in place for a reason."
Do you know why quartz halogen lights have glass covers? The temperatures reached by the portable halogen floodlights may exceed 1000F. OE17708 1/6/04 Plant Hatch declared an unusual event as the result of a small fire. The fire started by hot fragments of glass blown from a halogen lamp. The cover was not in Place and the resulting fragments started the fire.
Friday "Use your head and stay alert, it keeps you from getting hurt' OE17764 Limerick On 213/04 an electrician received a shock on a GFCI protected line. Why did this happen? The worker failed to ensure GFCI reset properly after testing. Do you check your GFCI prior to use to make sure it is working right?
Saturday "Safety Is a six letter word but a seven day Job" Remember to not let your guard down as you leave work for the day. Last week there were numerous AR s on inappropriate driving in the parking lot. Watch out for your coworker.
@'hmrt:U 1?y Ax 2
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 26 Path 1,tP Picture Meets Outaae Radiation Performance rnn, n
~
a
- - -IsIA--
I%0I I
L,1U~~5
& VIt7WL "A
U 3-S 0
A 0 This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
46.156 Rem Day 26 - April 29 Actual = 1.706 Cumulative = 46.156 Cumulative Forecast = 48.488 Daily dose and PCE goals reforecast on 4/23.
Meets: <= 18 Exceeds: <= 12 Actual PCE's:
6 co C.3 S0 S
.~
SI Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 J 16
' 14 09= 12 c 10 8
6 z 4 2
0 I
0
... oreast U) 0)
0 so 40 20 0 2 4 6 8 1012141618202224262830323436384042
+
Actual
-Forecast Goal
-- /,
F Z
0 2 4 6 8 101214161820222426283032343638404244464850
D. N WE C~onamiled} to Nuclear Excell
-7e> Outage Status Report Plant:
Point Beach Unit I Day: Friday Today's Date I Time:
4/30/04 1600 Outage Duration: Day 27 Of Refueling Outage Number U1R28 Safety Status Industrial -Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage 1
Summary:
Radiological Dose to date 46.156 Projected to date
- 48.488 Outage Goal 575 R Difference
-1.706 Number of PCEs 6
Summary:
- Reforecast on 4/23 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
D Hot Standby (Mode 3) a Hot Shutdown (Mode 4)
D Cold Shutdown (Mode5) 0D Refueling Shutdown (Mode 6)
RCS:
Temperature:
76 Pressure:
Vented to Atmosphere RV Level:
Refueling Height Time to Boll:
26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> Shutdown Safety Assessment Protected Equipment:
I.-
Major Activities Completed In Last 24 Hours
- Critlcal Path and Near Critical Path Activities (Next 24 Hours)
- Fuel Motion is at Step 317 of 464 @ 1300 4130/04
- SFP Upender Repairs
- IA and lB S/G Placed in Wet Lay-up
- Continue Reactor Vessel Head Inspection
- A & B S/G Eddy Current Analysis
- B RCP Motor Work
- B RHR Pump Fill & Vent
- B RHR Pump Testing Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair B lowdown Tank Leakage 5/7/04 Scott Manthei 4/04/04 1P2A Charging Pump Troubleshooting 5/04 Clay Hill 4125/04 B RCP Motor Oil 5/10/04 Rick Repshas Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <dO20 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/109/04 0900 4/2 1/04 1550 Heatup >200C 4/25/04 0900 Refueled 4/14/04 0300 Reactor Critical 4128/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 E _
4
Point 3ceach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
April 30. 2004 TIME:
(2((
KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
YELLOW YIELLO W GREEN GREEN YELLOW SFP COOLING:
GREEN PROTECTED EOUIPMENT:
COMMENTS:
RCS bIThe to loil iS 26.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> SFIP Time to Boil is 19.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (full core off-load is assumed)
Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency (11L PBF-1562 Revision 2 10/30/02 5
Page5of9 Reecnrccs NP 10.3.6 NP 10.2.1
_Defined Critical Path APR IMAY U
ID DESCRIPTION OD RD Cal U SYS EQID TF 30 1
2 1
EP0301957 EDDY CURRENT TEST 81 1 5 1 MS HX-OO0B 4
p DY CURRENT TEST STEAM GEN B -I SHIFT STEAM GEN B - I SHIFT 0301957-30APR04 12:5917APR04 07:OOA 1
01-135B-A FILL & VENT RHR TRAIN B 8
6 1 1
RH P.0108 0
01.135
&VENTRHRTRAINB A30APR04 17:5930APR04 08:OOA 1
IT-003 RHR P&V TEST TO RECOVER 5 5 1 1
RH O-IT-0003 0
ITr003RHR P&V TEST TO RECOVER P.01 OB TO OPERABILITY P-010B TO OPERABILITY 30A R04 18:00_0215886-30APR04 22:59 1
01-135B-B COMPLETE RHR B TRAIN F&V 3 3 1 1
RH P-010B 0
0 1.1358 4gCOMPLETE RHR B TRAIN F&V PER OIU.135B SECT 5.4 PER OIU-135B SECT 5.4 30APR04 23:00_01MAY04 01:59 I
IT-530D LRPM & PIGGYBACK TEST 8
8 1 1 RH O-IT-0530D 0
IT-530DLRPM & PIGGYBACK TEST OF TRAIN B SI OF TRAIN B SI 01MAY04 02:00_0215917- 01MAY04 09:59 I
IT-531B LRPM RHRTO SUMPBTRAIN 12 12 1 1
SI 0-IT-0531 0
IT-531 BLRPM RHR TO SUMP B TRAIN B 8
01MAY04 12:00 0215919- 01MAY04 23:59 00 1EI--
1I1II IIEIA um T-2618-R 1 SI IT-531 P-10B OPS REVO-1 1 1 1 1
SI IT-531 0
SI IT.531 P-l0B OPS REVO-1 02MAY04 00:0010012618- 02MAY04 00:59 1
OP7A-050 ALIGN AND START P-0010B 3
3 1 1
RH P-010B 0
OP7A.5oAUGN AND START P-00108 AS OPERATING DHR LOO AS OPERATING DHR LOOP 02MAY04 01:00_02MAY04 03:59 1
RHBOIZ CLOSE RHR B LOOP WORK 0
0 1 1 RH MILESTONE 0
RHBO1ZCLOSE RHR B LOOP WORK WINDOI I WINDOW 02MAY04 04:00l02MAY04 03:59 1
T-0690-R 1 SI IT-531 OPS REVO-1 1 1 1 1 SI O-IT-0531 1
T-0690.R1SI IT.531 OPS REVO-1 02MAY04 04:0030010690- 02MAY04 04:59 1
RHA01A START RHR A LOOP WORK 0
0 1 1 RH MILESTONE 0
RHA0IASTART RHR A LOOP WORK 02MAY04 06:00102MAY04 05:59 1
T-7932-H 1 SI SI-871A EM REV1-1 3
3 1 1 SI SI-00871A 0
T.7932441 SI SI-871A EM REVI-1 02MAY04 06:00_0017932- 02MAY04 08:59 I
EM0215186 SI-71A-OACTUATOR 30 30 1 1 SI SI-00871A-0 EM0215186SI1871A-O ACTUATOR REBUILD (SWAP REBUILD (SWAP) 0215186- 03MAY04 14:5902MAY04 09:000 Run Date 30APR04 13:53 LT-16 DEFINED CRITICAL PATH Shoot I of I Primavera Systems, Inc.
FL-16 DEFINED CRITICAL PATH SET
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00
-MA-
_ I I T
I II 9@,102,14,I&JI1&2022 0.2.4.6I 8 1O12.14,16,18.20,22 0,2 4,6.8.101121l411611 1
1 NRC-CALL-9 ADM MILESTONE O.D CALL NRC To 01MAY04 01MAY04 DR-Y ML-Y 0
_R.AL.
NRCL ALL NRC TO ESS CORE WITNESS CORE2t0 21S RYR-2 1
AP0216645 APM 76 E-02 1 E-02 ASSIST EM WITH 8
30APR04 30APR04 DR-N ML-N I
E0 ST EM WITH ME CHECK.OUT MEL CHECK-OUT 13004 21:59 ORT3-N R-N 90POITG-01 TG VOLTA( E REGULATOR E ITATION EaUIPM 0216645 3
1 AP0306103 APR 76 102-1ITG-0 APR RETEST 28 28APR04 03MAY04 DR-N ML-N 0
j0 3 APR ST(102-UTGO1 R PLACEPROTRE YS)
~~~~I PROT RELAYS)II---!
4 1
AP0306104 APR 76 102-2ITG-0 APR RETEST 28 28APR04 03MAY04 DR-N ML-N 0
R 1(1022/TrrG41 R GEN PROTREL YS) PTI I(102-2/TG-01 R&R GEN 119.00OA I1259 ORT3=N R.N
- 2 I
PROT RELAYS)
PT1 5
1 AP02151 15 APR 76 A-01 CAL 1A-01 NON-TECH 5
30APR04 30APR034 DR-N ML-N 0
I AL II NON-TECH SPEC RCP RELAYS 5tA01151AR 7 A-1 SPEC RCP RELAYS l08WMA 31A6:5R9 ORT3-N R-N 0 S 4.16 K JBUS SWTCHGEk 10215115II 1
AP0215t7 1
APR 76 A-O1 1A-0l CALIBRATE TECH. 30 01MAY04 04MAY04 DR-N ML-N 0
Ap021517 1 i CALIBRATE
- SPEC RELAYS 7
1 AP0215120 76APR B7 E-03 18-03 CALIBRATE TECH 8
02MAY04 02MAY04 DR-N ML-N 10 AP0215120 1
AP0400600 APS 76 X-04 1X-4 REMOVE SEALING 3
01MAY04 01MAY04 DR-Y ML-Y 21 AP0400600 1 -4REMOVESEALI MATERIAL MATERIAL 08:00*
10-59 ORT3-N R N 0400600 LOWVOLTAGE ATIONAUXILAR) TRANSFORMEF 9
0 CE0400801 CE 77 SERVICE FLAMMABLE STORAGE 3
30APR04 30APR04 DR-Y ML-Y 658 8G LOKRISPCIN 11 OVA 14:59 ORT3-Y R-N MISCE IENT REPAIR/SE RVlCE0400BO1 10 1l CE44CGATR CE3 77 IST-SISI REM INSULFOR FAC 145 04APR04 08MAY04 DR-YML-Y 0
NRREI FACPR
- CTMT44FTGE AREA PROG - CTMT 44 FT GEN 16:OVA 16:59 ORT3-Y R-N l
l l
l
~~AREA __..
11 1
CE08TOHTI CE3 77 IST-SISI REINSULATE - FAC 1 20APR04 08MAY094 DR-Y ML-Y 25.EO
~REINS TEFAO I HALL 8FT PROG -TURB HALL 8 FT 15 00A 16:59 ORT3-Y R-N 3
SE__________1 12 1
CE28TGATI CE3 77 IST-SISI REINSULATE-FAC 12 26APR04 30APR04 DR-Y ML-Y 33 REIN PROG ]TURB HALL26 FT G AN AREA PROC-TURB HALL 8FT 14-0OOA 23:59 ORT3-Y R-N SECONDARY__
I SERVICE INSPECT N0333 CGEN AREA I
1 3 1 CE26TGATI CE3 77 IST-SISI REINSULATE - FAC 130 28APR04 07MAY0-4 DR-Y ML.-Y
~
E
~lREINS I-FAC PROG. IIRB HALL 26 FT GE AREA PROC.- TREB HALL 28 FT 09:OOA 21:59 ORT3-Y R-N______
GEN AREA I__
14 1
CE301049TI CE3 76 FD-00006A INSTALL INSULATION 3
30APR04 30APR04 DR.Y ML-Y 39l 4-nS jINST INSULATION FOR IF-SOA FOR IFD-6A 07:00A 14:59 ORT3-Y R-N HX2 RTO FUNNEL DR IN FIRST OFF ISO TION0O301049 15 1
P1274-TI CE3 77 PIPING EB-NDELSI-REPLACE 11 30APR04 30APR04 DR-YML-Y 322 12 TNSE/S-.INSt-I G NGNEARFW-47 B
INSUL.- PIPING NEAR 1I.-M0A 23:59 ORT3-Y R-N AFW FROM CONT ISOLATION VAL ES TO FW HEADEF 0303877 FW-476B8 16 1
P1246-TI CE3 77 PIPINGEB-NDE/ISI-REPLACE 15 30APR04 01MAY04 DR-YML-Y l 12 TIMSI.
CEINSUL.STPORTSNEARFW 76B INSUL, SUPPORTS NEAR 11:00A 03:59 ORT3-Y R-N
_____FEEDW4\\TER CONT ISOL V yES TO STEAM G NERATORS 030 FW -476BB 17 1
CE309503TI CE3 l 82 CS-00066 INSTALL INSULATION 6
30APR04 30APR04 DR-Y ML-Y 389 3
- IST INSULATION FR S-CS FOR ICS-66 12
- 00*
17:59 ORT3-Y R-N IP.
SGFPI IP-24N P196A-C ROOT0309503 Run Date 30APR04 13:45l LT-03 STANDARD PUBLICATION Sheet I of 27 Primavera Systems, Inc.
I FL03 Execution Publication Set I
after30APR0412:00 U1R28 WORKING SCHEDULE after30APR0412:00 ID lRESPl EQID DESCRFnON RD EF RISK ILu ID RESPI WO ST EQID DESCRIPTION RD ES EF RISK APR I
MAY O. # 4 cz-2 9.1n 1921d.1
l
I I 10,2v i
i 8102,4,6.8,0,210.2.4 26 8
1 416 18 1
CE303871T1 ICE3 82 MS-00042 INSTALL INSULATION I 8 I 30APR04 30APR04 FOR1MS-42 12:00.
19 59 DR-Y ML-Y ORT3-Y R-N 247 19 1
CE216332TI CE3 76 FD-00204B INSTALL INSULATION 10 30APR04 30APR04 DR-Y ML-Y 253 FOR 1FD-204B 12:00' 21:59 ORT3-Y R-N 20 1
P1126-TI CE3 77 PIPING RC NDEASI -REPLACE 16 30APR04 01MAY04 DR-Y ML-Y 0
INSUL - PZR SURGE 12:00 04:59 ORT3-Y R-N 21 1
P1329-TI CE3 77 PIPING HB-NDEn/SI REPLACE 16 30APR04 01MAY04 DR-Y ML-Y 317 INSULATION - PIPING 12:00' 04:59 ORT3-Y R-N 22 1
CE214523TI CE3 87 HX-020B FW HEATER 48.
6 30APR04 30APR04 DR-Y ML-Y 258 REINSTALL SHELL 17:00 22M59 ORT3-Y R-N 23 1
CE214522TI CE3 77 HX-020A FW HEATER 4A -
10 30APR04 01MAY04 DR-Y ML-Y 254 REINSTALL SHELL 17:00 02:59 ORT3-Y R-N 24 1
CE310576TI CE3 76 RD-0o975 INSTALL INSULATION 8
30APR04 01MAY04 DR-Y ML-Y 0
FOR IRD-5975 21:00 09:59 ORT3-N R-N 25 1 CE44TGATRX CE3 77 IST-SISI REM INSUL FOR FAC 48 01MAY04 04MAY04 DR-Y ML.V 0
PROG -TRB HALL 44 FT 08:00 15:59 ORT3-Y R-N 2 CE060RC 76 M422 RMVINUAI ON 60MY40MY4 D MLY CE3(
CE21 P112 P132 CE:
CE 3871mNSTAL INSULATION FOR TURBINE INLET S 633mlNS AINSULATION FOR HX-21B HP FWH E
.T NDE/ISI.PLACE INSUL Pa iMS-42 r-2014 FIRST OFF I1 IFD-204B 3 LS-2639 UPPER I1 R SURGE LINE(B IC OR COOLANT MAJI N. PIPING NEAR B DLATION 0303871 OLATION 0216332 DP)
PIPING/SURGE LIN CFC
-REACI
=.0303886 LACE I
- MrND IISI FRIELACEINSULATKX
__SERIIII F~V/n.e,.,trfl at.
vicrs
- LJft GIEERED SAFEGUARDS 0303878 11 14523Tl!~2 4 B.~
48 REINSTJ 121453~ IPFEEDWATEF 4A - REINST0 121 4522LP FEEDS CE3057T1~STAI-INSULATIl r vnI tW nltI XV tv LL SHELL INSULA1 HEATER 48 LL SHELL INSULA1 JATER HEATER 4A
)N FOR 1RD-Ws7s ST Of RAlFVw ON ON 031057 6
1_II I.TANK VENT RUPTL PROG -TR HALL
-U CJLVSVUV
-ArYIAVR
~M INSLIL FOR FAC~
RE DISC 4 FT GEN AREF 0303636~ -----
r 25 1
CE407600TR I CE3 76 MS-00282 REMOVE INSULATION FOR I MS-282 6
01MAY04 03MAY941 DRT-V M-23:00 08:59 ORT3-N R-N 0
M REMOVE INSUL4TION FOR iMS 27 1
CE216164SI CE4 76 ISOL PHASE I BUILD SCAFFOLDING I 15 1 07APR04 01MAY04 DR-Y ML-Y FOR ISOL PHASE BUS I I 08:00A 02:59 ORT3-Y R-N 19 VF) 14g"JIBUILD SCAFFOLDING FOR
-~
~
Ihso PHA 28 1
CE44CGASI CE4 77 IST-SISI BUILD SCAFFOLDING 6
30APR04 30APR04 DR-Y ML-Y 191 FOR FAC PROG 12:00*
17:59 ORT3-Y R-N 29 1
CE3008745R CE4 76 ICP-05.054 REMOVE SCAFFOLDING 10 30APR04 30APR04 DR-Y ML-Y 385 FOR ICP 5.54 12:00 21:59 ORT3-Y R-N 30 1
CE934380SR CE4 76 HS-601R-37 REMOVE SCAFFOLDING 4
30APR04 30APR04 DR-Y ML-Y 237 FOR HS-601R-37A 14:00 17:59 ORT3-Y R-N 31 1
CE3017165R CE4 82 FD-00139 REMOVE SCAFFOLDING 4
30APR04 30APR04 DR-Y ML-Y 387 FOR I FD-139 18:00-19:59 ORT3-Y R-N 32 1
CE206957SR CE4 76 CS400466C REMOVE SCAFFOLDING 4
30APR04 30APR04 DR-Y ML-Y 386 FOR 1CS-466C 17:00-20:59 ORT3-Y R-N 33 1
CE213699SR CE4 82 CC-00762A REMOVE SCAFFOLDING 4
30APRo4 30APR04 DR-Y ML-Y 392 FOR 1CC-762A 17:00*
21:59 ORT3-Y R-N 34 1
CE206768SR CE4 76 CC-00763B REMOVE SCAFFOLDING 4
30APR04 30APR04 DR-Y ML-Y 281 FOR I CC-763B 19:00-22:59 ORT3-Y R-N 35 1
CE309424SR CE4 76 CW-00138A REMOVE SCAFFOLDING 4
30APR04 30APR04 DR-Y ML-Y 252 FOR ICW-138A 19:00 22:59 ORT3-Y R-N CE4j CE3 CE9 CE3 Oj CE2 CE CGASI BUILD CAFFOLDING FOR 3SEC DARY INSERVICE 0874SRREMO SCAFFOLDING f SECONDARY PLA 4380SRREMO SCAFFOLDING I MPZR ORV HEADER SNI 1716SRREMO /E SCAFFOLDING I 01716 _F
-21A HP FWH 5A 6957SRREMO /E SCAFFOLDtNGI 1206957 1HX-lASG 1FT-466 39SRREM SCAFFOLDING I I213699= IP-lARCPTHER?
-20676 SR OVE SCAFFOLDM 0206768 1P-1B RCP CCF
..309424SR OW SCAFFOLDt 0309424 P-30A CWP DIS(
-2140345RR OW SCAFFOLDIN 0214034 1HX-2 REGEi I
CE40760(
0407 SOL PHASE BUS E SE DUCT0216164 FAC PROG (11214-0 INSPECTION 03011 OR ICP 5.54 qT LOW RANGE PR OR HS-601R-37A BBER9934380 OR1FD-139 UMP TO COND FD-;
OR ICS4U6C HIGH SIDE ROOT OR ICC-762A IAL BARRIER COOL O FOR ICC-7638 ETURN HEADER RI OFOR ICW-i38A HARGE HEADER V 9 FOR CV-370 HX CHARGING INI JCT 97
~SSURE INSTRUMI 5148 CTL INLET NG RETURN RELIE LIEF
- NT ET CHECK lNTS0300874 36 8 1
CE214034SR CE4 82 CV-00370 REMOVE SCAFFOLDING FOR CV-370 6
30APR04 19:00 01MAY04 00:59 DR-Y ML-Y ORT3-Y R-N 0
Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATiON Sheet 2 of 27 C Primavera Systems. Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE I
after 30APR04 12:00 U
to RESPl WO EOID DESCRIPTION RD ES EF RISK MF APR 3
MAY ST
_12.14.16 18,202210.2.4.6 1
14118,20,221 02.4.6.
