Text
tout10 Committed to Nuclear Erc 1
0 1
)
Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda WednesdayApril 21, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer/ Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Une Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Work Activity Risk-Manager Assignment (SOM)
- 10. Management Expectations (SSM)
- 11. ACEMAN Assessment Results (SOM)
- 12. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Work Week Schedule Information In this record was deleted in accordance with Ie Freedom of Information 1
Act, e eWpions
- FOISA-s>z2 I
Site Communication Revised 4/12/04 Priorities:
- The Safe Operation of Unit 2
- Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist I" Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities
-SG Eddy Current and Sludge Lancing
-Main Turbine and Generator Work
-Rx Vessel Head Inspection
- Hx Hydro Lance and Eddy Current 3'd Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
Outage Briefing Schedule - NSB Cafeteria:
Day Shift NNight Shift Activity 0600 - 0640 C
n1800
-o1840 OCC Tutover T
o c
0645 0 - 0725 l 1845
- 19 lCCoetWerFc 0730- 0800 1930- 2000 Supervisor Feedback to OCC of Turnover to Work Force
- Outage Briefing Schedule Notes:
- The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.
- Attendance will be taken at the OCC turnover meeting.
- It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
- Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.
Additional Changes:
- Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
- A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
2
NM Coninditwd to Nucicar Excellence.
Polar t:H
- II EG Point Beach Nuclear Plant U1R28 Refueling Outage Theme for the week This week's theme Is Outace Reminders. An outage puts tremendous stress on all individuals Involved.
This stress Is an accumulation of several factors Including long work hours, poor nutrition habits, schedule adherence, unanticipated events and other items to numerous to mention. We must all remember to take care of each other, our families and ourselves during this time.
'Daily Safety Snippets Sunday "Remember to use STAR and you will shine" STAR Is en acronym we can rely on to keep us on track for a successful outage. Stop - Think - Act and Review it Is as simple as that Monday "Three way communication is a key communication tool" "I understand Three way communication Is a key communication tool" "That Is correct" Three way communication Is not just a good Idea it Is a great process that we can use to clearly define the message sent was In fact the message heard. Hold each other accountable for the use of this practice and soon It will become standard.
Tuesday "Avoid and recognize error likely situations Distractions and Unfamiliar tasks are just two of the error likely' situations that we could encounter of a daily basis. As an example of the consequences of this error situation, consider what happened at Calvert Cliffs in January 2004. Three workers, one being a student employee, were sent to empty salt from a dump truck. The two experienced workers were called away, leaving the student to finish. He brushed salt off an auger with his hand when his hand was caught a pulled Into the machine.
Wednesday "Follow the schedule or risk dancing with the devil (or Shift Outage birector)'
OE17554 - October 2003 Quad Cities - While performing scheduled cleaning In the condensate demineralizer, the crew noticed the atmosphere had become hazy. Upon exiting the space they found out welding was going on In a nearby heat exchanger and the turbine building ventilation was shut off for work.
Following the schedule helps to prevent such competing activities.
Thursday be educated-not nedicated Is the outage giving you a headache? Remember many people suffer serious side effects from the use of aspirin, laxatives, cold remedies, vitamins, herbals and diet aids. Misusing the product - like using too much, often causes reactions. More Is not necessarily better. Recommended dosages are determined by the amount needed to achieve the desired effect without causing other problems.
Friday "If the heat is making you sick, get out of the area quick."
OE17082 - September 2003 Fort Calhoun - RP technician working the In the lower cavity started experiencing heat stress symptoms. Rather than stopping the job and exiting the area, he decided to continue. The result was an ambulance ride to the local hospital of a contaminated worker. Do we all remember the signs of heat stress?
Saturday "OnlY fools would not use their error reduction tools" A reminder to use your error reduction tools for every job and every task, these include: Co-worker coaching, challenging information, peer checking, place keeping and procedure use and adherence to name lust a few.
3
F F
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 17 Path 8N.
1 Picture Meets Outage Radiation Performance Doesn't Meet Exceeds U
Moa [TIP MgiFA IThis indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<--75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
25.875 Rem jDay I 7 -April 20 I
Actual = 0.607 Cumulative = 25.875 Cumulative Forecast = 57.474 Meets: <=18 Exceeds: <= 12 Actual PCE's:
5 U
zfi
- 6 I~ AI k
a Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20.
18 16 14 -
-9 12 -
10 Id z 4 -0 2 -
0 0 2 4 6 8 1012 14 16 18202224 2628 3032 34 so 4
Actual
..Forecast
~
Goal F.
0 0
a 0
0I 0
60 40 II
_i I
I II
- I I
I I
- I*
0 61
4 I
Actual
..Fo Goal 20 To 0
2 4
6 8
10 12 14 16 18 20 22 24 26
Nuie Camfntled to Nuclear Exc.1elece Outage Status Report Plant:
Point Beach Unit I DaV:
Wednesday Todav's Date / Time:
4/21/04 Mn00 Outage Duration: Day 18 of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage I
Summary.
Radiological Dose outage to date 25.875 Projected to date 57A74 Outage Goal
- 75 R Difference
-31.599 Number of PCEs 5
Summary.
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
0 Hot Standby (Mode 3)
[]Hot Shutdown (Mode 4) [ Cold Shutdown (Modes) 3 Refueling Shutdown (mode 6)
RCS:
Temperature:
100 Pressure:
Vented to Atmosphere RV Level:
69%
Time to Boll:
47 Minutes Shutdown Safety Assessment Reactivity:
Green Core Cooling:
Yellow Power Availability:
Green Containment:
Green Inventory:
Yellow Spent Fuel Pool Cooling:
N/A Shutdown Safety Assessment Protected Equipment: A
& L' Activities Completed in Last 24 Hours Critical Path and Near Critic th Activities (Next 24 Hours)
- Reactor Vessel Stud Removal Activity
- Installed Cavity Seal Ring
- Installed Guide Studs
- Removed "B" SG Lower Hand Hole Covers
- Installed Tri-Nuke Filter Rx Vessel Head Lift Schedule:
Activities Required t-Tkit Yellow Risk Conditions I) S/G Sludge Lance
- 2) Flood Cavity for Rod Unlatch
- 3) Rod Unlatch Significant Outstanding Issues Date l_Issue lDue Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/30/04 Scott Manthei 4/04104 I P2A Charging Pump Troubleshooting 4123/04 Clay Hill 4/08/04 Incorporate Lessons Learned from 15s Reduced Inventory Orange Path 4/25/04 Dave Dyzak 4/20/04 Conoseal Bullet Nose 4121/04 John Flannagan Upcoming Major Milestones Scheduled Actual Scheduled Actual Date I Time Date l Time Date Time Date Time Cooldown <2000 4103/04 2100 4/03/04
. 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 4/2 1/04 1615 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 5
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 21, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
YELLOW YELLOW GREEN YELLOW YELLOW NA PROTECTED EOUIPMENT:
Unit I is in Mode 6 Fire Protection Condition III: Credit Is taken for fire rounds as fire prevention contingency RCS Time to Boll Is 47 minutes RCS is at 69 % Reactor Vessel Level Hot Leg Vent Path Is the Pressurizer manivay PBF41562 Revison 2 10/30102 PagJ 5 of 9 Refercnes: NP 10.3.6 NP 10.2.1
Defined Critical Path
.PR U
ID DESCRIPTION OD RDOCaI U SYS I EQID TF I 21 22 23 1
4 S 6. 8a o10014.16.1820221.4 6 8 n0l2l4146,18,20.2210,2.4.6. 8.1012.14.16,18,20,22
_NG-SGX-ASL OFFLOAD StG SWDGE 1
0 Ms _IM HX 001B O
NG-SGxAs&FFLAD SIG SLUDG LAC EQUIPMEN LANCE EQUIPMEN 01992AR465 I2
_A_
_4_0_
1 RPID-010 FILL LOWER CAVITY PER 1 1 1 1 FH O-RP-001D 0
RPiDo 01L*CAVITY PERRP RP-1D 1APR04 12:5921APR04 12:00 1 MM-8480D1 MOVE REACTOR VESSEL 4
4 1 1
RC R-1 0
MM8480 1MOVE REACTOR VESSEL HEAD TO RHUDA HEAD TO RHLDA 21APR04 13: _0214134-21APRO4 16:59 I
HEADLIFT REACTOR VESSEL HEAD 0 0 1 1
RC MILESTONE 0
HEAD FT REACTOR VESSEL HEAD UFT LUFT 21APR04 1 :00*
_ NG-SGB-ASLl S/G B -SETUP FOR 55 5
1 MS HX-001B 0
- GGB_
9_ E*
- FOR
_ E CL^ _ G TUBESHEET CLEANING 22APR04 07:00_0301939 - 22APR04 11:59 1 NG-SGA-BSL SIG B -SETUP HOSE THRU 1 1 5 1
MS HX-O00A 0
NG.SGA4S SIGB - SETUP HOSE THRU HATCH l HATCH 22APR04 12:00E0301938-22APR04 12:59 I NG-SGB-BSL SIG B - PERFORM 14 14 5 1
MS HX-OO1B 01 NG-SG4SIG B - PERFORM TUBESHEET CLEANING TUBESHEET CLEANING 0301939-23APR04 16:5922APR04 13:00_
1 MM9933444 W-1C2-A REPLACE 20 20 5 1 VNCC W-001C2-A 4
MM9933444W-1C2-A REPLACE BACKDRAFT DAMPER BACKDRAFT DAMPER 9933444-24APR04 12_5922APR04 13:00
~ I IIER*ET II I NGSGB.-CSL SIG B-REM SL EQUIPAND 6
6 _1 MS HX-001B 0
NG.SGB-CSLSJG B -REM SIL EQUIP AND CLOSEOUT INSPECTION CLOSEOUT INSPECTION
_______j0301939-23APR04 22 5923APR04 17:00 Run Dt-e 21APR0413:48l LT-16 DEFINED CRICAL PATH Shoot 1 of I 0 PFdfavera Systems, Inc FL-1 6 DEFINED CRITICAL PATH SET
after 21APR04 12:00 U1R28 WORKING SCHEDULE after 21APR04 12:00 4
U ID RESP WO IEQID DESCRIPTION RD ES EF RISK.
MF APR2 ST I Oi 2 10 1.1 8 20.22I 0 2. 4. 6.1.1Oi 214Z1 161 F,2.2 " 0. 2.46 B. 8.Oi 214.1 r146 1
1 PM-BRIEF1 ADM ADMIN OCC INTERACTIVE 2
21APR04 21APR04 712 P
_URIEFIOCO INTERAC7IVE n RNOVER and FOLLOWUP TURNOVER and 18:00' 19:59 D
2 1
AM-BRIEF1 ADM ADMIN OCC INTERACTIVE 2
22APR04 22APR04 700 AM-BRIEFIOC INTERACTIVE TUIlNOVER and FOI OWUP TURNOVER and 06:00' 07:59 H
3 1
PM-BRIEF2 ADM ADMIN OCC INTERACTIVE 2
22APR04 22APR04 688 8 PM-BRIEF20CcINTERACTIVE OVER and F TURNOVER and 18:00' 19:59 4
1 AM-BRIEF2 ADM ADMIN OCC INTERACTIVE 2
23APR04 23APR04 676 AM-BRIEFDCC INTERACTIVE TURNOVER and 06:00' 07:59 U
.e 1
SK1ll*
gl
_-E 5
1 AP0215130 APM 76 X-02 INSPECT CAL AND SET 10 22APR04 23APR04 DR-N ML-N 0 _
AP021513 NSPECT CAL AN) SET X.02 X-02 09W:00 10:59 ORT3-N R-.
021513 UNIT AUXI
-S i
K;4 3*
E.
6 1
AP0215121 APR 76 I
-04 1O4CALIBRATETECHI 8
23APR04 24APR04 DR-N ML-N 0 _
AP021 21.1B-04 CAUIE SPECRELAYS 11:00 10:59 ORT3-NR-L 0215 210 7L 0
CE0306041 CEI 76 INTAKE CRI INSPECT CRIB.
90 05APR04. 01MAY04 DR-Y ML-Y 170 IN 9414SPECT CRIB, INSTALL BUOYS AND FiSi$
INSTALL BUOYS AND 10:OOA 11:59 ORT3.Y R-L 8
1 CEDMNSP CE1 76 CW UNDERWATER 35 21APR04 27APR04 DR-Y ML-Y CI N RWATER INOPECTION OF CI WATER INSPECTION OF CIRC 09:00A 14:59 ORT3-N R-L ga3 1I q
- 6 4-E 9 I1 CE08TOHTI CE4 77 IST-SISI REINSULATE -. FAC 53 20APR04 24APR04 DR-Y ML-Y 51 _
TQH EINS(ILATE - FAC PRO -TURB HALLBS qOVERHD PROG - TURB HALL8 15:OOA 16:59 ORT3-Y R-L 10 I1 I CE300869SI CE4 76 ICP-05.049 BUILD SCAFFOLDING 22 21APR04 22APR04 DR-Y ML-Y 0 C UILDSCAFFOLDING I P59SEC CONTROL VALVES IICP5.49 SEC CONTROL 10:00A 13:59 ORT3-Y R-L SECONDAhY PLANT CONT OLVALVESo3 I
_____________I 11 I1 CE214035SI CE4 76 CW BUILD SCAFFOLDING 8
21APR04 21APR04 DR-Y ML-Y 0 CE2 UISCAFFOLDING FRT-5 FOR T-50 12:00' 21:59 ORT3.Y R-L CW SYSTEM M LI AND/OR NON-,NUMBERED EGUI MENT021403 12 1
CE214048SI CE4 76 HS-CS-01 MODIFY-SCAFFOLDING 8
21APR04 21APR04 DR-Y ML-Y 0 CE2 ODIFY SCAFFOLDING ORHS-CS.01 FOR HS-CS-01 12:00' 21:59 ORT3Y R-L CONDENSATE NE GB4 SNUBBE)30214048 13 1
CE66C00ISI CE4 P-001B-M BUILD SCAFFOLDING 10 21APR04 21APR04 DR-Y ML-Y 0 CES C1SIBUISCAFFOLDING FRB RCP MOTOCI FOR B RCP MOTOR 12:00 23:59 ORT3-Y R-L REACTOR CC OLANT PUMP MOTOR 14 1
CE212843SA CE4 76 P-028B-M MODIFY EXISTING 4
21APR04 21APR04 DR-Y ML-Y 0
.E212 435 ODIFY EXiSTING ;CAFFOLDING F0d 1P-28BM I
SCAFFOLDING FOR 20:00' 23:59 ORT3-Y R-L 0212 STEAM GEN RATOR FEED PUWP MOTOR 15 I1 CESH81-SI CE4 PACKAGE 81 BUILD SCAFFOLDING 6
21APR04 22APR04 DR-Y ML-Y 0
CESH81-SIBUIJLD SCAFFOLDI G FOR SHIELDING - RHLDA SHAD W FOR SHIELDING -
20:00' 01:59 ORT3-Y R-L 1
1 I CE95009651 CE4 76 CV-00313A-BUILD SCAFFOLDING 8
21APR04 22APR04 DR-Y ML-Y 42 E950096SMBILD SCAFFOLDI G FOR CV413A-FOR CV-313A-S 20:00' 03:59 ORT3-Y R-L 995009 IP-1 RCP #1 SEAL WDTER RETURN ISO1AON SOL RunDate 21APRo413 271 LT-03 STANDARD PUBLICATION Sheet I of 34 o Pdrmavera Systems, Inc.
FL-03 Execution Publication Set I
after21APR0412:00 I
U1R28 WORKING SCHEDULE I after 21APR04 12:00 APR U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF ThU 272 Fr 23 I
I ST P1011Z14,16 1120A 0,2.4. 6, a 11011Z14,1 6120 0,1 2.4. 6. 8, 10i214.161 91Iar0 I ilI M us Ia,
17 1 CE-RPI-SI CE4 76 RPI BUILD SCAFFOLD FORI 10 21APR04 22APR041 DR-Y ML-Y RPI COIL ON RX HEAD 20:00 -
05:59 ORT3-Y R-L 0
18 1
CE-1600-05 CE4 76 R-1 BUILD SCAFFOLDING 12 21APR04 22APR04 DR-Y ML-Y 0
TO SUPPORT 1600 20:00 09:59 ORT3-Y R-L 19 1
CE214523T1 CE4 87 HX-020B FW HEATER 4B -
6 21APR04 22APR04 DR-Y ML-Y 120 REINSTALL SHELL 21:00-02:59 ORT3-Y R-L 20 1
CE214048TR CE4 76 HS-CS-01 REMOVE INSULATION 4
21APR04 22APR04 DR-Y ML-Y 145 FOR HS-CS-01 22:00 01:59 ORT3-Y R-L 21 1
CE212843SB CE4 76 P-028B-M REPLACE 4
22APR04 22APR04.
DR-Y ML-Y 3
MODIFICATION OF 00:00 09:59 ORT3-Y R-L 22 1
CE202527SI CE4 76 8-42 BUILD SCAFFOLDING 17 22APR04 23APR04 DR-Y ML-Y 0
FOR 1B-42 00:00-00.59 ORT3-Y R-L 23 1
CE214034SI CE4 76 CV-00370 BUILD SCAFFOLDING 12 22APR04 22APR04 DR-Y ML-Y 0
FOR CV-370 05:00 20:59 ORT3-Y R-L 24 1
CE305523SI CE4 76 CV-00110C BUILD SCAFFOLDING 8
22APR04 22APR04 DR-Y ML-Y 0
FOR CV-110C 09:00 16:59 ORT3-Y R-L 1
P1274-TR CE4 77 PIPING EB-NDEllSI - REMOVE 5
22APR04 22APR04 DR-Y ML-Y 0
INSUL - PIPING NEAR 17:00-23:59 ORT3-Y R-L 26 1
CE-RPI-SR CE4 76 RPI REMOVE SCAFFOLD 5
22APR04 23APR04 DR-Y ML-Y 153 FOR RPI COIL ON RX 20:00 00:59 ORT3-Y R-L 27 1
CE309511TI CE4 76 SW-02862 INSTALL INSULATION 8
22APR04 23APR04 DR-Y ML-Y 167 ON ISW-2862 21:00-21:59 ORT3-Y R-L 28 1
CE207075TR CE4 76 FE-00134 REMOVE INSULATION 8
22APR04 23APR04 DR-Y ML-Y 0
FOR 1FE-134 2200 11:59 ORT3-Y R-L 29 1
CE309697TI CE4 82 MS-00177 INSTALL INSULATION 8
23APR04 23APR04 DR-Y ML-Y 446 FOR 1MS-177 00:00' 13:59 ORT3-Y R-L 30 1
CE919338TI CE4 76 PIPING EB-MS-2751 - INSTALL 8
23APRo4 23APR04 DR-Y ML-Y 216 INSULATION 07:00 14:59 ORT3-Y R-L 31 1 CE309424SR CE4 76 CW-00138A REMOVE 4
23APR04 23APR04 DR-Y ML-Y 304 SCAFFOLDING FOR 09:00 12:59 ORT3-Y R-L 32 1
CE214031SI CE4 76 CV-00257 BUILD SCAFFOLDING 5
23APR04 23APR04 DR-Y ML-Y 0
FOR CV-257 09:00 13:59 ORT3-Y R-L 33 1
CE206957TI CE4 76 CS-00466C INSTALL INSULATION 8
23APR04 23APR04 DR-Y ML-Y 0
FOR 1CS-468C 09:00 16:59 OR13-R-L CE.RPI.SIBUILD SCAFFOLD 021521RPI CE4f600.00iILD SCAFFOLDII 021 CE214523TfW HEATER 4B -
021452
_U FEED CE214048pREVF INSULi 02114011CONDENS CE212M43MBREPLACE MC 021 2-CE202!l27SeUlLD SCAFF 0202522 1
CE214034SUILC 02140341 CE305SsSI 0305523 OR RPI COIL ON FX HEAD VYSTEM MULTI AND/OR NON-NUMB IG TO SUPPORT 100 INSPECTION IREACTOR VESSgL AND ASSEMBL 1EINSTALL SHELL INSULATION PNATER HEATER 4B1 MON FOR HS-CS01 lTE UNE GB-4 SNUBBER DIFiCATION OF SCAFFOLDING FOF ISTEAM GENERA'TOR FEED PUMP OLDING FOR 1B, l lERED EOUIPN 1P-2BB-M IAOTOR o
tl t__io 9
..UV IvvMM i
SCAFFOLDING FbR CV-370 1HX-2 REGEN HX WUILD SCAFFOLDING FOR CV-110C 1T-4 VCT BORIC ACID It P127 44pTtDEI -REMOVE INSUI 030387 OfAFW FROM C CE-RPf.SI"_LMOE SCAFFOU 0215211
_RPI SYSTE9 ICE-309511TiMIALL INSULAT 0309511__
CE2070751TE INSULJ CE309d9TTNAU INSL 030969 7_
I CE91s338TPS I
991933E9 CE309424SFP 0309424 I
CE214031S1 l
0214031 CE2069s7TS 0206952l l
CE214113l I
021411 II CONTROL C CHARGING IN
[LET FLOW CC
.- PIPING NEA PNT ISOLAnc I FOR RPI COIl I MULTI AND/C ON ON 1SW-2 TION FOR IFE M1HXW LATION FORI P
Z-54 A
.2751. INSTAL MAIN 1EMOVE SCA P-30A C 3UILD SCAFFC 1T-4 VI NSTALL INSUI tNSTALL INSt l:lGIJ 34 1 CE214113T1 ICE4 76 MS-02719 INSTALL INSULATION FOR MS-2719 6
23APR04 23APR04 DR-Y ML-Y 10:00 W
15:59 ORT3-Y R-L 0
Run Date 21APR0413:27l LT.03 STANDARD PUBLICATION Shaet 2 of 34 Pdrmavera Systems. Inc.
I FL-03 Execution Publication Set I
after21APR0412:00 U1R28 WORKING SCHEDULE after21APR0412:00 Ul ID RES5 WO EOID DESCRIPTION RD ES EF RISK MF APR ST tgo ;[]
11 I] I g EC]
1 1
gyge k, n g ~
I_*_-_
35 1 CE214042SR CE4 76 FD-02404 REMOVE 5
23APR04 23APR04 DR-Y ML-Y 443 CE2140 25RE SCAFFOLDING FOR 12:00 16:59 ORT3-Y R-L 021 04 T-36 1
CE301049TI CE4 76 FD-0006A INSTALL INSULATION 8
23APR04 23APR04 DR-Y ML-Y 440 CE301 49T(2 TALLI FORi1FDO-A 12:00 21:59 ORT3-YR-L 03104 37 1
CE927251SI CE4 76 MS-00117 BUILD SCAFFOLDING 8
23APR04 23APR04 DR-Y ML-V 0
CE927 51I UILD SC FOR MS-117 12:00 21:59 ORT3-Y R-L 99 251 38 1
CE21633ZT CE4 76 FD-00204B INSTALL INSULATnON 10 23APR04 23APR04 DR-Y ML-Y 295 CE21 32T NSTALLI FOR IFD-204B 12:00 23:59 ORT3-Y R-L 021 39 1 CE311887SR CE4 76 HX-021B REMOVE 6
23APR04 23APR04 DR-Y ML-Y 439 C
118575RM SCAFFOLDING FOR 15:00 22:59 ORT3-Y R-L 03118 40 1 CE214113SR CE4 76 MS-02719 REMOVE 5
23APR04 23APR04 DR-Y ML-Y 439 C
141113S SCAFFOLDING FOR 16:00' 22:59 ORT3-Y R-L 021411 41 1 CE206957SR CE4 76 CS-00466C REMOVE 4
23APR04 23APR04 DR-Y ML-Y 439
'E2069575R SCAFFOLDING FOR 17:00 22 59 ORT3-Y R-L 02069 1 ;{1S1@
=>Nt S
m 42 1
CESISIPREP CES IST-SISI PREP OF SECONDARY 163 05APR04 29APR04 DR-Y ML-Y 230 :ES IPREREP OF SECONDARY OMPONENTS FOR FAC COMPONENTS FOR 07:DOA 14:59 ORT3-Y R-L 43 1
CE0309006 CE5 76 MS-00231 IMS-231 - REPLACE 15 20APR04 22APR04 DR-Y ML-Y 0 :EO 0fflMS -2
- REPLACE VAI
-EPT2 VALVE-PT2 23:OOA 02 59 ORT3-Y R-L A SHX i1A S' HEADER ST-2029 INLET030o9006 44 1
CE0301623 CES 76 FD400208A IFD-208A - REPLACE 24 21APR04 22APR04 DR-Y ML-Y 0
CE0 231lFD208A - REPLA E VALVE VALVE 20:001 23:59 ORT3-Y R-L 03016 X
1HX-21A HP F VH SA LS-2637 45 1
CE0305003 CE5 76 FD-00210A FD-210A-STEAMLEAK. 24 21APR04 22APR04 DR-Y ML-Y 0
CE0305003fP-I1A-STEAM K, REPLACE ALVE I
REPLACE VALVE 20:00-23:59 ORT3-Y R-L 030500 H
IX1A HP 5A LS-2376 46 1
CE0206957 CE5 76 CS-00466C ICS-466C, REPLACE 10 22APR04 22APR04 DR-Y ML-Y 1
I CE02069571 S-466C, REPLAdE VALVE VALVE 08:00 17:59 ORT3-Y R-L 02069 IHX74IA SG 1FT-466 H: H SIDE ROOl 47 0
CE0306266 CES 76 IA-01258 IA-1258 -AIR LEAK, 10 22APR04 22APR04 DR-Y ML-Y 0
CEO3 266A-1258 -AIR LEAK, REPLACE ALVE REPLACE VALVE 12-00' 21:59 ORT3-N R-L 03 2f 1
1SC-953 PZR I D SPACE SAM 48 1
CE9927254 CE5 76 MS-00115 I MS-15 LEAKS BY 10 23APR04 23APR04 DR-Y ML-Y 0
CE"s22541MS-115 LEA S BY SEAT -
SEAT - REPLACE 00:00 13:59 ORT3-Y R-L 99gt 2
s4Ui HX20 49 1
CE0304989 CES 76 CV-4-12 CV-D REPLACE 12 23APR04 23APR04 DR-N ML-N 89 CE030a sCV4)-12-R VALVE 11:00' 22:59 ORT3-N R-L s
0304 50 1
CE9927250 CE5 76 MS-00116
,1MS-116-LEAKSBY 10 23APRD4 23APR04 DR-YML-Y 0
CE smso1MS.11 SEAT - REPLACE 14:00 23:59 ORT3.Y R-L 2725 1t 1 1 K
S I
.- ~iA_
51 0
CE2 098 CE 77 SEC SEC SUPPORT MR 99 05APR04 07MAY04 DR-N ML-N 77 SEC S=IPPORT MR9l B 99-011-8 07:00A 14:59 ORT3-N R-L RunDate 21APR0413281 LT-03 STANDARD PUBLICATION Sheet3of34 6 Primavera Systems, Inc.
FL-03 Execution Publication Set I
after 21APR04 12:00 l I U1R28 WORKING SCHEDULE lafter21APR0412.00
_I ID IRESF wo ST EQID DESCRIPTION RD ES EF RISK MF APR Ned 21 Thu 22 FrI23
!12l4l6.EC INSTOA NEW.2.4.6.8Q.1U P
,MR 011 2
0.2.4.6.8,1011Z14I1 SQ9EC INsTA L-LNEW EQUIP MR 99.0i-E,=
52 CE0210989 CE6 75 SEC SEC, INSTALL NEW EQUIP MR 9"11-E 99I 05APR04 07MAY04 DR-N ML-N I 08:OOA 14:59 ORT3-N R-L 77 53 1
CE0407673 CES 76 T-026 OPEN BD TANK TO 5
20APR04 21APR04 DR-Y ML-Y 12 SUPPORT INTERNAL 20:OOA 16:59 ORT3-Y R-L 54 1
CE0306103A CE6 76 102-11TG-0 MR 014092 (102-11TGOI 84 22APR04 27APR04 DR-Y ML-Y 1
REPLACE PROT 19:00.
06:59 ORT3-N R-L 55 1
CE0306104A CE6 76 102-2rrG-0 MR 01092 (102-2TOG-Oi 84 22APR04 27APR04 DR.Y ML-Y 0
R&R GEN PROT 19:00 06:59 ORT3-N R-L i77 PEN 6D TANK TO SUPI BLOVDOWN TANK 0401 II I-ORT INTERNAL I;SPECTION 673 EninR1 niAR 01.92 (102-IITGCI RFPLACEFPR-W I51
_ I _
CE0306I04PM52j0FO2 (10-2-2lTG.l
!1 R&R GEN Pl 0306104 I
56 1 CE0407589A CE6 20 M
75 T-026 T-026 -REPAIR PACKAGE 20 23APR04 I 25APR04 11:00.
14:59 DR-Y ML-Y I ORT3-Y R-L 2
I.