3.101214,161 37 1
CE214031SR CE4 76 CV-00257 REMOVE SCAFFOLDING 8
30APR04 01MAY04 DR-Y ML-Y 246 CE214031SR EMOUE SCAFFO NG FOR CV-257 FOR CV-257 21:00 08:59 ORT3.Y R-N 0214031
_T-4VCT RELIEFT/ T-A-C CVCS HUI 38 1
CE214026SR CE4 82 CS-00141A REMOVE SCAFFOLDING 5
30APR04 01MAY04 DR-Y ML-Y 380 CE214026S REMOVE SCAFF LIG FOR CS-141 FOR CS-141A 22:00 02:59 ORT3-Y R-N 02140 1HX-20A P FWH 4A OuTLET HECK 39 1
CE-RPI-SR CE4 76 RPI REMOVE SCAFFOLD 5
30APR04 01MAY04 DR-Y ML-Y 168 CE-RP RREMVE SCAF OLDFOR RPI COL N RX HEAD FOR RPI COL ON RX 23:00 03:59 ORT3-Y R-N 0215 138 RPI SY TEM MULTI ANDIOF NON-NUMBERED IOUIPMENT 40 1
P1246-SR CE4 77 PIPING EB-NDE/ISI - REMOVE 6
01MAY04 01MAY04 DR-Y ML-Y 270 P124.SRNDEH/ISI REMOVE SCAFFOI DSUPPORTS NEA R FW-476BB SCAFFOLDOSUPPORTS 04:00 1059 ORT3-Y R-N 0303876 FEEDWATER C(NT ISOLVALVEST ) STEAM GENEF 41 1
P1126-SR CE4 77 PIPING RC NDEiISI-REMOVE 6
01MAY04 01MAY04 DR-YML-Y 281 P1126rSRNDElI
- -REMOUE SCAFF PZRSURGEUNE( LOOP)
SCAFF - PZR SURGE 0500W 11:59 ORT3-Y R-N 0303886 REACTOR CO LANT MAIN PIPIN URGE UNE 42 1
CE301694SR CE4 82 MS-02309 REMOVE RIGGING 6
01MAY04 01MAY04 DR-Y ML-Y 374 CE3Oi694SRR OVE RIGGING SO FFOLDING FOR M -2309 SCAFFOLDING FOR 07:00 12.59 ORT3-Y R-N 0301694 HX-21AHP F NH 5ABLEEDERTF IP 43 1
CE310576SR CE4 76 RD-05975 REMOVESCAFFOLDING 4
0tMAY04 0tMAY04 DR-Y ML-Y 134 CE310576S REMOVE SCAFFC LDING FOR IRD-59 FS FOR I RD-5975 10a00 13:59 ORT3-N R-N 03105 6M T-26 BLOV4 )OWN TANK VENT RUPTURE DISC 44 1
CE301979SI CE4 SC-IA BUILD SCAFFOLDING 10 01MAY04 01MAY04 7
CE301979 IBULDOSCAFF NGFORSC-IA FOR SC-1A 10:00 19.59 03019 45 1
CE202527SI CE4 76 8-42 BUILD SCAFFOLDING 20 OMAY04 03MAY04 DR-Y ML-Y 0
CE20252751 8 SCAFFOLDING.FOR 1B-42 FOR 1B-42 20:00 19.59 ORT3-Y R-N 0202527 46 1 CE216164SR CE4 76 ISOL PHASE REMOVE SCAFFOLDING 30 02MAY04 04MAY04 DR-Y ML-Y 199 CE2 164SRREMOVE S AFFOLDING FC FOR ISOL PHASE BUS 02:0 15:59 ORT3-Y R-N 2I6164-47 1
CE212803SI CE4 76 CPP-51 BUILD SCAFFOLDING 8
02MAY04 02MAY04 DR-Y ML-Y 37 CE212803SBULD SCAFFOLDING FOR ICPP-51 PAINTING _
05:0 13:59 ORT3-Y R-N 0212803 UIC PI 48 1
CE212804SI CE4 76 CPP-50 BUILD SCAFFOLDING 8
02MAY04 02MAY04 DR-Y ML-Y 48 CE212804SIBI SCAFFOLDING FOR 1CPP-50 PAINTING 05:00 13:59 ORT3-Y R-N 0212804 D
CE933444SI CE4 76 W-001C2-A BUILD SCAFFOLDING 8
02MAY04 02MAY04 DR-Y ML-Y t
CE93344SI8 SCAFFOLDIN FORW-1C2-A 06:00 13:59 ORT3-Y R-N 9933444 CONTA 50 1
CESISIPREP CE5 IST-SISI PREP OF SECONDARY 6
05APR04 30APR04 DR-Y ML-Y 301 ES IPREPPREP SECONDARY CO MPONENTS FOR FA C COMPONENTS FOR FAC 07:OOA 17:59 ORT3-Y R-N SEC DARY INSERVIC INSPECTION 51 0
CE0306266 CE5 76 IA-01258 IA-1258-AIRLEAK 6
24APRO4 30APR04 DR-Y ML-Y 0
IE 2681A-1258 ARLEAK. REPLA E VALVE REPLACE VALVE 18.0A 23:59 ORT3-N R-N I ISC-953 PZR l OD SPACE SAMPL CIV OPER AIR INLE T0306266 52 0
CE0212330A CE5 76 WT REROUTE MEMCOR 11 29APR04 03MAY04 144 EI 30ARERO MEMCOR PIPE PIPE 07:O0A 14:59---
53 1
CE0407589 CE5 71 T-026 T-026 - REPAIR LEAK ON 45 30APR04 05MAY04 DR-Y ML-Y a 0E 549T-026 -
PAIR LEAK ON B TANK BLOWDOWN TANK 08:OOA 16:59 ORT3-Y R-N 54 0
CE0210986 ICE6 77 SEC SEC SUPPORT MR 51 05APR04 10MAY04 DR-N ML-N 104 P
1 O
986SEC5U PORTMR99-011*
I 99-01 1B 07 00A 14:59 ORT3-N R-N Run Dato 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 3 of 27 O Prlmavera Systems, Inc.
FL-03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 ID IRESPI WO ADD RA&V E0ID DESCRIPTION RD ES EF RISK MF eC, 4
Q... 2 ST 1,10112.14.1
-IN~
- i"i.. :
I 0. 2.4.
6
- 8. 1 Oi12,14,16,18,20llss~6 I-1.10712.14.1R, 55 1 0 CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR 99-01 VE 43 05APR04 07MAY04 DR-N ML-N 08.00A 14:59 ORT3-N R-N 112CEo: 10989 SEC, IP TALL NEW EQUIP IR 99-011 E 58 I CE-1600-22 CE8 76 R-1 PERFORMUNDERHEAD 50 23APR04 02MAY04 DR-Y ML-Y 0
INSPECTION OF RX 2200A 17.59 ORT3-Y R-M 57 1
CH0300359 CH 77 CHEM-SAMPL RCSCLTSR3.4.5.2 1 1 25APR04 01MAY04 DR-NML-N 291 05:OOA 11:59 ORT3-N R-N 58 1
CH0300372 CH l 77 CHEM-SAMPL RCSDOTSR3.4.5.1 11 25APR04 01MAY04 DR-NML-N 291 05:OOA 11.59 ORT3-N R-N 59 1
CH0300402 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 1 1 25APR04 01MAY04 DR-N ML-N 291 I0500A 11:59 ORT3-N R-N 60 2
CH0300499 CHl-77 CHEM-SAMPL RCSCLTSR3.4.52 11 26APR04 01MAY04 DR-N ML-N 291 0500A 11:59 ORT3-N R-N 61 2
CH0300512 CH 77 CHEM-SAMPL RCSDOTSR3.4.5.1 11 26APR04 01MAY04 DR-NML-N 291 05:00A 11:59 ORT3-N R-N 62 1
CAMP-113BB CH CAMP-113 CAMP-P113(SPARGE) 3 01MAY04 01MAY04 DR-NML-N 0
SAMPLE B STEAM 00:00 02:59 ORT3-N R-N 63 1 CAMP-113AB CH-I CAMP-113 CAMP-113(SPARGE) 3 01MAY04 01MAY04 DR-N ML-N 0
SAMPLEASTEAM 15:00 17:59 ORT3-N R-N 64 1
EM0216638 EM 76 P-OOIB-M START REPAIRS FOR 30 25APR04 01MAY04 DR-N ML-N 0
P-1B HIGH BREAKAWAY 0100A 17:59 ORT3-N R-M 65 1
EM0304544 EM 76 POS-00466 POS-466 INSTALL WEEP 2
28APR04 30APR04 DR-N ML-N I 0
HOLEINFLEXCONDUIT 14:OOA 13:59 ORT3-NR-N 66 0
EM0304874 EM 76 A52-DHVR-1 IP-01ABREAKER 8
29APR04 30APR04 DR-Y ML-Y 0
I MAINTENANCE 1200-31 08:00A 20:59 ORT3-N R-N 67 1
EM0407740X EM 76 P-OO1B-M P-lB PERFORM LOCAL 83 29APR04 04MAY04 DR-N ML-N 36 OIL FLUSHS AS 19:00A 05:59 ORT3-N R-N 68 1 EM-BMFPCL2 EM 76 P-028B-M CONTINUE P28B 25 29APR04 03MAY04 DR-Y ML-Y 0
INPLACE CLEANING 20:OOA 09.59 ORT3-N R-M 69 1
EM0215216 EM 76 TG-01-G INSPECT GENERATOR 35 29APR04 02MAY04 DR-Y ML-Y 0
PHASEANDNEUTRAL 21:OOA 01:59 ORT3-NR-M 70 1
EM0216164 EM 76 ISOLPPHASE ISOLPPHASEBUSDUCT 35 29APR04 02MAY04 DR-YML-Y 0
INSPECTION AND 21:OOA 01:59 ORT3-N R-N 71 1
EM0407740C EM 76 P-001B-M lP-lBPERFORMOILUFT 28 30APR04 01MAY04 DR-N ML-N 0
SYSTEM CLEANING I
I 1:00A 17:59 ORT3-N R-N
-I-I.
-E:o 22 PERFO
'AUNDERHEAD IN PECTION OF RX HE 10H0O359 RCS CLITSR 3.4.2
_M IS MISC CHEMIS RY SAMPLING030t359
,H00L, RCS DOqTSR 3A.5.1lII
_I I
CHEMIS-RY SAMPLING 0300 372 LHO 0 2 RCS BC ON SR 3.9.1.i
=_
MISC CHEMISTRY SAMPUNG0300 02 H0 99RCS CL 3.4.5.2 l1S1 "N M ISC CHEMIS RY SAMPUNG0 99 0 0 512RCSD 1 TSR 3.4.5.1 II IIIIIIIIIMISC CHEMISt CAMP-1 3BBCAMP-113 (SP CA RGE) SAMPLE B S1 IP-113ABCAMP-11f rm^
RY SAMPUNG0300 TAM GENERATOR (SPARGE) SAMPL S12
.A STEAM GEN
-I-I-I-I-E START IlFPAIRS FOR PA1R IH BREAKAWAY i
IREACTOR COOLAT I PLWP MOTOR 0301 Emo EMO 94 5 4 4POS-461 EIHX-IASG T7740XP-1 9 F
- INSTALL WEEP HC FW REGULATOR C(
IREAKER MAINT 4.16KV/1200AMP V ERFORM LOCAL OI LE IN FLEX CONDUI pNTROL POSmON lNCE 1200-31 (A52 pCUUM BREAKER0 L
FLUSHS AS NECE WITCH0304544 04) p04874
EM0.58SPEC4 GENERATOR HEANEINETR L
j
_u ELECTRIC4A GENERATOR I EM0 161641SOLP AE BU5 D UCT IN5rECTION AND L _.
_... L
_..___.___
I I
SOL PHASF DlUiCT0l2l1664 EM EM 0 07740C P18 PDEDOL LIFT SEMCEANING I
I IREA TOR COOLANI IPtiMP MOTOR 0407 72 I
EM0215218 EM 76 W-0u1A1-M W-1A1-M INSPECT EQUALIZATION VALVE 1
30APR04 30APR04 12:00u 12:59 DR-Y ML-Y ORT3-N R-N 0
0 15218 W-1A14 lCONTAINME I INSPECT EQUALk TION VALVE 4TACCIDENT RECI CULATION FAN MCTOR 0215218
________________________.I.-I.
.1.
.1.
J Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Sheet 4 of 27 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 U
APR I
ID RESP wo ST EQID MAY DESCRIPTION RD ES EF RISK MF Ed 30 SaltI S'nm2 3,1C mom1=
11"r-g4l.]
I 4
4
.l~12.14,16,18 2.20 2
iiW 8.10B02,14j16j1 73 1 EM0215215 EM 76 RG-01 CLEAN AND INSP OF 5
30APR04 30APR04 NEUTRAL GROUNDING 12012 00 16:59 TRANS CUBE DR-Y ML-Y ORT3-N R-N 113 74 1
EM-84801 EM 76 RPI AT HEAD RPI COIL 10 30APR04 30APR04 DR-N ML-N 0
ESISTANCEIINDUCTANC 12:00 22:59 ORT3-N R-M 75 1
EM-8480J EM 76 R-1 AT HEAD CRDM COIL 10 30APR04 30APR04 DR-N ML-N 0
_SISTANCEJ1NDUCTANC 12:00 22:59 ORT3-N R-M 76 1
EM0400344 EM 76 P-028A-M 1P-28A-M PUMP END 10 30APR04 01MAY04 DR-Y ML-Y 4
MOTOR BEARING 12:00' 12:59 ORT3-Y R-N LEAKING_
77 1
EM0216165B EM 77 HX-401A REMOVE ECT POWER 2
30APR04 30APR04 DR-N ML-N 304 INSIDE CONTAINMENT 13:00 14:59 ORT3-N R-N 78 1
EM0216168 EM 76 E-02 1RMP 9375. VOLTAGE 36 30APR04 02MAY04 DR-N ML-N 0
REGULATOR CABINET 13:00 03:59 ORT3-N R-N EMO EM-EM-I EMO EMO EMO EMO 15215CLEAN
!GENE tDAT HEAD 80 AT HEAD 00344 P-28A-kND INSP OF NEUTn 7ATOR GROUNDIN(
Pl COIL RESISTAN WRPI SYSTEM ML CRDM COIL RESISI WREACTOR VESS 6 PUMP END MOTO LAL GROUNDING 71 RESISTOR WIXG-(
E11NDUCTANCE LT. AND/OR NONN WLNCE1INDUCTANCI
-L AND ASSEMBLY I BEARING LEAKIM tANS CUBE 10215215 JMBERED EQUIPM1
)215214 a
NT0215213 I
I 1
STEAM GEE RATOR FEED PUM MOTOR 04003 16165BREM 4'E ECT POWER INS IDE CONTAINMENT NSTEAM G 0NERATOR216165 16168RMP9rs, VOLTAGE REGI LATOR CABINET TG-011 VOLTAGE RE(
79 I
EM0216645 EM 76 E-02 1 E-02 REPAIR / RECAL/ 1361 30APR04 J 02MAY04 REPLACE MEL 13:00 03:59 DR-N ML-N ORT3-N R-N 0
16645 1E-02 R PAIR I RECAL I REkLACE MEL I
80 I
EM0305572 EM 76 POS-00476 INSTALL WEEP HOLE IN 4 30APR04 30APRO4 DR-Y ML-Y 0
FLEX CONDUIT 14:00 17:59 ORT3-N R-N IT I
EM0216167 EM 76 E-01 INSPECT AND MAINTAIN 10 30APR04 01MAY04 DR-N ML-N 15 EXCITER FUSES PER 20 00 20:59 ORT3-N R-M A~_
MW P 104._
i8 0
EM0301792 EM 76 A52-DHVR-3 BREAKER 24 30APR04 01MAY04 DR-N ML-N 0
MAINTENANCE 3000-01 21:00 22 59 ORT3-N R-N (A52-01) 83 0
EM0306110A EM 76 D72-16-08 IWP-037-02 REPL MOBS 16 30APR04 01MAY04 DR-N ML-Y 0
1MOB-009 - 019 22:00 13:59 ORT3-N R-N 84 1
EM0306574A EM 76 MOB-004 PERFORM PRE-INSTALL 8
01MAY04 01MAY04 DR-N ML-N 0
CHECK ON BREAKERS 00:00 08:59 ORT3-N R-N 85 1
EM0306578A EM 76 Y-04-01 PERFORM PRE-INSTALL 10 01MAY04 01MAY04 DR-N ML-N 0
CHECK ON BREAKERS 00:00 10-59 ORT3-N R-N 86 1
EM0302132B EM 76 L0-00291 P-059B - RETERM 4
01MAY04 01MAY04 DR-Y ML-Y 239 AIRSIDE SEAL OL B/U 08:00' 11:59 ORT3-Y R-N
_PUMP MOTOR 87 1
EM0304859 EM 76 N-07 IN-07 SOCKET BROKEN 8
01MAY04 01MAY04 DR-Y ML-Y 2
08:00 15:59 ORT3-N R-N 88 1
EM0215223 EM 76 W-003A-M PERFORM MCE 4
01MAY04 01MAY04 DR-N ML-N 0
W-003A-M 09:00 12:59 ORT3-N R-M (1B52-VISB-01) 89 1
EM0215227 EM 76 W-003A W-3A INSPECT AND 12 01MAY04 02MAY04 DR-N ML-N 0
MAINTAIN FAN AND 13:00 01:59 ORT3-N R-N MOTOR 90 0
EM0306110B EM 76 D72-16-08 IWP-037-02 EM PMT FOR I 01MAY04 01MAY04 DR-N ML-Y 0
MOBS I MOB-009 - 019 15:00 15:59 ORT3-N R-N Ar t
72 D^4 D4 e^c~o r*nssa u^^^^
rosz EMO 055"zNSTAL~
1WHX EM0216167 11 0216167M1 FU6l,0l?§ i-I-
.WEEP HOLE IN FL 1D SG FW REGULA JSPECT AND MAINT EX CONDUIT
'OR CONTROL POS UN EXCITER FUSE!
IG-0U1 I TION SWITCH 0305 o'PER MWP 104.
TG-01 TURBINE GE
-01)
M A.&1-t I
I I ~
m BREAKER MAINTEI IANCE 3000-1 (A fl3f17921 I
j
_4.1o rsvIouw NVP-037.27 REPM r rvvQ1;
-- - --- 1 EM30 03C EM0301 574APERFORM PR!
6574_
578APEROR PR!
ROBS IMOB-09-C
!PWRTO t(
4NSTALL CHECK I PWRTO IMO-8.1
-NSTALL CHECK NPWRTO2C-201 059B - RETERM AIF WTURBINE OL F 1-07 SOCKET BROIF nw s
.li C70 m
EM0302132BP 03021321 EM0304859 11 0304859l EM0215223 0215223 EMO:
01 EM 19
-04 SAFEGUARDS
)N BREAKERS AOB-49 AND IIRYL
)N BREAKERS US VOLTMETER (
SIDE SEAL OL BIU RESSURE REDUCI EN Y SAMPLE VALVE L 03A-M (1B52-3A/
4T CONTROL ROD I T AND MAINTAIN F G VOLTAGE RE(
572 NERATOR ExCr PVACUUM BRE 3US A(tMOB-19 (YELLOW)
ELLOW)
PUMP MOTOR IG CAL CONTROL 01)
)RIVE SHROUD I kN AND MOTOR ENT CONTROL F ISIMOB-409-0 IS BUS A (IMOB UOTOR I
=M A_
PERFORM MCE W4 MCONTAINME 15227W-3A INSPE(
I I5227IinUI IONTAINMI 330Sh1i0BWP 37 -C o306I11OEPWRTC EM021IS&UAP-11 0301756=
l 2 EM PMT FOR MOI I 1C-04 SAFEGUARI RE-ASSEMBLY OF I I I 1 1 mUZI0O 00 Mm (0
r-wu iiM r-I tS i=-f,>MbL MT Ur MOTOR 1W U U]MTu4LI 18:00 UDPAAYL4 21:59 UID-N ML-N ORT3-N R-M U
Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Shoot 5 of 27 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 ADD hAV
I0 Frl30 Sat 1 I
Stin 3,10112,14,16,la 221,57 4 6. 8,10012,14,16.18,20.221 012. 4. 6. 8,10012,14,16.1 T
I 1--
l =_I
~z~I mggg--
- g.
g M
921 t EM0213080 EM 76 RPI-B 8 CO I IRPI-B 8 CONN REPAIR GROUND WIRE I
01MAY04 01MAY04 DR-N ML-N 20:00' 20:59 ORT3-N R-N c
I I
I 93 1
EM0213081 EM 76 RPI-C 5 CO IRPI-C 5 CONN REPAIR 1
01MAY04 01MAY04 DR-N ML-N 0
GROUND WIRE 21:00 21:59 ORT3-N R-N 94 0
EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-1A01 CELL 1
01MAY04 01MAY04 DR-N ML-N 72 SWITCH INSPECTION 22o00 22:59 ORT3-N R-N 95 1
EM0213082 EM 76 RPI-E 3 CO IRPI-E 3 CONN REPAIR 4
01MAY04 02MAY04 DR-N ML-N 0
GROUNDWIRE 22.00 01:59 ORT3-N R-N 96 0
EM0306117A EM 76 D72-21-08 IWP-037-07 REPIL 16 02MAY04 02MAY04 DR-N 0
1MOB-020/ 03u051 01:00 16:59 ML-YORT3-N 97 1
EM0302252 EM 76 RPI-D10 I RPI-DO CONN REPAIR 1
02MAY04 02MAY04 DR-N ML-N 154 GROUND WIRE 02:00 02:59 ORT3-N R-N 98 1
EM0306574 EM 76 MOB-004 MOB-004 BREAKER 8
02MAY04 02MAY04 DR-N ML-N 2
MAINTENANCE 02:00 10:59 ORT3-N R-N 99 1
EM0306575 EM 76 MOB-008 MOB-008 BREAKER 8
02MAY04 02MAY04 DR-N ML-N 2
MAINTENANCE 02:00 10.59 ORT3-N R-N 100 1 EM0306576 EM 76 MOB-049 MOB -049 BREAKER 8
02MAY04 02MAY04 DR-N ML-N 2
MAINTENANCE 02:00 10T59 ORT3-N R-N 101 1
EM0306596 EM 76 MOB-121 1MOB-121 REPLACE 8
02MAY04 02MAY04 DR-N ML-N 0
AND TEST BREAKER 02:00 10.59 ORT3-N R-N 102 1 EM9929766 EM 76 MOB-121 1MOB-121 REPLACE 8
02MAY04 02MAY04 DR-N ML-N 0
MOUNTING SCREWS 02:00 10:59 ORT3-N R-N 103 1 EM0306577 EM 76 Y-04-04 Y-04-04 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12:59 ORT3-N R-N 104 1
EM0306578 EM 76 Y-04-01 Y-04-01 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 1Z59 ORT3-N R-N 105 1 EM0306579 EM 76 Y-04-12 Y-04-12 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12:59 ORT3-N R-N 106 1 EM0405920 EM 76 YV04-13 Y-04-13 BREAKER 10 02MAY04 02MAY04 DR-N ML-N REPLACEMENT 02:00 12:59 ORT3-N R-N 107 1 EM9908111 EM 76 Y-04-M1 Y4M 1BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12:59 ORT3-N R-N 108 1
EM9908112 EM 76 Y-04-05 Y04-05 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12:59 ORT-N R-N 109 1 EM9908113 EM 76 Y-04.06 Y-04-06 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00 12:59 ORT3-N R-N EM02130801 1 0213080U EM0213081 0213081 EM992501 99250C EM02130!