CE04075 0407
~jjAT-2~ RKEP 57 1 CE-1600-20 CE8 R-1 ENERGIZE AND CAL I 26 1 13APR04 I 23APR04 UNDERHEAD 02:OOA I 02:59 DR-Y ML-Y I ORT3-Y R-L 0
_A40.20ENERGIZE AND CAL UN! ERHEAD INSPECTION EQUIPMENT se 1 CE-1600-22 ICES I 76 I R-1 ZPERFORM UNDERHEA18 23APR04 129APR047 DR.Y ML-Y a
_ _l IINSPECTION OF RX I I 03:00 100:59 1ORT3-Y R-I 69 I CH0300358 CH I77 7CE-APt RCSCLTSR3.4.52 1301 18APR041 24APR04 IDR.Y ML-Y I270 07:OOA 11:59 ORT3-N R-L 60 1 CH0300371 Cm I 7 :CHEMSAMPt RCSDOTSR3.4.5.1 130 I8APRD4 24APRO4I DR.Y ML-Y I270 III07:OOA I 11 59 1ORT3N NR-LI 61 1
CH0300401 CH 77 ICHEM-SAMP RCS BORON SR 3.9.1.1 30 18APR04 24APR04 DR.Y ML-Y 270 07:OOA I 11:59 ORT3-N R-L I
REACTC VESSEL ANI IE46IO-22_PEP UNDERHEAD REACTOR VESS ANDASSEMBLT02134
- H010035RCS CC TSR 3A.5.2 I
- u I
-HO37RCS DO TSR 3A.5.1 IRCS BORON SR 3.9.11 62 12 1.CH03O 98IC 77
,HEM-SAMPI RCS CL TSR 3.4.5.2 30 1 18APR04 I 24APR04 I DR-Y ML-Y 07:00A 11:59 ORT3-N R-L 270 CS CL TSR 3A.52 I
63 2
CH0300511 I CH 77 EM-SAMPL RCS DO TSR 3.4.5.1 30 18APR04 24APR04 DR-Y ML-Y 07:OOA 11:59 ORT3-N R-L 270 6410 CH0300195 CH 77 LZHEM-SAMPI.
BAST BORON TSR 3.5.1.2 16 19APR04 23APR04 I DRY ML-Y 07:OOA 11:59 ORT3-N R-L-160 4
65 1 1 CH0300385 CH 77 HEM-SAMPISGBDFO GAMMA SCAN IS I 19APR04 I 23APR04 I DR-Y ML-Y 07:00A 11:59 ORT3-N R-L 160
_H105
,RC 1
'R3
, T_
h ~~BRSONTSRA51_.
MISC CHE iiH 1002 5SGOD 0 GAMASCAN I
MISC CHE 1p MISC Hrz2231 M iMISC CHE Z Q45GBDPO GAMMA SCAN
_H_
I l
6811 CH03004.40 CH 77 rHEM-SAMPt RE-229 ISOTOPIC 16 19APR04 123APR04 DR-YMLIY 07:00A 11:59 ORT3-NR-L 160 6712 CH0300524 CH.
77 HEM-SAMPLSGBDFO GAMMA SCANI 16 119APR04 1.23APR04 DR-Y ML-Y 07:WOA 11:59 ORT3-N R-L 160 68 2
CH0300550 CH 77 H-1EM-SAMPL RE-229 ISOTOPIC 1161 19APR04 j23APR04 I DR-Y ML-Y 1 160 07:OOA J11:59 ORT3-NR-L IJ5RE-22~lSOTOP1C.
I I
i I
"M""MMISCCHE Run Date 21APR04 13:28l LT-03 STANDARD PUBLICATION Shoot 4 of34 O Primem Systems. Inc.
I FL-03 Execution Publication Set I
after 21APR04 12:00 U1R28 WORKING SCHEDULE after 21APR04 12:00 sA R
U ID RESP WO E41D DESCRIPTION RD ES EF RISK MF AThu22 F 23 ST
_'10 tZ14l16l12la2> 0.7A..4.6.8,l1011,14.1618l20lU. 02.4.
- 6. 8.1DtlZ14.161 u I
_ej 69 0
OPB,-060 CH T-008B SAMPLE T-8B HUT FOR 3
21APR04 21APR04 DR-Y ML-Y 5
OPSB-O6OSAMPLE T-88 HUT FOR BORON BORON 20:00-22:59 ORT3-N R-L 70 1
SOP-CV-005 CH T-008C SAMPLE C HUT FOR 2
22APR04 22APR04 DR-N ML-N 0
hOP-CV-.0SAML 'C' HUT FOR OCYGEN PER SOP -. 002 OXYGEN PER 05:00 08:59 ORT3-N R-L 71 0
CH0300231 CH 77
- HEM-SAMP SFP BORON SR 3.7.11.1 1 22APR04 22APR04 DR-Y ML-Y 172 CH0300231SF ' BORON SR 3.7.t1.1 07:00-07:59 ORT3-N R-L, 03002311 ISC CHEMISTRY iAMPLING 72 0
CH0300244 CH 77 HEM-SAMPL WASTEWATER 1
22APR04 22APRo4 DR-Y ML-Y 172 CH0300244W ATER EFFL)4ENT COMPOS EFFLUENT COMPOSITE 07:00-07:59 ORT3-N R-L 0300244 ISC CHEMISTRY gAMPUNG 73 1
CH0300460 CH 77 HEM-SAMPL RWST BORON SR 1
22APR04 22APR04 DR-Y ML-Y 172 CH0300460R ST BORON SR 3.05.04.3 3.05.04.3 07:00' 07:59 ORT3-N R-L 030046(1 ISC CHEMISTRY tAMPLING 74 2
CH0300589 CH 77
22APR04 22APR04 DR-Y ML-Y 172 CH030058R ST BORON SR 3.95.04.3 3.05.04.3 07:00 07:59 ORT3-N R-L 0300589i ISC CHEMISTRY XAMPLING 75 1
RPIC-070 CH O-RP-OOIC SAMPLE REFUELING 2
22APR04 22APR04 DR-N ML-N
- 51.
RP1C 70SAMPLE REFUtuNG CAVInY FO BORON PER CAVITYFORBORON 11:00 12:59 ORT3-NR-L
,@lr~
n U_
I 76 0
EM0309070 EM 76 D-105 WEEKLY STATION 1
21APR04 21APR04 DR-Y ML-Y 0
OWEEKLY STATION BAT RY INSPECTION BATTERY INSPECTION 10:OOA 12:59 ORT3-N R-M 125V DC SATION BATTERYO 09070 77 1
EM-BMFP-PJ EM 76 P-028B-M P28B PRE-JOB 3
21APR04 21APR04 DR-Y ML-Y 0
M pj'28BPRE-JOB BREIFI G FOR MOTOR VORK BREIFING FOR MOTOR 12:00 14:59 ORT3-N R-M STEAM 9ENERATOR FEE PUMP MOTOR0312035 78 0
EM0309134 EM 76 D-106 WEEKLY STATION 3
21APR04 21APR04 DR-Y ML-Y 596 -M0 I
WEEKkY STATION BA RY INSPECTION:
BATTERY INSPECTION 13:00-15:59 ORT3-N R-M 125V Dt STATION BATE VY0309134 79 1
RP4A-030 EM O-RP-004A CLEAR WALKWAY FOR 2
21APR04 21APR04 DR-N ML-N 3 RP4 -03QCLEAR WALKWAY FORM NIPULATOR MANIPULATOR 15:00 16:59 ORT3-N R-L 80 1
EM-BMFP-1 EM 76 P-028B-M P288 PREP WORK FOR 6 21APR04 22APR04 DR-Y ML-Y 0
M MF P283 iPREP WORK FO MOTOR COVER FEMOVAL MOTOR COVER 15:00 12:59 ORT3-N R-M 031 STEAM GENERATOR FEED P MP MOTOR 81 1
EM0305150 EM 76 UIA-UV REL TEST U1A-UV RELAYS 3
21APR04 21APR04 DR-N ML-N 0 'M0 0515gEST2U1A-UV RELAYS 1RMP 9071 -1 & 9075-1 1RMP 9071-1 & 9075-1 16:00 20:59 ORT3-N R-M 0
515CQ TRAIN A 4.16 KV ND 480 V SWITCHGEAR RELAY TE T 82 1
0123A-15 EM 01-23A PHASE CHECK AND 3
21APR04 21APR04 DR-Y ML-Y 0
23A-19'HASt CHECK AND ST RTTRI NUKE FlLTRATION UNIT START TRI NUKE 17:00 21:59 ORT3-N R-L P-UINSTALL/CONN CT CAVITY FILTEF UNIT I
I 83 1
EM0215242 EM 76 521BYA BYA TRIP-FREE 2
21APR04 21APR04 DR-N ML-N 0
EM02152422A TRIP FREE IN ERLOCK TESTINCG IRMP 9026-1 INTERLOCK TESTING 20:00*
21:59 ORT3-N R-L 0215242REACTOR TRIP iYPASS BREAKEA 84 1
EM0302132A EM 76 LO-00291 P-059B - DE-TERM 2
21APR04 21APR04 DR-Y ML-Y 0
M03o2132AMi59B - DE-TERM RSIDE SEAL O MI
- 8.
PUMP MOT AIRSIDE SEAL OIL B/U 20:00-21:59 ORT3-Y R-L 030213ZTURBINE OIL P ESSURE REDUCING 85 0
EM0309637 EM 80 A52-DHVR-1 A52-DHVR-1200-14 2
21APR04 21APR04 DR-Y ML-Y 203 EM030963A2 DHVR-12W0-14 EPLACE AUX SV'TCH REPLACE AUX SWITCH 20:00 21:59 ORT3-N R-L 0309637U4.16 KV11200 P VACUUM BREAkER 86 1
EM0215153 EM 76 P-030B-M P-030B MCE ANALYZE 3
21APR04 21APR04 DR-N ML-N 0
EM0215153P'030 MCE ANAL) ZE MOTOR (1AS2t12I1A-02)
MOTOR (1A52-1211A-02) 20:00 22:59 ORT3-Y R-L 021515 CIRCULATING VATER PUMP MOTOR Run Date 21APR0 413281 LT-03 STANDARD PUBLICATION Sheet 5 of 34 O Pdmavera Systems, Inc.
FL~03 Execution Publication Set
after 21APR04 12:00 I
U1R28 WORKING SCHEDULE I
after21APR04 12:00
- JUI l ID RESPI WO I EQID I
DESCRIPTION IRD ErS EF.I RISK.
MF Wd2 APR 2
_I T
>131014,16.11120.22l102 4.6 8.10il124tlrt82o221o.2.4.6.8,1iltZt4,16
-.11=1elf_- 10111
_j!gj
., [a 87 11 EM0407696 EM 77 SERVICE ISERVICE OBTAIN GREASE SAMPLE 3 121APR04 12iAPRO41 DR-N ML-N 20:00-22:59 ORT3-N R-M 591 88 1
EM0216164Z EM 76 ISOL PHASE REMOVE BUS LINKS 8
21APR04 22APR04 DR-N ML-N 0
'ALL BUT 1 PER PHASE' 21:00-22:59 ORT3-N R-L 89 1
EM0216167 EM 76 E-01 INSPECT AND 10 21APR04 23APR04 DR-N ML-N 0
MAINTAIN EXCITER 21:00' 00:59 ORT3-N R-M 90 1
EM0215243 EM 76 52tBYB BYB TRIP-FREE 2
21APR04 21APR04 DR-N ML-N 0
INTERLOCK TESTING 22:00 23:59 ORT3-N R-L 91 1
EM0302139A EM 75 P-129D P-129D - DE-TERM #6 2
21APR04 21APR04 DR-Y ML-Y 0
BEARING LIFT PUMP 22:00 23:59 ORT3-Y R-L 92 1
EM0305155 EM 76 UIB-UVREL TEST UIB-W RELAYS 3
21APR04 22APR04 DR-N ML-N 8
1RMP 9071-2 & 9075-2 22:00 00:59.
ORT3-N R-M 93 1
EM0215208 EM 76 P-025A-M P-025A MCE ANALYZE 3
21APR04 22APR04 DR-Y ML-Y 0
MOTOR (1A52-07/1A-01) 23:00 01:59 ORT3-N R-L 94 1
EM0215244 EM 76 52/RTA RTA TRIP-FREE 2
22APR04 22APR04 DR-N ML-N 0
INTERLOCKTESTING 00:00 01:59 ORT3-N R-L
_&4 1 EM0407740 EM 71 P-001B-M P-lB PERFORM OIL 12 22APR04 22APR04 DR-N ML-N 0
FLUSH 00:00 13:59 ORT3-N R-L 98 1
EM0215245 EM 76 52tRTB RTB TRIP-FREE 2
22APR04 22APR04 DR-N ML-N 162 INTERLOCK TESTING 02:00 03:59 ORT3-N R-L 97 1
RP4A-031 EM O-RP-004A RESTORE WALKWAY 2
22APR04 22APR04 DR-N ML-N 68 POST ROD 02:00 03:59 ORT3-N R-L 98 1
EM02i5209 EM 76 P-025B-M P-0258 MCE ANALYZE 3
22APR04 22APR04 DR-Y ML-Y 0
MOTOR (1A52-11/1A-02) 0200 04:59 ORT3-N R-L 99 1
EM0301758 EM 76 P-037D-M 1P-037D-M PERFORM 3
22APR04 22APR04 DR-N ML-N 0
MCE TESTING 05:00 09.59 ORT3-N R-L 100 1 EM-84801 EM 78 RPI AT HEAD RPI COIL 10 22APR04 22APR04 DR-N ML-N 0
ESISTANCE/INDUCTAN 08:00 17:59 ORT3-N R-M 101 1
EM-8480J EM 76 R-1 AT HEAD CRDM COIL 10 22APR04 22APR04 DR-N ML-N 0
_SISTANCE/INDUCTANC 08:00 17:59 ORT3-N R-M 102 0 EM0301792 EM 78 A52-DHVR-3 BREAKER 24 22APR04 23APR04 DR-N ML-N 0
MAINTENANCE 3000-01 08:00' 11:59 ORT3-N R-L 103 1 EM0215219 EM 76 W-001BI1M W-1BI-M INSPECT 1
22APR04 22APR04 DR-N ML-N 0
EQUALIZATION VALVE 09:00' 09:59 ORT3-N R-L EM04076961SERVICE OBTAIN 040769_MISC EQUIPM1 EM02161642EEMOVE BUS UPI 02161 EM021616ONSPECT AND M.
02161
_1F EM0215243BYB TRIP-FREE 021524iREACTOR TF EM0302139AP1 29D - DE-TEF 03021 iMTURBINE BEJ EM0305145TEST U1B-UV R 03051 5TRAIN B 4.1 EM0215208P-025A MCE A 0215t0ICONDENS EM021>244RTA TRIP-FR 021 5244UREACTOR EM0407740P-1B PERFOF 04077 __
EMp215245RB TRIP-021524!UREACT Rt4A-031RESTORE EMQ21529P-0258 M(
021520MCONE EM03017581P-03' 0301754*-
EMI8480A 0215213 EM-8480 021521 EM0301792B 030179F EM025215 i
4 3REASE SAMPLE NT REPAIRISERVICE KS 'AUL BUT 1 PtR PHASE" (REST
-1SOL PHASE D INTAIN EXCITER FUSES PER MWP "G-01 TURE INTERLOCK TES1NG I RMP 9026-1 IP BYPASS BREAKER M #6 BEARING UFT PUMP MOTOR RING #601I UFTNUMP LAYS IRMP 90t1-2 & 9075-2 5KV AND 480 V SWITCHGEAR REL/
IALYZE MOTOR (1A52-0711A-01)
ATE PUMP MOTOk EE INTERLOCK TlSTING tRMP 902(
TRIP BREAKER M OIL FLUSH RREACTOR COOLANT PUMP
-REE INTERLOCK TESTING I RMP 9
)R TRIP BREAKEiR WALKWAY POSTROD UNLATCHIN' E ANALYZE MOTOR (1A52.11I1A-0 ENSATE PUMP MbTOR O-M PERFORM 4CE TESTING DC EMERGENCY LUBE OIL PUMP r HEAD RPI COIL RESISTANCEIND
_RPI bYSTEM MULTI Al r HEAD CROM COIL RESISTANCE/II REACTOR VESSEL AN FREAKER MAINTE&ANCE 3000-01 (A R1T)
JCT 04-.
INE GENERAT Y TEST
-1 AOTOR
)2St WOTOR JCTANCE
[DIOR NO IDUCTANCE IASSEMBLY 12-01)
I 1
FE 104 1 EM0309955 EM 76 G-06 IG-06 REMOVE I
VOLTAGE REG.
2 22APR04 22APR04 DR-N ML-N 09:00-10:59 I ORT3-N R-L I
0215219 EM0309955 0309955
-10B1-M INSPECT EQUAUZATION ICONTAINMENT ACCIDENT RECIR' 106 REMOVE V;LTAGE REG.
EROD CONTRO4 MG SET 4.16 KVI3(
'ALVE ULATION FAN Run Date 21APRO413-28 LT-03 STANDARD PUBLICATION Sheet 6 of 34 C Prinavera Systems, Inc.
FL-03 Execution Publication Set T
after 21APR04 12:00 l
U1R28 WORKING SCHEDULE I after 21APR04 12:00
MF IAWed2PR FI23 ST 3.10021416,11120,2210.2,4,6, 8.10il?,14.laia2O.2210,2,4,6,8.10ilZI4,lraI 1051 1 EM0400344 EM 76 P-028A-M 1P-28A-M PUMP END [0 I 22APR04 I 23APR04 DR-Y ML-Y MOTOR BEARING 09: W 10:59 ORT3-Y R-L a
106 1 EM0203130 EM 76 W-00102-M 1W-1D2-M CLEAN 16 22APR04 23APR04 DR-N ML-N 0
CONNECTIONS 09:00*
16:59 ORT3-N R-L 107 1 EM0212843 EM 76 P-028B-M 1P-28B-M CORR 60 22APR04 29APR04 DR-Y ML-Y 82 SKEWED BEARING 09:00 12 59 ORT3-N R-L 108 1 EM0215220 EM 76 W-OOICI-M INSPECT 1
22APR04 22APR04 DR-N ML-N 0
EQUALzATION VALVES 10:00' 10:59 ORT3-N R-L 109 1
EM0301995 EM 76 P-037C-M P-037C MCE ANALYZE 4
22APR04 22APR04 DR-N ML-N 0
MOTOR 10:00 13:59 ORT3-N R-L 110 1 EM0215221 EM 76 W-001DI-M INSPECT I
22APR04 22APR04 DR-N ML-N 0
EQUAUZATION VALVE 11:00 11:59 ORT3-N R-L 111 1
EM0309956 EM 76 G-07 1G-07 REMOVE 2
22APR04 22APR04 DR-N ML-N 0
VOLTAGE REG.
11:00 12:59 ORT3-N R-L 112 0 EM0306115E1 EM 76 D72.19-03 PMP-037-04 SUPPLY 3
22APR04 22APR04 DR-N ML-N 0
TEMP POWER TO 11:00 13:59 ORT3-N R-L 0
EM0407387 EM 76 W-030B-M W-30B-M COMPLTE 20 22APR04 23APR04 0
INSTALLATION-OF 12:00 11:59 114 1
EM0306569 EM 76 G52-07-AM 1G52-7-AM REPLACE 4
22APR04 22APR04 DR-N ML-N 36 AMMETER 13:00 16:59 ORT3-N R-L 115 1 EM-BMFP-01 EM 76 P-028B-M P28B REMOVE OIL 6
22APR04 23APR04 DR-Y ML-Y 0
LINES AND MOTOR 13:00 10:59 ORT3-N R-M 116 1 EZMRCP-E1 EM 76 P-OO1B-M P-1B B/
2 22APR04 22APR04 DR-N ML-N 0
RESISTANCE ON THE 14:00 15:59 ORT3-N R-L 117 0 EM0306115A EM 76 D72-19-03 IWP-037-04 REPL 16 22APR04 23APR04 DR-N ML-N 0
IMOB-110-1191146-154 14:00 09:59 ORT3-N R-L 118 0 EM0306115 EM 76 D72-19-03 PWP-037-04 REPL 24-22APR04 23APR04 DR-N ML-N 0
IMOB-110-1191146-154 14:00 17:59 ORT3-N R-L 119 1 EZMRCP-2U EM 76 P-001B-M INSP P-1B MOTOR ON 36 22APR04 24APR04 DR-N ML-N 0
THESTAND 16:00 11:59 ORT3-NR-L 120 1 EM02116638 EM 40 P-001B-M PERFORM REPAIRS 140 22APR04 29APR04 DR-N ML-N 0
FOR P-1B HIGH 16:00 15:59 ORT3-N R.M 121 1
EM0215217 EM 76 T-001 TEST HEATER 10 22APR04 23APR04 DR-Y ML-Y 0
INSULATION 20:00 05:59 ORT3-N R-L I_~_
EM0400:
0400 EM0203 0203 EM0212 02121 EM021 021 EM030 030 EM02 02 EM01 03 EMI E0 EMi El El 344 34 I13 13
!84
!84 5Z 5z 19 19' 215 215 109 109 61 106 104 I
qSIEAM GE W
IW.1D2-M CLEAN,CONNECTIONS IP.28A-M PUMP END MOTOR BEAF LEAKING TEA GE rLP-285-M CORR SKEWED DEARINE BRACKET II dNSPECT EQUAIVZATION VALVES TICONTAINMENT ACCIDENT RECII 5P-037C MCE ANALYZE MOTOR (1I lAC TURNIkG GEAR LUBE 0 11INSPECT EQU4LZATION VALVE 21ECONTAINMENT ACCIDENT REc 1561G-07 REMOVI VOLTAGE REG.
I5^ROD CONTIIOL MG SET 5BWP-03T-04 SUPPLY TEMP POWE I1PWR TO O.01 SAFGDS BUS 1387MW30BM COOPLTE INSTALLA CULATMON FA 52-414MIW-41 LPUMP MOTO IRCULATION F TO 14WL-72E (IMOB-110-1 1N OF MOTO I 04' n3 WF-231F-29 M0 5691G52-7-AM REPLACE AMMEI R 0 6561G52-07 GENERATOR UTPUT BREAI
.BP FP-01 2B REMOVE OIL UNES AND MOTOR COVE 0 1203~ E*IOiE ninI STEAM GE CP.E1P1 8 B1W & RESISTANCE 0 THE STAND 1520!REACTbR COOLANT PU P MOTOR M 1007 REPLI1MOB-11C 191146.1U4 30611
__PWR TO C-0 EM 306115P-037T04 REPL 1MOB-11 19t146 154 0611 I
IF E
I ZMRCP.2BINSP P115 MOTOR ON TE 021 q20 0"_l I
=M0216638PERFOM REPAIRS FOR 0216631 I
EMO215217TEST HEATER INSL 021521 PRE EM03090061:MS-231l RE-TER 030900:jHX-IA SG
- E STAND I-_
M'B HIGH BRE I
LATION RESIST SSURIZER TAM AINATE HEAT 1 HEADER ST-2C 122 1I.EM0309006A EM 76 MS-00231 IMS-231.
RE-TERMINATE HEAT 5
22APR04 I 23APR04 I DRN ML-N 21:00*
01:59 ORT3-N R-L 0
.I t
Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION Sheet 7 of 34 o Pdrmavera Systems, Inc.
I FL-03 Execution Publication Set I
after 21APR04 12:00 U1R28_WORKING SCHEDULE after 21APR04 12:00 1
R2 W
RING-APRUE UI RESPI WO EQID DESCRIPTION RD ES EF RISK I MF 21APR
- _lST km_1Oil-Thu 22 Fri jj jj_
_ I
.1 iZ 41 la
.2i 8.101, __14.6 F2.20 2
4
_ __10LqM Z 4.111 "L 1231 1 EM0305572 EM 76 POS-00476 IINSTALL WEEP HOLE!
8 1 22APR04 23APR04 I DR-Y ML-Y IN FLEX CONDUIT 21:00 22 59 ORT3-N R-L.
01.
EM03033721NSTALL WEEP Hi AXE IN FLEX C1 nItn9gr 124 1 EM0216166 EM 76 E-01 CHECK EXCITER 2
23APR04 23APR04 DR-N ML-N 4
GROUND DETECTION 01:00 02:59 ORT3-N R-E.
125 1 EM0213080 EM 76 RPI-B 8 CO IRPI-B 8 CONN REPAIR 1 23APR04 23APR04 DR-N ML-N 0
GROUND WIRE 09:00 09:59 ORT3-N R-L 126 1 EM0213081 EM 76 RPI-C 5 CO 1RPI-C 5 CONN REPAIR I 23APR04 23APR04 DR-N ML-N 0
GROUND WIRE 10:00 10:59 ORT3-N R-L 127 0 EM0306115C EM 76 D72-19-03 IWP-037-04 PERFORM 1
23APR04 23APR04 DR-N ML-N 0
PMTFOR 11:00 11:59 ORT3-NR-I 128 0 EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-1A01 CELL 1 23APR04 23APR04 DR-N ML-N 158 SWITCH INSPECTION 11:00 11:59 ORT3-N R-L 129 1 EM-BMFP-R7 EM 76 P-0288-M P28B REMOVE COND.
2 23APR04 23APR04 DR-Y ML-Y 0
RETURN LINE SPOOL 11:00 12:59 ORT3-N R-L 130 1 EM0213082 EM 76 RPI-E 3 CO 1RPI-E 3 CONN REPAIR 4 23APR04 23APR04 DR-N ML-N 0
GROUND WIRE 11:00 14:59 ORT3-N R-L 1;
0 EM0407387B EM 76 W-030B-M W-308-M PERFORM 1
23APR04 23APR04 DR-N ML-N 0
MCE TESTING 12.00 12:59 ORT3-N R-L 132 1 EM-BMFP-02 EM 76 P-028B-M P288 INSTALL MOTOR 4
23APR04 23APR04 DR-Y ML-Y 0
RIGGING EQUIPMENT 13:00 16:59 ORT3-N R-M 133 1
EM0215246 EM 76 62/AOI CAL AND TEST 621A01 6
23APR04 23APR04 DR-N ML-N 0
RELAY PER IRMP 13:00 20:59 ORT3-N R-L 134 0
EM03061150 EM 76 D72-19-03 IWP-037-04 RESTORE 4
23APR04 23APR04 DR-N ML-N 184 1-WL-1728 TO PERM 14:00 17:59 ORT3-N R-L 135 1
EZMRCP-82 EM 76 P-001BM REPLACE 'IT RCP 4
23APR04 23APRo4 DR-N ML-N 0
FLOOR PANEL FIRST 14:00 17:59 ORT3-N R-L 136 1
EM0302252 EM 76 RPI-D10 RPI-D10 CONN REPAIR I
23APRo4 23APR04 DR-N ML-N 215 GROUND WIRE 15:00 15:59 ORT3-N R-L 137 1 EM0302139B EM 76 P-129D P-129D - RETERM #6 4
23APR04 23APR04 DR-Y ML-Y 552 BEARING UFT PUMP 16:00 21:59 ORT3-Y R-L EM0216166CHECK EXC 01616E^TG-01 Tl EM021308 021308C EM021301 021301 EMW061 0306 EM9925 9925 I
EM4-MFP 0312 EM0213 0213 EM040T 040 EM-Sh O
EM0I O1I EZM
- El El TER GROUND rRBINE GENEF IRPI-B 8 CONN ERPI CONNEC I1RPI-C 5 CON IERPI CONNE 5CtWP-037-04 1!EPWR TO
)053000-1 IX0 10I4.1B KV/3C R7P28B REMO
)3MSTEAM C I8:
RPI C 3870W61B1 T387l1F-23/F-2 2035S 15246CAL AN 52 30611in 21520!
IO3O2 251RPIQ 0302252RP1 q0302139B'- 1 030213 j04m3s7cW 0407387F 1381 0 EM0407387C EM 76 W-030B-M W-30B-M PERFORM BUMP FOR ROTATION I
23APR04 I 23APR04 I DR-N ML-N 17:00 17:59
. ORT3-N R-L 0
139 1 EM0215183A EMV 76 Sl-00860A-SI-860A-0 MOV 3
20APR04 21APRO4 DR-Y ML-Y 2
83AS1460AO MOV ACTUA rOR CHECK-OUT RESTART)
ACTUATOR 13:OOA 14:59 ORT3-N R-L P-14A C6NT SPRAY PUMP DISCH REDUNDA4T ISOL OPER021 183 140 1 EM0215163 EMV 76 CC-00754A-CC-754A-O MOV 5
21APR04 21APR04 DR-Y ML-Y O C.
O MOV ACTUATOR CHEC -OUT ACTUATOR 09OOA 16:59 ORT3-N R-L 1ARCP CC INLET MOV OPERATOR Run Date 21APR0413:28 LT-03 STANDARD PUBLICATION l
Sheet8of34 O Primavera Systems, Inc FL.03 Execution Publication Set
after 21APR04 12:00 U1R28 WORKING SCHEDULE after21APR0412:00 U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF APR
_ST PAW 214,161ha2u22210.2.4. 6,.A011 214.161a2,22i 0.2.4. 6.
.3101214.16, j
1 2
141 1 EM9927043A EMV 76 CC-00754A-ICC-754A-O REPLACE 2
21APR04 21APR04 DR-Y ML-Y 26 9
M 27 g
ICC-754A-O REPLACE S COVER LSCOVER 15:00 16:59 ORT3-N R-L 99 04:1P-1AaRCPCCINLETM VOPERATOR 142 1 EM0403300 EMV 76 RC-00516-0 RC-516-0 PERFORM 10 21APR04 22APR04 DR-N ML-N 0 EM 403300 RC51"O PERFORM ST M LUBE AND FB) INSPECTION STEM LUBE AND FBJ 17:00 04:59 ORT3-N R-L 40330
- 1 Pi RC-430 POWEq-OPERATED REU F ISOL OPER 143 1 EM0403660A EMV 77 SI-00871A-ISI-871A-0 REBUILD 4
21APR04 21APR04 DR-Y ML-Y 166 M0403660AoI-871AO REBU1L D ACTUATOR (SPARE)
ACTUATOR (SPARE) 20:00 23:59 ORT3-Y R-L 040366CaP-14A CONT PRAY PUMP SUdTnON FROM HX-1 A OPER 144 0 EM0405880A EMV 76 W-013B1 W-013B1 INSTALL 6
21APR04 22APR04 DR-N ML-N 0
M0405880AVI-01381 INSTALL UMPER PER NWP p1)-128*E-FN JUMPER PER IWP 20:00 01:59 ORT3-N R-L 040588C CONTRO ROOM RECIRC FAN 145 1 EM0215165 EMV 76 CC-00759A-CC-759A-0 MOV 10 21APR04 22APR04 DR-Y ML-Y a
EM0215165CCb759A-O MOV AC TUATOR CHECK-OUT ACTUATOR 20:00 05:59 ORT3-N R-L 021516 1P-1 RCP CC OUTLEt MOV OPERATO 146 0 EM0405880B EMV 76 W-013B1 W-013B1 JUMPER 3
22APR04 22APR04 DR-N ML-N 0
EM64O58OBW-013B1 JUMPER TESTIN( PER IWP 01-128 E-FN TESTING PER IWP 03:00 05:59 ORT3-N R-L 040588C0CO 1
TROL ROOM RECIRC FAN 147 1 EM9927044 EMV 76 CC-00759A-1CC-759A-0 REPLACE 3
22APR04 22APR04 DR-Y ML-Y 0
EM9927 0441CC-759, O REPLACE LS COVER LS COVER 03:00 05:59 ORT3-N R-L _992704i1P-1 RCP CC OUTLEt MOV OPERATO 148 1 OP0215165 EMV 76 CC-00759A-CC-759A-O MOV PMT I
22APR04 22APR04 DR-Y ML-Y 343 OP0215165C -759A-O MOV PMT STROKE PER r -250 STROKE PER rT-250 08:00 08:59 ORT3-N R-L 1
0215165 IP-.A RC7 CC OUTLET MOV OPER TOR 0
EM0405896 EMV 76 W-02t1 W-021B INSTALL 4
22APR04 22APR04 DR-N ML-N 0
EM0405 96W21B INSTAtL JUMPER PER I VP 01-128 E-M JUMPER PER IWP 11:00 14:59 ORT3-N R-L 0405 PAB EXI-AUST STACK FAt 150 1
EM0215194 EMV 76 SW-02908-O SW-2908 STEM 4
22APR04 22APR04 DR-Y ML-Y 0
a EMO 15194SW-2908 STEM CLEANING At D LUBE CLEANING AND LUBE 13:00 16:59 ORT3-N R-L 0 15194HX-15A-D CONT RECIR HX EMERGE 151 1
EM0403298 EMV 76 SW-02908-0 SW-2908-O PERFORM 10 22APR04 23APR04 DR-Y ML-Y 0
EM0 03298SW-2908-IERFORM STEM L 1E AND FBJ I STEM LUBE AND FBJ 13:00 00:59 ORT3-N R-L a
J329_HX-15A-D C NT RECIRC 152 0 EM0405881A EMV 76 W-030A W-030A INSTALL 2
22APR04 22APR04 DR-N ML-N 0
EM 05881 AW030A INSTALL JUMPER ER rwP 01-128 JUMPER PER IWP 15:00 16:59 ORT3-N R-L a
0405881lF"23I-29 PAB EXHAUS FILTER FAN 153 0 EM0405881B EMV 76 W-030A W-030A INSTALL 2
22APR04 22APR04 DR-N ML-N 0
EMW05881
- 030A INSTALL HPER PER JUMPER PER IWP 20:00 21:59 ORT3-N R-L I
0405881IF-23/F-29 PAB S H
ST FILTE 154 1 EM0215192 EMV 76 SW42907-O SW-2907 MOV 30 23APR04 24APR04 DR-Y ML-Y 0
EM021519 W-2907 MOV ACTUATOR REBUILD 09 00 2059 ORT3-N R-I 021519 155 1 EM0202527B EMV 76 B-42 1B-42 REMOVE 20 23APRo4 24APR04 DR-N MLtN 0
EM0202 27B42 RE BUCKETSMR 1ZC0 11:59 ORT3-NR-L.
02 52 158 1 NG08TFC2EV EPI 77 IST-SISI ENG EVAL FOR FAC 1
08APR04 21APR04 DR Y ML-Y.
44 TC2EVENGEVAL FOR FAC P 0 G-TURB HAL4 8 FT GEN AREA PROG - TURB HALL 8 14:OOA 12.59 ORT3-Y R-L ISECONDARY INSERVICE INS ECTION0101897, 157 1 EP0301910 EPI 77 UI-CONTAIN INSPECT CTMT AND 8
21APR04 22APR04 DR-Y ML-Y 379 Epw3o19t)SPECT CTMT AN FEEDWATER PE'ETRATIONS FEEDWATER 20:00 03:59 ORT3-Y R-L 030191_UNIT I ONTAINMENT 158 1 iIEP0301909 EPI 77 Ui-CONTAIN VISUAL INSPECTION 80 21APR04 04MAY04 DR-Y ML-Y 40 EP03019 SUAL INSPE N OF CTMT LN9R PLATE OF CTMT LINER PLATE 21:00 22:59 ORT3-Y R-L 030190 U-Run Date 21APR04 13:28 LT-03 STANDARD PUBLICATION Sheet 9 of 34 C Prlmavera Systems, Inc.
I FL-03 Execution Publication Set
after21APR04 12:00 U1R28 WORKING SCHEDULE after21APR04 12:00 If U
ID RES WO EQID DESCIZUPTION RDI ES EF RISK MF SThU 22 Fr 23
-- a R&
- I I
_I I
159 1 NG44CFCIEV EPI 77 IST-SISI ENG EVAL FOR FAC 1
22APR04 22APR04 DR-Y ML-Y 30 _
NG44CFCIEVEh.EVAL FOR FAC' PROG - CTMT 44T GEN AREA PROG - CTMT 44FT 07:00 07:59 ORT3-Y R-L I
03018971 'CONDARY INSERVICE INSPECTIO 160 1 NG26TFC2EV EPI 77 IST-SISI ENG EVAL FOR FAC 6
.22APR04 23APR04 DR-Y ML-Y 20 NGZ6TF E2NG EVALFCIRFAC PROG -T U 1 HALL 26 FT PROG - TUR8 HALL 26 12 00 07:59 ORT3-Y R-L 03C 17 I
ECONDARY IN I i tou;15[ i L,W-If.I
- .a2iS
- v I av is _
161 1 EP0301958 EPrT 76 HX-001A EDDYCURRENTTEST 34 17APR04 24APR04 DR-N ML-Y 0 _DY URRENTTEST GEN A-1 S iFT STEAM GEN A - 1 SHIFT 07:OOA 15:59 ORT3-N R-L 162 1 EP0301957 EPT 76 HX-001B EDDY CURRENTTEST 34 17APR04 24APR04 DR-N ML-Y 0 E s7EDDY qURRENT TEST SE GEN B - 1 SHIFT STEAM GEN B - 1 SHIFT 07:OOA 15:59 ORT3-N R-L 163 1 NG-SGX.ASL EPT 76 HX-001B OFFLOAD S/G SLUDGE 5
20APR04 21APR04 DR-Y ML-Y 0 N' A
OFFI.)AD SIG SLUDGE LANCE EQUIPMENT
_LANCE EQUIPMENT 09:WUA 16:59 ORT3-Y R-L STEAA GENERATOR03 1939 164 1 NG-SC1BSEC EPT 76 SC-lB EDDY CURRENT 22 21APR04 22APR04 DR-Y ML-Y 0
CURRENT INSPI -CT COND (1B)
INSPECT COND (IBS) 10:OOA 13:59 ORT3-Y R-L CONDENhSR (DEAERATING 0301980 165 1 NG-SC1BNRV EPT 76 SC-iB SC-lB - EDDY 11 21APR04 21APR04 DR.Y ML-Y 67 NG G C B EDDY CURRE T REVIEW I RERON (I BN)
CURRENT REVIEW/
11:00A 22:59 ORT3-Y R-L CONDENSER ( EAERATING)0301980 166 1
EP0311835 EPT 77 HX-001B HX-1B-EXAMINE 1
21APR04 21APR04 DR-NML-Y 0
EP03111835H1B EXAMINE SEALNGSURFACE SEAUNG SURFACE 20:00 20:59 ORT3-N R-L 031183d1STEAM GENERA-OR 167 1 EP0311836 EPT 77 HX-001A HX-1A - EXAMINE I
21APR04 21APR04 DR-N ML-Y 0
EP031183 X.-IA - EXAMINE SEAUNG SURFA¢E SEALING SURFACE 21:00 21:59 ORT3-N R-L 031183E STEAM GENERS TOR 168 1 NG-SGB-ASL EPT 76 HX-001B SIG B. SETUP FOR 5
22APR04 22APR04 DR-Y ML-Y 0
NG-SOGn-AS St B SETUP FOR *iBESHEET CL NING TUBESHEET CLEANING 07:00 11:59 ORT3-Y R-L 0301939 STEAM GEN4RATOR 169 1 NG-SGA-BSL EPT 76 HX.001A SIG B - SETUP HOSE 1
22APR04 22APR04 DR-Y ML-Y 0
NG-SG)
&S-1G B - SETUP HOSE THRU HA rCH THRU HATCH 12:00 12:59 ORT3-Y R-L 03( 934STEAM GENERATOR 170 1 NG-SGB-BSL EPT 76 HX.001B SIG B - PERFORM 14 22APR04 23APR04 DR-Y ML-Y 0
NG-SG BSLSIG B - PERVORM TUBESHEE r CLEANING TUSESHEETCLEANING 13:00 16:59 ORT3-Y R-L S0 0193_
0 171 1 NG-SC1BSRV EPT 76 SC-1B SC-1B - EDDY 12 22APR04 23APR04 DR-Y ML-Y 44 NG;S BSRC-1BEY CURRENT IEWIRERUN CURRENT REVIEW I 14:00 01:59 ORT3-Y R-L 30198C CONDEN ER (DEAERAT 172 1 EP0301962 EPT 76 HX-020A HX-020A - EDDY 24 22APR04 23APR04 DR-Y ML-Y 0
E 3019
-020A
- DDY CURRENT I SPECT 4A LP CURRENT INSPECT4A 14:00 17:59 ORT3-Y R-L 173 1 NG-SGB-CSL EPT 76 HX-001B S/G B - REM S/IL EQUIP 6
23APR04 23APR04 DR-Y ML-Y 0
G4GB-CS AND CLOSEOUT 17:00 22:59 ORT3-Y R-L 030193 E
~,s-gs
-e_
174 1 FG216557RP FG1 76 FD-00282C REMOVE PAINT FROM 0
20APR04 20APR04 DR-Y ML-.
1FD-282C 12:00A 21:59A ORT3-Y R-L 175 1 FG309424P FG1 76 CW-00138A PAINT ICW-138A 25 21APR04 22APR04 DR-Y MLY-2 2AI rCW-138A VALVE AND PIPIN 3 VALVE AND PIPING 0900A 16:59 ORT3-Y R-L
_P-30A CWP DISCHARGE HEADERVEN Run Date 21APR04 13:281 LT03 STANDARD PUBLICATION I
Sheettlof34 O Pjimavera Systems, Inc.
I FL-03 Execution Publication Set S
after21APR04 12:00 I. U'R28 WORKING SCHEDULE after 21APR04 12:00 U
ES EF FUSK MF APR ST 10_112l~14.16.11120,2 0.2.4.
- 6.
8.l0llZl4,1fla20,210
.2.4.
6. 8.111t4,16t1 176 1 FG0212800P FGI 76 PIPING HB-PIPING HB-19 TO 8
21APR04 22APR04 DR-Y ML-Y 0 G0 12800FPIPING HBr-19 TO HX-15 NEEDS PAINT (Oart3)
HX-15P NEEDS PAINT 17:00 02 59 ORT3-Y R-L 21280 _SERVIC WATER TO ENGINEERED SAFEGU S
177 1 FG0212814P FG1 76 PIPE AC 01 PIPE AC 0152N-04 49 22APR04 24APR04 DR-Y ML-Y 244 a
FG0212814 PEAC0152N 04$TRIPIREPAINT(P rt2)
STRIP/REPAINT (part 2) 08:00 16:59 ORT3-Y R-L 021281 178 0 FG0302074 FG1 77 MANHOLE PUMP ELECTRICAL 8
23APR04 23APR04 DR-Y ML-Y m277 FG0302074P ELECTRIc PM MANHOLE SUMPS 07:00 14:59 ORT3-Y R-L a
030207 P0 179 1 FG0212816 FG1 76 CPP-36 I CPP-36 CLEAN RUST 28 23APR04 25APR04 DR-Y ML-Y 161 FG02128161C P36 CLEAN F AND PAINT 07:00 14:59 ORT3-Y R-L 021281 180 1 FG0212794 FGI 77 UI-CONTAIN CONT 46 FT SUPPORTS 27 23APR04 24APR04 DR-Y ML-Y 341 FG0212T9 NT46 FT SUF NEED PAINT 08:00 14:59 ORT3-Y R-L a
02127 181 1
FG301623P FGI 76 FD-00208A PAINT VALVES 4
23APR04 23APR04 DR-Y ML-Y 224 a
FG301623P IFD-207A & IFD-208A 17:00 20:59 ORT3-Y R-L 0301 a
a 182 0 RE-211-B05 HP HP RMS RE-2111212 AIR 1
22APR04 22APR04 DR-Y ML-Y 178 RE-211005RE-211I212 RSAMPLECHANEoUT SAMPLE CHANGE OUT 00:00_
00:59 ORT3-Y R-L 188 2 IC0407898 IC 76 LT-00935 LT-9341935 LEVEL 8
20APR04 21APR04 DR-V MI-712 T-78 341435 LEVEL DEVA ON DEVIATION 21:00A 19".59 ORT3-Y R-M r
3 4 6 SI ACCUMU TOR LEELTRA*SMITTER040M89 154 1
IC5.47-1 IC1 76 ICP-05.047 SECONDARY LEVEL 158 19APRo4 07MAY04 DR-V MI-Y SECONDARY LEVEL CO OIERS AND CONTROLLERS AND 11:OOA 09:59 ORT3-YR-L 185 1 1IC0302099 ICI 76 LC-02514 LC-2514 REFURBISH 158 19APR04 09MAY04 DR-Y ML-Y 0 CO 2099I.C214 REFURBISH 11:00A 14:59 ORT3-Y R-L I
186 1 IC0305085 IC1 76 LS-02376 ILS-2376 SMALL 158 19APR04 09MAY04 DR-Y ML-V 0 CO I
50851 LS-237' SMALL STEAM ON LVL SWJ STEAM LEAKON LVL 11:00A 14:59 ORT3-Y R-L 187 1 1ICLS3579 ICI 76 LS-03579 DISASSEMBLE. CLEAN 158 19APR04 09MAY04 DR-Y ML-Y 0 CL 3579DISASSEMBIF, CLEAN 0 INSPECT INSTRU!
AND INSPECT LEVEL 11:00A 14:59 ORT3Y R-L 188 1 1CLS3580 IC1 76 LS-03580 DISASSEMBLE. CLEAN 158 19APR04 09MAY04 DR-Y ML-Y 0 CL 3580DISASSMBLE, CLEAN 0 INSPECT LEVEE INSTRU ANDINSPECTLEVEL 11:00A 14:59 ORT3-YR-_
159 1 ICLS3581 ICI 76 LS-03581 DISASSEMBLE. CLEAN 158 19APR04 09MAY04 DR-Y ML-Y C CL-381DISASSEMBLE, CLEAN A4D INSPECT LEVEL INSTRU AND INSPECT LEVEL 11:OOA 14:59 ORT3-Y R-L 190 1 ICLS3582 ICI 76 LS-03582 DISASSEMBLE. CLEAN 158 19APR04 09MAY04 DR-Y MI-V CL 5 82 ISASSgMBLE, CLE AD INSPECT LEVE-INSTRU AND INSPECT LEVEL 11:00A 14:59 ORT3-Y R-L I
191 1
1C4.IJ ICI 76 ICP-04.001 PZR LVL AND FIRST 8
21APR04 22APR04 DR-N ML-Y 7
VL AND FIRST STAGE PRES CAL STAGE PRESS CAL 09:OOA 09:59 ORT3.N R-L
_RPSAFEGUARDS ANALOG RACKS PZR LVIJIST Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION Sheet I1 of34 0 Pnmavera Systems. Inc.
FL-03 Execution Publication Set I
after 21APR04 12:00 U12 OKN CEUEafterV2APR04f 12:00 I
MR2 WOKN SCEDL I.ts APR ID RESP WO ST EQID DESCRIPTION RD ES EF RISK MF WwI 21 Thu 22 I
Fri 92 D
- 2.4.6.R.1n121d.1ft1F61n.9'i F.
192j1 1C4.26N41 IC1 76 ICP-04.026 ICP 4.26 NIS PR CALIBRATION 14 I 21APR04 I 22APR04 I DR-Y ML-Y 11:OOA 15:59 ORT3-N R-LI 0 C4 SN4t1CP 4.2 MS PR CAUBRA)1ON I.~~~
I ~tI~
CAI :R INSTRUMENTATION SYSTEM 193 1 IC5.19-1 IC1 76 ICP-05.019 COND STEAM DUMP 28 21APR04 24APR04 DR-Y ML-Y 0
CNTL SYS CAL 11:00A 09:59 ORT3-N R-L 194 1 IC4.3-4 IC1 76 IICP-04.00 ICP-04.003-4 5
22APR04 22APR04 DR-N ML-Y 10 CHARGING FLOW 07:00 11:59 ORT3-N R-L 195 1 IC0307357 ICI 76 RDC-1BD RDC-1BD REPAIR 12 22APR04 23APR04 DR-Y ML-Y 0
SUPRESSION CIRCUIT 07:00 08:59 ORT3-Y R-L 196 1
IC5.74 IC1 76 ICP-05.074 RDC BLOCKING DIODE 12 22APR04 23APR04 DR-Y ML-Y 0
CHECK 07:00 08:59 ORT3-Y R-L 197 1 IC0400553B ICI 76 SERVICE SERVICE MAINT 20 22APR04 27APR04 DR-Y ML-Y 15 SUPPORT-EQ 12:00 07:59 ORT3-Y R-L 198 1 IC4.26N42 ICI 76 ICP-04.026 ICP 4.26 NIS PR 15 22APR04 24APR04 DR-Y ML-Y 0
CALIBRATION 16:00 10:59 ORT3-N R-L 199 1
IC0213740 ICI 76 FIT-00458 FIT-458 DRY BA 12 23APR04 24APR04 DR-Y ML-Y 0
BUILDUP ON XMITTER 07:00 08:59 ORT3-Y R-L 1
IC5.60 ICI 76 11CP-05.06 RTD MANIFOLD 12 23APR04 24APR04 DR-Y ML-Y 0
FLOWICO 07:00-08:59 ORT3-Y R-L 201 1
IC4.14 ICI 76 ICP-04.014 ICP 4.14 BA CONTROL 20 23APR04 24APR04 DR-N ML-N 0
INSTRUMENT CAL 07:00, 16:59 ORT3-N R-L 202 1 IC0309955 ICI 76 G-06 IG-08 INSPECTIREPAIR 10 23APR04 24APR04 DR-Y ML-Y 0
VOLTAGE REG.
09:00 08:59 ORT3-Y R-L 1.
AS.COND ST#AM DUMP CNTL YS CAL RESTARF III III II I
II I
l rC4.3-ICI 0300960.
IC03073S7RE
'.04.003-4 CHARGING FLOW MCHARGING FLOW TRANSMrmTI C-1BD REPAIR SOPRESSION CIRCI
=
.RS AND INDIC IT 03073-DC BANKS B IC5.74R BLOCKING DIODE CHECK 037 RDC BLOCKIN IC0400 153BSERVlCE MAWN SUPPORT-Ej4QE FYING nlAl kmc_
w IC4.26,N<CP 4.2& NIS PR CAUBRW TION WMILA3M
- - -I II fC0213T4~
021374 Ic5.60RT 0300381N IC4.141CF 03005340 IC030995!
030995!
IC030995i 030995L 458 DRY DA B 3 MANIFOLD, F1 4.14 BA CONT NN-w IG-OS INSPEC1 IG-O7 INSPEC't 203 1 1C0309956 1C0302376 ICI 76 G-07 1G-07 INSPECTIREPAIR 10 23APR04 24APR041 DR-Y ML-Y VOLTAGE REG 09:00 08:59 ORT3-Y R-L 2
2041 1 1C2I 76 TS-02134 TS-2134 RELOCATE 40 14APR04 25APR04 DR-N MLY SWITCH 22:60A 04:59 ORT3-Y R-L 120 IC0317BTs2134 RELOCATE SW1TTH I
- I I
I r
2051 1 IC5.52-1 IC2 76 ICP-05.052 ICP 5.52 SECONDARY 30 APR04 I 23APR04 DR-Y ML-Y TEMPERATURE INST 23:OOA 22 59 ORT3-Y R-L 0
5 C
- ICS,
-.tcp 5.5 S)ECONDARY-TEM 1 ERATURE INS 5
urn urn m
uI 206 1 IC0212748 IC2 76 TM-004010 ITM-4010 NEED REFURB/BAD 28 19APR04 I 24APR04 DR-N ML-Y 23:00A 02:59 ORT3-N R-L 72 IC02 748aTM-4010 NEED REFURB{BAD CAPACITORS I!
l 4
4 207 1 IC4.11D IC2 76 ICP-04.001 DELTA T SP2 & F(
129 19APR04 25APR04 DR-N ML-Y AVG) CAL -4.10 I 23:OOA 03:59 ORT3-N R-L 0 0C4.)0OELTA T SO, 2 9 F(T AVG) C4.4.1 III
_,1 2081 1
IC5.22 IC2 76 ICP-05.022 IFEEDWATER CONTROLI 54 19APR04 I 27APR04 DR-N ML-Y SYSTEM CAL 23:00A 22:59 ORT3-N R-L 16IC5.FEEDWATER CONTROL SY CAL I
L a
i rn I
1-i-I.
I-1 2091 1 IC4.4-6 IC2 76 IICP-04.00 ICP-04.004-6 LTOP XMTR CAL 8
21APR04 22APR04 DR-Y ML-Y 19:00 I059 I ORT3-Y R-L 2
IC4A4P0 048LTOP X1 0
0097OEP mT CAL
=SSURE MIGATION PRESSURET ANSMiTTERS I
Run Date 21APR04 13:281 LT-03 STANDARD PUBLICATION Sheet 12 of 34 C Pdrmavera Systems, Inc.
I FL-03 Execution Publication Set I
after21APRO412:00 I
U1R28 WORKING SCHEDULE after21APR0412:00 ID RESP WO ST EQID DESCRIPTION RO APR ES EF RISK DR-Y ML-Y ORT3-Y R-L MF 140 Wed 21 1.1i214.1 Thu 99 Fri 23 17.
2.4.6.8.10;12.14lr1j 2101 1 IC0212948 IC2 1 76 PT-00124 IPT-124 INSTALL NEW I 20 21APRo4 23APR04 VENT PLUGS I
19:00 04:59 1C02129481 PT-24 INSTALL NEN VENT PLUGS I 211 1
IC0212949 IC2 76 PT-00131 1PT-131 INSTALL NEW 20 21APR04. 23APR04 DR-Y ML-Y 140 VENT PLUGS 19:00 04:59 ORT3-Y R-L 212 1 ICS.14RCP IC2 76 IICP-05.01 ICP 5.14 RCP SEAL 20 21APR04 23APR04 DR-Y ML-Y 0
INSTRUMENT CALS 19:00 04:59 ORT3-Y R-L 213 1 IC5.9 IC2 76 ICP-05.009 MISC TURBINE 40 21APR04 26APR04 DR-Y ML-Y 0
INSTRUMENTATION 19:00' 04:59 ORT3-Y R-L 214 1 IC0407786 IC2 76 TC-00404A/
TC-404A/D FAILED 25 22APR04 25APR04 DR-Y ML-Y 98 BISTABLE 04:00 22:59 ORT3-Y R-L 215 1 IC0306469 IC2 76 LT-00428 ILT-428 BA BUILDUP 36 22APR04 26APR04 DR-Y ML-Y 0
ON MANIFOLD 19:00 00:59 ORT3-Y R-L 216 1 IC0306470 IC2 76 LT-00427 ILT-427 BA BUILDUP 36 22APR04 26APR04 DR-Y ML-Y 0
ON MANIFOLD 19:00 100:59 ORT3-Y R-L 217 1 IC0310192 IC2 76 LT-00442 I LT-442 REPLACE 36 22APR04 26APR04 DR-Y ML-Y 10 POWER SUPPLY 19:00 13:59 ORT3-Y R-L 22 1
IC4.3-1 IC2 76 ICP-04.00 ICP-04.7H3-1 PZR AND 36 22APR04 02MAY04 DR-Y ML-Y a
PTLEVELC 190 1:59 ORT3-Y R-L 219 1 ICS.54N1 IC5 76 ICP-05.054 ICP 5.54 SECONDARY 52 19APR04 06MAY04 DR-Y ML-Y S
LOW RANGE 1:00 18:59 ORT3-Y R-L 220 1 IC9944161 IC5 76 DPS 05,933 lDPS-5933 INSTALL 52 19APR04 26APR0-4 DR-Y ML-Y SNUBBERS 11:0CIA 13:59 ORT3-Y R-L.
221 1.ICs.7-1 IC5 76 ICP-05.W07 ICP 5.7 EH CNTL CAL 99 2OAPR04 02MAY04 DR Y ML-Y C
.THRU STEP 4A9.11 09 WOA 10:59 ORT3-Y R-L 222 1 IC0300766 ICV 76 CC-00769-0 ACC-769 DIAGNOSTIC 3
21APR04 21APR04 DR-Y ML-YV CHECK 02:00A 19:59 ORT3-N R-L 223 1 IC5.49C ICV 7ff ICP-05.049 ICP 5.49 CS-2273 11401 21APR04 03MAY04 DR-Y ML-Y 76 HEATER BYPASS 17:00, W:59 ORT3-Y R-L 224 1 IC5.49NGTI ICV 76 ICP-05.Q49 lCP 5.49 SEC CONTROLl180l 21APR04 06MAY04 lDR-YML-Y VALVES l19-00, 18:59 lORT3-Y R-L 225 1 IC030081 ICV 76 IA-0304740 lI-047 DIAGNOSTIC l4 l 21APR04 22APR04 DR-Y ML-Y CHECK 23:001 02:59 lORT3-N R-N 021 1P-1 RCP LABYRIN Co 2129 4 S1Pt-131 INSTALLNE NVENTPLUGS 1
021 29 4in 1P-I RCP LABYRIN C5.14RCPICP 5.14 RCP SEAL I 4STRUMENT CALS 0300DIFF RENTIAL PREE IC5.9 C TURBINE IN UMENTATION 0300851_
tIC0407TSTC-404{
FAILED DISTABLE 040778^
T U
ICO3OS46 LT-428 DA BUILDUF, ON MANIFOU 03 06 IC03064701Tf-427 BA BUILDUF ON MANFOL 030647 l
ICo310192?LT 442 REPLACE POWER SUPPLY 0301 0
1 1
IC4.3.40C4.0031 PZR ANh PRT LEVEL l03009B__
n IC5.54 SECONDARY LOW ANGE PRESSURE RESTART I
41011 PS5t33 INSTALL SNU BERS 7 EH NTL CAL TH P4.49.11 REStART i07 eTCC-769 IAGNOSTIC CH K
-1fkX-4 ELHX SHE SIDE OUTLET OPtRATOR0300766 I
I CSA4CCP 5S.19 CS-2273HE BYPASS 03008BE
~5.49NT1ICI 5.49 EC CO LALE I
I cS.