02130!
EM03C 0
EM EM EM EM' EM EM EM EM EM EM EM EM EM EM RPl CONNECTORS IRPIC 5 CONN REI IRPI CONNECTOR 53000.1 iX02-IAOI 514.16 KV/3000 Ah 21RPI-E3CONNRI
=RPI CONNE 6117AWP-0374o7 F
@ POSmON BS
'AR GROUND Vf t @ POSITION C CELL SWITCH n P VACUUM BRE.
- PAIR GROUND CTORS @ POSr EPL 1MOB4020) ftPI-B 8 CONN REP"R GROUND WIF i &4471 3 0 22 52 1RP.O1 C NNREPAIRGF 302252§RPI IN UMENTATION (C 306574 MOB.004 B EAXER MAINTI 306574 PWR TO 1M(
3 06 5 75MOB-M8 B MAINTE 306575 PWR TO 1 IR 130657 6 MOB -049 REAKERMAINI 306576 PWR TO U1 30g51IMOB.121 LACE AND T 306596 PWR TO C-0 1M2g766t1MOB12i EPLACEMOUN
.929766 PWR TO C-0 306577Y-04-04 BRER REPLAC 1306577 PWR TO 306sY-04-0 BR REPLAC
.306578 PWR TO 30657912 BR REPLAC 306579 PWRTO 140592 9
Y4-13 BR R REPLAC 405920 PWRTO 190 811 1Y4M B RREPLAC m908a 1
1 PWRTO 90 8 112 Y-05 BA REPLAC 908112 l_
PWRTO
- 908ll3Y°6 B REPLAC 1908113 PWRTO M08 1 14 Y-04-07 BR R REPLAC 98114 PWRTO 1101 1 EM9908114 I EM 76 Y.04-07 Y-04-07 BREAKER REPLACEMENT 10 02MAY04 02MAY04 02:00' 12:59 DR-N ML-N ORT3-N R-N 0
Run Date 30APR04 13:45l LT-03 STANDARD PUBLICATION Sheet 6 of 27 O Prirnavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APRO4 12:00 l
U1R28 WORKING SCHEDULE I
after 30APR04 12:00 rn RESP WO ST EQID DESCRIPTION RD ES EF RISK I MF APR I
MAY Fri in 1
Sat 1 I
Ii-l I'll1 EM9908115 EM 78 Y-04-08 Y 04-08 BREAKER REPLACEMENT 10 02MAY04 02MAY04 02:00' 12:59 DR-N ML-N ORT3-N R-N 0
112 1 EM9908116 EM 76 Y-04-09 YV04-09 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12 59 ORT3-N R-N 113 1
EM9908117 EM 76 Y-04-10 Y-04-10 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12s59 ORT3-N R-N 114 1
EM9908118 EM 76 Y04-11 Y04-411 BREAKER 10 02MAY04 02MAY04 DR-N ML-N 0
REPLACEMENT 02:00' 12s59 ORT3-N R-N 115 1
EM0215228 EM 76 W-003B W-38-M INSPECT AND 12 02MAY04 02MAY04 DR-N ML-N 0
MAINTAIN FAN AND 02:00' 14:59 ORT3-N R-N 116 1
EM0212645 EM 76 W-003B-M 1W-3B-M REPLACE 24 02MAY04 03MAY04 DR-N ML-N 0
MOTOR 02:00' 03:59 ORT3-N R-N 117 1
EM0216164D EM 76 ISOL PHASE POST-MAINTENANCE 3
02MAY04 02MAY04 DR-Y ML-Y 0
MEGGER OF ISOPHASE 03:00 05:59 ORT3-N R-N 118 1
EM0215225 EM 76 W4-04A-M PERFORM MCE 4
02MAY04 02MAY04 DR-N ML-N 0
W-004A-M 05:00 09-59 ORT3-N R-M 119 0
EM0305257 EM 77 4.16KV VISUALLY INSPECT 16 02MAY04 02MAY04 DR-N ML-N 551 TRANSFORMERS FOR 07:00' 23:59 ORT3-N R-N 20 0 EM0304876 EM 76 A52-DHVR-1 P-015A BREAKER 24 02MAY04 03MAY04 DR-N ML-N 0
MAINTENANCE 1200-22 07:00 08:59 ORT3-N R-N 121 0
EM0305376 EM 77 GLOVES REPLACE RUBBER 10 02MAYo4 03MAY04 DR-N ML-N 224 GLOVES AND BLANKETS 08:00' 08:59 ORT3-N R-N 122 0
EM0304872 EM
- 76.
A52-DHVR-1 IP-O25ABREAKER 24 02MAY04 04MAY04 DR-N ML-N 0
MAINTENANCE 1200-40 05:00' 13:59 ORT3-N R-N 123 1
EM0215226 EM 76 W-004B-M PERFORM MCE 4
02MAY04 02MAY04 DR-N ML-N 20 W-004B-M 19-00 13:59 ORT3-N R-M 124 1
EM0215229 EM 76 W-004A W-004A-INSPECTAND 12 02MAY04 02MAY04 DR-N ML-N 0
MAINTAIN FAN AND 1 0.0o 22 59 ORT3-N R-N 125 0
EM0306114B EM 76 D72-17-03 IWP-037-01 SUPPLY 3
02MAY04 02MAY04 DR-N ML-N 0
TEMP POWER TO 16800 1959 ORT3-N R-N In 1B42PREPS EME B-42 RECOVERY ACTIONS & 29 28APR04 01MAY04 27 PREPS FOR IB-42 12:00A 16 59 EM0205513 EMV 76 B52-433E CW-0003 BREAKER 4
30APR04 30APR04 DR-N ML-N 0
REPLACEMENT 1200' 15:59 ORT3-N R-N l a20.2210.2.4.6.
.10112,14,1612 EM EM EM EM iOS1i5 Y4-S B R REPLAC 90811 PWR TO Sj 16 Y-04-09 BR R REPLAC 908116 PWRTO 90811 7 Y410 BRKRREPLAC 908117 PWR TO 908118Y11 B
- REPLAC I0818 PWRTO 2 15U8 W-35M INMPECTND A 1215228CO&N
- 21 26 4514B-M RtLCE MOTOR 212645 1216164DPOSTM NTENANCE ME, 02161641S PHASE DUCT EM0215225PERFM MCE W004 0215225 CONTAINMEN EM0305257VI ALLY INSPECI 0305257 EM0304876 SA BREAKER 1 0304876 EM0305376 CE RUBBE 0305376 EM03048721 C5 BREAKE 0304872 EM0215 6PERFORM MC 0215 6 CONTA EM0215 gW-004A.INSP 02157;9_
E O3061148IBWP-0306114w Sun 2 miii01 14
-I-I-.
3421#REPSRECOVI RY ACTIONS & PRIPS FOR 1B-42
-I-I-
- MO EM0 055`13CW-M0 WPWR Tl 15148 AF-4021 11EF 3 BREAKER REPLJ 1CW-3 SEAL WELL STEM CLEANING A 38B AFP DISCHARC CEMENT OUTLET MOV0205 iD LUBRICATION ETO 1HX-IBSGOI 513 IERATOR 0215146 1281 0 EM0215146 EMV 76 AF-04021-0 AF-4021 STEM CLEANING AND 5
30APR04 I 30APR04 14:00 19:59 DR-N MI-N ORT3-N R-M 0
I II I
IL A
I Run Date 30APR04 13:45l LT43 STANDARD PUBLICATION l
Sheet 7 of 27 O Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APRO4 12:00 U
U ID RESPI WO EOID DESCRIPTION RD ES EF RISK MF APR I
MAY ST FlOSat1 Sun 2 I TI910112,14,16,11120,221 01 21 41 618.1 14,16,18,20,221 01 21 41 6..81 2,114.1601 I
- etEis
_1 129 0 EM0215147 EMV 76 AF-04023-0 AF-4023 STEM 5
30APR04 30APR04 DR-N ML-N 0 EM 51 M 47AF402X STEM CLEANING 0
RTEON CLEANING AND 14:00 19.59 ORT3-N R-M 4
3APDCAR TO1XAG EAOO257 LUBRICATION I__3A____SHRiAS f RTR 254 130 1
EM0306896 EMV 76 MS-02020-M lMS-2020-M INSPECT 5
30APR04 30APR04 DR-N ML-N 0 MO: 08fge 1MS-2
- INSPECTARlE ARMATURE 14:00 19:59 ORT3-N R-N T
O I-IA SGHEADER P AFPPSTEAM SUP YMOV MOTORD 06896 131 1
EM0304520 EMV 76 MS-02020-M MS-2020-M OIL LEAKING 8
30APR04 01MAY04 DR-N ML-N 0
EM0304520 2020- OLEA NG FROM GASKET FROM GASKET.
20:00 03:59 ORT3-N R-N 0304520 HX-IA 'HEADEF P-29 STEAM SUPPLY M )V MOTOR 132 0 EM0405896 EMV 78 W-021B W-021B JUMPER 4
01MAY04 01MAY04 DR-N ML-N 0
EM0405896 JUMPERXINSTALL IWP 0i-128E INSTALL 2
°P 17:00 2M1:59 ORT3-N R-N 0405896 PAB EXHAUST ST1-CK FAN 01-128'E-FN_
133 0 EM0405881A EMV 78 W-030A W-030A INSTALL 2
01MAY04 01MAY04 DR-N ML-N 0
EM0°05881 W6AINSTALL UMPER PER JUMPER PER IWP 22:00 23:59 ORT3-N R-N 0458 1F-231F-29 PAB -EHAUST FILTEI 01.1 28E-FN____
134 T EM0215186 EMV 76 SI-00871A-SI-871A-O ACTUATOR 30 02MAY04 03MAY04 DR-N ML-N 0
EM021518 AOAT REBUILD (SWAP) 09:00' 14:59 ORT3-N R-N 021518 135 1 EM0403301 EMV 76 SI-00857A-SFB57A-0 PERFORM 10 02MAYD4 02MAY04 DR-N ML-N 0
EM040 1SI857A.P STEM LUBE AND FBJ 10:00 20.59 ORT3-N R-N 040 1
INSPECTION 136 1 EP0301910 EPI 77 Ul-CONTAIN INSPECTCTMTAND 24 28APR04 03MAY1 4
DR5Y ML-95 P j11 10 tNSPE CTMTAND ATERPENETRAni NS FEEDWATER 08.OOA 15:59 ORT3-Y R-NI
___PENETRATIONS 137 1 NG44CFClEV EPI 77 IST-SISI ENG EVAL FOR FAC 1
29APR04 30APR04 DR-Y ML-Y 74 IEVENG EVAL FOR FAC PRO -CTMT 44FT GE AREA PROG - CTMIT 44FT GEN 08 OOA 12.59 ORT3-Y R-N SECONDARN INSERVICE INSPEC TN 0301 897 AREA_
138 1 EP0301901 EPI 76 RH VT-2 ASMEXJ PERIODIC 8
02MAY04 02MAY04 DR-N ML-N 0
EPO O
19 1VT2AS PRESSURETEST RH 13:00 21:59 ORT3-Y RN E00 139 1r EP.VNCc EP 70 SERVICE OBTAIN NAMEPLATE 2
27APR04 01MAY04 DR-Y ML-Y 6 p CCCBTAIN ELT DATA ( 0 FROM CFC3 3
DATA (EO) FROM CFC S 2 6.OQA 10:.59 ORT3-Y R-N 6 E MISC EOUIPMEtT REPAIR/SERVIC 0400553 140 1 EP0301957 EPT 76 HX-001A EDDYCURRENT TEST 17APR04 30APR04 DR-N ML-Y 0 P 57EDOYC TTEST MGENA0-319 SHIFT STEAM GENB8-ISHIFT 07OOA.
12.59 ORT3-N R-N STEAMO TG R3957 141 1
EP0301962A EPT 76 HX-020A HX-020A - EDDY 5
23APR04 30APR4 DR-Y ML-Y 30 962BAIHX-LEDDYCURRER REVIEW7RERUN CURRENT 08.00A 18:59 ORT3-Y R-N LP FEDAE ETRA0301962 REVIEWIRERUN_
142 T EP0301965A EPT 76 HX-0238 HX-023B - EDDY I
28APRO4 30APR04 DR-Y ML-Y 4 p0 965AHX-2B. EDDYCURREN REVIEWIRERUN CURRENT 15:OOA 12:59 ORT3-Y R-N TURBINE LU ~E OIL COOLER0301965 REVIEW/RERUN 143 7 EP0301964A EPT 76 HX-023A HX-O23A - EDDY T
29APR0-4 30APR04 DR-Y ML-Y 0
9M jHX40' EDDY CURRENIREVtEWIRERUN CURRENT 13:OOA 12.59 ORT3-Y R-N TRIE OLOLR3 6
REVIEW/RERUN TURBNE___
__OILCOOER0_19_
14 1
EP0214186B EPT 76 HX4001A PHX-OlA-REMOVEECT 6
30APR04 30APR04 DR-N ML-N 0
A -REMOVE CTEQUIPFROM LATFORMS EQUIP FROM 09:OOA 17:59 ORT3-N R-N ST)MGENERATOR PLATFORMS 145 1 EP0302114A EPT 76 SC-1A SC-1A-INSTALLCOND 3
30APRO04 30APR04 DR-YML-Y O P0 114ASC-'A INSTALLCONT 3ESHIELSIA)
TUBE SHIELDS CiA) 13:00' 15:59 ORT3-Y R-N WCONDE SR(DEAERATING)0302114 146 T EP0301957C FEPT7 HX-001B IHX-001B. REMOVE ECTI 5 0AR04 30APR04 DR-N ML-N 0C 1o 9S7CHX-00
- REMOVEECTE WIFROM PLT RS EQUIP FROM 5
13:00 17:59 ORT3-N R-N GENERATOR0 0 1957 PLATFORMS__
Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION l
Sheet 8 of 27 O Ptimavera Systems, Inc.
I FL-03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF APR MAY ST I 3,10112,14,16%120,22l 01 2,4, 61 8,l9l214,16,18.20,221 0.2.14.6, 810012.14.161 147 1
EP0302115A EPT 75 SC-l1B SC-18-INSTALLCOND 3
30APR04 01MAY04 DR-YML-Y 0 p=13211ACI NTLCN EILS (IB)
TUBE SHIELDS (1B) 16:00 08:59 ORT3-Y R-N 0
2115 ONDENSER (DEA RATING) 148 1 EE0305857 EPT 78 P1010B 1iP-10B-POST 2
30APR04 30APR04 DR-Y ML-Y 29 E030s7 1 OB-POST MAI NCEVIBRATION CHECKS MAINTENANCE 19 00 20 59 ORT3-Y R-N 30sS57 RESIDUAL HEAT R MOVAL PUMP 149 1 FG0212787 FG1 78 T-001 IT-1 PAINT/INSULATE 24 30APR04 01MAY04 DR-Y ML-Y 267 2
12771T-1 P NSULATE SUP RTS SUPPORTS 08O0A 13:59 ORT3-Y R-N PRESSUR TANK0212787 150 0 HP0301846 HP 77 HP RMS MONTHLY RMS 32 01MAY04 04MAY04 DR-Y ML-Y 221 HP0301S46MON tHYRMSOPERA ONALTEST
__OPERATIONAL TEST 06:00' 1 5:59 ORT3-Y R-N 0301 U6_
151 1 HP7.51.6C HP 85 HPPPURGET PURGERMSTRIPTEST 2
01MAY04 01MAY04 DR-Y ML-Y 0
IP7.51.6CPURGE R STRIPTEST(HPI 7.51.6)
(HPIP 7.51.6) 15:00' 16:59 ORT3-Y R-N 0301874gUNIT CONTAINMENT PUGE TRIP TEST 23 -
U U 152 1 IC0407662 IC 76 VNPSE-0001 VNPSE-13 REPAIRAIR 3
30APR04 30APR04 DR-Y ML-Y 31 IC0407662 PSE-I3REPAIRAII LEAK LEAK 20:00 22:59 ORT3-N R-N 0407662 VNPSE-3245 SU FAN DISCHARGE IR LINE LUBRICATOR 153 1 IC0212595 IC 76 VNPSE-0321 1VNPSE-3213 MINOR AIR 8 30APR04 01MAY04 DR-N ML-N 0
IC02125S 5 1VNPSE 323 MINDR RAR LEAKS LEAKS 22:00 05:59 ORT3-Y R-N 02125 W[W AB U1C PURGE EX AUST FAN SUCTIO1 54 2 ICRP1C-250 IC O-RP-001C RETRIEVE Z-16 2
02MAY04 02MAY04 DR-Y ML-Y
.250 ICRPI -25ORETRIEVE Z-1* CONSTANTSIR D
CONSTANTSIREPLC 00:00 01:59 ORT3-Y R-N 155 1 IC5.32 IC 76 ICP-05.032 U1107COMPUTER 5
02MAY04 02MAY04 DR-N ML-Y 250 IC 32U1 INPUTCHECK 17:00' 22.59 ORT3-N R-N 0300814>
156 1 IC5.47-1 ICI 78 ICP-05.047 SECONDARY LEVEL 88 19APR04 08MAY04 DR-Y ML-Y 0
.1 SECONDA4Y LEVEL CONTRO S AND SWIT CONTROLLERS AND 1.OOA 11:59 ORT3-Y R-N 157 1 IC0302099 ICI 76 LC-02514 LC-2514 REFURBISH 88 19APR04 09MAY04 DR-YML-V 0 C03 20sLC.2514 IEFURBISH
_ 1:00A 11:S9 ORT3-Y R-N 158 1
IC0305085 ICI 76 LS-02376 1LS-2376SMALLSTEAM 88 19APR04 09MAY04 DR-YML-Y 0 Co so85 ¶LS37 SMALLSTEAM ONLVLSW LEAKONLVLSW 11:OOA 11:59 ORT3-YR-N 159 1
ICLS3579 ICI 76 LS-03579 DISASSEMBLE, CLEAN 88 19APR04 09MAY04 DR-Y ML-Y 0 C DISASSE.BLE, CLEAN AND I SPECTEVELINSU AND INSPECT LEVEL I 1:OOA 11:59 ORT3-Y R-N
- 160 1
ICLS3580 ICI 76 LS-03580 DISASSEMBLtE CLEAN 88 19APR04 09MAY04 DR-Y ML-Y 0 CLF 580D15ASSE BLECLEAN AND I SPECTLEVELINS-RU ANDINSPECTLEVEL 110A 11:59 ORT3-Y R-N
.i 161 1
ICLS3581 IC1 75 LS-03581 DISASSEMBLE. CLEAN 88 19APR04 09MAY04 DR-Y ML-V 0 CLS BDISAs BLEE CLEAN AND ISPECT LEVEL INS U
AND INSPECT LEVEL 1 1:OOA 11:59 ORT3-Y R-N 162 1
ICLS3582 ICI 76 LS-03582 DISASSEMBLE, CLEAN 88 19APR04 09MAY04 DR-Y ML-Y 0 CS82DISASSEIBLE, CLEAN AND I IPECTLEvELNS U
ANDINSPECTLEVEL 11:WOA 1:59 ORT3-Y R-N 163 1
IC5.75 IC1 76 ICP-05.075 NI AUXILIARY CHANNE 25 28APR04 02MAY04 DR-Y M-0 C.
NACHANNELS.INSP CT
- INSPECT 09:00A 14:59 ORT3-Y R-N
______l_
=_l__
N ISA un Date 30APR04 13:45l LT.03 STANDARD PUBLICATION Sheet 9 of 27 O Primavera SYstems, Inc.
FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after30APR0412:00
MAY ST I
h.310112,14,16.,lam.221 o, 2, 4. 6, 8. 1 Q12,14,16 1 8,707o 2,4, 6,8,10l12l14,16l1 164 1 IC0306002 IC1 7
S so6050A 1 S60A IOPS CH1-1 24 2sAPRO4 02MAYQ4 DR-Y ML-Y oC0 10tSwOP lops CH 1 OVERSO aED UIGHT r-r-OVERSPEED LIGHT O8:OOA 13:59 ORT3-Y R-N TURB I 165 1 IC4.32 ICi 7
11CP-04.03 ICP-04.032 AUXFW 8
30APR04 01MAY04 DR-Y ML-Y 30 CP
.32AXFW SPEC 200 RACK IN iTRU CAL 166 1 IC4.32A ICI 76 tICP-04.03 ICP-04.032 AUX FW 8
30APR04 O1MAY04 DR-N ML-Y 30 CP 4n32AUXFW NALOG RACK IN rRU CAL ANALOG RACK INSTRU 09:00A 08:59 ORT3-N R-N
_AFW SYSTEM AND -HARGING FLOW E LECTRONIC INS 167 1 IC5.53 ICI 76 ICP-05.053 ICP 5.53 SECONDARY 60 01MAY04 07MAY04 DR-Y ML-Y 21 IC5.53 SECONDAR HIGH PRESSURE HIGH PRESSURE 08:00 12:59 ORT3-Y R-N 03008731 168 1 IC4.10-1A ICI 76 1ICP-04.01 PT-5971 TURBINE 5
01MAY04 02MAY04 DR-Y ML Y 74 IC4.1011APT-5971 TVF NNE PRESS XMTR AL PRESS XMTR CAL 13:00' 06:59 ORT3-YVR-N 0O92 FI srSTAGE PRE 169 1 tC428IOPS IC1 76 ICP-04.028 OVERSPEED 12 02MAY04 03MAY04 DR-Y ML-Y 0
I 2glIpSOVERS PROTECTION SYSTEM 1400 14:59 ORT3-Y R-N 300840 170 1 IC2.22 ICI 76 1ICP-0202 POWER RANGE NIS 3
02MAY04 04MAY04 DR-N ML-Y 13 IC2.22POW TESTING (POST-REFUEL 15: 0 06:59 ORT3-N R-N 0306921
}
171 1
1C5.15 IC2 76 ICP-oso05I RCDTINSTRUMENTCAL 10 27APR04 o0MAY04 DR-Y ML-Y 100 C5; RCDT INSTR MENTCAL 19 OOA 03:59 ORT3-Y R-N I
WASTE DISPOSAL SYSTEM (OUTAGE)0300729 372 1 10.5 1C2 76 ICP-05.051 ICP 5.51 SECONDARY 14 27APR04 02MAYD4 DR-Y ML-Y 63 C5 ICP 5.51 SEC NDARY VACUUM Il STRUMENTS VACUUM INSTRUMENTS 20:OOA 20:59 ORT3-Y R-N 173 1 1IC0400343 IC2 76 PS-02142 1PS-2142REPLACE 48 27APR04 05MAY04 DR-Y ML-Y 29 C4 0W431PS-214 REPLACE PRESS E SWITCH PRESSURE SWITCH 20:Q0A 21:59 ORT3-Y R-N 174 1 IC0400342 IC2 76 PS-02156 IPS-2156 REPLACE 53 27APR04 06MAY04 DR-Y ML-Y 24 C 03421PS-21 REPLACE PRESS E SWITCH PRESSURE SWITCH 2000A 02s59 ORT3-Y R-N 175 1 IC0213741 IC2 76 DPI.04835 DPI-4835 READING 15 29APRO4 02MAY04 DR-Y ML-Y 7 C02 3741DPW835 ING NEGA NEGATIVE 19:ooA 21:59 ORT3-Y R-N
_NW 176 1 IC5.77 IC2 76 ICP-05077 CONT FAN DISCHARGE 15 29APRO4 02MAY04 DR-Y ML.Y 0 C5.