- Ico, ICO3SOOOlA-3047 DIAGN 0300801_U1C IA 1-I 105 3STIC CHECK l
EADER INLET CONTROL OPERATOI 49DAY1CP 5.49 StC CONTROL VALVES 226 II IC5A9DAY1 ICV 76 I ICP-05.049 ICP 5.49 SEC CONTROL VALVES 160 22APR04 108MAY04 I DR-Y ML-Y 14:00 13:59 I ORT3-Y R-L 12 3008 Run Date
_21APR4 13:281 LT-03 STANDARD PUBLICATION Sheet 13 of 34 o Pdrf-avefa Systems, Inc.
I FL.03 Execution Publication Set 7
4
after21APR0412:00 U1R28 WORKING SCHEDULE.
after 2APR04 12:00 U
ID RESf WO EQID DESCRIPTION RD ES EF RISK MF APR eWd21 ThU 22 Fri 23 ST
.f
.1214.16.1920,22 O. 2.q4. 6S. 8,1012i4JR18.120,22 Q0.2.4. 6S.8 11246, 227 1 IC0300940 ICV 76 RH-00C25-0 RH-625 DIAGNOSTIC 4
22APR04 22APR04 DR-N ML-N 0
IC0300940RK425 DlAGNOSTl CHECK CHECK 20:00 23:59 ORT3-N R-L 030094i3IHX-I IB RHR OUTLET C 228 1 ICS.69-625 ICV 76 1ICP-05.06 ICP-05.069B TRAIN B 10 22APR04 23APR04 DR-N ML-N 0
IC5.69-62P-05.069B TRAIN 20:00-05:59 ORT3-N R-L 030099
_inR N B RHR HEAl 229 1 ICS.16-142 ICV 76 1ICP-05.01 CV-142 NORMAL 5
23APR04 23APR04 DR-N ML-N 0
IC5.16-14 142 NORMAL CHARGING 07:00-11:59 ORT3-Y R-L 03009 ROS AND 230 1 IC0304451 ICV 76 CC-00761B-1CC-761B-0 CK IA SY I
23APR04 23APR04 DR-Y ML-Y 266 S
IC03044511 C-761B-O CK FOR FOREIGN MATL 08:00 08:59 ORT3-Y R-L 0304451 1P-iB RCP TH 231 1
IC0304453 ICV 76 CV-00142-0 ICV-142 CHECK IA SY I
23APR04 23APR04 DR-N ML-N 153 IC0304453t
-142 CHECK FOR FOREIGN MATL 08:00 08:59 ORT3-Y R-L e
03044 CHARGING Ll 232 1 1IC0304452 ICV 76 CC-00761A-ICC-761A-0 CK IA SY I
23APR04 23APR04 DR-Y ML-Y 265 IC030445 CC-761A-O C FOR FOREIGN MATL 09:00-09:59 ORT3-Y R-L 030445 11P-lA RCPT 233 1 IC5.16-130 ICV 76 11CP-05.01 CC-130 NONREGEN HX 4
23APR04 23APR04 DR-Y MLY 0
10C5.1 *.130CC 130 NC CLG VLV DIAG-12.00-15:59' ORT3-Y R-L 03 97iRC!
234 1 IC5.16-135 ICV 76 1ICP-05.01 CV-135 LETDOWN LINE 4 23APR04 23APR04 DR-N ML-N 0
IC5.16.13!
17:00*
22:59 ORT3-Y R-L 0300971 b
2!
I. _
235 1 MM0305772 MM 76 HX-021A 1HX-21A PLUG TUBES -
5 22APR04 22APR04 5 _MM03052 CH 21A PLUG TUBgS - CONTINGENC WO CONTINGENCY WO 07:00-11:59 0305 WHP FEEDWATER HEATER SA m
W A:
a 236 1 MM0301145 MMI 76 HX-01585 HX-15B5, CFC COIL 2
15APR04 21APR04 DR-Y ML-Y 90 M Oil 4SHX15S. CFC COIL NTRNALINSPICLEA*lNG INTERNAL 02:00A 18:59 ORT3-N R-L CC NTAINMENT ACC )ENT RECIRC HEOT EXCHANGERO 01145 t
I 237 1 MM0301146 MMI 76 HX-015186 HX-01586-CFCCOIL 2
15APR04 21APR04 DR-Y ML-Y 90 MM 01146"X-015B6 -CFC COIL IN ERNAL INSPICLEANING INTERNAL 02:OOA 18:59 ORT3-N R-L OCdNTAINMENT ACC )ENT RECIRC HEAT EXCHANGERO 01146 238 1 MM0301148 MMI1 76 HX-0ls1s HX-15B8. CFC COIL 2
15APR04 21APR04 DR-Y ML-Y 90 PA 0 4qHX1508. CFC COIL INTRNAL INSPICLEA)NG INTERNAL 02:00A 18:59 ORT3-N R-L CONTAINMENTACCIENT RECIRC HET EXCHANGERO 01148 239 1 MM0214171 MMI 76 W-0Bt W-1Bt, INSPECTAND 10 15APR04 22APR04 DR-Y ML-Y 0 M 14 171W1B1l INSPECT AND I BRICATE FAN BiARINGS LUBRICATE FAN 02:A 02:59 ORT3-N R-L
-CO N
TAI lENTDRECIRCULATION AN0214171 240 1 MM0214064 MMI 76 HX-015B HX-15B. MOTOR 5
15APR04 21APR04 DR-YMLY M
0
-15q, MOTOR COOU G COIL INTERNAL INSPECTION COOLING COIL 10:OOA 16:59 ORT3-N R-L
-1B1 ACCIDENT RECI C FAN MOTOR COOLING COIL021 064 241 1 l MM0301147 MMI1 t6 HX-01587 HX-015B7-CFC COIL 2
17APR04 21APR04 DR-N ML-N 149 1 47HX-o14B7 -CFC COIL IERNAL INSPICLdANlNG INTERNAL 13:00A 13:59 ORT3-N R-L NTAINOENT ACCIDENT qECIRC HEAT EXC4ANGERo301147 242 1 MM0306449 lMMI 76 HX-015B1 HX-015B1. CFCCOIL 10 19APRO4 21APR04 DR-N MI-N 141 !
Q 01581 CFCCOILINrzRNALIhSPlCLANlNG INTERNAL 14:00A 23:59 ORT3-N R-L U
CONTAINME T ACCIDENT RECtRC HEAT EXCHA GER0306449 243 1
MM0306450 MMtl 76 l HX-015B2
'HX-015B2. CFCCOIL 10 19APR04 21APR04 DR-N ML-N 141
-0$62 CFC COIL I*RNAL INSPICL&ANING INTERNAL 14:OOA 23:59 ORT3-N R-L o
CONTAINMEq FACCIDENT RECORC HEAT EXCHA 4GER0306450 Run Date 21AP LT-03 STANDARD PUBLICATION Shoot 14 of _
O PrImavera Systems, Inc.
FL-03 Executlon Publication Set I
after 21APR04 12:00 U1R28 WORKING SCHEDULE after 21APR04 12:00 I
LI ID 1RESP WO IEQID DESCRIPTION lRD ES EF RISK MF APR ST I Wed 21 h
lFi2
'.10112.14,1.1120.2210*2*4.6. 8.10t12I44la6a2O2220.2.4.6,.81011ZI4,16 UKRU NM1
,:zYtlf l;las l-lglpdt4,-
2441 1 MM0306451 I MMt 76 HX-015B3 HX-015B3, CFC COIL 10 19APR04 21APR04 DR-N ML-N INTERNAL 14:00A 23:59 ORT3-N R-L 141 245 1 MM0306452 MM1 76 HX-015B4 HX-01584. CFC COIL 10 19APR04 22APR04 DR-N ML-N.
82 INTERNAL 15:OOA 02:59 ORT3-N R-L 246 1 MM-8480D1 MMI 76 R-1 MOVE REACTOR 4
21APR04 21APR04 DR-N ML-N 0
VESSEL HEAD TO 13:00 16:59 ORT3-Y R-H 247 1 MM0305396 MM1 76 W-001B1 W-1BI REPLACE 36 21APR04 24APR04 DR-N ML-N 0
SPRING ISOLATORS 17:00 04:59 ORT3-N R-L 248 2 MM0213893 MM1 77 ELECT PENE INSPECT AND 4
21APR04 21APR04 DR-N ML-N 590 MAINTAIN 03 AND 058 20:00' 23:59 ORT3-N R-L 249 1 MM-8480E2 MM1 76 R-1 JIT INFO SHARING 2
22APR04 22APR04 0
PRIOR TO UPPER 01:00 02:59 250 1 MM0214170 MM1 76 W-001B1 W-1B1. REPLACE 2
22APR04 22APR04 DR-N ML-N 58 AUTOMATIC 01:00 02:59 ORT3-N R-L 251 1
MM-8480E1 MMI 76 R-1 UPPER INTERNALS I
22APR04 22APR04 DR-Y ML-Y 0
LIFT IPTE BRIEF 03:00 03:59 ORT3-N R-L 2F 1 MM-8480E MM1 76 R-1 REMOVE UPPER 4
22APR04 22APR04 DR-N ML-N 0
INTERNALS 04:00 09:59 ORT3-N R-H 253 1 MM9924975 MMI 76 HS-1 HS-1, AS-FOUND VT-3, 2
22APRO4 22APR04 DR-Y ML-Y 0
REMOVE SNUBBER 07:00-08:59 ORT3-N R-L 254 1 MM9934376 MMPP1 76 HS-15 HS-15. AS-FOUND VT-3, 2 22APR04 22APR04 DR-Y ML-Y 0
REMOVE SNUBBER 09:00 10:59 ORT3-N R-L 255 1
MM-1600-20 MM1 76 R-1 INSTALL CONOSEAL 3
22APR04 22APR04 DR-Y ML-Y 0
COVERS 10:00 12:59 ORT3-N R-L 256 1 MM0304672 MMP 76 HS-601R-73 1 HS-601 R-73 CHANGE 32 22APR04 25APR04 DR-Y ML-Y 0
SNUBBER STROKE &
11:00 12:59 ORT3-Y R-L 257 1
MM-8859A MM1 82 W-001D1 W-1D1. FME CLOSE 1
22APR04 22APR04 DR-Y ML-Y 138 OUT INSPECTION 12 00-12:59 ORT3-N R-L 258 1 MM9933444 MM1 76 W-001C2-A W-1 C2-A REPLACE 20 22APR04 24APR04 DR-N ML-N 0
BACKDRAFT DAMPER 13:00-12:59 ORT3-N R-L 259 1
MM0214167 MMP 76 W-001A1 W-1A1; INSPECT AND 40 22APR04 25APR04 DR-N ML-N 0
WBRICATE FAN 15:00 14:59 ORTN R-L 260 1 MM0214182 AMM1 76 W-003A W-3A.
2 22APR04 22APR04 DR-N ML-N 0
INSPECT/LUBRICATE 17:001 18:59 ORT3-N R-L 0
MM(
MM-MM 106451HX-015B3, CFC COIL IN OCONTAINME.
106452HX-01
- 4. CFCCOILIN C
N ACONTAI I8jDtMOVE REACTOR VESSE
_REACTOR VESSEL ANC 3 05396
-1Bj REPLACE SPRIN
'ERNAL INSP/CLEANING ITACCIDENT REURC HEAT EXCHA
-ERNAL INSPtCLlANING MENT ACCIDENT:RECIRC HEAT EX
.AHEAD TO RHLDA ASSEMBLY0214134 SISOLATORS 4GER0306451
'HANGER0306 I
t-ff If5I p
g MO213893INSPECT AND MAI?
0213893MUNIT 2 ELEC7 MMm8180EtirT INFO SH 021413REACTO MM0214170W-101, REF 0X1417dUCONTAI M".8480EIUPPER II 10214134REACT
,MMN4MOEREMOV 02141349""
MM9924975S 992497.w MM993437f 9934376 MM4600C.
021341 MM0304i 03041 MM-S 021 MM9I 9;
l Mt TAIN Q3 AND 058 FRICAL PENETRATIONS ARING PRIOR TO zUPPER INTERNAt I VESSEL AND ASSEMBLY LACE AUTOMATb LUBRICATOR MENT ACCIDENTRECIRCULATION JTERNALS LIFT IPTE BRIEF 5R VESSEL AND ASSEMBLY E UPPER INTERNALS IREACTOR VESS)L AND ASSEMBL
.1, AS-FOUND VT-3, REMOVE SNUBS lHX-1A SG MAIN STIEAM LINE WEST 1IS15, AS-FOUND \\T-3, REMOVE SN ECONTAINMENT SPRAY HEADER IJNSTALL CONOSEAL COVERS 2;REACTOR VESSEL AND ASSE
,7-HS4OIR-73 CA, ANGE SNUBBER.
g S UFT TAN ER FOR TEST7 5NUBBER
)BBER FOR T
)NUBBER MBLY wTROKE
& SW W
5 81D1, FME CLOSE OUTINSP m17iCONTAINMtNT ACCIDENT RE F3344W-1C2-A RTPLACE BACKDRM
- CTION CIRCULATION FT DAMPER I]
U-10214167W-IAl. IkISPECT AND L 4 ~A B
0211 um MM0214182W-3A.' INSPECTALUBRIC 02141080C&NTAINMENT CON MM0214183W-38. INSPECTJUBRIC 02141 SCCWTAINMENT CON ATE BACKDRA
'ROL ROD DRI ATE BACKDRA
'ROL ROD DRI 261 1 MM0214183 IPMM1 76 W-003B W-3B.
INSPECT/LUBRICATE 2
22APR04 22APR04 DR-N ML-N 17:00 18:59 ORT3-N R-L 46 I
£ 1 1,.
I1 Run Date 21APRo413:28l LT-03 STANDARD PUBLICATION Sheet 15 of 34 O Prlmavera Systems, Inc.
I FL-03 Execution Publication Set T
after21APR04 12:00 U1R28 WORKING SCHEDULE after 21APR04 12:00 U
ID RESP WO EQID l
DESCRIPTION IRDI ES EF RISK MF APR 262 1 MM0305857 MM1 76 P-010B IP-10B REPLACE 30 23APR04 25APR04 DR-N MI-N 0 _
MM0 D5857 4P-lOB F ROTATING ELEMENT I13 00 00:59 ORT3-N R-L 0 0585_
2631 1 MM0306054 MM2 76 P-028A P-02DAU -CONTINUE E
451 18APR0 125APR DR-Y M-OVERHAUL MAIN FEEDI II1:O0A 151:59 ORT3-N R-L 0,Abg_-0284 - CONTINUE OVRHUL MAIN FEED PUMP U
U 264 1
MM0214091 MM2 76 HX-027 HX-27, HYDROLANCE 1
21APR04 21APR04 DR-N ML-N 0
CLEAN GENERATOR 09:OOA 12:59 ORT3-N R-L 265 1 MM0407389 MM2 76 P-028A 1P-28A, CONTINUE.
1 21APR04 21APR04 DR-Y ML-Y s0 INSPECT SPEED 09:0WA 12:59 ORT3-N R-L 266 1 MM0214089 MM2 76 HX-024 HX-24. HYDROLANCE 5
21APR04 21APR04 DR-N ML-N 0
CLEAN CONDENSATE 09OOA 16:59 ORT3-N R-L 267 1 MM0214099 MM2 76 HX-056A HX-056A - OPEN SGFP 2
21APR04 21APR04 DR-Y ML-Y 0
OIL COOLER 13:00 14:59 ORT3-N R-L 268 1 MM0214095 MM2 76 HX-0538 HX-053B -
3 21APR04 21APR04 DR-N ML-N 1
HYDROLANCE CLEAN 13:00 15:59 ORT3-N R-L 269 1 MM0213960 MM2 76 HX-053A HX-053A-4 21APR04 21APR04 DR-N ML-N 0
-_HYDROLANCE CLEAN 13:00 16:59 ORT3-N R-L 270 1 MM0214101 MM2 76 HX-056B HX-056B - OPEN SGFP 2
21APR04 21APR04 DR-Y ML-Y 0
OIL COOLER 15:00 16:59 ORT3-N R-L 271 1
MM0301046 MM2 76 LG-02561 1LG-2561 LEVEL 6
21APR04 21APR04 DR-N ML-N 12 GAUGE STUCK 17:00 22:59 ORT3-N R-L 272 1 MM0301048 MM2 76 L1-02563 1G-2563 LEVEL GAUGE 6
21APR04 21APR04 DR-N ML-N 48 STUCK 17:00 22:59 ORT3-N R-L 273 1 MM0304206 MM2 76 FD-00249A FD-00249A-INLET 6
21APR04 21APR04 DR-N ML-N 192 PLUGGED 17:00 22:59 ORT3-N R-L 274 0 MM0201304 MM2 77 WELDING-EO INSPECT FIRE 8
21APR04 22APR04 DR-N ML-N 352 EXTINGUISHERS 17:00 00:59 ORT3-N R-L 275 1 MM0400290 MM2 76 LG-02564 LG-2564 LEVEL 8
21APR04 22APR04 DR-N ML-N 48 GAUGE STUCK 17:00 00:59 ORT3-N R-L 276 1 MM0309696 MM2 76 LG-02697 1LG-2697 FLUSH LEVEL 12 21APR04 22APR04 DR-N ML-N 24 INDICATOR 17:00 04:59 ORT3-N R-L 277 1
MM0214128 MM2 76 P-029-T P-29-T, INSPECT IB &
20 21APR04 23APR04 DR-N ML-N 0
09 BEARING OIL 17:00 00:59 ORT3-N R-L 278 1 MM0214100 MM2 76 HX-056B HX-056B -
2 22APR04 22APR04 DR-N ML-N 52 HYDROLANCE CLEAN 07:00 08:59 ORT3-N R-L F. HYDROLAlCE CLEAN GENE ITG-01 TG B(IS COOLING UNr LA, CONTINUP INSPECT SPEEI ISTEAM GENERATOR FEED P
- h. HYDROLA*CE CLEAN CON CONOENSATE COOLEF 1I99HX-056A - OPEN SGFP C 1*IP-28A sdFP OIL COOLERC
$Q05HX-051B - HYDROLANCI IMHYDROEN SIDE SEAL C U96IX-053A - HYDROLANCI I-AIR SIDE SEAL OIL COt j4.1&HX.05§B - OPEN SGFP C
¶o10EP-2sa'SGFP OIL COOLE 30104aILG2561 LEVEL GAUG 30104 HX-22C MSR L 301048LG-2553 LEVEL GAUGE 30104 N HX-22D MSR L 304206FD-00i49A - INLET PLU 30420_HX.19A UP FW 201306ONSPECT FIRE EXTINGI 2013 ING A 4002901 LG-264 LEVEL GAUG 40029_H X-22B MSI 309696LG-2697 FLUSH LEVEI 309696in
-25A i214128.
INSPECT la & O 21412 IRATOR BUS INCREASER JMP iENSATE COOLEi IL COOLER 214099 CLEAN HYDROGEN SIDE SEAL IL COOLER0214"5 CLEAN AIR SlDE SEAL OIL LER0213960 IL COOLER
'STUCK VEL GAUGE STUCK YEL GAUGE
- GED 1 3A L-2536 LOWER ISOLATION ISHERS 4D CUTTING EQUIPMENT
.STUCK LEVEL GAUGE INDICATOR MSR STILLING MANIFOLD LEVEL G I
BEANG OIL COLERS 9
14n
,ft A. -Ig LUGE J.
,1
=w:s=R 1 rza woua n l IMM0214i00 I
021410U MM021409"H 02`1409A 056-. HYDROLAJCE CLEAN SGF P-28B SGFP OIL dOOLER lI 056A - HYDROLANCE CLEAN SGFI EP-28A SGFP OIL'COOLER EEDWATER Tl OIL COOLER OIL COOLER 279 1 MM0214098 I MM2 76 HX-056A HX-056A -
3 22APR04 I 22APR04 I DR-N ML-N 07:00 I 09.59 I ORT3-N R-L 0
HYDROLANCE CLEAN
=
II I
Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION Sheet1Bof34 C Primavera Systems, Inc.
I FL-03 Execution Publication Set T
after 21APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 21APR04 72:00 U
ID RES WO EQID DESCRIPTION RD I ES EF RISK MF AP'R ST 1
h l
280 1
MM0306061 MM2 76 T-052A OPEN/CLEAN AND 10 22APR04 23APR04 DR-N ML-N 65 _
MM0306061 PENICLEAN AND INSPECT LO RES RVOIR INSPECT LO 08:00' 07:59 ORT3-N R-L 030606{
B 28A SGFP LU 281 0
MM0201361 MM2 75 W-030A W-30A. LUBRICATE 4
22APR04 22APR04 DR-Y ML-Y 0
I MMO2 1361W-30A, LUBI*CATE AND MUN AIN FAN AND MAINTAIN FAN 12:00 15:59 ORT3-N R-H 02C 1361MF-23/F-:9 PAB EXHAUST ILTER FAN 282 1
MM0214082A MM2 76 HX-021A HX-21A. CLOSE HP 8
22APR04 23APR04 DR-Y ML-Y 0
I AM02148ACLOSE HP FEE )WATER HEAT FEEDWATER HEATER 17:00' 00:59 ORT3-N R-L 0214082 HP FEEDW TER HEATER 283 1 MM0214129 MM2 76 P-029-T EMERGENCY GOV 6
23APR04 23APR04 DR-N ML-N 0
MM0214129EMERGENC ' GOV INSPEC' INSPECT1ON P-29-T 01:00 18:59 ORT3-N R-L
.014129M 284 1 MM0311887A MM2 76 HX-021B 1HX-218 CLOSE HX 8
23APR04 23APR04 DR-N ML-N 0
MMO311887 1.21B CLOSE AFTER ECT 07:00 14:59 ORT3-N R-L 0311887 HH P FE 285 2 MM0304865 MM2 75 YS-03587 2YS-3587 REPLACE 36 23APR04 25APR04. DR-Y ML-Y 0
7 RPMM03048L5 2 S-3 R
A STRAINER 08:00' 01:59 ORT3-Y R-L 030485 286 1 MM0214087 MM2 76 HX-023A HX-023A-20 23APR04 25APR04 DR-N ML-N 8 a MM02408 YD HYDROLANCE CLEAN 09:00' 08:59 ORT3-N R-L 02140 287 1 MM0214088 MM2 76 HX-023B HX-023B -
20 23APR04 25APR04 DR-N ML-N 10 MM021408 H 23B-HYD HYDROLANCE CLEAN 09:00' 08:59 ORT3-N R-L 021408 I~
MM0207075 MM2 76 FE-00134 IFE-134 REPL FLANGE 8
23APR04 24APR04 DR-N MAL-N 0
MM2705 GASKETS 17:00' 00:59 ORT3-N R-L 020707!
Z 4 I A
Z4 1 I 3
m 289 1 MM-8485B1 MM3 76 P-I01B PLACE BACKSEAT I
21APR04 21APR04 DR-Y ML-Y 0 UM 155PLACI BACKSEAT COL ECTION SYS IN SERVICE (8 FT.)
COLLECTION SYS IN 1200 12:59 ORT3-Y R-M REACTOR COOLANT PUMPO 14119 290 1 MM-8485K MM3 76 P-001B P-1B, AUGN SEAL I 1K21APR04 21APR04 DR-N MI-N 250 MM 8485KBL1.
AUGN SEAL COLLECTION TO CAVITY RMP9002 COLLECTION TO 20:00 20:59 ORT3-N R-M 0214119iREACTOR COOL) NT PUMP 291 1
MM-8485C MM3 76 P-OOIB P-1B. REMOVE PUMP 14 22APR04 23APR04 DR-Y ML-Y 0
MM-848! CP-1B, REMOVE PUMP COUPLING
-MP9002-5 COUPLING RMP 9002-5 10:00 01:59 ORT3-Y R-M 02141 5_
EACTOR COOLANT PUt 292 1 MM-8485D MM3 76 P-001B REMOVE SEAL P-1B 10 23APR04 23APR04 DR-Y ML-Y 0
Ml848sDREMOV EAL PB RMP RMP 9002-5 02:00 13:59 ORT3-N R-M 021411 REAC1 1
u;T_
!I 2931 MM0303383 MMV 76 SC-00966B SC-9661 - VALVE 20 09APR04 24APR04 DR-Y ML-Y 0 M 3SC98qB -VALVE LEAI GBY, REPAIR LEAKING BY. REPAIR 11:OWA 10:59 ORT3-NR-L I
294 1 MM0213109 MMV.
76 CS-00038C ICS-00038CBODYTO 4
19APR04 21APR04 DR-YML-Y 0 M ICS-0038CBODYTOB NNETLEAK BONNETLEAK 09:OOA 15:59 ORT3-N R-L 1HX-18JB SGBD HX CL FLOW RETURN Tp ISC-1A CONDO 13109 2951 1 MM0304279 MMV 76 MS-02037 1MS-2037-VALVE 18 19APR04 23APR04 DR-N ML-N 0
IMS-2837 -VALVE SBY. REBUILD VALVE LEAKS BY, REBUILD 10:OOA 15:59 ORT3-N R-L 296 l1l MM0214147 MMV 76 STEAM.TRA INSPECTAND REPAIR I
19APR04 21APR04 DR-N ML-N 0 M 1414 7INSPEfT AND REPAIR 1-29 STEAM TRAOS I P-29STEAMTRAPS 11:00A 12:59 ORT3-NR-L UNITI STE" TRAPS02141 Run Date 21APR04 13:28l LT-03 STANDARD PUBLICATION Sheet 17 of 34 OPrimavera Stes, Inc I
FL-03 Execution Publication Set I
after 21APR04 12:00 l
U1R28 WORKING SCHEDULE I after 21APR04 12:00 l Ul ID lRESP WO l ED DESCRIPTION IRDI ES EF I
RISK MF W
21 APR ST lA 7
l
][t 22L Fr 23--
- 10 24611M 2 _. 2..
,,011.
1102 Q, 2_..810 21, MT~ ~ ~
IM v
291 MM0406916 MV 76 MS-02016 tMS-2016 VALVE LEAKS BY 35 20APR04 27APR04 DR-YlML-Y 22:OOA 03:59 ORT3-N R-L 0 MM+k069161MS-2016 VALVE LEAK4 BY I
I-I.
-
298 1 MM0214042A UMV 76 FD-02404 FD-2404 - REINSTALL 2
21APR04 21APR04 DR-N ML-N 2
VALVE AFTER TESTING 09:OOA 13:59 ORT3-N R-L 299 1 MM0214113A MMV 76 MS-02719 MS-2719-RE-INSTALL 2
21APR04 21APR04 DR-N ML-N 0 M VALVE AFTER TESTING 09:OOA 13:59 ORT3-N R-L 300 1 MM0214044A MMV 76 FD-02413 FD-2413 - REINSTALL 4
21APR04 21APR04 DR-N ML-N 0
ALVE AFTER TESTING 09:OWA 15:59 ORT3-N R-L 301 1
MM0407623 MMV 75 CS-00460BA ICS-460BA REPACK 6
21APR04 22APR04 26 Mt
_ 12k00 10:59 302 1 MM0214025 MMV 76 CS-00022A CS-22A - INSP I 30 21APR04 26APR04 DR-Y ML-Y 0 Mt MAINTAIN CHECK 13:00-14:59 ORT3-N R-L 303 1 MM0302915 MMV 76 SC-00966C 1SC-966C - PACKING 20 21APR04 24APR04 DR-N ML-N 0
I I
LEAK 21:00-02:59 ORT3-N R-L 304 1 MM0214035 MMV 76 CW FLUSH CW SYSTEM 28 21APR04 26APR04 DR-N ML-N 0
AND CLEANIlNSPECT 22:00-21:59 ORT3-N R-L 38 1 MM0214137E MMV 76 RC-00434 RC-434 - SWAP VALVE 14 22APR04 23APR04 DR-Y ML-Y 0
WITH SPARE. SHIP FOR 10:00 01:59 ORT3-Y R-L 306 1 MM0407620 MMV 76 CV-00200C ICV-200C RETORQUE 3
22APR04 22APR04 60 PACKING 21:00 23:59 307 1 MMM0311052 MMV 76 SI-00830A SI-830A - REPLACE 8
22APR04 23APR04 DR-N ML-N 69 REUEFVALVE-IST 21:00 21:59 ORT3-N R-L 308 1 MM0214034 MMV 76 CV-00370 CV-370 - INSP /
40 22APR04 29APR04 DR-Y ML-Y 0
MAINTAIN CHECK 21:00 01:59 ORT3-N R-L 309 1 MM0214137D MW 76 RC-00434 RC-435 - LOOSEN 10 22APR04 23APR04 DR-Y ML-Y 0
VALVE TO INSTALL 22.00 09:59 ORT3-N R-L 310 1 MM0214022 MMV 76 AF-00101 AF-101 - REMOVE 4
23APR04 Z3APR04 DR-N MI-N 0
VALVE TO SUPPORT 00:00 03:59 ORT3-N R-L 311 1 MM0216196 MMV 76 CV-00275 1CV-275 PACKING 6
23APR04 23APR04 DR-N ML-N a
LEAK 6DPM. REPACK 09:00 14:59 ORT3-N R-L 312 1 MM0304280 MMV 76 SW-000ISA 1SW-ISA-MANUALLY 10 23APR04 24APR04 DR-Y ML-Y 0
CYCLE VALVE FOR IST 09:0 11:59 ORT3-N R-L 313 1 MM0216627 MMV 76 CV-01296
-1296 - INSTALL NEW 40 23APR04 29APR04 DR-N ML-N 9
TRIM PER MOD 02-0271 09:00 13:59 ORT3-N R-M W119 I
I.,
I 41 I
A(
AC I04 - REINST^Ll-VALVE AFTE ET-23 HOT *AFETY T19 - RE4NSTALL VALVE AFTI EGLAND STIEAM HEADER SA 0
113 - REINSTtu VALVE AFTE T-23 HqT SAFETY MM3 1CS-460BA REPACK TESTING R TESTING ETY RELIEF TESTING I
II II II i
E LOWER RO(
pgTiHX-lA SG 1Li460B WIDE RAN(
I CHECK VALVE PER RMP9158
!1MCCS42A - INSP I MAINTA
_ Iurn.
MM030291 1SC4966C - PACK~
IMM0214015uSH CW SYS IlG LEAK II I
EM AND CLEAN/It=SPECT NASH FL )AT VAL nl,l Afli
- MM021413, 02141 I
" A I
a-I a AUXILIARY EEC 434 - SWAP VALVE WIH SPAR I PZR S MM040762!1CV-200C RETOR 040762 LETDOWN 0 MM0311052SI-830A - REPLAC 031105S MM0214034 70 - INSP I M, 02140 MM021413itfRC-435 - LOOSE 02141 3,7_
MMo214022AF-101 - REM 021402~1HX-1E MM0216191 0216191 MM0304281 v030428.
MM021662 HARGING UNE ISOLATION021662.
MM0207 0207
. SHIP FORTE VFEMY TO T-21 UE PACKING IFICE C OUTL RELEFVALV INTAIN CHECI I VALVE TO IN
.T-1 PZR SAF
?VE VALVE TO SG AUXILIAR)
CV-275 PACP
_1F-39 SW-15A - MAI CV-1296 -INST 3721 CV-277 RE 3141 1 MM0207072 IMMV 76 CV-00277 1CV-277 REPLACE BtB 1 12 23APR04 24APR04 DR-N ML-N I
GASKET I
I 11:00 15:59 ORT3-N R-L 0
Run Date 21APR04 13:28 LT-03 STANDARD PUBLICATION Sheet 18 of 34 O Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 21APR04 12:00 1U1R28 WORKING SCHEDULE _Tafter 21APR04 12:00 U Ii I
RESP WO ECHO DESCRPTP7ON IRDI
.ES EF I
RISK APR Fri 23 JST F
ini141.aO2~)210.2.4,6.
.10i12,14.1(1Si2). 0,2,1.24,6,8.1jjjjjjj 3151 11 NG26TFC2ND NDTE 77.IST.SISI NDE FOR FAC PROG -
20 105APR04 22APR04 DR-V Mt-V G
f4E'FOR FAC PROG TRS HALL 26 FT GEN AREA TURB HALL 26 FT GEN 07:OOA 11:59 ORT3-YVR-L
_SECONDARY.INSERVICE INSPI CTlON03O189, 315 1 NG08TFC2ND NDE 77 IST-SISI NDE FOR FAC PROG -
5 07APR04 21APR04 DR-Y ML-VY ENDEFOR FAC PROD TRD HALL:S FT 4EN AREA TURB HALL 8 FT GEN 08:OOA 15:59 ORT3-Y R-L SECC~NDARV INSERVIC EINSPECT1ONO3qI1897 317 1 NG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROD -
10 21APR04 22APR04 DR-V Mt-VY CFCINDNDE FOR FAC PRO
- CONTAINMENT 44 FT GEN ARJ CONTAINMENT 44 FT 20:00 05:59 ORT3-Y R-L 30 8
7 EC. NDARY INSERVIbE INSPECTION 318 1
TG0302107 NOE 76 EH PT EH FITTINGS 10 21APR04 22APR04 DR-Y Mt-V 218 TG0302107F EH FITTINGS I
20:00.
05:59 ORT3-Y R-L 0217~~Eli, (STEM MULTI AN)IOR NON-NUMB RED EQUIPME 319 1 NGNDE18X NDE NDE-18 MINI-SUB 3 122APR04 22APR04 DR-N Mt-N 3
NGNDEISMIM-S4 IS INSPECTIONS-ITRNALS UIFT (NDE-18) kSPECTIONS-INTERNAL 04:00 06:59 ORT3-N R-M MI I1-SUB3 INSPEcTIdNS PER NDE-18 320 1
ND0407673 NDE 76 T-026 T-026 - DETERMINE 10 22APR04 23APR04 DR-V Mt-V 0a ND0407T. T-026 - DETERM1N XTN O E
IRS TO BO TA EXTENT OF REPAIRS 09:00' 10:59 ORT3-V R-t 47BLWO 321 1 EP0301912 NDE 77 Z-021 EXAMINE REACTOR 10 22APR04 22APR04 DR-V Mt-V 147 EP03019' 2AINE REACfOR HEAD LIFT R WELDS HEAD LIFT RIG WELDS 10:00 21:59 ORT3-Y R-L 03019 R-REACTOR SEt HEADL 3221 1 NM0214475 NDE 77' R-1 EXMINE FOR LEAKING 10 22APR04 23APR04 DR-V Mt-V 57 NM002144' 5EAUIE OR LFAKCING CROM NOPY SEAL CRDM CANOPY SEAL 10:00, 09:59 ORT3-Y R-L 01RV I
TGHX22DUT NOE 76 HX-022D NDE UT 8
22APR04 22APR04 DR-V Mt-V 12 TGH DUTNDE UT MEAWUREMENT MSR MEASUREMENT MSR D 12:00 21:59 ORT3-V R-L 030 O11 MO TURE SEP O REHE 324 1
P1201NDE NDE 77 PIPING EB-HX-01B - EXAMINE FWN623P0 23APR04 DR-VYt-01P2ID I-XM NOZZLE WELDS 07:00' 12:59 ORT3-V R-L 03038 EW 325 1 P1246NDE NDE 77 PIPING EB-EXAMINE PIPING 6 123APR04 23APR04 OR-V Mt-V 14
'a P1246ND MIEPIPING WELDS AND 07:00 12:59 ORT3-Y R-L 03038FED 32 I P1274NDE NOE 77 PIPING EB-EXAMINE PIPING 6
23APR04 23APR04 DR-V Mt-V 4
P17N IEPIPING WELDS NEAR 07:00' 12:59 ORT3-V R-LFR 32I NM0407680 NMS 77 FE-02804A I FE-2804A CHECK 8
22APR04 22APR04 DR-Y Mt-V 152 NM0407660
-2804A CHECK COUPUING ADH IV COUPUING ADHEASIV 0700 14:59 ORT3-V R-L
-4I66Al CONT RECIRO A
TO L
328 0
0P0215287 Opo 77, o-mT-007 I-oTs. P-32B SERVICE 2 121APR04 21APR04 DR-WN Mt-N 0
PO 87IT.07BD 'P4321 SERVICE V ATER Pump WATER PUMP 12:00' 13:59 ORT3-N R-M P38SERVICE WATER PU P TEST0215287 390 OP0ZI15288 OPO 77' 04T-000C IT-07C. P-32C SERVICE 2
21APR042AR4 DR-N Mt-N 0
52
¶5 T-O7CIIP-32C SERVICE V ATER PUMP WATER PUMP 140 1559.
ORT3-N R-M
- jP-32C 4ERV1CE WATER FUMP TESTO2IS2*
SHIFT WEEKLY 00OA 06:59 ORT3-N R-L URA71ONS MID SIkFT WEEKLY R0 NE-0215354 Ru ae21APR04 13B1T-03 STANDARD PUBLICATION I
9heet 19 of 34 C Pdmavera Systems, Inc.
FL03Execution Publication Set
after 21APR04 12:00 U1R28_WORKING SCHEDULE after 21APR04 12:00 U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF APR 2 1 Tht 2 Frii 23__-_l1 331 0
OP0215373 OP1 77 TS-EP-001 POWER AVAILABILITY 2
22APR04 22APR04 DR-Y ML-Y 209 OP0 21p373POWER AVA LABILITY VERIFICATIONS VERIFICATIONS 00:W-00.59 ORT3-N R-L 02165373POWER AV ILABILITY VERIF1CATIONS 332 0 OP0215406 OP1 77 O-IT-Wo1 I-16, aTRLY FAIL-SAFE 1
23APR04 23APR04 DR-N ML-N 202 OPO2154odT16. QTRLY AILAFE STF STROKE TEST 00:00 00:59 ORT3-N R-M 021 4OGQQTRLY FAI STROKI 333 2 OP0216032 OPI 77 O-TS-010AB TS-10A. U2C AIR LOCK 2
23APR04 23APR04 DR-Y ML-Y 201
- OP023p_
3 2 -10A U2C IR LOCK DO0 DOOR SEAL TEST 00:00 01:59 ORT3-N R-M 0216032UU2 CONT UR LOCK DOO 334 0 OP0215355 OPI 77 O-PC-MIDS OPERATIONS MID' 49 23APR04 29APR04 DR-Y ML-Y 154 OP02jI 5
PERATION MID SHIFT WE SHIFT WEEKLY 00:00' 06:59 ORT3-N R-L OPERATIOS MID SHIFT WE KLYROUTINE021p5!-
S.
S 3'!^tP S. a_-
335 0 OP0215433 OP2 77 O-PC-DAYS OPERATIONS DAY 24 19APR04 24APR04 DR-Y ML-Y 18 33 OPERDTIONS DAY SHI WEEKLY ROUT'IE SHIFT WEEKLY 08:OOA 14:59 ORT3-N R-L 336 0 OP0215484 OP2 77 O-PC-028.1 TEST OF FIRE.
1 23APR04 23APR04 DR-N ML-N 199 OP0215484 ST OF FIRE, EVACUATION AND 08:00-08:59 ORT3-N R-L a
02154 ST OF FIRE
.1 I ES
.1 1:,
- M, 337 OP0215558 OP3 77 T-132 SODIUM BISULFITE 1
21APR04 21APR04 DR-Y ML-Y 209 0Pt 1 555 eODIUM BISULFITE STO tAGE TANK LOOP STORAGE TANK LOOP 16:00-16:59 ORT3-N R-L 0 0555USODIWM BISULFITE ST RAGE TANK 3
Ie I
OP0215869 OP3 77 O-PC-001.2 TBI MONTHLY 32 21APR04 25APR04 DR-N ML-N 178 PO0 1586.T31 M6(NTHLy HEATING VENTILATION HEATINGNVENTILATION 16:00' 19:59 ORT3-N R-L 58_
339 0 OP0215549 OP3 77 0-PC-SWING OPS SWING SHIFT 49 21APR04 27APR04 DR-Y ML-Y 161 DP01554 PS SWING SHIFT WEE LY ROUTINE WEEKLY ROUTINE 16:00*
22:59 ORT3-N R-L C 5540,i 340 0 OP0215562 OP3 77 O-PC-0452 RADWASTE HEAT 3
22APR04 22APR04 DR-Y ML-Y 200
,Po21556w4sTE HEAT TRAC AMPS LOG TRACE AMPS LOG 16:00-18:59 ORT3-N R-L 021556MqNTHLY RADWAS7E SYSTEM H 341 0
OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE 32 22APR04 26APR04 DR-N ML-N 171
,PO 215 624CLEANSERVICEWATER STRAINERS WATER STRAINERS 16:00-19:59 ORT3-N R-L 021562-342 2 U2GNDR005 OP3 O-PC-021.3 DRAIN U2 MAIN I
22APR04 22APR04 DR-Y ML-Y 0
I 2GNOR00SDRAI" U2 MAIN ELECT CAL GENERA ELECTRICAL 17:00 17:59 ORT3-Y R-L I I 343 0 OP0215586 OP3 77 O-PC-083.6 VERIFY ANY OOS CON1 1
23APR04 23APR04 DR-N ML-N 195
,'P021558 ISOL VALVES ARE 16:00 16:59 ORT3-N R-L L l
021558aIC 344 1 OP5B-050 OPS T-008B BATCH BA TO T-8B HUt 4
03APR04 21APR04 DR-Y ML-Y 2
PS SBATCH BA TO T-8B HUT I W OP SB PART 4i IAWOP5BPART4 1200A 15:59 ORT3-NR-L l 345 1 OIIOA-010 OPS T-008C PROCESS C HUT PER 2
06APR04 21APR04 DR-Y MLtY 4 IIP-O1rPROCE$
'C HUT PER 01 10A OID1A 0200A 13:59 ORT3-Y R-L 346 0 0I150-30 OPS T-024A RESTORE HOSES &
20 20APR04 22APR04 DR-N ML-N 405 01
-3ORESTORE HOSES & CST PI R 01-1 50 CST PER 01-1 50 08:OOA 11:59 ORT3-N R-L RESTORE Fpbm WARM up 0F CST TO 1100D Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION I
Sheet 20 of 34 O Prlmavera Systems, Incl FL-03 Executlon Publication Set I
after21APR04 12:00 1
U1R28 WORKING SCHEDULE l after21APR04 12:00
,RISK M ~
I ST I -.
61 J 16120.22i0, 2. 4I 6.
EMi-APR Thu 22 Fri 23
.inilAA1t.RRFIlw~.7~ nl 2 A.* R.* R.10il1214.I16 347 j IT-760-,A OPS 77 O-IT-0760 HIGH HEAD SI CHECK 1 4 Z1APR04 21APR04 DR-Y ML-Y FULLFLOWTEST 11:OOA 15:59 ORT3-NR-L a IT.i RPI 3481 1.
RP1D-010 OPS O-RP-001D FILL LOWER CAVITY I
21APR04 21APR04 DR-Y ML-Y PER RP-1D I I 12:00 12.59 ORT3-N R-L 0
349 1 O-RT-066C OPS 77 O-RT-066C LLRT CONT PRESSURE 3
21APR04 21APR04 DR-N ML-N j TRANSMITTER LINE 12:00 14:59 ORT3-N R-L 350 1 O-RT-044 OPS 77 O-RT-044 ORT44 PACVS -
4 21APR04 21APR04 DR-N ML-N EXHAUST 12:00 15:59 ORT3-N R-L 351 1
01100-40 OPS T
A034A I
DRAIN S' 12 3
21APR04 I 22APR04 I DR-V ML.Y ACCUMULATOR T-34A 1 13:00' 02:59 JORT3-N R-t.
352 1 OP0305150A OPS 75 P-010B ENSURE iP-10B &
I 21APR04 21APR04 DR-N ML-N _
0 IP-11BARE 15:00 15:59 ORT3-N R-M 353 1 RPIA-060 OPS O-RP-001A FILL CAVITY FOR ROD 3
21APR04 21APR04 DR-N ML-N 0-R UNLATCH 15:00 17:59 ORT3-N R-M 354 1
IT-760-B OPS 77 OIT-0760 HIGH HEAD SI CHECK 4
21APR04 21APR04 DR-N ML-N 0
FULL FLOW TEST 16:00 19:59 ORT3-N R-L I
OP0215163 OPS 76 CC-00754A-CC-754A-O MOV PMT I
21APR04 21APR04 DR-Y ML-Y 281 STROKE PER IT-250 20:00 20:59 ORT3-N R-L 356 1 RP1A-054 OPS O-RP-V01A RELAX CONTAINMENT I
21APR04 21APR04 DR-N ML-N 62 CLOSURE AFTER HEAD 20:00 20:59 ORT3-N R-L 357 1
RP4A-050 OPS O-RP-004A JIT INFO SHARING FOR i
21APR04 21APR04 0
ROD UNLATCH 20:00 20:59 358 1 IT-760-C OPS 77 O-IT-0760 HIGH HEAD SI CHECK 3
21APR04 21APR04 DR-N ML-N 10 FULL FLOW TEST 20:00 22k59 OCR3-N R-L 359 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
21APR04 21APR04 DR-Y ML-Y 326 OF INIAL RCS 20:00 23:59 ORT3-N R-L 360 1 01-164-A OPS T-008C ENSURE C HUT LEVE 12 21APR04 22APR04 DR-N ML-N 0
20%
20:00 09:59 ORT3-N R-L 361 1
OP0305155A OPS 76 P-010A ENSURE IP-10A &
I 21APR04 21APR04 DR-N ML-N 0
1P-l.A ARE 21:00 21:59 ORT3-N R-M 362 1
RP4A-060 OPS O-RP-004A BRIEF FOR ROD 1
21APR04 21APR04 0
UNLATCH 21:00 21:59 363 1 0123A-20 OPS 0I-23A INMATE CAVITY 1
21APR04 21APR04 DR-N ML-N 61 PURIFICATION 22:00 22:59 ORT3-N R-L PC 13(
Pi nI 0:
D;AIGOH HEA D SI CHECK FULL UNIT 1 HIGH HEAD SI CHI I-010FILL LOt4ER CAVITY PER
[FILL LOWEEq CAVIIY & VERIF 66CLLRT CONT PRESSUREI WCONTAIAMENT PRESSURE 4ORT 44 PACVS - EXHAUS' POST-CCIDENT CONTV I.40DRAIN SI:ACCUMULATOR 1 0l5;OAENSU!RE IP-10B & IP-1
- 15rTRAIN A 4.16 KV AND 480
,-60FILL CAITY FOR ROD UN WFILQ'UPPER CAVITY F 7604BHIGH HFAD SI CHECK Ft t592EUNrr I HIGH HEAD OP0215 163Cb.754A-O MOV P 02151 631P-1A RCP CC IN]
RP1A-V54RELAX CONTAINMI
[PREPARATION F(
RP4A-05WJ(T INFO SHARING IT.760-CHIGH HEAD SI CHE 021592UNIT 1 HIGH H TPO403494A ERATNG SUPP 0403494_REACTOR CC oI.1B4-AEkSURE 'C HUT L OP0305155*NSURE 1P-10A 030515 TRAIN B 4.16 KW RP4A-osdRIEF FOR ROD I 0123A-2ONmATE CAVir
- INmATECAm RP4A-00LNLATCH CON1 VUNLATCH FLOW TEST PREPS
-CK VALVES FLOW TEST (RF)0215 6 FP-1DI DRAIN FLANGE (EAKAGE RANSMITTER UNE (P-32A)0215999 NT SYSTEM - VErT (P-31C)02159 34A B. ARE OPERAnIG I
V SWITCHGEAR RELAY TEST ATCH
)R UNLATCHING AODS (RP-1A)
ILL FLOW TEST I1 CHECK VALVES FLOW TEST (RF)
I STROKE PER r02s0 ET MOV OPERATOR NT CLOSURE AFTER HEAD LIFT
)R REFUELING
'OR ROD UNLAT4HI K FULL FLOW TEST RECOVERY
-AD SI CHECK VALVES FLOW TEST (F IRT OF INMAL RCS WALKDOWN OLANT SYSTEM TCS) PRESSURErE VEL >20%
I IP.IIAAREOPqRATING AND 480 V SWITCHGEAR RELAY S
INLATCH PURIFICATION Y PURIFICATION:
ROL RODS CONTROL RODS:
(RP-4 ZF)
'ST -INI T
34.1 RP4A-020 OPS O-RP-004A UNLATCH CONTROL RODS 4
21APR04 22APR04 I DR-N ML-N 22:00 I 01:59 ORT3-N R-M 0
Run Date 21APR0413:28I LT-03 STANDARD PUBLICATION Sheet21of34 C Prmavera Systemns,Inc.
l FLB03 Execution Publication Set I
after 21APR04 12:00 l
U1R28 WORKING SCHEDULE I
ID P)WO ECID DESCRIPTION RD ES EF I
RISK MF I-l l_
T
. I PA002,14,161211812o2;* n.2.4.6*
after 21APR04 12:00 APR ThU 22 Fri 23l 3651 1 RPIA-080 OPS O-RP-MOA FILL CAVITY FOR INTERNALS UFT 2
22APR04 22APR04 I DR-N ML-N 02.00 03:59 ORT3-N R-L 0
366 1 OP0300801 OPS 76 IA-03047-0 IA-3047 PMT STROKE I
22APR04 22APR04 DR-Y ML-Y 193 PER IT 110 03:00' 03:59 ORT3-N R-N 367 1
O-RT-030 OPS 77 O-RT-030 LURT RCDT VENT 4
22APR04 22APR04 DR-Y ML-Y 353 HEADER 03:00-08:59 ORT3-N R-L 368 1 O-RT-034A OPS 77 O-RT-034 PRE LLRT OF NORMAL 4
22APR04 22APR04 DR-N ML-N 0
CHARGING 04:00 09:59 ORT3-N R-L 369 1 OP0403299 OPS 76 RC-00515-O RC-515 PMT STROKE 1
22APR04 22APR04 DR-N ML-N 0
PER IT-200 08:00 08:59 ORT3-N R-L 370 1 OP0403300 OPS 76 RC-00516-0 RC-518 PMT STROKE 1
22APR04 22APR04 DR-N ML-N 0
PER IT-200 08:00 08:59 ORT3-N R-L 371 0
01-39A OPS 76 W-030A SECURE PAB 2
22APR04 22APR04 0
VENTILAION 08:00 09:59 372 1
IT-200 OPS 77 O-IT4-0200 PZR PORV & BLOCK 6
22APR04 22APR04 DR-N ML-N 0
VALVES 08:00 13:59 ORT3-N R-L 333 1 RP1A-090 OPS O-RP-41A FILL CAVITY TO 1
22APR04 22APR04 DR-N ML-N 0
REFUELING HEIGHT 10:00 10:59 ORT3-N R-L 374 1 0151-020 OPS 01-51 PEN SFP/XFER CANAL I
22APR04 22APR04 DR-N ML-N 50 DOOR 11:00 11:59 ORT3-N R-L 375 1 O-RT-0158 OPS Z-016 FUEL XFER CHECKS 2
22APR04 22APR04 DR-N ML-N 49 OVER CORE 11:00 12:59 ORT3-N R-L 376 2 OPS-P23B OPS P423B ALIGN P-0238 TO U-2 3
22APR04 22APR04 DR-N ML-N 0
BLENDER FOR IWP 11:00 13:59 ORT3-N R-L 377 1
O-RT-046A OPS 77 O-RT-046 PRE LLRT FOR AUX 4
22APR04 22APR04 DR-N ML-N 0
CHARGING 11:00 14:59 ORT3-N R-L 378 1 SOP-CV-010 OPS T-04 DRAIN THE VCT PER 8
22APR04 22APR04 DR-N ML-N 0
SOP-CV-002 SECT 5.1 11:00 20:59 ORT3-N R-M 379 1 SOP-B04A OPS B-42 PREPARATION FOR 8
22APR04 23APR04 DR-Y ML-Y 0
1-B42 OUTAGE 17:00 02:59 ORT3-N R-L 380 1 SOP-CV-015 OPS T-004 DRAIN LETDOWN PER 8 22APR04 23APR04 DR-N ML-N 0
SOP-CV-02 SECT 5.2 21:00 04:59 ORT3-N R-M 381 0
0135AG02-C OPS G-02 ALIGN G-02 TO IA-05 & 1 22APR04 22APR04 DR-N ML-N 0
2A-05 FOR 1B-42 22:00 22:59 ORT3-N R-L RPIA-08IFILL CAVI' EF1ILLCJ OP030BOIIjA-304T I
- 03008011UlC IA P-RT.03OLLRT RC IDRT.034ARCEIL 0159*"
0P0403299 04032!
OP040330*
040330r 01-39A 040581 IT-200~
0215893!
RP1IA-C' O-RT-01 Ops-Pz O-RT4 021 51 sOP-CV.4 Oil Z14s1l 120, 2
- 0. 2,4. 6.
Y FOR INTERNALS LIFT ITY FOR INTERNALS LIFT MT STROKE PERIT 110 AEADER INLET CQNTROL OPERAT
)T VENT HEADER RCDT TO VENT HEADER (P-12C) tT OF NORMAL CIARGING INORMAL CHARRING LINE (P-26) p;515 PMT STROKE PER IT-O2O r-1 PZR RC-431C 'OWER-OPERATI p-51 a PMT STROIE PER IT-200 r-i PZR RC-430 POWER-OPERATEI 2CURE PA8 VENTILATION EF-23/F-29 PAB E.*HAUST FILTER F ZR PORV & BLOCK VALVES
_UNIT 1 PORV AND BLOCK V FILL CAVITY TO'REFUEUNG HEI IFILL CAVITY AI¶JD EQUALIZE 20OPEN SFPIXFER CANAL DOOR EFUEL TRANSFER SYSTEM IN C 5BFUEL XFER CECKS OVER COR EFUEL MANI, 'ULATORIFUEL 3BAUGN P-023B 0o U-2 BLENDER 6
LLRT FORSAUX CHARGING B1 AUXILW~tV CHARGING LIN 1(CORAIN THE VCi PER SOP-CV-00 SOP.404APREP N FOR 18 SOP-CV-01iRAIN LETDO OI35AG02'RUGN G-02 TO I I
G02-ALIG~t1G02 AIGNED T dim 0 RELIEF ISO!
RELIEF ISOL kN LVES (CSD)
ISFP kNAL ANSFER SYS1 OR IWP 00-037-(P-32C)
! SECT 5.1 42 OUTAGE PER SOP-CV-0
-05 & 2A-05 F
)IA-05&2A-0 382 0
G02-ALIGN1 OPS G-02 t-02 ALIGNED TO 1A-0+381 22APR04 I 28APR04
&2A-05FORIB-42 I
22:00 I
15:59 DR-N ML-N ORT3-N R-L 0
Run Date 21APRO4 13:281 LT-03 STANDARD PUBLICATION Sheet 22 of 34 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 21APR04 12:00 I U1R28 WORKING SCHEDULE I
after 21APR04 12:00 U
ID RESP WO EalD DESCRIPTION RO ES EF RISK M
APR MF D
RD E
F Wed 21 Thsu22 Fri 23 ST*
121416,11120JsL~iO 52.4.65 810:1214jaiR820,220.2.4 o 6jjjjjjj14 1 383 1 OP0300940 OPS 76 RH-00625-O RH-625 PMT STROKE I
23APR04 23APR04 DR-N ML-N 5
OPO300)4DfHN62S PMT 'ROKE PER IT PER IT 390 00:00 00:59 ORT3-N R-L 030094tiHX-11BRH HXOOUrLETC 384 1
01-164-B OPS T-008C PREPARE C HUT FOR 10 23APR04 23APR04 DR-N ML-N 0
01.1,PREPARE C UTFOR ICV-2Z ICV-257.