CONT FAN D CHARGE FLOWS VTCHES l
FLOW SWITCHES 19:OOA 21:59 ORT3-Y R-N l
177 1 ICRKCLN-1 IC2 76 I&C MISC RACK CLEANING - ESF 6
30APR04 30APR04 DR-N ML-N 0
K tRKCLN1 RAC CLEANING - ESF tOGIC RACKS LOGIC RACKS 18:00 23:59 ORT3-N R-N 0300797 MISC IC WO* ACTIVITIES 178 1 ICRKCLN-2 IC2 76 I&C MISC RACK CLEANING -RP 8
30APR04 OMAY04 DR-N ML-N 25 l RKCLN2RA CLEANNG-RPL GIC & RDC RACK LOGIC & RDC RACKS 18:00 01:59 ORT3-N R-N 0300797 MISC IC WRK ACTIVITIES 179 1 ICRKCLN-3 IC2 76 I&C MISC RACK CLEANING -EH 8
30APR04 01MAY04 DR-YML-Y 47 K RKCLN.3RAC ANNG.EHRCKS RACKS 18:00 01:59 ORT3-Y R-N 0300797 MISC IC ACTIVITIES 180 0 IC0407946 IC2 77 FH-CAV-03A REPAIR CAMERA 10 30APR04 01MAY04 DR-Y ML-Y 242 ICO407946 AIR CAMERA 19:00 04:59 ORT3-Y R-N 0407946 VIT CVZOOM CAMERA PT 4.3 181 1 IC4.23-1 IC2 76 1ICP-04.02 ICP-04.023-1 RV LEVEL 1 5 02MAY04 03MAY04 DR-N ML-N 56 IC4 23-1 ICP404.023-1 R LEVEL CAL CAL 0000 03:59 ORT3-Y R-N 030p9733_
Run Date 30APR04 13:451 LT.03 STANDARD PUBLICATION Shoet 10 of 27 O Primavera Systems. Inc.
l FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 APR MAY
a~t 1 Sun 3.1021411182022 0,2,4.6.8,0014,16.18,202
- 0.
- 4.
1jjj12j m
I 1821 1 100300795 IC5 76 I&C MISC VISUAL INSPECTION OF 1 12 1 25APR04 01MAY04 RELAY RACKS 09:OOA 12:59 DR-Y ML-Y ORT3-Y R-N 37 !C03 0795VISUAL IOSPECTION OF REL$Y RACKS Il
~
I ISC IC WOtK ACTMT[ES03001'5 t83T1 1IC5.21 IC5 76 ICP-05.021 PZR LEVEL CONTROL I 2WAPR04 I 30APR04 I DR-N ML-Y 37 I
SYSTEM CALS 09:00A 12:59 ORT3-N R-N U
CS.!
PZR LEVEL C EPRESSURIZE
? ICP 5.50 SEC
)NTROL SYSTEM C R LEVEL CONTROL
)NDARY MIDRANG1 ALS 0300859
'PRESSURE t8,4 1 IC5.50 lCS 76 ICP-05.050 I ICP 5.50 SECONDARY 1 40 1 28APR04 05MAY04 MIDRANGE PRESSURE I 09:OOA 07:59 DR.Y ML-Y ORT3-Y R-N 48 urn a
m urn 1851 11 ICtO.46AUX IICS 76 1 ICP-10.046 ICP t0.46 RDC LOGIC 1161 29APR04 01MAY04 I DR-Y ML-Y 0
CAB PWR SUPPLY 08:OOA 16:59 ORT3-Y R-N IC71t 1AuxlCP 10.8RDCLOGICCA WRSUPPLY ADJUT 7
u RuD I RE SYSTEM 1861 1 IC5.72 ICS 76 RDC-LOGIC I CAP 5.72 SLAVE CYCLER AND PULSER 16 I 29APR04 01 MAY04 08 00A 16:59 DR-Y ML-Y ORT3-Y R-N 18IaC4~CJ5.2 S4VE CYCLER AND PJLSER
.n POa J
_AX s AL urn a
i m
nI zwF rnfmTROL i r'C 15171 I
1C030932A ICs 76 FM-031 10 1FM-31 10 INSTALL TRANSDUCERS 4 1 30APR04 30APR04 09:OOA 15:59 DR-Y ML-Y ORT3-Y R-N 0
F 188 1 ICTE-3111 IC5 77 TE-03111 TE-311 LEFM FW TEMP 2 30APR04 30APR04 DR-Y ML-Y 97
- REPLACE ELEMENT 1200-13:59 ORT3-Y R-N 189 1 IC2.15 IC5 76 ICP-02.015 ICP Z15RP 8
30APR04 01MAY04 DR-N ML-Y 8
PERMISSIVEINI LOGIC 12:00 08:59 ORT3-N R-N 190 0 IC0300668 IC5 76 YR-05832 REPLACE DATA DISK 2
01MAY04 01MAY04 DR-Y ML-Y 586 08:00 09:59 ORT3-Y R-N 191 1
IC429-4 IC5 76 ICP-04.029 ROD INSERTION LIMIT 6
01MAY04 01MAY04 DR-N ML-Y 0
(RIL) CAL (ICP-04.029-4 09:00-14:59 ORT3-N R-N 192 1 IC0302917 ICS 76 C-108 IC-108 CORRECT 8
01MAY04 01MAY04 DR-N ML-Y 154 WIRINGtABELING 09:00 16:59 ORT3-N R-N 193 1 IC5.18-1A ICS 76 ICP-05.018 ICP5.18MANUALBUAS I
01MAY04 01MAY04 DR-YML-Y 112 ADJUSTMENT 16:00 16:59 ORT3-N R-N 194 2 tC0301005 ICS 76 ICP-02001 RP AND SG ANALOG 5
02MAY04 02MAY04 DR-N ML-N 23 I
TEST-RED 07:00' 11:59 ORT3-N R-M IFM CTE IC2.1 110 INSTALL
_LEFM E 3111TE-31111
- LEFM FEEI
- ICP2.15RP
'RANSOUCERS ECTRONICS EFM FW TEMP -RE TEMPERATURE El ERMISSIVEINI LOG]
'LACE ELEMENT EMENT0300956 PRE-CRIT TEST 10000NWWW REACTOR PRvTE IC0300668R 0300668I 1C429-4 0300843 IC0302917 0302917 tlI UK 1'MU I ML EPLACE DATA DISI EMET/FOREBAY L ROD INSERTION U ROD INSI hc-108 CORRECTI l_ROD II l0IC5.1831ADCP 5.1 03008563ROD!
AION SYSTEM LOG VEL RECORDER IT (RIL) CAL (ICF RTION UMIT CONT ntRING/LABEUNG JSERTION LIMIT PA MANUAL BIAS AD.
PEED CONTROL IC0301005RF 0301005E IC9950758?
99507581
_X 5
Wp ER SUPPLY CHI iIC CIRCUIT CAI 0300807 04.029.4)
=REACTOR 0 ECAD CABLI MN]
FISSI 1951 1 IC9950758 lC5 76 N-00040 N-40 ECAD CABLE TESTING 6
02MAY04 02MAY04 08:00-13:59 DR-N ML-N ORT3-N R-N 5
196 1
IC5.49DAY1 ICV 76 ICP-05.049 ICP 549 SEC CONTROL 60 21APR04 05MAY04 DR-Y ML.Y 55 CS. DAYt ICP &4. SEC CONTROL V VS VALVES 1400A 16:59 ORT3-Y R-N 197 1
IC5.49NGTI ICV 76 ICP-05.049 ICP 5.49 SEC CONTROL 60 21APR04 05MAY04 DR-Y ML-Y 0 C5 N4GTICP54 SEC CONTROLV yVES VALVES 19:00A 22.59 ORT3-Y R-N 198 1 IC9950097A ICV 82 CV-W371A.
CV-371AREPLACE 2
30APR04 30APR04 DR-N ML-Y 23 IC597)945IA REPLACE DAP RAGM AIR HOSE DIAPHRAGM AIR HOSE 18:00 19:59 ORT3-N R-N 9950097EL UNE COWAINMENT ISOLATI N SOLENOID 199 1 IC0300905 ICV 76 MS-02037-O MS-2037 DIAGNOSTIC 4
30APR04 30APR04 DR-Y ML-Y 221 IC030905M 2037DIAGNOSTIC HECK CHECK 19:00 22:59 ORT3-Y R-N 0300905 Z-53A1B PRIMING AE INLET STEAM F EG CONTROL OPE I 200 1 IC0304279 ICV 76 MS-02037 MS-2037 POST MTN 4
30APR04 30APR04 DR-Y ML-Y 0
IC0304279M 37POST MTN IGNOSTIC DIAGNOSTIC 1a.00 22:59 ORT3-Y R-N 0304279 Z-53A PRIMIN AE INLET STEAM IlEGULATOR CONOL Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 11 of 27 O Pnmavera Systems, Inc.
FL-03 Execution Publication Set
after 30APRO4 12:00 l
U1R28 WORKING SCHEDULE l
after 30APR04 12:00 U
ID RESP WO ST EQID DESCRIPTION RD ES EF RISK APR MAY Fu 30 Sat 1 Sun 2 3, 1214,16,1820221 0. 2. 4. 6. 8,10112,14,16,18.20.22 0, 2. 4, 8l1 2
1 4
EC!_
I -
i 2011 1 1C0300945 lCV 76 SC-00955-0 SC-955 DIAGNOSTIC CHECK 10 01MAY04 01MAY04 08:00 17:59 DR-Y ML-Y ORT3-N R-N 0
03009451F 1C0300993 S I
"955 DIAGNOSTIC
~RRC I
!-955-S REPLACE!
202 1 IC0300993 ICV 76 SC-00955-S SC-955-S REPLACE 10 01MAY04 01MAY04 DR-Y ML-Y 0
SOLENOID VALVE 08:00 17:59 ORT3-N R-N 203 1 IC0406916 ICV 76 MS-02016 1 MS-2016 POST 4
01MAY04 01MAY04 DR-Y ML-Y 0
MAINTENANCE 19:00 22-59 ORT3-Y R-N 204 1 IC5.49A ICV 76 ICP-05.049 MS-2016HX-1AATM 5
01MAY04 01MAY04 DR-YML-Y 0
DUMP VALVE STROKE 19:00 23:59 ORT3-Y R-N 205 1 IC5.49B ICV 76 ICP-05.049 MS-20151HX-1B ATM STU 5
01MAY04 01MAY04 DR-Y ML-Y 19 DUMP VALVE STROKE 19:00 23:59 ORT3-Y R-N 206 0 IC0213035 ICV 76 tA-01249 IA-1249AIR LEAKS 4
02MAY04 02MAY04 DR-N ML-N 0
07:00 10.59 ORT3-Y R-N 207 1 IC0300941 ICV 76 RH-00626-0 RH-626 DIAGNOSTIC 4
02MAY04 02MAY04 DR-Y ML-Y 0
CHECK 09:00-12:59 ORT3-Y R-N 208 1 IC0300939 ICV 76 RH-00624-O RH-624 DIAGNOSTIC 10 02MAY04 02MAY04 DR-N ML-N 0
CHECK 09:00 19:59 ORT3-N R-N 209 1 C5.69-624 ICV 76 1 CP-05.06 ICP-05.069A TRAIN A.
10 02MAY04 02MAY04 DR-N ML-N 0
09:00-19:59 ORT3-N R-N 0300993=I 1C04069161M 0406916lill 1C5.49AMS 0300869fil 1C5. 495MS 0300869fl I
CHECK OT LEG SAMPLE Ic OLENOID VALVE OT LEG SAMPLE
-2016 HX-IA ATM S
!SECONDARY 120.5 HX1-B ATMS MSECONDARY IC0213035 0213035E IC0300941 0300941 IC0300939 0300939 IC5.69-624 0300989 IICS.1 03(
YAP LINE SNUBBER (F
)ISCHARGE DAMPE PECTION
)LATION OPER,
)LATlON SOLED
-NANCE DIAGN
,TMOSPHERIC S M DUMP VALVE LANT CONTROI M DUMP VALVE LNT CONTROI 249 AIR LEAKS
.lCV-133 RHI IH4626 DIAGNO
_HX-1 1AA3 RH-624 DIAGNO
_b1
CP-05.069A TRJ
_i_
210 1
IC5.10-133 lCV 76 ICP-05.010 CV-133 LTDN VALVE STROKE 4
02MAY04 02MAY04 1200 15:59 DR-N ML-N ORT3-Y R-N 111"r-Mmm"', -
4 I
0 2111 1 MM0304672 IMMI
.133CV-133 LTE
)852~VAL`
)RMER HS-1 7) 0 R9933-413 76 HS-601R-73 1HS-601R-73 CHANGE 10 24APR04 I 01MAY04 SNUBBER STROKE I
10:00A 10 59 DR-Y ML-Y ORT3-Y R-N MMOi04672 1IS-10j R-73 CHANGE SN~pBER STROKE &
_PZR SRV RELIE!
l 2121 I MM9933443 I MMI 76 W-00IB2-A W-IB2-A REPLACE I 8 125APR04 01MAY04 BACKDRAFT DAMPER 18: OOA 01:59 DR-Y ML-Y ORT3-N R-N 0 043MW-_1B21REPLACE BACKDI
-
2131 1 MM0214055 I MM1 76 HX-015A HX-15A. MOTOR COOLING COIL 28 26APR04 I 02MAY04 02:OOA 23:59 DR-Y ML-Y ORT3-N R-N 0 MM0114055HX-15A MOTOR COOLNG
-4
~ I~ I
~
WE4 2141 1 MM9924975A I MM1 76 HS-1 HS-1, REBUILD &TEST 1 20 26APR04 02MAY04 SNUBBER (SHOP)
I 06:00A 09:59 DR-Y MLtY ORT3-N R-N 0 MM'L2497SAiIS-i.REBUILD & TESTS BER(SHOP) i
~ii m
e r
n4Y.1A rr MA l
l 2151 1 MM0301141 I MMI 76 HX-015A5 HX-015A5. CFC COIL INTERNAL 6
27APR04 I 30APR04 13:00A 23:59 DR-Y ML-Y ORT3-N R-N 22 %aM0I01i41iHX-015, CFC COIL INTER CONTAINMEN MZAL INSPICLEANIN
'ACCIDENT RECIRI NAL INSPICLEANIF
=
I 1^-
l n
Isin 216j 1 MM0301142 I MM1 76 HX-015A8 HX-015A6, CFCCOIL INTERNAL 6 1 27APR04 30APR04 14.O0A 23:59 DR-Y ML-Y ORT3-N R-N 22 qM4O01142 HXIIAS. CICOILINTEYI HEAT EXCHANGE G
10301141 r s
-PnKlTIi IF.ItIg:g ' SPPl"T D=PlD U=AT RY^U ^ KIrr z "s"
- *n WN I AINMtN t r L -
I 4-4 1
l 2171 i MM0301144 MM1 76 HX-015A8 HX-015AB. CFC COIL INTERNAL S
27APR04 I 30APRO4 15:OOA 23:59 DR-Y ML-Y ORT3-N R-N 22 VWMOL`1 I
44 HXCFC COIL INTEF
-W9mCONTAINMEN`
I-218l 1 MM0301143 I MMI 1 76 HX-01SA7 HX-015A7. CFCCOtL INTERNAL 10 27APR04 I 01MAY04 16:00A 03:59 DR-Y ML-Y ORT3-N R-N 18~MM4Oll43HX~157,CFCOIL INTE NAL INSPICLEANIf ACCIDENT RECIR NAL INSPICLEANIt IMENT ACCIDENTI SNUBBER AFTER 1934380 4
G HEAT EXCHANGE G
tECIRC HEAT EXCt TESTING r
iU31q4z 0301144 ANGER 0301143 OMNTAI l
l l
2191 1 MM9934380B I MM1 76 HS-S01R-37 HS-601R-37A.
REINSTALL SNUBBER 2
30APR04 I 30APR04 11:0OA I 13:59 DR-Y ML.Y ORT3-N R-N 0
AMS I
34380gHS-60 R47A, REINSTALU NPZR PORV EADER SNUBBER Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 12 of 27 O Prtmavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after30APRO412:00
MAY ST Sat 1Sun 2
S -1011-.16,18,*8j2 2,14416.18.20 2210. 2.4.
j1jjjj2,14,161 220 MM0310576 MM1 76 RD-05975 IRD-5975 RUPTURE 8
30APR04 30APR04 DR-Y ML-Y 0 MO 1OS761RD59 5 RUPTURE DISC t
ANGE OUT DISC CHANGE OUT 12:00 20-59 ORT3-N R-N
-25 BLOWDOWN K VENT RUPTU E DISC 0310576 221 1
MM0407674 MMI 76 VNCRD 1VNCRD. WELD REPAIR 8
30APR04 01MAY04 DR-Y ML-Y 0
MM0407674 VNCRD, WELD PAR DUCT DUCT 21 00 04:59 ORT3-N R-N 0407674 VNCR SYSTEM MULT Al DIOR NON-NUMBE ED EOUIPME 222 1 MM0214187A MM1 T6 C-2 INSPECT UPPER HATCH 20 02MAY04 03MAY04 DR-Y ML-Y 0
MM0214 87ANSPECT UPP HATCH 0_ 000 21 59 ORT3-N R-N 021 187 Lg 223 1
MM0305397 MM1 76 W-001C1 W-1C1 REPLACE 36 02MAY04 05MAY04 DR-YML-Y 19 MM0305397W-1 I REPLACESP SPRING ISOLATORS 06 00 08:59 ORT3-N R-N 0305397 224 1
MM9933444 MMI 76 W-001C2-A W-1C2-A REPLACE 100 02MAY04 06MAY04 DR-Y ML-Y 0
MM9933444W-C2A REPLACE BACKDRAFT DAMPER 07 00 19:59 ORT3-N R-N 9933444 225 1 MM9934376A MM1 76 HS-15 HS-15. REBUILD & TEST 30 02MAY04 05MAY04 DR-Y ML-Y 0
MM993437 HS"15, REBUI SNUBBER (SHOP) 10-00 06859 ORT3-N R-N 99343 226 1
MM-8857A1 MMI 82 HX-015B HX-15B. PERFORM SW 6
02MAY04 03MAY04 DR-Y ML-Y 0
MMU8 ;Al HX.15B, P LEAK CHECK & INSTALL 12:00 06:59 ORT3-N R-N 02 064
- v m m_ _ _
I NQW19 _ _
227 1
MM02140481 MM21 761 HS-CS-)1 HS-CS-01.