00:00 11:59 ORT3-NRM 385 1 oP0403298 OPS 76 SW-02908-O SW-2905-0 PMT I
23APR04 23APR04 DR-Y ML-Y 0
OP0403298SW-29080 'MT.STROKE STROKE 01:00 01:59 ORT3-N R-L 040329HX-15A-D ONTRECIRC 386 1 SOP-B04B OPS B-42 DE-ENERGIZE 1-42 4
23APR04 23APR04 DR-N ML-N 0
.OP4040DE-ENEF GIE 1142 PEI PER 1-SOP-480-B04 03:00 08:59 ORT3-N R-L 387 1 O-RT-032B OPS 77 O-RT-032 POST LLRT OF N2 TO S 4
23APR04 23APR04 DR-N ML-N 307 O-RT-0 2EPOST LLRT ACC CONTINGENCY 11:00 14:59 ORT3-N R-L 0215 7tiNITR 388 0 OPS-037-04 OPS 76 D72-19-03 IWP-037-04 ALIGN 2
23APR04 23APR04 DR-N ML-N 0
OPS-0 7.WP4374 MOBS AND RESTORE 12.00 13:59 ORT3-N R-L 03 11!PWR T 389 1 HEADUFT PPG MILESTONE REACTOR VESSEL 0
21APR04 DR-N ML-N 717 H UFTREACTIR VESSEL HEAD uFT HEAD UFT 15:00 ORT3-N R-L
- SAFETT MONITOR PLAN OPERATING STATE MILESTONE 390 1 ENFPC04D PPG MILESTONE ENTER SID FIRE PROT 0
21APR04 21APR04 DR-N ML-N 303 E FPC0DENTER SA/ FIRE PRO COND IV COND IV 18:00 17:59 ORT3-N R-L 391 1
SIB01A PPG MILESTONE START HHSI B LOOP 0
21APR04 21APR04 DR.N ML-N 163 SIBOIASrART HHSI B LO P WORK WORK 20:00 19:59 ORT3-N R-I
.ISTART HIGH HEAD AFE1Y INJECTION B LOOP WORK 392 1 CVX03A PPG MILESTONE START CVCS NORMAL 0
22APR04 22APR04 DR-N ML-N O
CVX03ASTART CS NORMAL ChARGING WORK CHARGING WORK 04:00 03:59 ORT3-N R-L
[START ORMAL CHARGING WORK 393 1
SIA01F PPG MILESTONE RECOVER HHSI A 0
22APR04 22APR04 DR-N ML-N O
SIA01FRECO R HHSI A LOOP FOR REACTIVITY -LOW OATH LOOP FOR REACTIVTY 04:00 03:59 ORT3-N R-L
[END HI H HEAD SAFETY INJECTION A LO P WORK 394 1
VNCCA5iA PPG MILESTONE START CONTAINMENT 0
22APR04 22APR04 DR-N ML-N 0
VNCCA5 ASTART CONTAIRMENT FAN COOL RS A WORK FAN COOLERS A WORK 10:00 09:59 ORT3-N R-L
[CONTAINMENT tAN COOLERS A (N-TRAIN) 395 1 480VB01A PPG B-04 START 480V BUS B04 0
22APR04 22APR04 DR-N ML-N 24 48UOVB1/8 ASTART 480V BUS B04 RELATED NERGIZEDW RELATED ENERGIZED 11:00 10:59 ORT3-N R-L
[BEGINNING O9 BTRAIN BUSWC RKWINDOW 398 1 AFBI IA PPG MILESTONE START ELECTRIC 0
22APR04 22APR04 DR-N ML-N 0
AFB 1 ASTART ELECTNIC DRIVEN TRAIN 3AUX FEED DRIVEN TRAIN B AUX 11:00 10:59 ORT3-N R-L I
397 1 CVX02A PPG MILESTONE START CVCS LOW 0
22APR04 22APR04 DR-N ML-N 0
CVX 2ASTART CVCS LOW PRESSURE L DO WOR PRESSURE LETDOWN 11:00 10:59 ORT3-N R-L I [START NORMAL LETDOWN WOF K 398 1 CVX04A PPG MILESTONE START CVCS SEAL 0
22APR04 22APR04 DR-N ML-N 0
CVX 4ASTART CVCS $EAL INJECTION V ORK INJECTION WORK 11:00 10:59 ORT3-N R-L
[START CVCS SEAL INJECTION V ORK 399 2 CVX06A PPG MILESTONE START CVCS 0
22APR04 22APR04 DR-N ML-N 0
CVX 5ASTART CVCS A'U)IARY CHAR ING WORK AUXILIARY CHARGING 11:00 10:59 ORT3-N R-L
[START CVCS AUXILIARY CHARG NG WORK 400 2
CVX07A PPG MILESTONE START CVCS 0
22APR04 22APR04 DR-N ML-N 17 CVX 7ASTART CVCS M.AKEUP1BLENDE WORK MAKEUP/BLENDER 11:00 10:59 ORT3-N R-L
[START CHARGING MAKEUPIBLE qDER WORK Run Date 21APR04 13:28l LT-03 STANDARD PUBLICATION Sheet 23 of 34 PIldmavera Systems. Inc.
FL-03 Execution Publication Set
after 21APR04 12:00 I U1R28 WORKING SCHEDULE I
after 21APR04 12:00 U
ID RESP WO EQID DESCRIPTtON RD ES EF RISK MF APR ST 2
h 2Ft2 Tl.
..to1nZ14.16.I8.2022l 02, 224,@6,@ 8101l2t4.16la82O,22 0.2.4. 6,.l 8,1024.161 401 1 RHB01A PPG MILESTONE START RHR B LOOP 0
22APR04 22APR04 DR-N ML-N 0 _
RHBI IASTART RHR 8 LOOP WORK WORK 11:00 10:59 ORT3-N R-L ISTART RHR B3 OOP WORK 402 1 RHX90A PPG MILESTONE START REACTOR 0
22APR04 DR-N ML-N 0
RHX90 k START REACTOR CAVITY FLOO ED CAVITY FLOODED 11:00 ORT3-N R-L
- SAFETY MOIqrTOR PLANT OPE lAtNG STATE 403 1 AFBI11Z PPG MILESTONE END ELECTRIC DRIVEN 0
23APR04 23APR04 DR-N ML-N 61 FB11ZEND EL TRAIN B AUX FEED 14:00 13:59 ORT3-N R-L 404 1 SIX31A PPG MILESTONE START RWSTAND 0
23APR04 23APR04 DR-N ML-N 0
a SIX31AST COMMON ECCS 17:00 16:59 ORT3-N R-L RE 405 0 PRO407903 PRE 76 Z-025A SPENT FUEL POOL.
3 23APR04 23APR04 35 PR0407913SPENT FUEL INSPECT OPEN CELLS 10:00 12:59 040791 1
406 1
RPSH081-t RP1 PACKAGE 81 INSTALL SHADOW 3
22APR04 22APR04 DR-Y MLY 371 RPSH0814NSTALL HADOW SHIELDING (FROM RX HED)
SHIELDING (FROM RX 02:00 04:59 ORT3-Y R-L 407 1 RPJF-121C RPI 76 R-1 UNDERHEAD DECON 2
22APR04 22APR04 DR-Y ML-Y 0
RPJF-1 I1CUNDERHEAD DECON PRE-JOB RIEF PRE-jOB BRIEF 11:00 12:59 ORT3-Y R-L a
0213 i72UREACTOR VESSEL AND ASS MBLY 40J 1
RPJF-121B RP1 76 R-1 ERfORM UNDERHEAD 12 22APR04 23APR04 DR-Y ML-Y 0
RPJ -121BPERFORM LINDERHEAD DECC N IN PREPARA DECON IN 13:00 02:59 ORT3-Y R-L 0 1347_REACTO VESSEL ANt 1-G ERNG-LKSM NISINSSE 409 SD GSI-191 SDS CONT ENGINEERING 40 08APR04 28APR04 DR-Y ML-Y 67 D 51.11ENGINEERING WALK SUMP INTR SION ISSUES WALKOOWN -SUMP 08:WOA 11:59 ORT3-YR-L E !74^{l{ 1_-
_-0E 410 0 SECB42COMP SEC D-24 SECURITYTO 2
22AP22APR2APR04 DR-N ML-N 0 _
SECB42COMFECUR-YTOESABUSHCOMP ESTABLISH 21:00 2259 ORT3-N R-L
- USECURIT SY BATTERV 411 1 TG9949102N TGG 76 TG-1-T1I UPI-REPLACE 28 13APR04 24APR04 DR-Y 0 r9s 491O2N!
- REPLACE EXTRATION BELLOWS(NIGHTS)
CEXTRACION BELLOWS 00:OOA 0059 ORT3-Y R-L 412 1 TG-30470 TGG 76 TG-01-T PERFORM HP SPINDLE 5
13APR0 21APR04 DR-Y ML-Y 0
ERFORM HP SPINDLE R TOR BORE INSPtCTION4-T2 ROTORBORE 09:OOA 16:59 ORT3-Y R-L HIGH PRESSURE TURB NE0302153 a
413 1 TG9949102D TGG 76 TG-01-TI LP1-REPLACE 25 13APR04 23APR04 DR-YML-Y 0
2 1-REPLACE EXTRAC ION BELLOWS (DAYS)4PT2
_CTON BELLOWS 09:OOA 16:59 ORT3MY R-L 414 1 ITGSUPPORT TGGI l
TG-01-T PROVIDE CRANE.
207 13APR04 03MAY04 DR-Y ML-Y 313 OS PPORTPR DE CRANE, RIGER,ANDTOOLROMSUPPORTA) 1 I
P G
T I
RGGER, AND 09:OOA 18:59 ORTMY R-L TLRj_
415 1 TG-30540R TGG 76 TG-01-T PERFORM REPAIRSTO 35 17APR04 23APR04 DR-VML-Y 18 ERFORM REPAIRS TO PIBLADERINGS a HP BLADE RINGS 14:OOA 02:59 ORT3-Y R-L HIGH PSSt
_URS TJ Run Date 21APRO413:28J LT-03 STANDARD PUBLICATION I
Sheet24 of 34 a Prlmavera Systems, Inc.
I FL-03 Execution Publication Set T
after 21APR04 12:00 I U1R28 WORKING SCHEDULE I
after 21APR04 12:00 I
I 2
I
.ID 1REsPjWO I EQID IDESCRIPTION IKD IES I
EF IRISK hI M
oI APR12020~~6.1h2 0246~
ST-1*
I eI2 Tu2 Fi2 411I I TGO302148 TGG 76 T-029 T-M 2 H2 DRIN1REGj 8 17APR04 I 22APR04 I DR-Y MLY 21:OOA 00:59 ORT3-Y R-L 1
417 1
TG-30615 JTGG T
76 TG-Ot T 1PERFROMREPAIRSTO 6 19APR04 21APR04 DR-Y ML-Y 0
CYLINDER BASED ON 09:OOA j 17:59 ORT3-V R-L TOO TGO 02148T-029 -IH2 DRAIN REG TA
-_HYDROGEE 15PERFROM REPAIRS TO C)
HIGI PRESSURE TUR 21LIUS 2026 - REINSTALL L 4t8 1 TG0302133B TGG 76 MS-.02028 MS-2026 - REINSTALL 15 I 19APR04 I 22APR04 I DR-Y ML-Y LH STOP AND PILOT I
09:OOA 1 16:59 1 ORT3-Y R-L 34 419 1 TG0302119 TGG 76 Z-026 CLEAN LUBE OIL 7
19APR04 21APR04 DR-Y ML-Y 10 CONDmONER AND 20:OOA 23:59 ORT3-Y R-L 420 1 TG0302116A TGG 76 T-036 T-036 - CLEAN LUBE 10 19APR04 22APR04 DR-Y ML-Y 0
___OIL RESERVOIR 22:00A 02:59 ORT3-Y R-L TGO TGO MOO 02119CL LUBE OIL CONDI
~LUBE OIL C0 021t6AT-036P-CUEAN LUSE O
_ItlRBINI g212jM TURBINE CRAWL-T!
NK INTERNALS INSPECTION SIDE DRAIN REGULATOR TANK03C UNDER BASED CN INSPECTION 3INE0302153 H STOP AND PILOT VALVE
_HP TuRBINE LEFT HANI lONER AND REP.ACE FILTERS IDmONER0302119
.RESERVOIR LUBE OIL RESEFOVOIR0302116 ROUGH INSPECT"ON
.LP2 LOW PRESSURE TURBINE0302 SPECTION I REPAiRS(PT2) 2148
) STOP030213
[55 421 1
TG0302155 TGG 76 TG-01-T2 UP2 TURBINE 17 20APR04 22APR04 DR-Y ML-Y CRAWL-THROUGH 09:OOA 08:59 ORT3-Y R-L 352
_ _ fi 11
'Eli 422 1 TG0302140 TGG 76 PIPING CRO CROSSUNOER PIPING 49 20APR04 127APR041 DR-Y ML-Y INSPECTIONI 11:OOA 10:59 ORT3-Y R-L a
qIZ14ROS~UNDER PIPING I l
r urn
.
Em 4231 1 TG03021348 TGG 76 MS-02027 IMS-2027 - REINSTALL 20 21APR04 23APR04 DR-Y ML-Y RH STOP VALVE I
08:OOA 11:59 ORT3-Y R-L I
i I
R
=~; S-q
=
RISALHSO AV
__I I
t...d_
I -
ii urn.
I 424 1 TGHX22CRP TOG 76 HX-022C MSR C INTERNALS 10 21APR04 22APR04 DR-Y ML-Y 0
REPAIRS (SHELL SIDE) 12:00 11:59 ORT3-Y R-L 425 1 TG9919338 TMG 76 PIPING EB-MS-2751 - REALIGN 14 21APR04 22APR04 DR-Y ML-Y 0
PIPING DOWNSTREAM 13:00' 16:59 ORT3-Y R-L 426 1 TG0215001 TGG 76 HX-053B HX-53B - REPLACE 8
21APR04 22APR04 DR-Y ML-Y 0
BRASS RING 17:00' 00:59 ORT3-Y R-L 427 1 TG-30440 TGG 76 TG-01-T CLEAN HP SPINDLE 4
21APR04 21APR04 DR-Y ML-Y 0
18:00 21:59 ORT3-Y R-L 428 1 TG-30600 TGG 76 TG-01-T INSPECT HP TURBINE 4
21APR04 21APR04 DR-Y ML-Y 0
EXHAUST PIPING 18:00 21:59 ORT3-Y R-L 429 1 TG0306774 TGG 76 L0-00254 10-254 -
6 21APR04 21APR04 DR-Y ML-Y 147 REPACKIGLAND 18:00' 23:59 ORT3-Y R-L 430 1 TG0205677 TGG 76 T-029 T TIGHTEN 8
21APR04 22APR04 DR-Y ML-Y 145 FLANGES AND 18:00 01:59 ORT3-Y R-L 431 1
TG-30590 TGG
.78 TG-01-T BLUE CHECK LOWER 16 21APR04 22APR04 DR-Y ML-Y 0
HALF OUTER STEAM 18:00' 13:59 ORT3-Y R-L 432 1 TG0216167A TGG 76 E-01 REMOVEDUCTTO 2
21APR04 21APR04 DR-Y ML-Y 0
SUPPORT EXCITER 19-.00 20:59 ORT3-Y R-L
'GH
'G9 TG MOEMSR 6 INTERNALS REIAS (SHELL SID0)
U 215001HX-53) - REPLACE B~b 21500 IHYDROGEt G.30 440CLEAN HP SPINDLE 0302153MHIGH PRESSUR G.30oOdNSPECT HP TURBINE 03021 5HIGH PRESSUR 030own41LO2#5 - REPACKIGI 030t77P-59A AIR Sl1
,0205677T-2 -I GHTEN FLAN 020567_IHYDROGI G-3 05 oBLUk CHECK LOWER i
MMOISTURE SgPARATOR REHE G DOWNSTREAM OF VALVE-PT2 MAIN STEAM SUPPLY 1 SS RING SIDE SEAL OIL CpOLER TURBINE EXHAUST PIPINq
- TTURBINE WD FOLLOWER COCKED E SEAL OIL PUMO DISCHARGE HE, ES AND REPLAC, GASKETS N SIDE DRAIN REGULATOR TANK UALF OUTER ST"AM GLAND CASII
_HIGH PRE$SURE TURBINE jPPORT EXCITER FUSE INSPECTic ENERATOR EXCriER rMAIN LUBE OI4LPUMP WURBINE LUBE O( PUMP (SHAFT I IHP TURBI TER0302110 THE TURBI DER IS GS N
RIVEN) 302l15I T 0216167pLEMOVE DUCT TO!
0216167TG-01 TURBINE C TG03021i'037A - INSPE(
0302145 niN 4331 1 TG0302136 I TGG 76 P-037A P-037A - INSPECT MAIN LUBE OIL PUMP 7
21APR04 I 22APR04 I DR-Y ML-Y 22:00 08:59 ORT3-Y R-L 0
.I I
_I_
I.
I.
Run Date 21APR04 13:281 LT-03 STANDARD PUBLICATION S
lhoet 25 of 34 C Pdlmavera Systems, Incm I
FL-03 Execution Publication Set T
after 21APR04 12:00 I
U1R28 WORKING SCHE I
U ID RESP WO ST EGID TO-a 1-T DESCRIPTION RD ES EF RISK DR.Y ML-Y ORT3-Y R-L MF l_
434 1
.TG-30620 TGG 76 FINAL CLEAN NOZZLE 1 15 1 21APR04 I 22APR04 BLOCK IN-PLACE 22:00 16:59 a
435 1 TG0302139 TGG 76 P-129D P-129D - REPLACE #6 32 22APR04 23APR04 DR-Y ML-Y a
BEARING LIFT PUMP 00:00' 15:59 ORT3-Y R-L 436 1 TG0213962A TGG 76 HX-053B HX-53B - CLOSE 5
22APR04 22APR04 DR-Y ML-Y 0
HYDROGEN SIDE SEAL 01:00 09:59 ORT3-Y R-L 437 1 TG0407680 TGG 76 HX-022B 1HX-22B: REPLACE 8
22APR04 22APR04 DR-Y ML-Y 21 WELDED DRAIN LINE 07:00 14:59 ORT3-Y R-L 438 1 TG0407682 TGG 76 HX-022D IHX-22D: REPLACE 8
22APRO4 22APR04 DR-Y ML-Y 25 WELDED DRAIN LINE 07:00 14:59 ORT3-Y R-L 439 1 TG0214117 TGG 76 SR DUO-Cl INSPECT AND 20 22APR04 23APR04 DR-Y ML-Y 69 MAINTAIN MSR 07:00-16:59 ORT3-Y R-L 440 1 TG0403278 TGG 10 Z-008 GAS LEAK DOWN 20 22APR04 23APR04 DR-Y ML-Y 0
STREAM OF TEST 07:00' 16:59 ORT3-Y R-L 441 1 TGHX22CLKT TGG 76 HX-022C MSR C LEAK CHECK 20 22APR04 23APR04 DR-Y ML-Y 0
(TUBE SIDE) 07:00 16:59 ORT3-Y R-L 44;2 I
TG-30470A TGG 76 TG-01-T HP SPINDLE 24 22APR04 24APR04 DR-Y ML-Y 231 MACHINING 07:00 10:59 ORT3-Y R-L 443 1 TGO214999 TGG 76 TG-01-T2 LP2 - EROSION 30 22APRo4 24APR04 DR-Y ML-Y 5
SHIELDS OVER BRG 07:00 16:59 ORT3-Y R-L 444 1 TG0303396 TGG 76 LO-00035 LO-35 VALVE STEM 8
22APR04 22APR04 DR-Y MLY 0
BENT.
08:00 15:59 ORT3-Y R-L 445 1 TG0302137 TGG 76 P.058 P-058 - H2 SIDE SEAL 40 22APR04 24APR04 DR-Y ML-Y 0
OIL PUMP OVERHAUL 08:00' 07:59 ORT3-Y R-L 445 1 TG0302149 TGG 76 TG-01 MECHANICAL i5 22APRo4 22APR04 DR-Y ML-Y 38 OVERSPEED DEVICE 09:00 23:59 ORT3-Y R-L 447 1 TG0213961A TGG 76 HX-053A HX-053A - CLOSE AIR 5
22APR04 22APR04 DR-N ML-N 90 SIDE SEAL OIL COOLER 10:00 14:59 ORT3-N R-L 448 1 TGHX22DVIS TGG 76 HX-022D MSR D INTERNALS 10 22APR04 23APR04 DR-Y ML-Y 0
INSPECTION (SHELL 12:00 11:59 ORT3-Y R-L 449 1 TG-30520 TGG 76 TG-01-T MEASURE HP INNER 16 22APR04 23APR04 DR-Y ML-Y 0
STEAM GLAND 14:00 09:59 ORT3-Y R-L 450 1 TG0306590 TGG 76 L0-00256-0 L0-256 CANNOT 20 22APR04 23APR04 DR-Y ML-Y
- 0 ADJUST AIR SIDE SO 16:00 15:59 ORT3-Y R-L FDULE lafter 21APR04 12:00 APR Wed 21
,Thu 22 Fri 23
'1 2124,16,la20 22Lo. 2.4.6.8.101lZ14,16la20,221 0.2.4.56*8.1011Z14.16'9 TG-3064OFINAL CLEAN NOZZLE BLOCK INfLACE 030215 2
HIIGH PRESSURE TURB NE TG03021 39P.129D - REP CE #6 BEARINev UFT PUMP 030R1_
TG021P96 B538
- C SE HYDROGEN SIDE SEAL OIL Ct IoLER 02139 HYDROGEN SIDE SEAL OIL COOL 'R TG 407680114 22B: REPLACE "LDED DRAIN L NE
' 04076MOISTUR.E SEPARATOR R HEATER
' TG040768 14 -22: REPLACE WELDED DRAIN NE 04076 MOISTUAE SEPARATOR R EATER
'TG02141171NPECT AND MAINTAIN MSR DUO-C ECK VALVES 0214117 1
Ft TG04032750 S LEAK DWN ST~REAM OF TEST S LENOID TGHX22CLKT R C LEAK CHECN (TUBE SIDE) 021408 TG-30470 SPINDLE MACHIOING CONTINGEN 03021 TGO21499 1
-~ EROSION SHIELDS OVER BROSG DANI 0214991 TG030339
-35 VALVE STENl BENT.
030339 5 -
q CONDmONER L ;3614 LOWER TG030213 58 - H2 SIDE SEAL OIL PUMP OVE RHAUL 03021371
=
TG030214 CHANICAL ORSPEED DEVICE INSPECTION I
030214' _URBINE GEI ERATOR (GE TG021396 A-053A - CLOSE AIR SIDE SEAL IL COOLER
,02139 1_
INIR SIDE SEAL OIL COOLE R TGHO VISR 0 INTE1 ALS INSPECTIO (SHELL SID
' '03C 2111 MOIS1UF T.30520IEASURE IIP INNER STEAM GLAND CASIN
.1302 15__HIG H PRESS rGO306593 Ous6 CANNOT ADJUST IR SIDE SOP 030659inP U
I TG0302116T-036 r LUBE OIL RESE OIR INSPE
_.030O21I 11TURBINE LUB OIL RESERVI Sheet 26 of 34 t
I 14511 1 TG0302118 TOG 76 T-036 T-036 - LUBE OIL RESERVOIR 6
22APR04 22APR04 DR-Y MLY 17:00 I 22:59 ORT3-Y R-L 42 I
Run Date 21APRo413:28 LT-03 STANDARD PUBLICATIOI Primavera Systems, Inc.
FL-03 Execution Publication Se
after 21APR04 12:00 I
U1R28 WORKING SCHEDULE after 21APR04 12:00
- UI ID RESI WOI EQID DESCRIPTION R1D0 ES I
EF_
RISK IMF APR ST e21 Thu 22 46 Fri 23 1
1 z14,1,1B.2022i 0 2.4.6.~j~
8.10:1214,1 P18. 2202,42.
8101jj41j 452 1
TC-30625 TOG 76 TG-oi-T OBTAIN TIGHT-WIRE 20 22APR04 23APR104 DRt-Y ML.Y 0,TG.306250BTAIN TIGHT-WIRE M.rUE NT MEASUREMENTS OF 17:00 16:59 ORT3-Y R-L 03021 A
iH 453 1 TGO216167B TOG 76 E-01 REINSTALL DUCT 4
23APR04 23APR04 DR-N ML-N 0
TG021616TBREINSTAILL C
OL FOLLOWING EXCITER 01:00 05:59 ORT3-N R-L 0161
-1TRIN 4541 1 TG0302113A TGG 76 HX-052 HX-052 - REINSTALL 4
23APR04 23APR0 DRVM-G321 52 -REIN!
GENERATOR EXCITER 09:00 12:59 ORT3-Y R-L
.a 0302111T 455 1 TG-3o6go TGG 76 TG-01-T HAND CLEAN HP CYL 30 23APR0-4 24APR04 DR-V ML-Y 0
TG-306 dHAND CLE HORIZONTAL JOINT 10:00 19:59 ORT3-V R-L 0302 456 1 TGHX22DRP TGG 76 HX-022D MSR 0 INTERNALS 10 2-3APR04 24APR0-4 DR-V MI-Y 0
'TO pMTSR DIN REPAIRS (SHELL SIDE) 12:00 1 1:59 ORT3-YVR-L
,03 Z11 457 1 TG-HIX52-PT TGG 76 HX-052 HX-052 - PRESS TEST 4
23APR04 23APR04 DR-V MI-V 157
,TO-524Plt-052 -
GEN EXCITER COOLER 13:00 16:59 ORT3-V R-L
'0 021133NC 458 1 TGO302132 TGG 76 L0-002911 LO-291 - OVERHAUL 25 23APR04 27APR04 DR-Y MI-V 0
030213 PRESSURE REDUCING 16:00 10:59 ORT3-Y R-L
- '030213 459 1 TC-30640 TOG 75 TG-01-T FINAL INSPECT HP 2-123APR04 23APR04 DR-V MI-V 0
T.04f TURBINE CYLINDER 17:00 15:59 ORT3-Y R-L 031 4601 1 T-801 7-H WCC FP-03705 I FP FP-3705 MM I
21APR04 21APR04 7
s FP FP-;70S MM REVO-2 REVO-2 12:00 12:59 1 FP FP-37Q5 MM REVO-2001 E 17 461 1
T.8358-R WCC CC-759B 1 CC CC-7599 EM 1
21APR04 21APR04 38 1 CC CC-459B EM REVI-1 REVI-1 12:00 12:59 1 CC CC-7501B EM REVI-1 0011 58 462 1 T-8363-R W#CC Z-2481 I FH Z-24B1 MM REV2-1 I
21APR0-4 21APR04 DR.V MI-V 18 RI~ FHI Z-24U1 MM REV241 12:00 12:59 ORT3-N R-L FH Z-24B1' MM REV2-1 00153 63 463 1 T-0477-R WCC T-034B 1 St T-34B MMV REVO-1 2
21APR0-4 21APR04 31 1
Si T-346 MMV REVO-1 12:00 13:59 1 SI T-3413:MMV kEVO-1 001 477 464 1
T-0512-R WCC WD1D11102 I VNCC W-IDI/iD2 MM 3
21APR04 21APR04 DR-V MI-V 156 r-05 VNCC W-D101112 MM REI0-1 REVO-1 12:00 14:59 0RT3-V R-L I VNCC W-1DII1D2 MMR 010010S12 465 1 T-6460-R WCC TURBINE I SW TURBINE MM 3
21APR04 21APR04 116 1 SW TUI4BINE MMV REV0.
REVO-1
.12:00 14:59 11 SW TIJBBNE MMV REV1 1 0016480 466 1 T-3426-H WCC P-0016 I RC P-1a RMP 21.21APR04 21APR04 DR-V MI-V 0
1 RC P-IS0 RMP 9002-8/19 M REVO-1 9002-8/19 MM REVD-1 13:00 14:59 ORT3-Y R-IL E
RC P-IbRMP9002-8119 A MREVO.1 013U2k 4671 1 T-2759-R WCC CS.38C 1 CS CS-38C MM 1P0 1P0 355 V., 594;iCS C -3C MM REVO-4 REVO-1 15:00 21:59 0C 25911-1 CS CS-38C MN REVD-1 468 1 T-5554-14 WO HX-15B.