14 27APR04 01MAY04 DR-Y ML-Y 4 MO1S-
. REMOVEIRE CENBEWIRE BUILT REMOVE/REPLACE 08 00A 14.59 ORT3-N R-N I
CONDEN$ATE LINE GB-4 SN JBBER021404EI J228 I
MM0214128 MM2 76 P-02-T P-29-T, INSPECT IB & OE 8
28APR04 01MAY04 DR-Y ML-Y 0
14128P-29T, NSPECT IB & OBB OIL COOLE S BEARING OIL COOLERS 14:OOA 08:59 ORT3-N R-N P-29 AUX FEEDWATER TURBINE-DRr PUMP TURB 229 1
MM0305t72 MM2 76 HX-021A IHX-21A PLUG TUBES -
2 30APR04 30APR04 DR-Y ML-Y 3 MO0 1HX-21L PLUG TUBES - C O
ENCY WO CONTINGENCY WO 07:00A 13:59 ORT3-N R-N HP FEEDA TER HEATER 5A0 05772 230 1 MM0214129 MM2 76 P-029-T EMERGENCY GOV 3
30APR04 30APR04 DR-Y ML-Y MO 14 2 gEMERC NCY GOV INSPE ON P-29-T INSPECTION P-29-T 0700A 14:59 ORT3-N R-N 1P-29AU FEEDWATER TUR1INE-DRrVEN PUMPlTURBINE0214129 231 0 MM0407967 MM2 74 K-026 K-26, AIR UNE LEAK 5
30APR04 30APR04 0 M 0796rK-26, A UNE LEAK 12 16:59 SCBA -MA CHARGING CO PRESSOR 040796' 232 0 MM0403661 MM2 77 DA-03056B DA-3056B TEST VALVE 8
30APR04 30APR04 DR-Y ML-Y 0 M 0361 DA-305 B TEST VALVE BY b304 BY 5/3/04 12:00 20-59 ORT3-N R-N G-02 EDG T-61B ST AIR RECEIVER RELIEF0403661 233 1 MM0407390 MM2 76 P-028B 1P-28B INSPECT SPEED 12 30APR04 01MAY04 DR-Y ML-Y 188 M
o IP-28B NSPECT SPEED IN REASER INCREASER 12:00 00t59 ORT3-N R-N STEAM GEN RATOR FEED PUM 0407390 234 1 MM0304995 MM2 76 P-028B P-028B - OVERHAUL 99 30APR04 09MAY04 DR-Y ML-Y O 04995 P-028B OVERHAUL MAIN PUMP MAIN FEED PUMP 12W00 11:59 ORT3-N R-N t
235 1
MM0214127 MM2 76 P-029 UNCOUPLE IP-29-T 2
30APR04 30APRo4 DR-Y ML-Y 0
M 0214127UNC UPLE IP-29-T I
18:00a 19-59 ORT3-N R-N 0214127E X FEEDWATER TL RBINE-DRIVEN PU P 236 1
MM0207075 MM2 76 FE-00134 I FE-134 REPL FLANGE 8
30APR04 01MAY04 DR-Y ML-Y 0
M 020TO75 1FE-34REPL FLANGE ASKETS GASKETS 18:00 01:59 ORT3-N R-N 0207075 HX-3A1B hON-REGEN HX OU'LET FLOW ELEME~ T 237 1
MM0214082A MM2 76 HX-021A HX-21A, CLOSE HP 8
30APR04 01MAY04 DR-YML-Y 0 M j 404 HX-A. CLOSEHP FEE ATER HEATER 4 FEEDWATER HEATER S 18:00 01:59 ORT3-N R-N 0214082
_HPFEEDW TER HEATER 5A 238 0
MM0403664 MM2 77 DA-03056C DA-3056C TEST VALVE 8
30APR04 01MAYO4 DR-Y ML-Y 590 MM04036641A-3056C TEST VA.VE BY 53104 BY 53104 21:00 04:59 ORT3-N R-N
_I04036CG 02 E DGT CSTARTAlI RECEIVER RELIE Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 13 of 27 O Primavera Systems. Inc, FL.03 Execution Publication Set I
a t t e 3 0 P R 0 1 2 : 0 a t e r 3 0 A P 0 4 2 : 0 after 30APRO4 12. 00 TI U1R28 WORKING SCHEDULE I
after 30APR04 12. 00 I
a U
RESP WO EQID DESCRIPTtION RD ES EF RISK MF APR 3
MAY
-E-d 30 14 1Su I__gST 1.31011214.168120,2210.2.4.6. 81011214,16,18,20,2210.2,4 6.8.l0l2,14.16 239 1 MM0302663 MM2 76 FS-02852 IFS-2852 CLEANIREPL 20 01MAY04 03MAY04 DR-Y ML-Y 0
MM0302663IFS-s52 CLEANIREPLF IPING TO FS PIPING TO FS 18 :00' 02:59 ORT3-N R-N 0302663 240 1 MM0301107 MM2 77 Z.027-1 LUBRICATE AND 2
02MAY04 02MAY04 DR-Y ML-Y 0
MM0301107 W 3RICATE AND M MAINTAIN SCREEN 07:00 08:59 ORT3-N R-N 0301107[
TRAVELING WA 241 2
MM0301163 MM2 77 Z.027-1 LUBRICATE AND 2
02MAY04 02MAY04 DR-Y ML-Y 563 MM0301163 LUBRICATE AN!
MAINTAIN SCREEN 090009 10.59 ORT3-N R-N 0301163 MTRAVELING 242 1 MM0306052 MM2 75 CS-02297 INSPECT & MAINTAIN 3
02MAY04 02MAY04 DR-Y ML-Y 0
MM 306052INSPE IP-28BSEALWATER 14:00 16:59 ORT3-N R-N 306052=1P IC -
.M 243 1
MM0303383 MMV 76 SC-00966B SC-9668 - VALVE 13 09APRo4 01MAY04 DR-Y ML-Y 0 M 0 338 S
-VALVE LEAKING Y REPAIR LEAKING BY, REPAIR 1 11:00A 15:59 ORT3-N R-N PZR Ut JID SAMPLE CONT dNMENT ISOLAI 244 1 MM0214113A MMV 75 MS-02719 MS-2719-RE-INSTALL 6
21APR04 01MAY04 DR-Y ML-Y 0 MO 1411 MS-9-RE-4NSTALLV VEAFTERTESTIN VALVEAFTERTESTING 09:OOA 12:59 ORT3-N R-N
-GLAND STE M HEADERSAFET RELIEF0214112 245 1
MM0214025 MMV 76 CS-00022A CS-22A - INSP I MAINTAIN 9
21APR04 01MAY04 DR-Y ML-Y 0 MO 14025CS-22A INSP I MAINTAIN VECKVALVE PER MP9158 CHECK VALVE PER 21:OOA 11:59 ORT3-N R-N I
IP-25ACON UMPDISCHARGE HECK0214025 246 1
MM0302915 MMV 76 SC-00966C 1SC-966C-PACKING 6
21APR04 01MAY04 DR-Y ML-Y 0 M0 2915 1SC-96 C
- PACKING LEAK 23:00A 00:59 ORT3-N R-N RC HOT LE lAMPLE0302915 247 1
MM0407719 MMV 76 MS-02746 1MS-2748 REFURBISH 25 24APR04 04MAY04 DR-Y ML-Y 42 M 077191MS-7 REFURBISH VAl VALVE I 11:OOA 0959 ORT3-N R-N 248 1
MM0216627 MMV 76 CV-01296 CV.1296-INSTALL NEW 20 27APR04 03MAY04 DR-N MI-N 11 MO 16627CCV129 INSTALL NEW PER MOD 02 0 TRIM PER MOD 02-027 08:00A 13:59 ORT3-N R-M 249 1
MM0407621 MMV 76 CV-00296 I CV-296, BODY TO 12 27APR04 01MAY04 DR-YML-Y 0 M I7621 1 CV BODY TO BONN+ LEAK BONNETLEAK 21.OOA 21:59 ORT3-N R-N IHX-2 REGEN HX O AUXILIARY S 250 1
MM0303680 MMV 76 MS-02005 1MS-2005-REMOVE 10 30APR04 30APR04 DR.Y ML-Y 0 MO 03M g0 MS-5-REMOVEVALVI TO PERFORM ERMOD VALVE TO PERFORM 1:00 2259 ORT3-N R-M HX-1B SG HEAD ER SAFETY030368 251 1
MM0303681 MMV 76 MS-02010 1MS-2010-REMOVE 12 30APR04 01MAY04 DR-YML-Y 0
MM0303 8
1 1 1MS2010.REM VEVALVETO ORMHEADER M VALVE TO PERFORM 23:00 11:59 ORT3-N R-M IHX1A SG HEI ER SAFETY 252 1
MM0303680A MMV 76 MS-02005 IMS PERFORM 48 01MAY04 05MAY04 DR-Y ML-Y 0
MM0303680A 1M s-PERFORM M FOR ROUNDED NTRANCE MOD FOR ROUNDED 06:00 09.59 ORT3-N R-M 0303680 253 1
MM0407598 MMV 76 MS-00238 lMS-238REPACKVALVE 6
01MAY04 01MAY04 DR-Y ML-Y 57 MM0407s981M REPACK VAL /E 07:00 12Z59 ORT3-N R-N 0407598 HX-1B SG H AER DRAIN AND ISOLAT1ON 254 1
MM0407597 MMV 76 MS-00228 I MS-228 REPACK VALVE 12 01MAY04 03MAY04 DR-Y ML-Y 50 MM0407597 1 S-228 REPACK V VE 20:00 22:59 ORT3-N R-N 255 1
MM0214109 MMV 76 MS-02017-O MS-2017 - INSP I 30 o1MAY04 O5MAY04 DR-Y ML-Y 0
MM02141 IO2Ol7-INSPI NTAIN OPERA1 MAINTAIN OPERATOR-21:00 23:59 ORT3-N R-N 02141 256 1
MM0214110 MMV 71 MS_02018 MS-2018-OPEN&
50 01MAY04 04MAY04 DR-Y ML-Y 0
MM0214 10 MS-2018 -OPE
& INSPECTVAL INSPECT VALVE -
23:00 04:59 ORT3-N R-N 0214110 257 1 MM0407661 MW 76 VNPSE-0324 VNPSE-3245, REPLACE 6
02MAY04 02MAY04 DR-Y ML-Y 0
MM0407661VNS -3245, REPLAC MILLER SLIDE VALVE 05:00 11:59 ORT3-N R-N 0407661 W-2AIBUI Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Sheet 14 of 27 O Prlmavera Systems, Inc.
I FL-03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after30APR0412:00 U
ID RESP WO EOID DESCRIPTION RD ES EF RISK MF APR 3
MAY ISI T_
M00214116,18,20 221 0,2,4. 6. 8.1O12,14,16,18.2a4221 02 2141 61 8j.10j2j14j1 258 1 NG44CFC1ND NDE 77 IST-SISI NDE FOR FAC PROGS 26 26APR04 04MAY04 DR-Y ML-Y 0
CFC1ND NE -OR FAC PROG.C CNTAINMENT 4 FT ;EN AREA CONTAJNMENT 44 FT 08:00A 07:59 ORT3-Y R-N 259 1 EP0301909 NDE 77 U1-CONTAIN VISUAL INSPECTION OF 76 30APR04 10MAY04 DR-Y ML-Y 43 P0 4nVISUAL NSPECTION OF PLATE CTMT LINER PLATE 08 00A 07.59 ORT3-Y R-N 260 1 ND9934380B NDE 76 HS-601R-37 HS-601R-37A PERFORM I
30APR04 30APR04 DR-Y ML-Y 2
3 438OBHS0 R-37A PERFORM A FVT3 ON SN BER AS-LEFT V`1-3 ON 14:00 14:59 ORT3-Y R-NIPRP HEDRSUE9340 SNUBBER
_______RHEADERS=____43_0 261 1 NG44TFC1ND NDE 77 IST-SISI NDE FORFAC PROG-9 01MAY04 01MAY04 DR-Y ML-Y 0
NC44TFC1ND EFORFACPROG TRBIHALL44FT NAREA TRB HALL 44 FT GEN 08:00' 16:59 ORT3-Y R-N C030 1897 F
SECO DARY INSERVICE 4
SPECTION AREA I_
E0 DR NSRIE1SETO 262 1
ND0304672B NDE 76 HS-601 R-73 HS-601 R-73, PERFORM I
01MAY04 01MAY04 DR-Y ML-Y 285 ND03046 25 H5-81R-73,PE ORMASLEFTVT ONSNUBBER AS LEFT VT.3 ON 11:00 11:59 ORT3-Y R-N 0304 T2PZRSRVRELI F LINE SNU8BER ORMERHS-17 SNUBBER
__SV_____FLIESNBBR
=RMR S.7 263 1
EP0301951 NDE 77 CV-00295 CV-295 - CHECK VALVE 6
02MAY04 02MAY04 DR-Y ML-Y 0
CLOSURE 00:00 05:59 ORT3-Y R-N EP030 951 CV-295 - CHE VALVE CLOS RADIOGRAPHY 0 0951 1HX 2REGEN HXCH 264 1 EP0301953 NDE 77 CV-00304A CV-304A-CHECKVALVE 6
02MAY04 02MAY04 DR-Y ML-Y 0
EP030 953CW304A-C KVALVE CLO CLOSURE 0000 05:59 ORT3-YR-N 030 953 1P-1 RCPSEALWA RADIOGRAPHY 030__
265 1 EP0301954 NDE 77 CV-00304B CV-304B - CHECK VALVE 6 02MAY04 02MAY04 DR-Y ML-Y 0
EP0301954CV 4CHECK V CLOSURE 06:00 11:I59 ORT3-Y R-N E0301954 iP-i RCHPK RADIOGRAPHY 0319_4IPBRC 266 1 EP0301955 NDE 77 CV-00383 CV-483 -CHECK VALVE 6
02MAY04 02MAY04 DR-Y ML-Y 66 EP0301955CV 8 CHECK V CLOSURE 06:00 11:59 ORT3-Y R-N 0301955 HRC LOOP RADIOGRAPHY0315 RCO q
E*
E
__~-
-E 267 0
oP0215356 OP1 77 O-PC-MIDS OPERATIONS MID SHIFT 42 30APR04 06MAY04 DR-N ML-N 148 ^P0 1535 6 OPERA IONS MID SHIFT W EKLY ROUTINE WEEKLY ROUTINE 00:00A 06:59 ORT3-N R-N 268 0
OP030 1323 OPI 77 04C095 POST-ACCIDENT I
01MAY04 01MAY04 DR-N ML-N 189 OP 1 3 2 3P0ST-ACCIDE SAMPLE S NITROGEN SAMPLE SYSTEM
_3_33____CINTSMLESSEMNTOGNBT'ECE 269 2 OP0301588 OPI 77 TS-RE-004 AXIAL FLUX DIFFERENCE 2
01MAY04 01MAY04 DR-N ML-N 18 OP0381588AXaL FLUX o FERENCE AND Ot AD POWER AND OQUAD POWER 00:00(
01:59 ORT3-N R-N 03t 1 5 88AXIAL FLUX DIFFERENCE AND QUAD POWERTLTRATO 270 2
OP0301579 OP1 77 O-PC-023.5 CHARGING PUMP 3
01MAY04 01MAY04 DR-N ML-N 187 oPoY 15 9CHARGING Pl MP ROTATION AND ROTATION AND 00 00*
0259 ORT3-N R-N 03C I S7MCHARGN 3 PUMP ROTATIO PREVENTIVE MA!
NANCE 271 0
OP0301312 OP1 77 O-PC-049.7 WEEKLY VERIFICATION I
02MAY04 02MAY04 DR-N ML-N 182 OP0311312WEEKLY VERI TIONOF FA OF FACADE FREEZE 00_00o 00s59 ORT3-N R-N 030 1312EFACADE FR EZE PROTEC
- E -~i H[PSS&.-----
-9 272 r0 OP0215434 OP2 76 O-PCDAYS OPERATIONS DAY SHIFT 10 26APR04 01MAY04 DR-Y ML-Y 182 Dp0 15 4 JOPERA IONS DAY SHIFT YROUTINE WEEKLY ROUT1NE 08.00A 14:59 ORT3-N R-N OPERATI )NS DAY SHIFT W1 V ROUTINEO 2731 0 OP0301340 OP2 77 O-PC-012.4 G-02 COOLANT I
02MAY04 02MAY04 DR-N ML-N 6
OP030134 0 2 COOLANT S SAMPUNG 08:00 08:59 ORT3-N R-N 01013'40 EMERGEN 274 0
OP0301382 OP2 76 G-02-GOV OBTAIN G-02 EDG I
02MAY04 02MAY04 DR-N ML-N 6
OP0301382 GAING02 EDG GOVERNOR OIL SAMPLE 08:00 08:59 ORT3-N R-N 0301382 G-O2EDGGO 275 0
OP0301383 OP2 77 O-PC-OtZ2 G-02 EDG VIBRATION I
02MAY04 02MAY04 DR-N ML-N 6
OPOSOI 383 2EDGVBRA (OtUARTERLY) 08:00 08:59 ORT3PN R-N 0301383 G.2EMERGEN Run Date 30APR04 13:451 LT.03 STANDARD PUBLICATION Sheet 15 of 27 Primavera Systems, Inc.
l FL-03 Execution Publication Set I
J
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APRO4 12:00 N
U ID RESP WO EQID DESCRIPTION RD ES EF RISK MF APR 3
MAY ST
_3.0C12,14,16,18,20,221 0, 2. 4. 6,1 810112,14,16,18,20,221 0. 2. 4. 6. 8.10112l14.16l1 276 0 OP0215479 OP2 76 04T-001i IT-11, P-12AiB SPENT 2
02MAY04 02MAY04 DR-N ML-N 180 OP0215479.11, P-12AJ3 SP FUEL POOL 08:00-09.59 ORT3-N R-N 0215479MP-12ASPE 277 0
OP0301343 OP2 77 O-TS-082 TS-82. G-02 6
02MAY04 02MAY04 DR-N ML-N 03 oPoo1343 Z -02 EME EMERGENCY DIESEL 08:00 13:59 ORT3-N R-M 0301343 G.02E 278 0
OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE WATER 7
22APR04 30APR04 DR-N ML-N 654 P0 t2 4CLEAN ERV ICWATER 5 RANERS STRAINERS 16.00A 18:59 ORT3-N R-N S
CE WATER STR kINERS0215624 279 0 0P02 15550 0P3 76 0-PC-SWING OPS SWING SHIFT 35 28APR04 04MAY04 DR-N ML-N 161 p~ 1555OPS N SHIFT WEEKLI ROUTINE WEEKLY ROUTINE 16:OOA 2259 ORT3-N R-N e 280 2 U2GNDR009 OP3 04C021.3 DRAIN U2 MAIN 1
30APR04 30APR04 DR-Y ML-Y 0 U2 DRt09 DRAIN u2 MAIN ELECTRIC l GENERATOR PE R PC 213 ELECTRICAL 16:00 16:59 ORT3-Y R-N 281 2 OP0301626 OP3 77 O-TS-004A TS-4A UNIT 2 TURBINE 1
01MAY04 01MAY04 DR-N ML-N 188 OP0301626TS-4A. L NIT2 TURBINE TRII TEST TRIPTEST 16:00 16:59 ORT3-N R-M 0301626EUNrT TURBINE TRIP TEE T 282 0 OP0301404 OP3 77 P-118 MONTHLY 1
02MAY04 02MAY04 DR-N ML-N 181 0P0301404MON OPERATIONAL CHECK 16:00 16:59 ORT3-N R-N 301404DSt 283 2
U2GNDROIO OP3 O-PC-021.3 DRAIN U2 MAIN 1
02MAY04 02MAY04 DR-Y ML-Y 0
t 2GNOROtODRA ELECTRICAL 16:00 16:59 ORT3-Y R-N I
0 OP0301450 OP3 77 04T-0014.
IT-14, FOTRANSFER 3
02MAY04 02MAY04 DR-N ML-N 4
0P03014501'14 SYSTEM PUMPS 16:00 18:59 ORT3-N R-M 0301450 285 0 OP0301451 OP3 77 04T-0100.
IT-100.SEATLKGTEST 3
02MAY04 02MAY04 DR-N ML-N 4
0P0301451 I OF DA-200 AND 16-00 18:59 ORT3-N R-M 0301451 286 1 RPIC-030 OPS O-RP4001C FUELMOTIONAND 36 25APR04 01MAY04 DR-N ML-N 0
MP oFELMO riON AND INSERT INSERT SHUFFLE 08:OOA 23:59 ORT3-N R-M U
3REFUELING 287 1 01-135B-A OPS P-0108 FILL &VENT RHR TRAIN 6 30APR04 30APR04 DR-N ML-N 0
1 FILL& VIT RHRTRAINB B
08D0A 17:59 ORT3-N R-N 288 1 EP0403494A OPS 76l PT-RCS-1 OPERATING SUPPORT 4
30APR04 30APR04 DR-Y ML-Y 251 E 34gM TING SUPORT OFNIIAL RCS WALKOWN OF INITIAL RCS 12:00 15:59 ORT3-N R-N REACTRCOOLANT ST M (RCS) PRESSUR TEST-IN/040349, 289 1
O-RT-052A OPS 77 O-RT-052 PRE LURT HX-1 B 4
30APR04 30APR04 0
052APRE LLiT HX.1B SAMPLE LhE SAMPLE LINE 12:00 15:59 EB STEAlA GENERATOR SAXPLE ISOLATION (PF4C)0215987 290 1
O-RT-034B OPS 77 O-RT-034 POST LRT OF NORMAL 4
30APR04 30APR04 DR-N ML-N 0 OR1n034B POST U T OF NORMAL CH RGING P
CHARGING 14:00 17:59 ORT3-N R-N NOF CHARGING UINE (P-26)0215972 291 1 IT-320AX OPS 77 O-IT-0320A CV-294 LIFT TEST (SEAL 4 30APR04 30APR04 DR-N ML-N 0 IT4 OAX CV-294 TEST (SEAL N)
I RETURN) 15:00 18:59 ORT3-N R-N 021 909_RCP SEAL RET PIPE P NETR THERMAL R IEF CHECK TE 292 1 O-RT-30 OPS 77 O-RT-030 LLRT RCDT VENT 4
30APR04 30APR04 DR-Y ML-Y 279 Or. 030 LLRTRC TVENTHEADER HEADER 15:00 19a.59 ORT3-N R-N 021 968f F
DT TO VENT HEX)ER (P-12C) 293 1 OP0205513 ORB 76 B52-433E CW-00003 PERFORM I
30APR04 30APRO4 DR-N ML-N 0 nPo 05513w 3 PERFORM PMT S OROKE PMT STROKE 16:00 16:59 ORT3-N R-N 0 055131PWR 0CW-3 SEAL WE L OUTLET MOV Run Date 30APR04 13:45l LT-03 STANDARD PUBLICATION I
Sheet 16 of 27 C Prhnavera Systems, Inc.
FL-03 Execution Publication Set I
after 30APR04 12:00 l
U1R28 WORKING SCHEDULE after 30APRO4 12:00
MAY ES EF RIS MFrFi 30 S at 1 Rirn fil 2941 O-RT-040 OPS 77 O-RT-040 LLRT P-I1 SEAL SUPP2I41 30APR04 30APR04 17:00' 121:59 DR-N ML-N ORT3-N R-N 0
I 295 1
IT-003 OPS 77 O-IT-0003 RHR P&V TEST TO 5
30APR04 30APR04 DR-N ML-N 0
RECOVER P-010B TO 18:00 22:59 ORT3-N R-M 296 1
OP9C-070 OPS OP-9C SECURE CONTAINMENT 1
30APR04 30APR04 DR-N ML-N 0
PURGE FOR IWP 19:00 19:59 ORT3-N R-N 297 1
O-RT-027 OPS 77 O-RT-027 LLRT SEAL 4
30APR04 30APR04 DR-N ML-N 42 RTRN/EXCESS 19:00 22:59 ORT3-N R-N 298 0 OP0215146 OPS 76 AF-04021-O AF-4021 PMT STROKE 2
30APR04 30APR04 DR-N ML-N 0
PER IT-10A 20:00 21:59 ORT3-N R-N 299 0 OP0215147 OPS 76 AF-04023-O AF-4023 PMT STROKE 2
30APR04 30APR04 DR-N ML-N 183 PER IT-IA 20.00 21:59 ORT3-N R-N 300 1 RF-340B OPS 77 O-RF-340 CLEAN/CHANGE 8
30APR04 01MAY04 DR-N ML-N 164 HOTWELL & WATERBO 20.00 03:59 ORT3-N R-N 301 1
O-RT-032B OPS 77 O-RT-032 POST LLRT OF N2TO SI 4
30APR04 01MAY04 DR-N ML-N 264 ACC CONTINGENCY 21:00 00.59 ORT3-N R-N 302 1 O-RT-039 OPS 77 O-RT-039 LURT P-IA SEAL SUPPLY 4 30APR04 01MAY04 DR-N ML-N 34 22.00 01:59 ORT3-N R-N 303 1 01-135B-B OPS P-010B COMPLETE RHR B 3
30APR04 01MAY04 DR-N ML-N 0
TRAIN F&V PER 23:00 01:59 ORT3-N R-M 304 1 IT-531C OPS 77 O4T-0531 REMOVESUMPB 4
01MAY04 01MAY04 DR-N ML-N 0
SCREEN 00:00 03:59 ORT3-N R-N 305 1 OP0300992 OPS 76 SC-00966C-PMT STROKE SC-966C I
01MAY04 01MAY04 DR-N ML-N 77 PER IT 60 01:00 01:59 ORT3-N R-N 306 1 O-RT-066C OPS 77 O-RT-066C LLRT CONT PRESSURE 3
01MAY04 01MAY04 DR-N ML-N 288 TRANSMITTER UNE 01:00 03:59 ORT3-N R-N 307 1
rT-530D OPS 77 0-4T-0530D LRPM & PIGGYBACK 8
01MAY04 01MAY04 DR-N ML-N 0
TEST OF TRAIN B SI 02:00 09:59 ORT3-N R-M 308 1
OP0306896 OPS 76 MS-02020-M I MS-2020-M PMT 2
01MAY04 01MAY04 DR-N ML-N 213 STROKE PER IT-8A 05:00 07:59 ORT3-N R-N 309 1
Y04PREPS OPS Y-04 PREPS FOR 1Y-04 12 01MAY04 01MAY04 0
OUTAGE 10.00 21:59 310 1
RF-070 OPS 77 O-RF-070 RF-70. CTMT FIRE HOSE 8
01MAY04 01MAY04 DR-N ML-N 36 SURVEILLANCE 12:00 20:59 ORT3-N R-N 311 1
IT-531B OPS 77 O-IT-0531 URPM RHR TO SUMPB 12 01MAY04 01MAY04 DR-N ML-N 0
TRAIN B 12:00 23:59 ORT3-N R-M
.R.4LLRT
.15 SEAL SUPPLY 21 5977 SEAL INJECTION IT-03RHR &VTESTTO RECC 0215886 RHR PUMP AND OP9C-070SE URE CONTAINMEF O-RT-027ET SEAL RTRN/EXC 0215966 REACTOR COOI OP0215146 I4021 PMTSTROKI 0215146 P-38B AFP DISCH, OP0215147
-4023 PMT STROK 0215147 P-38AAFPDISCH RF-340BC N/CHANGE HO1 0215940 GAUGE O-RT.032B ST ULRT OF N21 0215970 NITROGEN I O-RT-0 LLRTP1A SEAL!
02159 !SEALINJE(01-13S I COMPLETE RHF IT-31CREMOVE SUM 021 5919_UNIT 1 OPO 00992 PMT STROKI 0 00992ERC HOT LE O.
.066C LLRT CONT I 0 15999MCONTAI rr.5300 WRPM & PR 215917E OP0306895 1MS-2 030689641l-Y04PREP 021 IT.
021 opo:
0:
0 IP-IB (P-298)
VER P-0108 TO OP VALVE TESTS IND TPU RGEFOR FWP
.Ss LETDOWN ANT PUMP SEAL R PER IT-10A RGE TO IHX-IB SC PER IT.1OA RGE TO 1HX-IA SC NELL & WATERBO SLASS CHANGEOL O SI ACC CONTING
) THE SI ACCUMUI UPPLY
- TONTO 1P-1A(P-:
B TRAIN F&V PER IB SCREEN ERABnLTrY iR MODE (CSD) UN 00-037.02 &.07 ETURN (P-1 1)
OPERATOR OPERATOR (GAUGE GLASSE!
r ENCY ATORS (P-14C) 9A) nIU-135B SECT 54 r
ONT SUMP B SUC ION LINE LEAK TE!
SC-966C PER IT S 3 SAMPLE SOLEN D RESSURE TRANS rTER UNE SIMENT PRESSURE (P-32A)
YBACK TEST OFTRAIN B SI LRPM PROGRAM rRAIN B HHSI AND 20-M PMT STROKE PER lT-8A F1A SG HEADER P 29 AFP STEAM SUF PREPS FOR IY0 OUTAGE
.O70 RF70, CTMT HOSE SURVEI.
1935 FIRE HOSE AND FI
- B 31BRPM RHR TOUMP B TRAIN B 1919 UNIT I CONT t5162AF400&6O #MV PMT STROKE P 15162E1P-29AF SUCTION FROM S r (RFSD) iHR PIGGYBAC PLY MOV MOTC ANCE IE STATION SUF UMP B SUCTIO R IT-290 RVICE WATER 3121 1 OP0215162 OPS 82 AF-04006-0 AF-4006-O MOV PMT STROKE PER IT-290 2
01MAY04 I 01MAY04 DR-N ML-N 13:00 14:59 ORT3-N R-N 239 Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 17 of 27 C Primavera Sytemsr Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 I
U1R28 WORKING SCHEDULE after30APR0412:00 DECRPTONAPR I
MAY WO EQID DESCRIPTON RD ES EF RISK MF Fri 30 Sat 1 Sun 2 I
ST I
____101_2_14_
__?
3131 1 oP0306893 OPS 82 MS-02082-M IMS-2082-M PMT STROKE PER IT-8A 2
01 MAY04 01 MAY04 13:00 14:59 DR-N ML-N ORT3-N R-N 206 oPo:
a:
314 0 01-39C OPS SECURE PAB 2
01MAY04 o1MAY04 0
VENTILATION 15:00 16:59 315 0
OPS-037-02 OPS 76 D72-1648 IWP-037-02 OPS PMT &
I 01MAY04 01MAY04 DR-N ML-N 0
ALIGNMENT POST MOD 16:00 16:59 ORT3-N R-N 316 1
OP0300945 OPS 76 SC-00955-o SC-955 PMT STROKE 1
01MAY04 01MAY04 DR-Y ML-Y 53 PER IT 330 20:00' 20:59 ORT3-N R-N 317 1 OP9C-080 OPS OP-9C SECURE CONT PURGE 1
01MAY04 01MAY04 0
FOR 1Y-04 OUTAGE 22:00 22:59 318 1 Y04BRIEF OPS Y-04 IPTE BRIEF TO 1
01MAY04 01MAY04 0
DE-ENERGIZE 1Y-04 22:00 22s59 319 0 01-39D OPS RESTORE PAB 2
02MAY04 02MAY04 0
VENTILATION 00:00 01:59 320 1
RF-400 OPS 77 O-RF-400 REFUELING CAVITY 3
02MAY04 02MAY04 DR-N ML-N 277 SKIMMER PUMP FILTER 00:00 02.59 ORT3-N R-N 321 1
PT-FP-W1 OPS 77 PT-FP-001 TEST CONTAINMENT 8
02MAY04 02MAY04 DR-N ML-N 323 FIRE DETECTORS 00W00 07:59 ORT3-N R-N I22 1
OP7A-05 OPS P-0101O ALIGN AND START 3
02MAY04 02MAY04 DR-N ML-N 0
P-010B AS OPERATING 01:00 03:59 ORT3-N R-N 323 1
IT-700 OPS 77 OIT-0700 REACTOR COOLANT 4
02MAY04 02MAY04 DR-N ML-N 132 GAS VENT VALVES 05:00 09:59 ORT3-N R-N 324 1
O-RT-068B OPS 77 O-RT-068 POST LURT ON P-1A 4
02MAY04 02MAY04 DR-N ML-N 191 CCW LINES 05:00 09.59 ORT3-N R-N 325 1
IT-531A OPS 77 O4T-0531 LRPM RHR TO SUMP B 12 02MAY04 02MAY04 DR-N ML-N 0
TRAINA 0900 21:59 ORT3-N R-N 326 1
OP0407661 OPS 76 VNPSE-0324 VNPSE-3245. PMT 2
02MAY04 02MAY04
. STROKE PER IT 360 12:00 13:59 327 2 AC-376-A OPS ENTER TURBINE 0
02MAY04 02MAY04 1
OVERSPEED TWCO 3.7.6 14:00 13:59 328 1
OP9C-085 OPS OP-9C RESTORE CONT PURGE 1
02MAY04 02MAY04 DR-N ML-N 146 14:00 14:59 ORT3-N R-N 329 2, 01-17B-2 OPs 0I17A RESTART U-2 LDGS 2
02MAY04 02MAY04 DR-N ML-N 558 14:00 15:59 ORT3-N R-N O 8 9 31MS-2082-M 06893=P-29 AFP 01-39C SECURE
)PS-037.02 WP-031 0306110IPWRF 0P0300945S 0300945 Y04BRII 0
RI 021 PT-Fl 021 OP
'MT STROKE PER YVERSPEED TRIP I AB VENTLATION 02 OPS PMT & AU O 1C-04 SAFEGUA 455 PM[T STROKI RC HOT LEG SAMF SECURE CONT P I
- IPTE BRIEF TO D 390 RESTORE PA!
m
.40 0REFUEUNG C 943=REFUEU 4oo1 TEST CONTAII WO9L A-05OAUGN AND rr-T00REAC 0215924!^
O-RT.M68BPOST 0216001w IT-531A 0215919 OP04(
04(
/
C T-8A OTOR'
'NMENT POSTA DS BUS A (1MC PER IT 330 ISOLATION C RGE FOR IY-4o
-ENERGI2E IY4 VENTILATION VflY SKIMMER 4G CAVITY SKIM IMENT FIRE DE1 NIT 1 CONTAINI ART P-00OBi OR COOLANT ZUNIT I REACI LRT ON P-1A C wCCW TO AND LRPMHRTO 6651VNPSE.32A 7661EW-2A/B C-376-AENTER I
I I-7B-2RESTA1 AC-376-ZEXITr1 3301 2 AC-376-Z OPS EXIT TURBINE OVERSPEED TnCo 3.7.6 0
02MAY04 I 02MAY04 15:00 14:59 610 LOOPI L
3AR4I3ARO 2 1 331 _
SIBOIZ PPG MILESTONE CLOSE HHSI B LOOP 30APR04 30APR04 DR-N ML-N 12 SI IZCLOSE HH ;IB LOOP WORK NOOW WORKWINDOW j
14:00 13:59 ORT3-N R-N END HIGH PEAD SAFETY INJE ON B LOOP WOF Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 18 of 27 O Primavera Systems, Inc.
FL.03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 U
ID RESP WO EOID DESCRIPTION RD ES I
EF RISK MF APR I
MAY Fri 30 Sat 12 4
SjinM2 II ST
_I91O,102.14.16,18, 2O2102.O24.6 IOtl2.l4,l6,l8,2O.2210.2.4,6-i8,lOil2.14,16,1 332 1 CVX01Z PPG MILESTONE END CVCS HIGH 0
01MAY04 01MAY04 DR-N ML-N 167 CVXOIZEND C CS HIGH PRESSU E LETDOWN W PRESSURE LETDOWN 17.00 16 59 ORT3-N R-N IEND C IARGING MAKEUP ILENDER WOR 333 1 FUELMOVE4 PPG MILESTONE REACTOR REFUELED 0
01MAY04 DR-N ML-N 625 FUELMO 4 REACTOR RE UELED 23:59 ORT3-N R-N
- SAFErY MO ITOR PLANT OF 334 1 RP1 B-071 PPG O-RP-001B RELAX CLOSURE POST 1
02MAY04 02MAY04 DR-N ML-N 153 RPIE 071 RELAX CLOS RE POST CORE CORE SHUFFLE 00 00 00:59 ORT3-N R-N
[0ESTABUSH t DNTAINMENT C 335 1 RHB01Z PPG MILESTONE CLOSE RHR B LOOP 0
02MAY04 02MAY04 DR-N ML-N 0
RHBO1ZCLOSE HR B LOOP W WORK WINDOW 04:00 03:59 ORT3-N R-N.ENDR R B LOOP WOR 336 1 480VA01A PPG B-03 START 480V BUS 0
02MAY04 02MAY04 DR-N ML-N 207 48OVAO1ASTA 480V BUS RE RELATED ENERGIZED 06:00 05:59 ORT3-N R-N lBE NNINGOFA WORK 337 1 RHA01A PPG MILESTONE START RHR A LOOP 0
02MAY0-4 02MAY04 DR-N ML-N 0
RHA0IASTA RHR A LOOP WORK 06:00 05:59 ORT3-N R-N ISTI RTHRALOOP 3381 1-SIA01U PPG MILESTONE END OF SI-A TRAIN 0
02MAY04 02MAY04 DR-N ML-N 0
SIA01UEND OF SIATRAIN ALIGNED AS REACT VITY 06:00 05:59 ORT3-N R-N FLOWPTH I STAT HIGH HIEA 339 1 CVX04Z PPG MILESTONE END CVCS SEAL 0
02MAY04 02MAY04 DR-N ML-N 142 CV K04ZEND CVCS INJECTIONWORK 1200 11 59 ORT3-N R-N IEND CVCS 1,40 1 RP1C-180 PRE RP-1C CORE MAPPING 2
02MAY04 02MAY04 DR-N ML-N 0
RP1 180 CORE MAPPI O
0W00 01:59 ORT3-N R-N ECORE ING E!~
U -
-m 341 1
RP1C-O010B RP O-RP-001C
-DEPOST REFUEL 5
02MAY04 02MAY04 DR.Y ML-Y 0
RP1 10B DEPOST RE L BARRIERS BARRIERS W000 04:59 ORT3-Y R-N
=
342 1 RPDC-SGA2 RP1 HX-001A A SIG PLTFRM DECON 1
30APR04 30APR04 DR-Y ML-Y 0
GA2AS1i PLTFRM DECON /FERECT EQUIP MOVAL AFTER ECT EQUIP 18:00 18059 ORT3-Y R-N IST A GENERATOR REMOVAL 34 1
RPDC-SGB2 RP1 HX-OO1A B S/S3 PLTFRM DECON T
30APR04 30IAPR04 DR-Y ML-Y C RSSGB2B S PLTFRM DECON }
KECT EOUIP MOVAL AFTER ECT EQUIP 18:00 18:59 ORT3-Y R-N US1AM GENERATOR REMOVAL U
344 SDC.GSI.191 SDS CONT ENGINEERING 43 08APR04 07MAY04 DR-Y MLRY 36 S SI-191 ENG ERiNG W I SUMP INTRUSIO ISSUES WALKDOWN -SUMP
.0800A 14:59 ORT3-Y R-N INTRUSION ISSUES _
E RI-3P -
-N _N-SECCW03 SEC 76 B52-433E SECURITY OFFICER 1
30APR04 30APR04 DRN MLN 174 SE 'W03SECU OF-CER REQUI FOR CW4003 OKE CW0003 STOKE 1600 1659 ORT3-NR-N a055131PWR oICW-3SEALWE OUTLETMOV 3461 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.
107 13APR04 07MAY04 DR-Y ML-Y 208 GS PORTPRO ECRANE, RIGE, ANDTOOLROOM UPPORT(PT2)
I RIGGER, AND 09:00A 18:59 ORT3-Y R-N TOOLROOM 347 1
)TG0302140 TGG 76ER PIPING 19 20APR04 04MAY04 DR-V ML-Y 0 (30 NDER PIPING INSP CTION I REPAIRS(
INSECIO__
4_5_
REPAIRS(PT2)
_ISPETO I
I 1
Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Sheet 19 of 27 C Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 30APRO4 12:00 U1R28 WORKING SCHEDULE I
after 30APR04 12:00 ID IRESP MAAV
34811 1 1 TGHX12AASY ITGG 76 HX0)22A MSR A TUBESIDE REASSEMBLY 2
26APR04 I 30APR04 DR-Y ML-Y I I 100A 13:59 ORT3-Y R-N I 93 3491 1 TGO302132 ITGG 76 LO-00291 0O-291 -OVERHAUL 5
PRESSURE REDUCING 26APR04 30APR04 DR-Y ML-Y 07:OOA 16:59 ORT3-Y R-N 1
F 4
30 Sat 1 141 S1 2
8.10012.14.16,15.20,221 0. 2.4. 6.8,10112,14.16,18,20.2210. 2. 4,6
- 6. 810112i 14,16,1 TON MSR TUBESIDE REAS EMBLY MOISTURE SEPARATOR REHE kTER0214083 rGa 10291 OVERHIAUL PRESS URE REDUCING VA VE TURE OIL PRESSURE EDUCING0302132 TGF CASVMSR TUBESIDE REAS BLY MOISTUI SEPARATOR R TER 0214085 TGH BASYMSR TUBESIDE REAS ELY.
MOIS RE SEPARATOR R HEATER0214084 T9 191 02B U1 EMOVE SCAFFOLD AFTER BELLOWS EPLACEMENT 3501 1 1 TGHX22CASY I TOG 76 HX-022C MSR C TUBESIDE REASSEMBLY 3
28APR04 30APR04 DR-Y ML-Y I 08OOA 14:59 ORT3-Y R-N I
4.4-4
-44
_4 3511 1 TGHX22BASY I TGG 76 HX-022B MSR B TUBESIDE REASSEMBLY 4
28APR04 30APR04 DR-Y ML-Y 14:OOA 15:59 ORT3-Y R-N 91 3521 1 TG9949102B TTGG 76r TG-01-TI 1 LP1-REMOVE 30 29APR04 03MAV04 DR-VMI-V 0
11 S L 1600A 21:59 ORT3-Y R-N 3531 ¶ TG0302262 I TGG 76 MG4)0055 1 HG-55 REPLACE HYDROGEN 10I 29APR04 I 01MAY04 I DR-Y ML-Y
_ 17:0A 02:59 ORT3-Y R-N 100 T043I22621"G-55
~
U tEPLACE HYDROGI
_ITG-01 TG NO TIGHTEN HP Ul N REGULATOR.
HYDROGEN HEADI PER HALF BLADE R PRESSURE CON UNGS
'ROL0302262 354f1 11T-07 TOG 76 TG-01-T INSTALL AND TIGHTEN 12 29APR04 30APR04 DR-Y ML-Y HP UPPER HALF BLADE 1 8:00A 23:59 ORT3-Y R-N 0 TO4 770INSTA~LL
- U U
U9V~~~~U D~czq [I;: TI IiWV14-4 355 1 TG0302136A TGG 76 P-037A P-037A - REASSEMBLE 3
30APR04 30APR04 DR-Y ML-Y 0
MAIN OIL PUMP 08:OOA 14:59 ORT3-Y R-N 356 1
TG-30430 TGG 76 TG-01-T SET GOVERNOR PED.
3 30APR04 30APR04 DR-Y ML-Y 79
_,H OIL SEALS 13:00-15:59 ORT3-Y R-N 1
TG-30900 TGG 76 TG-01-T INSTALL #2-3 BEARING 5
30APR04 30APR04 DR-Y ML-Y 31 PEDESTAL LIH OIL 13:00-17:59 ORT3-Y R-N 358 1
TG-8376B TGG 76 HX023A HX423A - CLOSE 10 30APR04 30APR04 DR-Y ML-Y 0
TURBINE LUBE OIL 13:00 22:59 ORT3-Y R-N TGO TG.
TGO
.rG4 nn.
021360P 037 WTURBINE W305ET GOV HIGH P Woo INSTALL HIG1 176BHX423A I2-7MS6-
- REASSEMBLE MW
-UBE OIL PUMP (St RNOR PED. LIH OIL ESSURE TURBINE 2-3 BEARING PEDE PRESSURE TURBI CLOSE TURBINE L ETURBINE LUBE
- LVE LEAKING BY, I -
. - I-,..----.
IN OIL PUMP AFT DRIVEN) 03021 SEALS 1302153 STAL LH OIL SEAL 4E0302153 JBE OIL COOLER
)IL COOLER 021395 REPLACE VALVE 6
359 1
TG0303847 TGG 76 MS-00006 MS VALVE LEAKING I 16 I 30APR04 03MAY04 DR-Y ML-Y BY, REPLACE VALVE I 13:00 08:59 ORT3-Y R-N 0
-8756*
I I
I I I --
360 1
TG0302141 TGG 76 RO-02711 RO-2711 - INTERSTAGE 7
30APR04 03MAY04 DR-Y ML-Y 0
ORIFICE INSPECTION 13:00 11:59 ORT3-Y R-N 361 1
TG03021368 TGG 76 P-037A P-037A - REASSEMBLE 4
30APR04 30APR04 DR-Y ML-Y 76 ZERO SPEED ASSEMBU_
15:00 18:59 ORT3-Y R-N 362 1 TG0403278 TGG 10 Z40B GAS LEAK DOWN 20 30APR04 03MAY04 DR-Y ML-Y 0
STREAM OF TEST 17:00' 0Z59 ORT3-Y R-N 363 1 TG-30690 TGG 76 TG-01-T HAND CLEAN HP CYL 6
30APR04 30APR04 DR-Y ML-Y 0
HORIZONTALJOINT._
18:00 23:59 ORT3-Y R-N 364 1 TG-8377B TGG 76 HX-023B HX-023B - CLOSE 10 30APR04 03MAY04 DR-Y ML-Y 0
TURBINE LUBE OIL 23:00 1Z59 ORT3-Y R-N 365 1 TG-30870 TGG 76 TG-01-T INSTALL HP OUTER CYL 15 01MAY04 03MAY04 DR-Y ML-Y 0
COVER & BOLTING 00:00 18:59 ORT3-Y R-N rGO0 rGO' 030 TG 02141 1RO-271'.INTERSTAGE OR CE INSPECTION c
I i2l 3eBP037ADREASSEMBLE ZE 0 SPEED ASSEMI L 136=TLRBINE LUBE OIL PU P (SHAFT DRIVEN 03278 GAS IEAK DOWN S OF TEST SOLENO D 43278_
- TG306go HAN 03021530 TG-8I 0213 TG-031
) CLEAN HP CYL Hi HIGH PRESSU 9 HX-0238 - CLOS
)RIZONTAL JOINT RETURBINE TURBINE LUBE 0.COOLER W
.. q'r m
q m
366 1
TG03021 15B TGG 76 SC-1B COND FINAL INTERNAL INSP (1B) 2 01MAY04 1OMAY04 DR-Y ML-Y 09:00 10:59 ORT3-Y R-N 69 TG0302115B 0302115 COND FINAL INTES WCONDENSER (t MAL INSP (19)
EAERATING)
JJ I
I J.LI 4
1 J
4.
Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Sheet 20 of 27 C Prtmavera Systems, Inc.
I FL.03 Execution Publication Set I
after 30APR04 12:00 U1R28 WORKING SCHEDULE after30APRO4 12:00
- t U
tD lRESP WO I EOID DESCRIPTION lRDI ES EF RISK MF E
APR I
MAY S-tn 5,,2 II ST I
I I.021.
i1,41,82,2.2.6 E
C 1 1
- {
1 i2 1
'w 3671 1 CL-2B wCC CL 28 MODE 6 TO MODE 5 CHECKLIST 258 25APR04 11MAY04 08:OOA 05:59 DR-N ML-N ORT3-N R-N 0 CL.2bMODE 6 TO M$ODE 5 CHECKUIST rl -
368 1 T-2683-R WCC CC-763B 1 CC CC-763B MMV 1
30APR04 30APR04 253 REVO-1 12:00 12:59 369 1 T-3310-R WCC P-OOIA-M I RC P-1A-M RMP 9002.1 1 30APR04 30APR04 110 EM REV1-1 12:00 1259 370 1 T-7097-H WCC E-02 1 TU E-02 EM REV0-1 1
30APR04 30APR04 0
12__
00 12:59 371 1
T-7521-R WCC MS-00231 I MS MS-231 EM REVD-1 I
30APR04 30APR04 366 12:00 12:59 372 1 T-8598-R WCC WG-1788-0 1 WG WG-1788-0 MM 1
30APR04 30APR04 DR-Y ML-Y 131 REVO-1 1ZW00 12:59 ORT3-N R-N 373 1 T-8599-R WCC WG-1789-O I WG WG-1789-O MM I
30APR04 30APR04 DR-Y ML-Y 131 REVO-1 12:00 12:59 ORT3-N R-N 374 1 T-8764-R WCC HX-1A 1 MS HX-IA FILL OPS 1
30APR04 30APR04 26 REVO-1 12:00 12:59 375 1 T-9895-R WCC W-0011D 1 VNCC W-1D1ID2 EM 1
30APR04 30APR04 71 REVO-1 12:00 12:59 1 1 T-0509R WCC W-1A1/1A2 1 VNCCW-1A1/1A2MM 2
30APR04 30APR04 170 REVO-1 12:00 13:59 377 0 T-1 644-H WCC AF-4021 0 AF AF-4021 EM REV0-1 2
30APR04 30APR04 0
12:00 13:59 378 0 T-1645-H-1 WCC AF-4023 0 AF AF4023 EM REVO-1 2
30APR04 30APR04 0
1200 13:59 379 1 T-1780-R WCC HX-15A I VNCC HX-I5A MMV 2
30APR04 30APR04 22 REV0-1 12:00 13:59 380 1 T-2612-R WCC SI-878A 1 SI SI-878A EM REVO-1 2
30APR04 30APR04 0
12:00 13:59 381 1
T-2815-H WCC MS-2020 1 MS MS-2020 EM 2
30APR04 30APR04 0
REVO-1 12:00 13:59 382 1 T-4681-R WCC CHARGING I CVCHARGINGMMV 2
30APR04 30APR04 0
REVO-1 1200 13:59 383 0
T-6419-R WCC IA-01277 OIAAW1277MMREVO-1 2
30APR04 30APR04 7
12:00 13:59 384 1 T-8378-R WCC P-2A 1 CV P-2A MM REV0-1 2
30APR04 30APR04 DR-N ML-N 194 12:00 13:59 ORT3-N R-N 3-R1 CCCC.7 II CC CC-763 oR1 RCP-1A II RC P-IA-M 7.H1 TUE02 II TU E-02 EN 1-R1 MS MS; I1 MS MS-231 8 R IWGWG-I WGWG-17 9-R 1 WG W-G I IWG WG-17 4.R1 MSHX.1 II MS HX-IAI 5-R1 VNCCW 1 VNCCW-11 I VNCC W W 1VNCC W-4-H O AF AFA4
5-H 1 MS MS-I I MSMS-2 1-R 1 CVCHAJ MI CV CHAS 9-R0 IA IA-1 NO IA W127-1 8R1 CV P-2A U1 CV P-2A I 0-HI MS HX-I miMSHX-3B MMV REV0-1 3 MMV REVO- 0012 M RMP 9002-1 EM F RMP 9002.1 EM RE)
..M REVO-1 REVO-1 0017097 31 EM REVO-1 EM REVO-1 0017521 178.-0MM REVO-j 38-MM REV0-1 001 1789-0 MM REVO-1 9-0 MM REVO-1 001 FILL OPS REV0.1 ILL OPS REV0-1 001 1D13tD2 EM REVO-11D2 EM REVO-10
- IAIIA2 MM REVO-IA11IA2 MM REV0.1 21 EM REVO-1
.1 EM REVO-1 00111 23 EM REVO-1
.3 EM REVO-1 00111
,-15A MMV REV0-1 ISA MMV REV0-10 k EM REVO-1 EM REVO-1 001261 20 EM REVO-1 20 EM REV0-I 0012
~GING MW REVO-1 ING MW REVO-1 C MM REV0-1 MM REVO-1 001641 M REVO-1 M REVO- 0018378 WLU MMV REVI-1 AWLU MMV REVI-3 EVI-1 1.1 0013310 8598 8599 3764 09895 3010509 Is 11780 15 214681 0012080 3851 1 T-2080-H wCC HX-OOIA 1 MS HX-1A WLu MW REV1-1 3
30APR04 30APR04 12:00 14:59 8
.3 L
I J1.......L
.3.
L
.3
.3-Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Sheet 21 of 27 0 Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 l
U1R28 WORKING SCHEDULE after 30APR04 12. 00 It U I ID lRESPI WO I EQ0ID DESCRIPTION RD I ES I EF I
RISK IMF APri 30N' aA1.Su
_I ST I
310112,14.161820,2210,2 4 246, 8.10112 14.16,18202210. 2. 4 6. 8,1011214 16 3861 1 T-7970-R wCC CV-257 I CVCV-257MM REVO.1-1 3
30APR04 30APR04 12:00 14:59 121 387 1 T-8732-R WCC CV-00294 1 CV CV-294 MM REV0-1 3
30APR04 30APR04 c
12:00 14:59 388 1 T-1301-R WCC P-028A I CS P-28A MM REVD-1 4
30APR04 30APR04 200 12:00 15:59 389 1 T-6601-R WCC RC 1 RC SG PRIMARY 1
30APR04 30APR04 290 MANWAYS EPT REV0-1 13:00 13:59 390 1 T-8439-H WCC RC-5268 1 RC RC-5268 MM 1
30APR04 30APR04 DR-N ML-N 65 REV0-1 13:00 13:59 ORT3-N R-N 391 1
T-9892-R WCC W-OO1A1 I VNCCW-1AIIA2 EM I
30APR04 30APR04 DR-Y ML-Y 170 REV0-1 13:00 13:59 ORT3-Y R-N 392 1 T-3784-R WCC POS-466 1 CS POS-466 EM 1
30APR04 30APR04 22 REVO-1 14:00 14:59 393 1
T-7144-R WCC FM-03110 1 FW FM-3110IC REVO-1 I
30APR04 30APR04 364 16:00 16:59 394 1
T-7941-H WCC MS-02084 I MS MS-2084 REVO-1 3
30APR04 30APR04 108 16:00 18:59 9
0 T-8731-R WCC K-26 0 EBA K-26 MM REVO-1 I
30APR04 30APR04 542 17:00 17:59 396 1
T-8507-R WCC POS-476 I CS POS-476 EM 1
30APR04 30APR04 DR-Y ML-Y 18 REV.2-1 18:00 18:59 ORT3-N R-N 397 0 T-1645-R WCC AF-4023 0 AF AF4023 EM REVO-1 1
30APR04 30APR04 200 20:00 20:59 398 1
T-2075-R WCC P-029 I AF P-29 UNCOUPLE 1
30APR04 30APR04 382 MM REVO-1 20:00 20:59 399 1
T-6929-H WCC D72-16-08 I 125V IWP 00-037-02 EM I 30APR04 30APR04 0
REVD-1 20:00 20:59 400 1 T-2726-H WCC VNPSE-3213 1 VNPSE VNPSE-3213 IC 2 30APR04 30APR04 0
REVO1 20:00 21:59 401 1 T-8698-R WCC T-26 1 MS T-26 RUPTURE 1
30APR04 30APR04 193 DISC MM REV0-1 21:00 21:59 402 1 T-8770-H WCC CV-01296 1 CVCV-1296 MMV 1
30APR04 30APR04 0
REVI-I 21:00 21:59 403 0 T-1644-R WCC AF-4021 OAF AF-4021 EM REV0-1 I 30APR04 30APR04 0
22.00 22:59 r-87:
r-131 MC"I r-3TI T-.
0I T.,
el
- 1 0-R I CV CV.2 1 cvcvC 2-1 CV CV-2 I CvCv 1R CS P.28 I CS P-1.RI RC SG P I1 RCSGPt 9-H 1 RC RC-5 II RCRC-5S 2-R 1 VNCC W I1 VNCC W-4-RI CS Pos-I1 CS POS 144-1R1 FWFh 1714411 FWI 941-H-1 MS M 17941I1 ?
6j3rR0 EBA
)01873110 EB T-8507-R1 CS 001850711 C T-1645-R0 00116451 T-2075-R 1 0012075N T-6929-H 1 00169291 T-m6-H 1 00127261 T-8698-R 0018698 T-8770-H 0018770 T-164" 001164 T-06w 001069 7 MM REVO.I-I 57 MM REVO.1-1 001 4MM REV0.1 94 MM REV0-1 0018 MM REVO-1
'BA MM REVD-1 001' WMARY MANWAYS IMARY MANWAYS E
.68 MM REVO-1 68MM REVO-1 0011 IAIIIA2 EM REVO-1 IAIIIA2 EM REVD-1 168 EM REVO-1 466 EM REVO-1 001
.31101C REVO-1 M-3110ICREVO-1
-2084 REVO-1 S MS-2084 REVO-1 K-26 MM REVO-1 k K-26 MM REV0-1 POS-476 EM REVO.
S POS-476 EM REV kF AF.4023 EM RE%
DAF AF-4023 EM RI
'F P-29 UNCOUPU 1 AF P-29 UNCOUPI 125 IWP 00-037-02 1 125V IWP 00-037-4 NPSE VNPSE-321:
1 VNPSEVNPSE-:
I MS T-26 RUPTUR]
II MS T-26 RUPTU I CV CV-1296 MMV I
0 AF AF.4021 EM I 10 AF AF-4021 E&
i1 SI IT-531 OPS RI EM SI rr-531 OPm 7970 1F32Sa 4301 EPT REVO-1
$PT REV-1 0016601 439 3009892 7684 P-1 V-1 MM REVO-1
.E MM REV0-1 EM REVO-1 2 EM REV0-1 t IC REVO-1 213 IC REVO-1
'DISC MM REVO-1 IE DISC MM REVO-REVI.1 tEV0-1 REV0-1 REVO-1 4041 1 T-0690-H WCC 0-IT-0531 I1SI IT-531 OPS REVD-1I 12 30APR04 30APR04 22:00 23:59 0
l l
l Run Date 30APR04 13:451 LT03 STANDARD PUBLICATION Sheet 22 of 27 O Prmavera Svstems, Inc.
I FL-03 Execution Publication Set
after 30APR04 12:00 U1R28 WORKING SCHEDULE after 30APR04 12:00 ID RESP WO EQID DESCRIPTION RD ES EF RISK MF 30 Sat I
MATlII ST
.16Jj 20221024. 68.101214,16,18,202210. 2, 4. 6,8 1012,1416 4051 1 T-2081-R wCC HX-0018 MSHX-1 BWLUMMV REV1-1 I
30APR04 30APR04 23:00 23:59 a
406 1 T-9696-H WCC HX-0018 1 MS HX-1B SMP OPS 1
30APR04 30APR04 0
REV0-1 23:00 23:59 407 1 T-2728-H WCC AF-104 1 AFAF-104 MMVREVO-1 3
30APR04 01MAY04 65 23:00 01:59 408 0 T-6418-R WCC IA-1258 0IALA-1258MMREV0-1 1
01MAY04 01MAY04 174 00:00 00.59 409 1 T-8034-H WCC TG-01-T I TUTG-01-T 3
01MAY04 01MAY04 0
REV7-1 (RESTORE EH TO _
00 W 02.59 410 1 T-7969-R WCC CV LD 1 CV CV LUD SYSNCT I
01MAY04 01MAY04 92 MMV REVO.1-1 02:00 02:59 411 1
T-0510-R WCC W-1B111B2 1VNCCW-1B1/B2MM 3
01MAY04 01MAY04 56 REVO-1 02:00 04:59 412 1 T-1273-R WCC HX-21A 1 CS HX-21A MM REVO-1 3
01MAY04 01MAY04 19I 0200 04:59 413 1 T-7546-H WCC HX-1B I MSHX-1BWLUMMV I
01MAY04 01MAY04 0
REV1.1-1 03:00 03:59 414 1 T-8034-R WCC TG-01-T 1 TU TG-01-T REV7-1 I
01MAY04 01MAY04 645 03:00 03:59 415 1 T-9696-R WCC HX-001B I MS HX-1 B SMP OPS 1
01MAY04 01MAY04 2
REV0-1 03:00 03:59 416 1 T-2815-R WCC MS-2020 I MS MS-2020 EM I
01MAY04 01MAY04 REVO-1 04:00 04:59 417 1
T-1840-R WCC W-3E8 1 VNCRDW-3B MM 1
01MAY04 01MAY04 296 REVO-1 05:00 05:59 418 1 T-2726-R WCC VNPSE-3213 I VNPSE VNPSE-3213IC I
01MAY04 01MAY04 80 REV0-1 07:00 07:59 419 1 T-2659-R WCC P.029 I AF P-29 MM REVO-1 4
01MAY04 01MAY04 0
09:00 12:59 420 1 T-2618-H WCC IT-531 I Si IT-531 P-108 OPS 2
01MAY04 01MAY04 0
REVO-1 10:00 11:59 421 1
T-2746-R WCC P-025A I CS P-25A MM REVO-1 I 01MAY04 01MAY04 73 12:00 12:59 4221 T-2080R WCC HXO001A 1 MS HX-IAWLU MMV 2
01MAY04 01MAY04 92 REV1-1 12:00 13:59 T.208 0012 T-969 0009 T.272 0012 T-6 001 T..8 001 A
I1 MS HX-IBWL 181E1 MSHX-IB 1 MS HX.IB SM
,9631 MS HX-1B S W1 AFAF-104M S28 1 AF AF-1 1.ROIAIA.1258M 641830 IALA.1258 34H 1JTUTG.01.T 80341 1 TU T
.7969-R 1 CV CV
,01796911 CVCV
-.0510-Ri VNCC W.
)0105101 VNC
.1273-R 1 CS HX-21
001754631 MSH T.8034R 1 TUT 0018034M1 TUTd T.96966 R1 MS HX.
00096963 1 MS H T.2815R1 IMSM 001281511 MS N T-1840 R1 VNC4 001184011 VN T.2726-R 001272631 T.2659-R 0012659 T-2618-001261 T-27 001 T.20 001 T-96 000 MMV REVI-1 U MMV REVI-1 OPS REVO-1 P OPS REVO-1 REV0-1 MMV REVO-1 I REVO-1 M REV0-1 EV7-1(RESTORE Et I-T REV7-1 SYSNCT MMV RE DSYSNCT MMV RI BIIIB2 MM REVO-1 W-1B1/1B2 MM RE MM REV0.1 K-21A MM REVO-1 I WLU MMV REVI.
- 1B WLU MMV REV
.T REV7.1 01-T REV7.1 I SMP OPS REVO-1
.2020 EM REVO-1
[S-2020 EM REVO-1
!D W-3AIB MM REV RD W-3A8 MM RE 4PSE VNPSE-3213 VNPSE VNPSE-321:
I AF P-29 MM REVI 1 AF P-29 MR j1 Si IT.531 P-10B I Ii1 Sl IT-531 P-1l WR 1 CS P-25A M
!74611 CS P-25A K WR 1 MS HX.IA W m080I MS HX-1 12441 MS HX.1A S 1692_1 MS HX-TO STROKE VALV 11.11.1 v01-1 v0-1
.1
.1-1 1
1D-1 C REVO1 IC REV0-1 I REVO1
)PS REVO-1 B OPS REVO-1 REV0-1 M REV0-1
.U MMV REV1.1
.WLU MMVREV P OPS REVO-1 A SMP OPS REV0-'
ES) 423 I
T-9692-H wcC HX.O01A 1 MSHX-IASMPOPS REVO-I 3
01MAY04 12:00 01MAY04 14:59 0
Run Date 30APR04 13:451 LT.03 STANDARD PUBLICATION Sheet 23 of 27 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 30APR04 12:00 l
UIR28 WORKING SCHEDULE I
after 30APR04 12:00
MAY LE inII 3
Sat 1 Swrn 2 ST 1
4162,14,FL22I0.2
.4. 618.1012012.14.16, z~
I IEPjXTE$lu wam r--
4241 I
T-6929-R wcc D72-16-08 1 125V IWP 00-037'-02EIV REVO-I 1
01MAY04 01MAY04 14:00 14:59 425 1 T-8694-H WCC 1NP 1 480VMWP0t-128 E-FN 1
01MAY04 01MAY04 0
(W-21A) CAUT REVI-1 14:00 14:59 426 1 T-8024-H WCC IWP 1 480VIWP01-128 E-FN 2
01MAY04 01MAY04 (01-39) EM REVO-2 15:00 16:59 427 1 T-8608-R WCC FD-204B 1 FD FD-204B MMV I
01MAY04 01MAY04 0
REV0.1-2 17:00 17:59 428 1 TAGSWAP WCC MS-02017 TAG MOD TO WORK 1
01MAY04 01MAY04 DR-N ML-N 0
MS-02017 & MS-2018 18:00 18:59 ORT3-N R-N 429 1 T-0475-R WCC SC-955 1 SC SC-955 IC REV0-1 1
01MAY04 01MAY04 54 19:00 19.59 430 1 T-2607-R WCC SC-955-S 1 SC SC-955-S IC REV0-1 I 01MAY04 01MAY04 0
19:00 19:59 431 1
T-2709-H WCC MS-2018 1 MS MS-2018 MMV 1
01MAY04 01MAY04 3
REVO-1 19:00 19.59 432 1 T-3767-H WCC MS-02017 I MS MS-2017 MW I
01MAY04 01MAY04 I
REVO-1 19:00 1959 433 1 T-5946-H WCC MAIN I MS MAIN STEAM MMV 1
01MAY04 01MAY04 DR-N ML-N 0
REVI-1 19:00 19-59 ORT3-N R-N 434 1
T-7421-H WCC HX-401A I MS HX-1A WLU MMV 1
01MAY04 01MAY04 0
REV2-1 19:00 19:59 435 1 T-7422-H WCC HX-O01B 1 MS HX-18 WLU MMV 1
01MAY04 01MAY04 35 REV2-1 19:00 19:59 438 1
T-8375-R WCC FD-196A 1 MS FD-196A CE REVO-1 1 01MAY04 01MAY04 DR-YMML-Y 113 19:00 19:59 ORT3-Y R-N 437 1 T-8377-H WCC FD-196A 1 MS FD-I96A CE REV.1 I
01MAY04 01MAY04 DR-Y ML-Y 0
19:00 19:59 ORT3-Y R-N 438 1 T-9692-R WCC HX-001A 1 MS HX-1A SMP OPS 1
01MAY04 01MAY04 3
REVO-1 19.00 19.59 439 1 T-5948-H WCC T-23 I FDT-23MMVREVI-1 2
01MAY04 01MAY04 0
19:00 20:59 440 1 T-6819-H WCC L5-02376 1 MSLS-237BICREV1-1 2
01MAY04 01MAY04 0
19:00 20.59 16929-RI 125V IWP 01692911 125V PA 1-8694H 1 480V IWP 01869411 480V W
T.8024-H I 480V IW 0018024f1 48M T-8608.R 1 FD F 001860811 FD TAGSWAPTAG ii T.0475R I S 001047511 T-2607R 1 S 001260711 T.2709 H M 001270911 T-37674H1 M 001376711 T.5946-H M 001594611 T-7421-H1i 001742111 T.7422-H I 001742211 T.8375-R I1 001837511 T-8377 H 1 00183771 T-9692-R1 000969211 T.5948-HI F 0015948 T-6819.H1 0016819 0010448 T-6786 0016678 00-037.02 EM REVI P00-037-02 EM RE' 01.1228E-FN (W-21 01.128 E-FN (W.2 01.128 E-FN (0W3 IWP 01-128E-FN ((
04B MMV REVO.
FD-204B MMV REV O TO WORK MS SC-955 IC REVO.1 SC SC-955 IC REVC SC-955-S IC REV(
C SC-955-S IC RE MS-2018 MMV RE MS MS-2018 MMV F MS-2017 MMV RE S MS-2017 MMV F MAIN STEAM MM S MAIN STEAM Ml HX-IAWLU MMV MSHX-1AWLUMM HX.IBWLU MMV MS HX.18 WLU MM FO196A CE REVE MS FD-196A CE RE FD.196A CE REV' S FD-196A CE RE HX.1A SMP OPS I MS HX-1A SMP OPX
~ T-23 MMV REVI.1 I FD T-23 MW RE\\
LS.2376 IC REVI-I MS L5-2376 IC R MS MAIN STEAM MI 1 MS MAIN STEAM I MS LS2376 IC R6 MI MS LS-2376,q
-1 r0-1 k) CAUT REV-1.