I VNCC HX-158 MM I
21APR04 21APR04 DR-V MI-V 145 1 5554-H VNCC HX-155 MM
-E 71 REV2-i 17:00 17:59 ORT3-NR-015554V1CC RX-15B MMRI
-12 469 1
T-8018-H WOCC W03B 480V IWP 01-128"E-FN 1 21APR04 21APR04 0
1goH 480Y MWP 01-128*E-(W-13B1) EM RE',0.1
______(W-13B1)
EM REVO-1 17:00 17:59 01 80i~48(V IWP 01-128-E-N (W-13B1) EM REVO-1 Run Date 21APR04 13:281 LT-03 STANDARD PUBLICATION Set2 f3 C Pilmavera Systems. Incm FL-03 Execution Publication Set ITSet2 f3
after21APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 21APR04 12:00 U
ID RESPI WO I EQID DESCRIPTION l RD l ES EF
' RISK I MF APR
~ST~
VW2ITh IEd2 I
SV`@
10112141_6' B2 01 0 24 4.68 el0I'l224.16 a202t.2A0 2,,6 8110214l161 I
470 1 T-1270-R wCC CC-769 I CC CC-769 IC REVO-1 1
I 21APR04 I 21APR04 20:00 20:59 20 471 1
T-2586-R WCC RC-00515 1 RC RC-515 EM REVO-1 1
21APR04 21APR04 9
20:00 20:59 472 1 T-8001-H WCC B52-429DL 1 480V B52-4290L1DR 1
21APR04 21APR04 53 EM REVO-1 20:00' 20:59 473 1 T.8265-R WCC RMP I RP RMP 9026-4 EM I
21APR04 21APR04 169 REV2-1 20:00 20:59 474 1 T-8439-H WCC RC-526B 1 RC RC-5260 MM 1
21APR04 21APRC4 DR-N ML-N 70 REVO-1 20:00 20:59 ORT3-N R-L 475 1 T-5945-R WCC SI-00860A 1 SI SI-860A EM REVO-1 2
21APR04 21APR04 DR-Y ML-Y 204 20:00 21:59 ORT3-Y R-L 476 1 T-2566-R WCC PRIMARY I RC PRIMARY
- 1. 21APR04 21APR04 DR-Y ML-Y 24 MANWAYS EPI REVO-1 22:00 22:59 ORT3-Y R-L 477 1 T-8018-R WCC W-013B1 I 480V IWP 01-12rE-FN I 22APR04 22APR04 C
(W-13B1) EM REVO-1 02:00 02:59 4
1 0199-010 WCC SI-828A ALIGN & W/D BAST &
2 22APR04 22APR04 DR-N ML-N 0
P-15A FOR REACTIVITY 02:00 03:59 ORT3-N R-L 479 1 T-0682-H WCC ICP-5.10 1 MMS ICP-5.10 IC 2
22APR04 22APR04 DR-Y ML-Y 34 REVO-1 03:00 04:59 ORT3-N R-L 480 1 T-3717-H WCC T-034A 1 SI T-34A MMV REVO-1 3
22APR04 22APR04 DR-Y ML-Y 11 03:00 05:59 ORT3-N R-L 481 1
T-2587-R WCC RC-00516 1 RC RC-516 EM REVO-1 I
22APR04 22APR04 05:00 05:59 482 1 T-2436-R WCC CC-759A 1 CC CC-759A EM I
22APR04 22APR04 DR-Y ML-Y 16 REVO-1 08:00 08:59 ORT3-Y R-L 483 1 T-8019-H WCC W-013B1 I 480V IWP 01-128-E-FN I 22APR04 22APR04 1l (W-13B1) CAUT REV01 08:00 08:59 484 1
T-8023-H WCC W-021A 1 480V IWP 01-128 E-N 2 22APRO4 22APR04 Ia (01-39) EM REVO-1 08:00 09:59 485 1 T-0711-R WCC Z-024A I RC Z-24A RMP-9096 1
22APR04 22APR04 51 MM REVO-1 10:00 10:59 488 1 T-7935-R WCC P-037D-M 1 LO P-37D-M EM 1
22APRO4 22APR04 138 REVO-1 10:00 10:59 T.1270R CI C CC-769 IC RE 001127ilU CC CC-769 IC R T.258"1:RC RC-515 EM RE 001258(41 RC RC-515 EM I T-800141 480V B52-429D0L1 0018001o1 480V B52-429DI T-82654RtlP RMP 90254 E 00182651 RP RMP 9026-4 T-8439-H aRC RC-526B MM I 001 84341 RC RC-526B M T-5945-R1 w SI-860A EM RE 001 594wI SI SI-860A EM T-2566 I 1IRC PRIMARY I 00125441 RC PRIMARN 8018-RI 480V 1W 001801E1 480V B 0 lgg190 0ALIGN & '
901741701 SI SI-T-06824._MMS IC i001068!1 MM!
T-37174t S1 T-34
,0013717=1 SI T-2587RI RCI 001258711 RC T-24364R 0012435 T-8019-0 T-80234-0018023 T-0711.
001071 T-7935 00179:
T-8020 00180o tEVO-1 REM REVO-1 (DREM REVO-1 A REV2-1 M REV2-1 EV0-1 REVO-1 10-1 REVO-1 tANWAYS EPI RE'0 1 MANWAYS EPI RtV0-1 01-128E-FN (W-13B1) EM REVO-1 iP 01-128'E-FN (W-13B1) EM REVO-'
I/D BAST & P-15A,FOR REACTVMITY 326A CT OPS REVp-1 P-5.10 IC REVO-1 I ICP-5.10 IC REV0-1 k MMV REVO-1 r-34A MMV REVO-,t tC-516 EM REV01-RC-516 EM REV0,1 CC CC-759A EM IEVO-1 I CC CC-759A EM;REVO-1 4U0V IWP 01.128r-FN (W-1381) CA 1 480V IWP 01-124-E-FN (W-13B1) C 48WV tWP 01 -1 25 N (0I 39) EM R 1 480V IWP 01-128-E-FN (01-39) EM
.. RC 014A R P
-FN MM
.E.N-It RC Z 24A RMP,9096 MM REV0-1 I I RC Z-24A RMp-9096 MM REVO-R1 LO P-37D-M EM REVO-1 1 LO P-37D-M EM REVO-1 480V tWP 011 *8E-FN (W-21X) E 1 480V IWP 01-I428rE-FN (W-21X)
FLOWPATH JT REVO-1 WT REVO-1 rVo-1 REVO-1 A REVO-1 EM REVO-1 48711 T-80204G WCC W-021A 1 480V IWP 01-1286E-FNI I (W-21X) EM REVO-1 22APR04 I 22APR04 10:00' I
10:59 a
Run Date 21APR04 13:281 LT-03 STANDARD PUBLICATION Sheet 28 of 34 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 21APR04 12:00 I
U1R28 WORKING SCHEDULE I
after21APRO4 12:00 Jl U I ID lRESP WO I E0D DESCRIPTION RD ES EF RISK ed 21 I
Thu Fri 23 IST
- 1-1-210-2.4-6-8-101-14-161-2-22-,2-4-6-8-1-I1Z14-161 N Afe k1t.U~~k%
48811 T4802 1-H-WCC W-021A I 480V IWP 01-128E-R (W-21A) CAUT REVO-1 I I 22APR04 I 22APR04 10:00 10:59 489 1 T-9893-R WCC W-1B111B2 1 VNCCW-;B11B2 EM I
22APR04 22APR04 154 REVO-1 10:00 10:59 490 1 T-2095-H WCC ICP-5.77 1 VNCC ICP-5.77 IC 2
22APR04 22APR04 DR-Y ML-Y 0
REVO-1 10:00 11:59 ORT3-Y R-L 491 0 T-8157-H WCC W-030B 0 VNPAB W-30B EM 2
22APR04 22APR04 C
REV2-1 (IN GROUP 10:00 11:59 492 0 T-8203-H WCC W-030A 0 VNPAB W.30A MM 2
22APR04 22APR04 C
REV0.1 (IN GROUP 10:00 11:59 493 1 T-2616-H WCC SW-2908 1 SW SW-2908 EM 3
22APR04 22APR04 DR-Y ML-Y 0
REVO-1 10:00 12:59 ORT3-Y R-L 494 1 T.9892-H WCC W-001A1 1 VNCC W-1A1/tA2 EM 3
22APR04 22APR04 DR-Y ML-Y 116 REVO-1 10:00 1Z59 ORT3-Y R-L 495 1 T-5919-H WCC CHARGING I CV CHARGING 4
22APR04 22APR04 5
INSIDE CONTAINMENT 10:00 13:59 48 1 T-0509-H WCC W-1A111A2 1 VNCC W-1AII1A2 MM 5
22APR04 22APR04 DR-Y ML-Y 0
REV0-1 10:00 14:59 ORT3-Y R-L 497 1 T-17B0-H WCC HX-15A I VNCC HX-15A MMV 5
22APR04 22APR04 DR-Y ML-Y 14 REVO-1 10:00 14:59 ORT3-Y R-L 498 1 T-1830-H WCC HX-15A I VNCC HX-15A MM 5
22APR04 22APR04 DR-Y ML-Y 0
REVO-1 10:00 14:59 ORT3-Y R-L 499 1 T-8435-R WCC Z-24A 1 FH Z-24A RP-1A OPS I
22APR04 22APR04 50 REV1-5 1100 11:59 500 1 T-9894-R WCC W-001CI 1 VNCCW-1CV1C2 EM I
22APR04 22APR04 204 REVO-1 11:00 11:59 501 1
T-0683-H WCC ICP-5.16 1 CV ICP-5.16 IC REV-1 2 22APR04 22APR04 19 11:00 1259 502 1 T-0686-H WCC ICP-5.698 I RH ICP-5.69B IC 2
22APR04 22APR04 5
REV0-1 11:00 1Z59 503 1 T-1714-H WCC LT-433 I RC LT-433 IC REV0-1 4
22APR04 22APR04 33 11:00 14:59 504 1 T-6123-H WCC CV-0275 1 CV CV-275 MMV 4
22APR04 22APR04 14 REVO-1 11:00 14:59 I.
I.
T-8021 00180:
T-9893 000981 T-2095 001201 T-8157 00181!
T-8203 00182Z T-2B16 00126 T-9B92 000981 T-5919 00159 T.0509 001051 T-1780 00117 T-1830 oo118 T4843 0018 T-989 0009 T-068 0010 T-068 0010 T-1T1 0011' T-612 0016 T-639 0018 HI 480V IWP 01 128 E-FN (W-21A) C 111 480V IWP 01-t28-E-FN (W-21A) 1 VNCC W-1111132 EM REVO-1 1 VNCC W-1B141B2 EM REVO-1 F41VNCC ICP-5.771C REVO-1 1 VNCC ICP-5.77 IC REVO-1 VENPAB W-30B EM REV2-1 (IN GI H0 VNPAB W-30A;MM REVO-1 (IN GI H SW-2908 EM REV0-1 qI SW SW-2908 EM REVO-1 H1 VNCC W-1A111A2 EM REVO-1 i2n1 VNCC W-A1I1A2 EM REVD-6V CkCHARGING -INSIDE CONTAIM 1 iCV CHARGING INSIDE CC Hl VNCC W-1A1J1A2 MM REV01 9 _!1 VNCC V-lA11A2 MM RE "1 VNCC HX-15A MMV REVO.1
_11 VNCC AX-15A MMV REVI HI VNCC HX-15A tAM REVO-1 t_1 VNCC VIX-15A MM REVO-F FH Z.24A RP4A OPS REV1.5 A1 FH Z-24A R'1A OPS REV1-5 I
I VNCC W-1C1t1C2 EM REV0.1 419 VNCC W-iOtiiC2 EM REVO-1 141 CV ICP-5.16 1C REVO-1 i&'i CV ICP-5.A6 IC REVO-1 RjOH ICP-5.69B IC REVO-1
~81RH ICP-5.69B IC REV0-1 14 iRLT433 ICREVO.1 1_1i RC LT433 IC REVO-1
,441 CV CV-27S M MV REV0-1 231 CV CV-75 MMV REVO-1 1ii RP LT.427 ;C)REV0-1 19_1 RP LT-427 IC REVO-1 UT REV0-1 CUT REVO-1 OUP 2004)
ZOUP 2004)
SENT MMV RE%
NTAINMENT M
/0-1
-1 50511 T-6398-H WCC LT-00427 1 RP LT-427 IC REVO-1 4
22APR04 22APR04 11:00 1
14:59 3
Run Date 21APR0413281 LT-03 STANDARD PUBLICATION Sheet 29 of 34 C P1imavera Systems, Inc.
FL-03 Execution Publication Set 7
after 21APR4 12:00 U
U after 21APR4 12:00
- U I
S EQID DESCRIPTION RD ES F
MAPR l
_S I
e2l0,2 6.,111214,1l20.2.2 0. 2.4.6. 8,1ii14,161
- 0 J R S P W<
O Je h ;
1E QI R
506j1 T-6399-H-WCCI LT-M028 1RP LT-428 IC REVMIt 4
22APR04 I 22APR04 11:00 14:59 3
507 1 T-2068-R WCC I Y IGY-4-M REV1-1 I
22APR04 22APR04 0
12:00 12:59 508 1 T-1679-R WCC P-037C 1 LO P-37C EM REVO-1 1
22APR04 22APR04 132 14:00 14:59 509 1 T-6933-H WCC D72-19-03 1 125V IWP 00-037-04 1
22APR04 22APR04 15 EM REVO-1 14:00 14:59 510 1 T-1831-H WCC HX-15A 1 VNCC HX-15A MM 2
22APR04 22APR04 DR-Y MLVY 0
REVI-1 15:00 16:59 ORT3-Y R-L 511 1 T-2765-H WCC CV-01296 I CV CV.1296 MMV 2
22APR04 22APR04 12 REVO-1 15:00 16:59 512 0 T-8203-R WCC W-030A 0 VNPAB W-30A MM 2
22APR04 22APR04 26 REVO-1 (IN GROUP 18:00 17:59 513 1 T-8025-H WCC W-035 1480V IWP 01-128E-FN 1
22APR04 22APR04 0
(W-35) EM REV0-1 17:00 17:59 1
T.1830-R WCC HX-15A I VNCC HX-15A MM 2
22APR04 22APR04 DR-Y ML-Y 35 REVO-1 17:00 20:59 ORT3-Y R-L 515 1 T-8507-H WCC POS-476 1 CS POS-476 EM 1
22APR04 22APR04 DR-Y ML-Y 0
REVO.2-1 20:00 20:59 ORT3-N R-L 516 1 T-2743-R WCC CS-00466C 1 CS A FEED UNE 2
22APR04 22APR04 80 MMV REV0-1 20:00 21:59 517 1 T-8117-H WCC MR 01-128 480V MR 01-128 1B-42 3 22APR04 22APR04 0
CAUTION TAGS EM 20:00 22:59 518 1
T-2368-R WCC B-42 REMOVE CYCLEOPS 1 2 22APR04 22APR04 0
480 1B-42 CTS OPS 21:00 22:59 519 1 T-3161-R WCC B-42 REMOVE CYCLEOPS 1 2 22APR04 22APR04 0
480V 1B-42 BUCKETS 21:00 22:59 520 1 T-8123-H WCC MR 01-128 480V MR 01-12818-42 2 22APR04 22APR04 0
CAUTION TAGS EM 21:00 22:59 521 1
T-6411-H WCC 01-164 1 CV 01-164 OPS 5
22APR04 23APR04 36 REVO-1 21:00 01:59 522 0 T-6418-R WCC IA-1258 OIAIA-1258MMREVO-1 1
22APR04 22APR04 164 22:00 22:59 I
I II II I
I II
.I II III I
T4639 0016 T-2(
DDl 001 1I 441 RP LT-428 ICREV041 19n1 RP LT-428 IC REVO-1 684RY 1GY4-M fEV1-1 2064
- 167gILO P-37C EM REV0-1 1011641 LO P-37C EM REVO-1 4933441 125V PWIN 00-037-04 EM RE 1016933d1 125VyP 00-037-04 EM F T.18314 1 VNCC NX-15A MM REVI-001831Ui^ VNdC HX-15A MM RE' T-2765r4 CV CV.-296 MMV REV04 001276!^1 CV ¢V-1296 MMV RE\\
T.8203p0VNPA3 W-30A MM REY 00182031^
T-80254i480V IWP 01-128 E-FN 00180241 480V IWP 01-128-E4 T.1830.IVNC HX-15A MM RE' 001183A1q VNCC HX-15A IV T-85074 CS POS-476 EM F 00185041 CS POS-476 EM T-2743.R5 AS WFEED UNE 001274311 CS 'A FEED U T-81174. _j0V MR 01.128 11 001 8171 480V MR 01-T.2368g$MOVE CYCLEC 001236w T.3161JRREMOVE CYCLEC 0013161E T-81234I480V MR 01.128 00181231 480V MR 01-T-6411 164 OPS 00164111 CV01.1I T-6418* 0 IA tA-1258 MM 00164140 IA IA-1258 MI T.8023' 480VIWP0141 00180 1 480V IWP 01-v0a1 EVO-1
'1-1 D-1
-1 ON GROUP 2 W-35) EM REV, N (W-35) EM R
'0-1 M REVO-1 EV0.2-1 REVO.2-1 MMV REV0-1 E MMV REV0O 1-42 CAUTION 28 1-B42 CAUI PS 1 480 1B-42 PS 1 480V 1B-4 1842 CAUTIO 28 18-42 CAU1 tEV0-1 4 OPS REVO-1 REVO-1 4REV0-1 8-E-FN (0149)1 128-E-FN (01-3 5231 1 T-8023-R WCC W-021A 1480V IWP 01-128-E-Fh (01-39) EM REV0-1 1 I 22APR04 I 22APR04
_ 22:00 22:59 23 Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION I
Sheet 30 of 34 O Prlmavera Systems, Inc.
I FL-03 Execution Publication Set I
after21APR0412:00 U1R28 WORKING SCHEDULE after 21APR04 12:00
TI
'§10ilZ14,6,1a2OZ0.22i,. 4.6, 8.10112,14,1518,20,22 0.2.4.6.8.lOiI114,16l1 m~veE *IC-Itsl-Uflt
_IRE 5241 1 T-8025-R wCc W-035 1480V IWP 01-128-E-FNI I I 22APR04 22APR04 (W-35) EM REVO-1 I
22:00 2259 231 525 1 T-7106 WCC TG-01-G 1TUTG-01-GEM 2
22APR04 23APRo4 62 REVI-1 23:00 00:59 526 1 T-2434-R WCC CC-754A I CC CC-754A EM 2
23APR04 23APR04 DR-Y ML-Y 0
REV01 01:00 02:59 ORT3-Y R-L 527 1 T-1273-R WCC HX-21A I CS HX-21A MM 3
23APR04 23APR04 329 REV0-1 01:00 03:59 528 1 T-2616-R WCC SW-2908 1 SW SW-2908 EM 1
23APR04 23APR04 DR-Y ML-Y 0
REVO-1 02.00 02:59 ORT3-Y R-L 529 1 T-7521-R WCC MS-00231 1 MS MS-231 EM 1 23APR04 23APR04 392 REVO-1 02:00 02:59 530 1 T-7590-H WCC MR01-128 1480VMR01.1281B-42 1
23APR04 23APR04 0
BUS BRACING EM 02:00 02.59 531 1
T-2615-H WCC SW-2907 1 SW SW-2907 EM 2
23APR04 23APR04 DR-Y ML-Y 3
REVO-1 02:00 03:59 ORT3-Y R-L I I T-7401-R WCC SOP-CC-002 1 CC SOP-CC-002 OPS 1
23APR04 23APR04 6
REV3-1 03:00 03:59 533 1 T-7504-H WCC SOP-CC-002 I CC SOP-CC-002 OPS I
23APR04 23APR04 0
REV4-1 03:00 03:59 534 1
T-8348-H WCC P.148 1 SI P-14B MMV REVI-1 1 23APR04 23APR04 DR-Y ML-Y 0
03:00 03:59 ORT3-N R-L 535 1 T-3715-R WCC P-014B 1 SI P-14BMMVREVO-1 3
23APR04 23APR04 117 03:00 05:59 536 t T-8116-H WCC MR01-128 1480VMR01.128 1B42 4
23APR04 23APR04 0
BUS BRACING EM 03:00 08:59 537 1 T-7047-H WCC P-028A-M 1 CS P-28A-M EM I
23APR04 23APR04 DR-Y ML-Y 5
REV1-1 04:00 04:59 ORT3-Y R-L 538 1 T-3790-H WCC S-6050A I 10PS S-6050A IC 2
23APR04 23APR04 40 REVO-1.
04:00-05:59 539 1 T-1305-H WCC CV-00313A-1 CV CV-313A-S IC I
23APR04 23APR04 20 REVO-1 05:00 05:59 540 1 T-7969-H WCC CV L/D I CV CV L/D SYSNCT 4
23APR04 23APR04 0
MMV REVO.1-1 05:00 10:59 I
I II II II II II T-8025;R1 40V IWP 01-1 00180241 480VIWP01-T.710-41 TU TG-01 -G 0017 1 061 TU TG-01l T.;4344I CC CC 0012434fl CC CC T-4273RICS HX-21) 0ql 273_1CS -
T.2616.RSW SW-:
-e,75214 I MS MS 001752111 MS MS 7m59044 480V MR 001759rU1 480V IV Y, 2 S154_W SW-s 801261!^1 SWS iT-7401 ffCC S0 0017401A1 CC SI T.75044ilCCSOF
- 00175041 CC S
,T-3483ASI P.14
- T.1164aI 480VM
,001811ildn" T-704704 CS P-00170411 CS I T-37904-HIOPS 001379l1 101 T.1305SH CV C 00113051C T.7969 4HCVl 001796-T.74584eCVY 001745EV-rE-FN (W-3S) I 128-E-FN (W-3 M REV1-1 EM REVI-1 A EM REVO-1 754A EM REVC MM REVO-1
-21A MM REV(
908 EM REVO-1
-2908 EM REV 31 EM REVO-1 231 EM REVO-01-128 15-42 B R01-128 1B-4 907 EM REVO-1 V-2907 EM RE
-CC-002 OPS
)P-CC-002 OPc
-CC-002 OPS
)P-CC-002 OP 3 MMV REV1-1 4B MMV REVI 3MMV REVO-1
-146 MMV RE
~011Z8 1B-4Z I480V MR 01-8A-M EM REV
~28AM EM RE 6OSO0A IC RE IS S-6050A IC V-313A-S IC R CV-313A-S IC
- w.
V LID SY5C El CVCV V LD SYSVC
_1 CVCV 541 I
T-7458-H WCC CV LID I CV CV LID SYSNCT OPS REVO-1 6
23APR04 23APR04 05:00 12:59 O)
Run Date 21APR0413:281 LT.03 STANDARD PUBLICATION Sheet 31 of 34 Pdimavera Systems, Inc.
FL-03 Execution Publication Set T
after 21APR04 12:00 U1R28 WORKING SCHEDULE after21APR04 12:00
-101121 6A1,202210, 2 4 6 1012 14,1820.2210. 2.4,6* 8.10M1416 131MOON "
tie]
N3E43................................................I.......
.5421 1 T-7465-H wCC CV LID I CV CV LID SYS.CT OPS REVI-1 23APR04' 23APR04 05:00 12:59 0
543 1 T-7968-H WCC CV*209 1 CV CV-209 MM 6
23APR04 23APR04 8
REVO.1-1.
05:00 12:59 544 1
T-9779-R WCC PZR 1 RC PZR HTRS EM I
23APR04 23APR04 DR.Y ML-Y 341 REV0-1 08:00 08:59 ORT3-Y R-L 545 1 T40686-R WCC ICP-5.69B 1 RH ICP-5.69B IC 2
23APR04 23APR04 135 REVO-1 08:00 09:59 546 1
T-0466-R WCC LOGICS 1 RDC LOGICS IC 1
23APR04 23APR04 26 REVO-1 09:00 09:59 547 1 T-7441-H WCC MR 01.128 1 480V MR 01-128 1
23APR04 23APR04 108 1B52-424J (CC-7388) 09:00 09:59 54 1
T-7460-H WCC MR 01.128 1 480V MR 01-128 1
23APR04 23APR04 110 lBS2-426C (CC-719) 09:00 09:59 549 1 T-7462-H WCC B52-426F 1 480V MR 01-128 1
23APR04 23APR04 112 1B52-426F (CV-1298) 09:00 09:59 1
T-7463-H WCC B52-426M 1 480V MR 01-128 1
23APR04 23APR04 113 1 B52-426M (RC-427) 09:00 09:59 551 1
T-7471-H WCC MR 01-128 1 480V MR 01-128 1
23APR04 23APR04 120 1B52-4210F (SW-2880) 09:00 09:59 552 1 T-7484-H WCC MR 01-128 1 480V MR 01-128 1
23APR04 23APR04 119
_1B52-4210C (SW-2908) 09.00 09:59 553 1 T-7490-H WCC RC 1 RC SG PRIMARY I
23APR04 23APR04 0
MANWAYS EPT REV1-1 09-00 09:59 554 1 T-7492-H WCC PRIMARY I RC PRIMARY I
23APR04 23APR04 0
MANWAYS MM REV1-1 09:0 09 59 555 1 T-7497-H WCC T-001 1 RC PZR MANWAY MM I 23APR04 23APR04 0
REV1-1 090W 09:59 556 1 T-7507-H WCC P-001B-M 1 RC P-1B-M RMP 1
23APR04 23APR04 73 9002-1 EM REV2.1-1 09:W 09.59 557 1 T-7509-H WCC P-001B-M 1 RC P-1B-M RMP I
23APR04 23APR04 0
9002-1 MM REV1-1 09:00 09:59 55 1
T-7590-R WCC MR 01-128 1 480V MR 01-128 1B.42 1 23APR04 23APR04 102 BUS BRACING EM' 09:00 09:59 001746:
T179684"CV I
00179641 I
T.9779-R$
00097791 T-06864R 001068 T-04664 001046 T.74414H 1
0017441 I
T-7460-H 0017468 T.7462-H 0017462 T.74631 0017463 T-7471-4 0017471 T-74844-0017484 I
T-749041 1
0017490 T-74924I 0017492 I
T-74974 0017497 T-7507-H I
0017507 T-7509-f 0017501 T-7590F 1
0017591 I
T-6639 001683 V LID SYSrVC1
_1 CVCV V.209 MM REY 1
Cv CV RC PZR HTRS I RC PZR HTK RH ICP-5.69B I 1 RH ICP-5.61 I RDC LOGICS 1 RDC LOGIC I480V MR 01-1 1 480V MR O 480V MR 01-1 480V MR 0 I480V MR 01-1 II 480V MR 0 48WVMR 01.1 I1 480V MR 0 h 480V MR 011 11 480V MR 0 h 48WVMROI-1 I1 480V MR 0-I RC SG PRIM, 11 RC SG PRII I RC PRIMARY I1 RC PRIMAI I RC PZR MAN 11 RC PZR Ml I RC P-1B-M RI I1 RC P-1B-M I RC P-1B-MR I1 RC P-1B-M 1 480V MR O1-1 I1 480V MR 01 I RC PZR MAN E1 RC PZR L 55s 1 T-6639-R WCC T-001 1 RC PZR MANWAY MM REV0 1 2
23APRO4 23APR04 09:00 10:59 303 Run Date 21APR0413:28l LT-03 STANDARD PUBLICATiON l
Shoot 32 of 34 0 Plmavera Systems, Inc.
FL-03 Execution Publication Set I
after 21APR04 12:00 I
U1R28 WORKING SCHEDULE after 21APR04 12:00 l l U ID lRESPI WO I EQID DESCRIP'ION RDI ES EF RISK I MF W APR I I ST I
I I
56011 T-7427-H wCC MR 01 28 I1 480V MR 01-128 1B52-421J (SI-66B) 2 1 23APR04 I 23APR04 09:00 10:59 107 561 1
T-7432-H WCC MR 01-128 1 480V MR 01.128 2
23APR04 23APR04 109 1B52-422J (SI-878B) 09:00 10:59 562 1 T-7452-H WCC B52-425M 1 480V MR 01 28 2
23APR04 23APR04 110 1B52-425M (CV-350) 09:00 10:59 563 1 T-3375-R WCC P-001B-M I RC P-1B-M RMP 3
23APR04 23APR04 0
9002.1 MM REVO-1 09:00 11:59 564 1 T-7456-H WCC CV.00296 I CV CV-296 MMV 3
23APR04 23APR04 7
REVI-1 09:00 11:59 565 1 T-7455-H WCC P-010B 1 RH P-10B MM REVI-1 4
23APR04 23APR04 0
09:00 12:59 566 1 T-1680-R WCC PRIMARY I RC PRIMARY I
23APR04 23APR04 103 MANWAYS MM REVO-1 10:00 10:59 567 1 T-6601-R WCC RC I RC SG PRIMARY I
23APR04 23APR04 303 MANWAYS EPT REVO-1 10:00 10:59 568 1 T-6933-R WCC D72-19-03 1 125V IWP 00-037.04 1
23APR04 23APR04 0
EM REV0-1 10:00 10:59 569 1 T1715-R WCC RC-M434 I RC RC-434 MMV 2
23APR04 23APR04 289 REVO-1 10:00 11:59 570 1 T.7043-R WCC P-028A-M I CS P-28A-M EM 1
23APR04 23APR04 DR-Y ML-Y 0
REV0-1 11:00 11:59 ORT3-Y R-L 571 1
T-0964-H WCC 62)A01 1 MRR 62VA01 RMP I
23APR04 23APR04 0
9302.1 EM REVO-1 12:00 12:59 572 1 T-2407-H WCC RMP 1 4.16KV RMP 9364-1 1
23APR04 23APR04 56 UMBIUCAL CORD EM 12:00 12:59 573 1 T-7970-H WCC CV-257 1 CV CV-257 MM 4
23APR04 23APR04 3
REVO.1-1 12.00 15:59 574 1 T-7458-R WCC CV LID 1 CV CV LID SYSNCT I
23APR04 23APR04 0
OPS REVO-1 13:00 13:59 575 0 T78156-H WCC W-030B 0 VNPAB W-30B EM 2
23APR04 23APR04 0
REV3-1 (IN GROUP 13:00 14:59 57 1
T-2606-H IWCC SCIS SC SC-966C-S IC 1
23APR04 23APR04 92 REVO-1 14:00' 14:59 I
II II I
II I
I I
I T-7427-H 0017427 T-743241 0017432 T-745241 0017452 T.33754-0013375 T-74564 0017456 T-7455-H 0017455 T-1680.