IA) CAUT REVI-
-2
.1-2 02017 & MS-201
- 1
.1 ID-1 EV0-1 EVO-1 P REV1-1 f REVI-1 lREV2.1 rREV2-1 REV2-1 rREV2-1 R1
.1 1-1 tEVO.1 REVO-1 IV1.1 UV REV0-1 IMV REV0.1 4W REVD-1
/0.1 REVO.1 441 1 1 T-0448-R wcc MAIN 1 MS MAIN STEAM MW I 1 R
01MAY04 I 01MAY04 DR-V MI-V REVD-I M
9.00 j20:59 ORT3-Y R-N 0
4421 T11 78-R wcc LS-02376 I MS LS-2376 IC REV0-1I 2 01MAY04 01MAY04 DR-Y ML-Y 21:00 1 2Z59 I ORT3-Y R-N 0
J. _
J
_II_
L
.I I
I IJ Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION l
Sheet 24 of 27 O PrimaVera SYSTem, Inc.
I FL.03 Execution Publication Set I
after 30APRO4 12:00
- U1R28 WORKING SCHEDULE after 30APRO4 12:00 U
ID lRESPl WO EQID DESCRIPTION lRD ES EF RISK 30 1
A I
MAYS2 ST LTD 0 IESt ISunj
_ _ I I ST I
9.10T1Z14,16L1120.2210, 214.6 68.1012,14.1618.2Q22) 0,2. 4.8*01116 "I311 T-6122-R wCC CV-00296 1 CV CV-296 MW REVO-I I I 01MAY04 I 01MAY04 22:00 j22:59 24 444 1
T-8694-R WCC WP 1 480V IWP 01-128 E-FN 1
01MAY04 01MAY04 626 (W-21A) CAUT REVI-1 22:00 2259 445 1 T-2618-R WCC IT-531 I SI IT-531 P-10B OPS I
02MAY04 02MAY04 0
REVO-1 00:00 00:59 446 1 T-6939-H WCC D72-21-08 1 125V IWP 00-037.07 El 1
02MAY04 02MAY04 C
REVO-1 00:00 00.59 447 1
T-0721-H WCC Z-024A 1 FH Z-24A RP-1B OPS 2
02MAY04 02MAY04 152 REVO-1 00:00 01:59 448 1
T-2622-H WCC YV04 1 Y YV4 EM REV0-1 2
02MAY04 02MAY04 0
0000 01:59 449 1
T-7992-R WCC MS-2016 1 MS MS-2016 MMV 2
02MAY04 02MAY04 157 REV0-1 00:00 01:59 450 1 T-2084-H WCC RVU 1 RC RVU RELIEFS MMV 4 02MAY04 02MAY04 27 REVO-1 00.00 03:59 451 1
T-2083-H WCC PRT 1 RC PRT MMV REVO-1 5
02MAY04 02MAY04 26 00.00 04:59 452 1
CL-2E WCC CL, 2E MODE 3 TO MODE 2 406 02MAY04 18MAY04 DR-N ML-N 0
CHECKLIST 00:00 21:59 ORT3-N R.N 453 1 CL-2F WCC CL 2F MODE 2 TO MODE 1 421 02MAY04 19MAY04 DR-N ML-N C
CHECKLIST 00.00 18:59 ORT3-N R-N 454 1
T-7108-R WCC TG-01-G 1TUTG-01-GEMREV3-1 102MAY04 02MAY04 DR-Y ML-Y 0
02:00 0259 ORT3-Y R-N 455 1 T-7109-H WCC TG-01-G 1TUTG-01-GEMREV4-1 I
02MAY04 02MAY04 DR-Y ML-Y C
0ZW0 0259 ORT3-Y R-N 456 1 T-7149-H WCC 1F52-122 1 345KV 1F52-122 APS 1
02MAY04 02MAY04 DR-N ML-N 0
REV3-1 0200 02:59 ORT3-Y R-N 457 1 T-8024-R WCC IWP 1 48VW IP 01-128E-FN 1
02MAY04 02MAY04 622 (01-39) EM REV0.2 02.0 02:59 458 1 T-0690-R WCC O-IT-0531 I SI IT-531 OPS REV0-1 1
02MAY04 02MAY04 1
04:00 04:59 459 1 T-7043-R WCC P-028A-M I CS P-28A-M EM REV0-1 1
02MAY04 02MAY04 DR-Y ML-Y C
04:00 04:59 ORT3-Y R-N 460 1 T.7047-H WCC P-028A-M 1 CS P-28A-M EM REVI-1 1
02MAY04 02MAY04 DR-Y ML-Y C
04:00 04:59 ORT3-Y R-N T-6122-001612 T-8694-00186S T.26 001 T-69 001 T-07 001 T.26 001 T-79 001 T.20 001 7-20 001 C
C IJ CVCV296 MMV 2111 CV CV.296 Mh 11 480V IWP 01-121 4[1 480VIWPo0-1 8-R 1 St IT531 P.11 61811 SI IT-531 P S9-H 1 12sV WP oa i9391 125V IWPC 214 1 FH Z-24A RP
)721 1 FH Z-24A
!2-H I Y Y.4 EM RE 1622E1 YY-4 EM 12-Rl MS MS-2016
!992E1 MS MS-2(
14-H 1 RC RVU REL 1084 t RCR' 3H 1 RC PRT MM 1083[1 RC I L-2EMODE 3 TO M Xl il L-2FMODE 2 TO MC
.71081 TU TG-01 101710811 TUTG4
.7109441 TU TG-01 101710911 TUTG4
-7149-H1 345KVlF 101714911 345KV
-8024-R1 4OV IWP 01802411 480V M T-0690-R 1 S IT-!
001069011 SI IT T-7043-RI CS P.:
001704311 CSF T-7047-H I CS P-:
001704711 CS F 0199-020 ALIGN I MI St REVO-1 V REVO-I E-FN (W-21A) C 28E-FN (W-21A)
'SOPS REVO-1 10B OPS REV0.1 037-07 EM REVC 0-037-07 EM REV 18 OPS REVO-1 RP.1B OPS REV p-1 REVO-1 1IMV REVO-I 16 MMV REVO-1 IEFS MMV REVO U RELIEFS MM REV9-1
,DE 1 CHECKUS W -
G EM REV3-1 1-G EM REV3-1 G EM REV4.1 1-G EM REV4-1 32-122 APS REV, F52-122 APS RE 01.128-E-FN (Ol P 01-128E-FN (
31 OPS REVO-1 531 OPS REV0-i 8A-M EM REV0-
-28A-M EM REV AST&P-41583F 3-826A CT OPS 461 I
01994020 wCC sl-828 ALIGN BAST&P-015 FOR REACTIVITY 2
02MAY04 I 02MAY04 I DR-N MR-N 04:00 05.59 ORT3-N R-N
-C]
.I.
a
.j........&
A I
U Run Date 30APR04 13:451 LT-03 STANDARD PUBLICATION Shoot 25 of 27 C PflmaveraSystens, Inc.
lFL-03 Execution Publication Set I
after 30APR04 12:00 l
U1R28 WORKING SCHEDULE I
after 30APRO4 12:00
MAY S
I
-ST
_II
- k. 1 12.14,1n1 P.
Io. 2.4..8.102,1416,14 1
Eq; l^l-.lsS^lu.
_SZI 4621 I T-7438-H I WCC 04T-0531 I Si IT-531 OP'S REV1-1 2
02MAY04 02MAY04 04:00 05:59 0
463 0 T-1678-H WCC IA-1249 0 IA -I 249 IC REVO-1 2
02MAY04 02MAY04 0
05:00 06:59 464 1 T-7150-H WCC 1 F52-122 1345KV IF52-122APS I
02MAY04 02MAY04 0
REV2-1 06:00 06:59 465 1
T-8710-R WCC I SI REACT1VTTY PATH I
02MAY04 02MAY04 360 DSS REVO-1 06:00 06:59 466 1 T-8716-R WCC P-15A I Si P-15A FLOWPATH I
02MAY04 02MAY04 360 DSS REV0-1 06:00 06:59 467 1
T-8761-R WCC S1-826B 1 SI S-82M CT OPS 1
02MAY04 02MAY04 198 REVI-1 06:00 06:59 468 1 T-7932-H WCC SW-871A 1 SI SI-871A EM REV1-1 3
02MAY04 02MAY04 0
06:00 08:59 469 1 T-7109-R WCC TG-01-G 1 TU TG-01-G EM REV4-1 1
02MAY04 02MAY04 DR-Y ML-Y 64 07:00 07:59 ORT3-Y R-N 470 1 T-7147-R WCC 1 F52-122 I 345KV 1 F52-122 APS I
02MAY04 02MAY04 85 REV1-1 07:00 07:59 I I T-7783-H WCC TG-01-G 1 TU TG-01-G EM I
02MAY04 02MAY04 64 REV4.1-1 07:00 07:59 472 1 T-0467-H WCC RH-626 1 RH RH-626 IC REV0-1 2
02MAY04 02MAY04 0
07:00 08:59 473 1
T-0685-H WCC ICP-5.69A 1 RH ICP-5.69A IC REVO-1 2 02MAY04 02MAY04 0
07:00 08:59 474 1
T-2617-H WCC IT-531 1 SIIT-531 P-OA 1
OPS 2
02MAY04 02MAY04 0
REVO-1 07:00 08:59 475 1 T-2610-H WCC S-857A I SI SI-857A EM REVO-1 3
02MAY04 02MAY04 0
07:00 09:59 476 1 T-7047-R WCC P-028A-M 1 CS P-28A-M EM REV1.1 1
02MAY04 02MAY04 DR-Y ML-Y 158 09:00 09 59 ORT3-Y R-N 477 1 T-6123-R WCC CV-00275 I CV CV-275 MMV 3
02MAY04 02MAY04 0
REVO-1 09:00 11:59 478 1 T-1832-R WCC HX-158 1 VNCC HX-15B MM 2
02MAY04 02MAY04 0
REV1-1 10:00 11:59 479 0 T-1678-R WCC IA-1249 0 IAIA-1249IC REV0-1 I
02MAY04 02MAY04 0
11:00 11:59 T-743gH 1 SI IT-!
0017438U1 SI T-16781 0 UIAU 0011678[0 L T-7150-H 1 3 4 '
001715011,
T-8710-R1 Si 001871011 E T48716-R1 SI 001871611 c T-8761-R1I Si 001876111 E T-79324H1 SI 0017932Mn T-7109-R1 7 00171091 T-7147-R1 3 001714711 T-7783M 1 001778311 T-0467-H F 00104679 T-068S I 0010685oO T-2617441 S 0012617j T-2610-H1I 5 00126101 T-7047-R 0017047 T-6123-R 0016123 T-1832.
00118:
T-167 0011 31 OPS REV1-1 T-531 OPS REV1
.1249 IC REVO-1 IA-1249 IC REV
,KV 1F52.122 AP 15KV 1F52-122 A ZEACTIVTY PAl I REACTMTY PI 15-SA FLQOWPAT I P-15A FLOWPA
- "8268 CT OPS I SI-826 CT OP i871A EM REV' 1 Si SI-871A EM JTG-01-GEMRI TU TG EM 15KV 1F52-122 A 345KV 1F52-122 JTG-01-G EM R TU TG-01-G EM H R626 IC RE) 1 RH RH-626 IC H ICP-5.69A IC P I RH ICP-5.69A I rTr531 P-10A 01 I SI IT-531 P-10I I S857A EM RE' II SI S-857A E 1 CS P-28A-M El
.II CS P-28A-MI I CV CV-275 MM 1 CVCV-27 R1 VNCC HX-51I 2E1 VNCC HX
.R° IA IA-1249I f'810 IA W124 480 1
T-0467-R WCC RH-626 1 RH RH-626 IC REVO-1 1
02MAY04 I 02MAY04 13:00 13:59 25 T4~46T.R IRH RH4 0?1 OMNI7 RH RI-Run Date 30APR04 13:45 LT-03 STANDARD PUBLICATION Sheet 26 of 27 O Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 30APR04 12:00 l
U1R28 WORKING SCHEDULE after 30APRO4 12:00
MAY ST I I I I11121411120,22101214161 102114,161182 22101214161 141
= ]I~I;
-l~u". I _
WIN kle101i14 1
481 1
T-2622-R WCC r.04 1 Y YJ4 EM REVO-1 I
02MAY04 02MAY04 0
622-RI V Y-4 El 13:00 13:59 1621 YY-4 482 1 T-3790-R WCC S-6050A 1 IOPS S-6050A IC I
02MAYO4 02MAY04 0
l379-R 1 IOPS REVO-1 14:00 14:59 013790111 IOP" 483 1 T-6939-R WCC _
D72-2149 1 125V IWP 00037-07 EM 1 02MAY04 02MAY04 0
T-6939-R I REVO-1 17:00 17:59 1
001693911 Run Date 30APR04 13:461 LT-03 STANDARD PUBLICATION Sheet 27 of 27 C Primavera Systems, Inc.
l FL03 Execution Publication Set I
Run Date 30APR04 13:5 7]
Work Activity Risk Assignment Sheet 1 of 2 U
ACT WIwoGRPI HPE EQUIPMENT Activity Cal DUR START IFINISH ER I
MAY ID S IKDescription ID~
292*
F aGI2f u'
g I jCE 1600-22 76 CE R-V ML-Y R-1 PERFORM UNDERHEAD U
50 23APR04102MAY04
~
ZZ~ECO ESLADASML ORT3-Y R-M INSPECTION OF RX HEAD 22:OOA 17:59 213472 128CE LZIR II 1
EM0216638 76 EM DR-N ML-N P-001B-M START REPAIRS FOR P-lB1 30 28APR04 OIMAYo4
____REACTOR COOLANT PUMP MOTOR ORT3-N R-M HIGH BREAKAWAY 01:OOA 17:59 0301756 128EM
¶EM-BMFPCL2 76 EM DR-V ML-Y P-028B1-M CONTINUE P28B INPLACE 8
25 29APR04 03MAY04 I~~STEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M CLEANING (ROTOR &
20:OOA 09:59 03120 5-128 1
EM0215216 76 EM D1R-Y ML-Y TG-01-G INSPECT GENERATOR U
35 29APR04 02MAY04 D~ELECTRICAL GENERATOR ORT3-N R-M PHASE AND NEUTRAL 21:OOA 01:59 0215216 -
128EM 1
EM-84 801 76 EM DR-N ML-N RPI AT HEAD RPI COIL U
10 30APR04 30APR04
- 3RPI SYSTEM MULTI AND/OR NON-NUMBERED EQUIPMENT ORT3.-N R-M RESISTANCE/INDUCTANCE 12:00' 22:59 3215213 -
128EM 1
EM-8480J 76 EM DR-N ML-N R-1 AT HEAD CROM COIL U
10 30APR04 30APR04
=REACTOR VESSEL AND ASSEMBLY ORT3-N R-M RESISTANCE/INDUCTANCE 12:00' 22:59 215214 - 128EM 1
EM0216167 76 EM DR-N ML-N E-01 INSPECT AND MAINTAIN 9
10 30APR04 01MAY04 (Zj==~jr-oi TURBINE GENERATOR EXCITER ORT3-N R-M EXCITER FUSES PER MWP 20:00' 20:59 0216167 - 128EM 1
EM0215223 76 EM DR-N ML-N W-003A-M PERFORM MCE W-003A-M U
4 01MAY04 01MAY04
(]CONTAINMENT CONTROL ROD DRIVE SHROUD FAN MOTOR ORT3-N R-M (11B52.3AM1B-0l) 09:00' 12:59 0215223 -
128EM I
EM0216638A 76 EM DR-N ML-N P-001B-M P-l B RE-ASSEMBLY OF 1
100 01MAY04 05MAY04 I
-REACTOR COOLANT P (DORT3-N R-M MOTOR 18:00 21:59 0301755 - 128EM 1
EM0215225 76 EM DR-N ML-N W-00.4A-M PERFORM MCE W-004A-M U
4 02MAY04 02MAY04 KIuICONTAINMENT REACTOR CAVITY COOLING FAN MOT ORT3-N R-M (1B52-317M)1B-31) 05:00 09:59 0215225 - 128EM I
EM02 15225 76 EM DR-N ML-N W-0048-M PERFORM MCE W-004B-M U
4 02MAY04 02MAY04
[ICONTAINMENT REACTOR CAVITY COOUING FAN MO ORT3-N R-M (1B52-318M/1B.31) 10:00 13:59 0215226 -
128EM LZI* 1*
- L-0 EM0215146 76 EMV DR-N ML-N AF-04021-0 AF-4021 STEM CLEANING U
5 30APR04 30APR04
[iP-388BAFP DISCHARGE TO I1HX-1 B SG OPERATOR ORT3-N R-M AND LUBRICATION 14:00 19:59 0215146 - 128EM 0
EM02 15147 76 IEMV DR-N ML-N AF-04023-0 AF-4023 STEM CLEANING U
5 30APR04 30APR04 a]~P-38A AFP DISCHARGE TO I HX-I A SG OPERATOR ORT3-N R-M AND LUBRICATION 14:00 19:59 0215147 - 128EM 2
IC0301005 76 IC5 DR-N ML-N ICP-02.001 I RP AND SG ANALOG TEST.
5 5
02MAY04 02MAY04
[]REACTOR PROTECTION AND SAFEGUARDS ANALOG ORT3-N R-M RED 07.00' 11:59 0301005 - B07A2 I
MM02i6627 7
MMV DR-N ML-N CV-01296 CV-1 296 -INSTALL NEW Y
20 27APR04 03MAY04 *--
- ~~UXIUIARY CHARGING UINE ISOLATION ORT3-N R-M TRIM PER MOD 02-027 08:OOA 13:59 0216627 128MM 1
MM030368 76 MMV DR-Y ML.-Y MS-02005 1IMS-2005 -REMOVE VALVE U
10 30APR04-30APR04 DHX-l13B SG HEADER SAFETY ORT3-N R-M TO PERFORM HEADER MOD 12:00 22:59
)303680.- 128MM 1
MM0303681 76 MMV DR-V ML-Y MS-02010 IMS-2010 -REMOVE VALVE U
12 30APR04 01MAY04 EXIIHX-1A SG; HEADER SAFETY ORT3-N R-M TPEFORM HEDR MOD 23:00 11:59 0303681 - 128MM I
MM0303680A 76 MW DR-Y ML-Y MS-02005 IMS-2005 - PERFORM MOD 5
48 01MAY04 05MAY04 E~
U~~x-is sr. HEADER SAFETY ORT3-N R-M FOR ROUNDED ENTRANCE 06:00 109:59 I0303680 128MM it""
ME P-5.
I NMC /WE PBNP U1 Refueling 28 Outage LT-81 HUMAN ERROR RISK BARCHART FL-81 HUMAN ERROR POTENTIAL
-~#-
. I 0 Primavera Systems, Inc
Run Date 30APR04 13:57)
Work Activity Risk Assignment I
Sheet2of2 U
ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH APR I
MAY ID ST RISK Description tD 1
0-EI 0016li:lyV zll~ti
_ 8 _
0 OP0301343 77 OP2 DR-N ML-N O-TS-082 TS-82. G002 EMERGENCY 2
6 02MAY04 02MAY04 OG-02 EMERGENCY DIESEL GENERATOR MONTHLY '
ORT3-N R-M DIESEL 08:00-13:59 0301343 - B07A2 JiM 1
2 OP0301626 77 OP3 DR-N ML-N O-TS-004A TS-4A. UNIT 2 TURBINE TRIP 3
1 01MAY04 01MAY04 OUNIT 2 TURBINE TRIP TEST ORT3-N R-M TEST 16:00-16:59 0301626 - B06BI 0
OP0301450 77 OP3 DR-N ML-N O-IT-0014.2 IT-14. FO TRANSFER 3
3 02MAY04 02MAY04 0G-02 EDG FUEL OIL TRANSFER SYSTEM PUMPSNALV ORT3-N R-M SYSTEM PUMPS/
16:00-18:59 0301450 - B07A2 0
OP0301451 77 OP3 DR-N ML-N O-IT-0100.2 IT-100. SEAT LKG TEST OF 3
3 02MAY04 02MAY04 G0-02 EDG SEAT LKG TEST OF DA COMP DISCH CHK Vl ORT3-N R-M DA-200 AND 16:00' 18:59 0301451 - B07A2 i
I RPiC-030 OPS DR-N ML-N O-RP-001C FUEL MOTION AND INSERT 1
36 25APR04 01MAY04 REFUEUNG ORT3-N R-M SHUFFLE 08 00A 23:59 1280P 1
IT-003 77 OPS DR-N ML-N O-IT-0003 RHR P&V TEST TO 1
5 30APR04 30APR04 ERHR PUMP AND VALVE TESTS IN DHR MODE (CSD) UNIT ORT3-N R-M RECOVER P-010B TO 18:00 22:59 0215886 - 1280P 1
01-135B-B OPS DR-N ML-N P-010B COMPLETE RHR B TRAIN 1
3 30APR04 01MAY04 I
ORT3-N R-M F&V PER OIU-135B SECT 5.4 23:00 01:59 1280P 1
IT-530D 77 OPS DR-N ML-N O-IT-0530D LRPM & PIGGYBACK TEST 1
8 01MAY04 01MAY04 ELRPM PROGRAM TRAIN 8 HHSI AND RHR PIGGYBACK TEST ORT3-N R-M OF TRAIN B SI 02:00 09:59 0215917 - 1280P IT-531B 77 OPS DR-N ML-N O-IT-0531 LRPM RHR TO SUMP B 1
12 01 MAY04 01MAY04 UNIT I CONT SUMP B SUCTION LINE LEAK TEST (RFSD)
ORT3-N R-M TRAIN B 12:00 23:59 0215919 - 1280P NMIWELT-81 HUMAN ERROR RISK BARCHART C.
PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL O Prmavera St PBNP l1Rfeig 8Otg