00116 T-6601 00166 T76933 00169 T.1715 00117 T-7 0017 T
001 T-001 T.
001 480V MR 01.1 I 480V MR 480V MR01.1 I 480V MR 480V MR 01-1 480V MR P-IB-M RI 1 RC P-1E CVV296 M I CV CV-2 RH P-10B M I RH P-I I RC PRIMAR I RC PRIM 1RCSG PRIK 1 1RC SG PF I 125V IWP(
1 125VIWP RC RC-434 l 1 R~C RC-4 ICS P.28A-Ipl CS P-25 164MRR 621 Ip984 MRR 6 o 7 4414.16KVF 24071 4.16n Ip97tl_1C' e4S8.CV CV 1745s1CVC
- 1 5 6 4 VNPA8 41815c
-26064l SC SC 101260d1 SC
.7 3 94 4 1 CV C' I0173941 CV 577 I
T-7394H WCC CV.1 12C I CV CV-112C EM REVO.1 I
23APR04 I 23APR04 14:00 14:59 0
Run Date 21APR0413:281 LT-03 STANDARD PUBLICATION l
Sheet 33 of 34 O Pimavera Systems, Inc.
I FL-03 Execution Publication Set I
after 21APR04 12:00 U1R28 WORKING SCHEDULE I
after 21APR04 12:00 K.D O
IMFWd~
APR lU ID RESP WO EQID DESCRIPTION RD ES EF RISK.
MF W
21 2
Fri 23 N;;.{Vels,!ll{
kX Ii
_-_
23APR04 23APR04 i0 I.74074 CV C1 REVI-1 14:00 14:59
.01740731 CV 579 1 T-7465-R WCC CV L/D 1 CV CV LID SYSNCT 1
23APRo4 23APR04 167 T -746s-_CV OPS REV1-1 15:00 15:59 001746il C' 580 0 T-8157-R WCC W-030B 0 VNPAB W-308 EM 2
23APR04 23APR04 0
1 T
58s7.RYN REV2-1 (IN GROUP 15:00 16:59 0018157K 581 1
T-6123-R WCC CV-00275 1 CV CV-275 MMV 3
23APR04 23APR04 111
.T6123 ICV(
REVO-1 15:00 17:59 001612 1
582 1 T-0683-R WCC ICP-5.16 I CV ICP-5.16 IC REVO-1 1
23APR04 23APR04 187 IT 06834tC%
16:00 16:59 00106841(
583 1 T-7047-R WCC P-028A-M I CS P-28A-M EM 1
23APR04 23APR04 DR-Y ML-Y 37 T.7047 1 CS REV1-1 16:00 16:59 ORT3-Y R-L 00170471t1 584 1 T-7373-R WCC Z-8 1 TU Z-8 TGG REVO-1 I
23APR04 23APR04 554 T-7373-R 1 17:00 17:59 001737i1 585 1 T-9895-R WCC W 001DI I VNCCW-IDII1D2EM 1
23APR04 23APR04 0
T-98985g-i REVO-1 17:00 17:59 s
000989 1 Cffl Run Date 21AP 13 STANDARD PUBLICATION She 3 o O Pdmavera Systenms, Inc.
FL-03 Execution Publication Set
after 21APRO4 12:00 I
WORKWEEK SCHEDULE thru 23APR04 1700 U
ID RESP Tl WO EQID DESCRIPTION RD ES EF RISK R
APR V
ST ID 21 2
2 2
0 CE0306041 CE1 76 INTAKE CRI INSPECT CRIB.
90 05APR04 01MAY04 DR-Y ML-Y 406.47 INSPECT CRIB. INSTA(L BUOYS AND F SH INSTALL BUOYS AND 10:00A 11:59 ORT3-Y R-L FISH 12>.1f3El 3R o
CE0210988 CEB M 77 SEC SEC SUPPORT MR 99 05APR04 07MAY04 DR-N ML-N 926 E
EC UPPORT MR 99 11B 99-011-B 07:OOA 14:59 ORT3-N R-L
_m
_re-appro ed techspec ST - Resta CLnotreqd 0
CE0210989 CE6 M 76 SEC SEC. INSTALL NEW 99 05APR04 07MAY04 DR-N ML-N 926 E
EC, tNSTALL NEW E UIP MR 99-011-4 EQUIP MR 99-01-E 08:OOA 14:59 ORT3-N R-L
__;i
_ appr.d ted" spec ST - Resta CL not req'd I
CH0300358 CH 77
-HEM-SAMP RCS CL TSR 3.4.52 30 18APR04 24APR04 DR-V Mt-V H3 CS dl. TSR 3A.52 I
07':OOA 11:59 ORT3-N R-L______
_re-appro ed tecI) spec ST - Resta CL not reqd 1
CH0300371 CH P 7
3HEM-SAMP RCS DO TSR 3.4.5.1 30 18APR04 24APR04 DR-V Mt-V IRCSDO TSR 3.4.5.1 07:OOA 11:59 ORT3-N R-L
_re-appro ed tect; spec ST - Resta CL not rmd ftCH0300401 CH IP77
_E-APL RCS BORON SR 3.9.1.1 30 108APoR04 24APRo4 ORT-N RL-LY O
O R39t R
07:OOA
.11:59 ORT3-N R-t jj C
ORON SR 3.9.1.
.re-appro ed tech spec ST - Resta CL not req'd 2
CH0300498 CH P
77 EM-SAMP RCS CL TSR 3.4.5.2 30 18APR04 24APR04 DR-V Mt-V H
C TSR 3.45_2 07:OOA 11:59 ORT3-N R-L re-appro ed tecIspec ST - Resta CL not req'd 2
CH0300511 CH P 77 HEM-SAMP RCS DO TSR 3.4.5.1 30 18APR04 24APR04 DRYML-YV Mt-H RS TSR 3A.5.1 07:OOA 11:59 ORT3-N R-tL.
J
_re-appro ed tech spec ST Restb CL not req'd 0
CH0300195 CH P 77 HEM-SAMPI BAST BORON TSR 1B 19APR04 23APR04 DR-Y ML-Y H
- BORON TSR 3.5 1.2 3.5.1.2 07:OOA 11:59 ORT3-N R-L l
- mMISC lH4 re-appro edted) specST-Resta CLnotreq'd CH0300385 CH P 77 CHEM-SAMP SGBDFO GAMMA SCAN 16 19APR04 23APR04 DR-Y ML-Y H
OBOFO GAMMA SCA4 07:OOA 11:59 ORT3-N R-L I
l-MISC dHi re-appo ad tec4 spec ST-Resta CL not reqd CH0300440 CH P 77 HEM-SAMP RE-229 ISOTOPIC 16 19APR04 23APR04 DR-Y ML-Y H
-2t9 rsoo, 07:WOA 11:59 ORT3-NR-L i-n MISCCtHI ppro ed tech spec ST - Resta CL not reqd 2
CH0300524 CH 77 M-SAMP SGBDFO GAMMA SCAN 16 19APR04 23APR04 DR-Y ML-Y H0300 SGFOGAMMASCl 07:OOA 11:59 ORT3-N R-L
_MISC OH[
appro ad ted) spec ST - Resta CL not reqd l
Run Date 21APR04 14:18l LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet I of 5 C Pimavera Systems, Inc.
I FL-52 Workweek Activities during UIR28 T
after 21APR04 12:00 WORKWEEK SCHEDULE thru 23APR04 1700
.I WRWESCEUEI U
ID RESPlTl WO I ECID DESCRIPTION RDl ES l
EF l
RISK I Rerce 2
APR I~lST g
1 1
1 1
IDc6j8.1012,416,182(12210.2.4.6,8§101214,a161.2022 0,2.4,6.8,1a12.14161 EI -I 1 i
-t 1
-6 I
.B_
2 CH0300550 CH _
77
'HEM-SAMPl RE-229 ISOTOPIC 16 19APR04 23APR04 DR-Y ML-Y C
R 229 ISOTOPIC 07:OOA 11:59 ORT3-N R-L
-I-i MISC CCH
_ eppo ed tecl spec ST - Restb CL not reqd O
CH0300231 CH P 77
- HEM-SAMP SFP BORON SR 3.7.11.1 I 22APR04 22APR04 DR-Y ML-Y CH0300 1 SFP BORON IR 3.7.11.1 07:00' 07:59 ORT3-N R-L 0300 1IMISC CHEMISTRY SAMPLIN Pro-approved tech spec ST - Re tart CL not reqd 0
CH0300244 CH _
77 HEM-SAMPI WASTEWATER I
22APR04 22APR04 DR-Y ML-Y CH0300 444WASTEWATER EFFLUENT CO POSITE EFFLUENT COMPOSITE 07:00-07:59 ORT3-N R-L 0300 44MISC CHEMISTRY SAMPLINC Pm-approved tch spec ST - Re tart CL not req'd 1
CH0300460 CH 77
22APR04 22APR04 DR-Y ML-Y CH0300 6ORWST BORO, SR 3.05.04.3 3.05.04.3 07:00-07:59 ORT3-N R-L I
0300 6CMtSC CHEMISTRY SAMPLIN(
Pre-approved tech spec ST - Re tart CL not reqd 2
CH0300589 CH 77 MP RWST BORON SR 1
22APR04 22APR04 DR-Y ML-Y CH0300 ggRWST BORO0I SR 3.05.04.3 3.05.04.3 07:00-07:59 ORT3-N R-L 0300 8s9MISC CHEM8STRY SAMPUN Pre-approved tpch spec ST - Re tart CL not reqd EM0309070 EM P
76 D-105 WEEKLY STATION 1
21APR04 21APR04 DR Y ML 20 44 030 Y STATION BA rERY INSPECTION BATTERY INSPECTION 10:OOA 12:59 ORT3-N R-M 125V )C STATION BA TERY0309070 P
pproted tech spec ST Restart CL not re'd 0
EM0304827 EM P 77 P-001AIB-M INSPECT SPARE RCP 0
21APR04 21APR04 420.44 EM3048 NSPECT SPARE RCP OTOR MOTOR 12:00 11:59 03048 PARS 1/2P-IA1B REAC OR COOLANT PUMP MOTOR 0
EM0309134 EM P
76 D-106 WEEKLY STATION 3
21APR04 21APR04 DR-Y ML-Y 20,44 EM03091 4WEE*LY STATION BA rTERY INSPECTIN BATTERY INSPECTION 13:00-15:59 ORT3-N R-M 03091 1?5V DC STATIO BATTERY Pre-approved tech spe ST - Restart CL npt req'd 1
EM0305150 EM 6 76 U1A-V REL TEST U1A-UV RELAYS 3
21APR04 21APR04 DR-N ML-N
- 420, EM02 s3s6ksTU1A-UV RE AYS 1RMP 9071-1 & 9075-1 1RMP 9071-1 & 9075-1 16:00 20:59 ORT3-NR-M J,
.515(-ITRAINA4.
6KVAND480V WITCHGEARRR LAYTEST 442.
RELAY Pye-approved tech pec ST - Restart CL not req'd III
.I 1
EM0305155 EM 6 76 U1B-WV REL TEST U1B-WV RELAYS 3
21APR04 22APR04 DR-N ML-N 442.
EM3 05155TEST U1 -4V RELAYS 1MP 9071-2 & 90 5-2 1RMP 9071-2 & 9075-2 22:00 00:59 ORT3-N R-M 420.
030515TRAI B 4.16 KV AND 480 V SWITCHGE tR RELAY TEST R
Pre-app tech spec ST 4 Restart CL not re 'd 0
FG0302074 FGI P 77 MANHOLE PUMP ELECTRICAL 8
23APR04 23APR04 DR-Y ML-Y 60.451 FG0302) 741PMP ELECTIIC PM MANHOLE SUMPS 07:900 14:59 ORT3-Y R-L 7r Run Date 21APR0414:18 LT-52 WORKWEEK ACTIVIES DURING Ul R28 Sheet 2 of 5 O Primavera Systems. Inc a FL-52 Workweek Activities during U1R28
after 21APR04 12:00 WORKWEEK SCHEDULE thru 23APR04 1700 U l I0 RESP T WO EQID DESCRIPTION lRD ES EF RISK ResrcI APR Y ST jID 21 22az23 1
6
.ln _ Il hl ie2..68.l112.1416,18202.O2.4.6.8.1012,161 224
, nvl 1
1 I I 1
0 RE-211-B05 HP HP RMS RE-211/212 AIR 1
22APRo4 22APR04 DR-Y ML-Y RMS RE-2114-05RE-21 1212 AIR SAMPLE CHANGE OUT SAMPLE CHANGE OUT 00:00' 00:59 ORT3-Y R-L Pro-p rovedtech spec dT - Restart CLn reqd M 3-M 2
IC0407898 IC P
76 LT-00935 LT-934/935 LEVEL 8
20APR04 21APR04 DR-Y ML-Y 330 n
T.9 35 LEVEL DE TION DEVIATION 21:OOA 19:59 ORT3-Y R-M
-34B SIAC UMULATORLEVIELTRANSMITTE 0407898 2
MM0213893 MMI 77 ELECTPENE INSPECT AND 4
21APRo4 21APR04 DR-N ML-N 441 M021i893INSPECTA DMAINTAIN 03 4ND Q58 MAINTAIN 03 AND 058 20:00 23:59 ORT3-N R-L 021S8E9M UNrT ELECTRICAL PENETRATIONS Pro-app tech spec ST-Restart CL not reqd 0
MM0201304 MM2 77 HELDING-EQ INSPECT FIRE 8
21APR04 22APR04 DR-N ML-N 441 MM( 2013042 NECT FIRE E MNGUISHERS EXTINGUISHERS 17:00l 00:59 ORT3-N R-L 201304 NWEU ING AND CU1WIG EQUIPMENT 0
MM0201361 MM2 C 75 W-030A W-30A. LUBRICATE 4
22APR04 22APR04 DR-Y ML-Y l M0201361W.30A; LUBRICATE AN D MAINTAIN FAN AND MAINTAIN FAN 12:00 15:59 ORT3-N R-H 0201361iFr23/F-29 PAB EX IAUST FILTER F4N 2
MM0304865 MM2 M 75 YS-03587 2YS-3587 REPLACE 36 23APR04 25APR04 DR-Y ML-Y l441 MM03 652YS-3587 REp STRAINER 08:00*
01:59 ORT3-Y R-L 30 913 03 6
_ I I.
0 OP0215287 OPO 77 OIT4007B IT-07B, P-32B SERVICE 2 21APR04 21APR04 DR-N ML-N
- 010, P02o1521
-07q, P-32B SERVIC WATER PUMP WATER PUMP 12:00l 13:59 ORT3-N R-M
- 521, 021528, P-325 SERVICE WA RPUMPTEST K06 aproved tech spec 'T - Restart CL not req d K06 I______
I 0
OP0215288 OPO P 77 O4T-007C IT-07C. P-32C SERVICE 2 21APR04 21APR04 DR-N ML N
- 521, OP021 88dT-OfC. P-32C SERVI 5 WATER PUMF WATERPUMP 14:00 15:59 ORT3-NR-M
- 510, 0215 8P,32CSERVICE TERPUMPTEST
- _010, PnFpproved techs ST-RestrtCLiot reqd 0
OP0215354 OPI P 77 O-PC-MIDS OPERATIONS MID 7
16APR04 22APR04 DR-Y ML-Y l02153 4OPERATIONS MID SHI WEEKLY ROuNE SHIFT WEEKLY 00:00A 06:59 ORT3-N R-L i
IOPERATIONS MID SHIFT WEEK LY ROUTINE02 1J3 ROUTINE re-appo ed tedc spec ST - Restai CL not reqd 0
OP0215373 OPI IP 77n TS-EP-001 POWERAVAILABILILY 1
22APR04 22APR04 DR-YML-Y (Po 215373POWE tAVAILABILrTYVERIFICATIONS VERIFICATIONS 00:00l 00:59 ORT3-N R-L l 0215373POW RAVAILABILTY'VERIFICATIONS Pro-op roved tech spec dT - Restart CL no reqd Run Date 21APR0414:18l LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet 3 of 5 O Prlmavera Systems, Inc l
FL-52 Workweek Activities during U1 R28
after 21APR04 12:00 I
WORKWEEK SCHEDULE I
thru 23APR04 1700
-APR U
10 RESPT WO I EQID DESCRIPTION. '
RD ES EF RISK Rerce APR Y
ST 6,8.1....1.1....182...2210.2,4,6,8.......l......l4,1...18....02...0,2,4ID,6;=_9.1fi12.1i _4 £* a lI
- I ag a I
-I-a I-hi
-u m
0 OP0215406 OP1 P77 O-T-0016 IT-16, QTRLY FAIL-SAFE I
23APR04 23APR04 DR-N ML-N 521.51i
.P0215OdT-16.
TRLY FAIL-SAFES STROKE TEST 00:00 00:59 ORT3-N R-M 02154051TRY FAIL-SAFE STRO t
Pre-approved tech spec ST 2
OP0216032 OP1 P 77 O-TS-010AB TS-10A. U2C AIR LOCK 2
23APR04 23APR04 DR-Y ML-Y
.2021r032M O U2C AIR'LOCK 00 DOOR SEAL TEST 00:00' 01:59 ORT3-N R-M 021603ZMU2 ONTAIRLOCKq0 P
roved tech specST 0
OP0215355 OP1 77 O-PC-MIDS OPERATIONS MID 49 23APR04 29APR04 DR-Y ML-Y 02153550PERU IONS MID SHIO SHIFrWEEKLY 00:00' 06:59 ORT3-N R-L ERA1ONS MID SHIFT EKL ROUTINE021535 ROUTINE t,
Pre-a roved tedi spec $T U
0 OP0215433 OP2 77 O-PC-DAYS OPERATIONS DAY 24 19APR04 24APR04 DR-Y ML-Y OP PERATIONS DAY SH FT WEEKLY ROUTINE=
SHIF RWEEKLY 08:OOA 14:59 ORT3-N R-L RT
_a P~ppro ed tech spec ST - Resta CL not req d O
OP0215484 OP2 77 O-PC-028.1 TEST OF FIRE.
I 23APR04 23APR04 DR-N ML-N OP021 S4UTEST OF FIRF, EVACUATION AND 08:00' 08:59 ORT3-N R-L 021 EST OF FIR Pre-approved te 0 >
OP0215558 OP3 P 77 T-132 SODIUM BISULFITE 1
21APR04 21APR04 DR-Y MLVY OP0 1s555EODIUM BISU STORAGE TA1hK LOOP STORAGE TANK LOOP 16:00' 16:59 ORT3-N R-L 0
51555SODIUM BISLILF STORAGE TANK Pm-approved tech pec ST - Restart CL not req'd 1
OP0215869 OP3 _
77 O-PC-001.2 TIB MONTHLY 32 21APR04 25APR04 DR-N ML-N OP0 586 T I MONTHLY H NowEti-A&W HEATINGNENTILATION 16:00' 19:59 ORT3-N R-L 0 586 M-E A
P__e-approved tech pec ST - Restart :L not reqd O
OP0215549 OP3 77 O-PC-SWING OPS SWING SHIFT 49 21APR04 27APR04 DR-Y MLVY DPW s55
=
G SHIF WEEKLY ROUTINE WEEKLY ROUTINE 16:00' 22:59 ORT3-N R-L 0P 5 5
4 S
Pre-approved tech ST-Reslart7L not req'd 0
OP0215562 OP3 77 O-PC-045.2 RADWASTE HEAT 3
22APR04 22APR04 DR-Y ML-Y OP02155621PDWASTE HEAl TRACE AMPS LbG TRACE AMPS LOG 16:00" 18:59 ORT3-N R-L 0215562MMONTHLY RA WASTE SYSTEPI-
,P e-appmved tech pec ST -Restart,L O
OP0215624 OP3 i 77 O-PC-043.3 CLEAN SERVICE 32 22APR04 26APR04 DR-N ML-N 521. 01C OP0215624CLEAN SERVICE ' VATER STRAINERS WATER STRAINERS 16:W0' 19:59 ORT3-N R-L 0215 644
_P'e-approved tech pec ST - Restart bL 2
U2GNDR005 OP3 O-PC-021.3 DRAIN U2 MAIN I
22APR04 22APR04 DR-Y ML-Y 524 1U2GNDR00t3RAIN U2 MAIN LECTRICAL GEN)F ELECTRICAL 17:00 17:59 ORT3-Y R-L S
GENERATOR PER PC
_e21.3 Pre-approved tec i spec ST - Restat C 0
OP0215586 OP3 77 O-PC-083.8 VERIFY ANY OOS CONT I
23APR04 23APR04 DR-N ML-N OP02108655 ISOL VALVES ARE 16:00' 16:59 ORT3-N R-L 021558t Run Date 21APR0414:18l LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet4of5 0 Primavera Systems, Inc.
FL-52 Workweek Activities during U1 R28 1
50ANSURE1IP-10B &
i dITRAINAX4.16KVA Prol-approved tech si OP036'155A*NSURE 11 Pre-approvr P-118 ARE OPERATING ND 480 V SWITCHGEAR RELAY ec ST - Restart CL not reqd
-1A & 1P-11A AWE OPERATING
.16 KV AND 480 rev SWITCHGEAR I d tech spec ST - Restart CL not req L"
Run Date 21APR04 13:52l WorkActivity RiskAssignment I
Sheet I of 2 U
ACT WO GRP HPE EQUIPMENT ActIvlty Cal DUR START FINISH APR IDl ST RISK De wIMnon I, IHt 2
T Wed 28-,zTt 13 21; tgwt:l
(:
I
_?O 621 O
0 EM0309070 76 EM DR-Y ML-Y D0105 WEEKLY STATION BATTERY U
I 21APR04 21APR04 125V DC STATION BATTERY ORT3-N R-M INSPECTION 10:00A 12:59 09070 - BOSAI I
EM-BMFP-PJ 76 EM DR-Y ML-Y P-028B-M P28B PRE-JOB BREIFING U
3 21APR04 21APR04
]STEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M FOR MOTOR WORK 12:00 14:59 312035 - 128EM 0
EM0309134 76 EM DR-Y ML-Y D-106 WEEKLY STATION BATTERY U
3 21APR04 21APR04 125V DC STATION BATTERY ORT3-N R-M INSPECTION 13:00-15:59 309134 - BOSA1 1
EM-BMFP-11 76 EM DR-Y ML-Y P-028B-M P28B PREP WORK FOR 8
6 21APR04 22APR04 C==1OSTEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M MOTOR COVER REMOVAL 15:00 12:59 0312035 - 128EM 1
EM0305150 76 EM DR-N ML-N U1A-UV TEST UIA-UV RELAYS U
3 21APR04 21APR04 DWTRAIN A 4.16 KVAND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS 1RMP 9071-1 & 9075-1 16:00 20:59 0305150 - BOSAI I
EM0407695 77 EM DR-N ML-N SERVICE*
1SERVICE OBTAIN GREASE U
3 21APR04 21APR04 0MISC EQUIPMENT REPAIRISERVICE ORT3-N R-M SAMPLE 20:00-22:59 0407696 - 128EM I
EM0305155 76 EM DR-N ML-N U1B-UV TEST U1B-UV RELAYS U
3 21APR04 22APR04 OTRAIN 9 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS IRMP 9071-2 & 9075-2 22:00 00:59 0305155 - B05A1 1
EM-BMFP-01 76 EM DR-Y ML-Y P-028B-M P28B REMOVE OIL UNES 8
6 22APR04 23APR04 D==
STEAM GENERATOR FEED PUMP MOTOR ORr3-N R-M AND MOTOR COVERS 13:00 10:59 0312035 - 128EM 1
EM-BMFP-02 76 EM DR-Y ML-Y P-028B-M P288 INSTALL MOTOR 8
4 23APR04 23APR04 OSTEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M RIGGING EQUIPMENT 13:00 16:59 0312035 - 128EM Eiiil- _ _ -
2 IC0407898 76 IC DR-Y ML-Y LT-00935 LT-934/935 LEVEL 1
8 20APR04 21APR04
-34B SI ACCUMULATOR LEVEL TRANSMITTER ORT3-Y R-M DEVIATION 21 00A 19:59 0407 )8 - 1281C 1
MM-8480D1 76 MM1 DR-N ML-N R 1 MOVE REACTOR VESSEL 1
4' 21APR04 21APR04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-H HEAD TO RHLDA 13 00 16 59 0214134 - 128MM 1
MM-8480E 76 MM1 DR-N ML-N R-1 REMOVE UPPER INTERNALS U
4 22APR04 22APR04 WREACTOR VESSEL AND ASSEMBLY ORT3-N R-H 04:00 09 59 0214134 - 128MM 1'=
E __
I MM-8485B1 76 MM3 DR-Y ML-Y P-001B PLACE BACKSEAT U
I 21APR04 21APR04 REACTOR COOLANT PUMP ORT3-Y R.M COLLECTION SYS IN.
12:00 12:59 214119. 128MM.
1 MM-485K 76 MM3 DR-N ML-N P-001B P-B.I ALIGN SEAL U
1 21APR04 21APR04 DREACTOR COOLANT PUMP ORT3-N R-M COLLECTION TO CAVITY 20:00 20:59 0214119 - 128MM I
NGNDE18X NDE DR-N ML-N NDE-18 MINI-SUB 1
3 22APR04 22APR04
[0MINI-SUB INSPECTIONS PER NDE-18 ORT3-N R-M INSPECTIONS-INTERNALS 04:00 06:59 226EN 0
OP0215287 77 OPO DR-N ML-N O-IT-0007B IT-07B, P-32B SERVICE 2
2 21APR04 21APR04 32B SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 12:00 13:59 15287 - BOSAI 0
OP0215288 77 OPO DR-N ML-N O-IT-0007C IT-07C, P-32C SERVICE 1
2 21APR04 21APR04 0P-32C SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 14:00 15:59 0215288 - BOSA1 NMC / WE LT-81 HUMAN ERROR RISK BARCHART
_PBNPU1_Refueling_28________l_FL-81 HUMAN ERROR POTENTIAL C Prdmavera Systems, Inc.
PBNP U1 Refueling 28 Outage
Run Date 21APR04 13:53)
Work Activity Risk Assignment Sheet 2 of 2 U
ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH i
Ed I Mon 26.
27 ID ST RISK DescrIption ID
'I 021 22nt 026n21d 1121FI0.6 n21810,6 0
OP0215406 77 OPI DR-N ML-N O-IT-0016 rr-16, QTRLY FAIL-SAFE 4
1 23APR04 23APR04 OQTRLY FAIL-SAFE STROKE TEST OF AIR-OPERATED VLVS ORT3-N R-M STROKE TEST 00:W0 00.59 0215406 - B05At 2
OP0215032 77 OPI DR-Y ML-Y O-TS-010AB.1 TS-10AU2CAIRLOCK 4
2 23APR04 23APR04 U2 CONTAIR LOCKDOORSEALTEST ORT3-N R-M DOOR SEAL TEST 00:00-01:59 0216032 - B05A1 1
OP0305150A 76 OPS DR-N ML-N P-010B ENSURE 1P-108 & IP-11B 1
1 21APR04 21APR04 ITRAIN A4.16 KVAND 480 V SWITCHGEAR RELAYTEST ORT3-N R-M ARE OPERATING 15:00 15:59 0305150 - B05A1 1
RP1A-060 OPS DR-N ML-N O-RP-001A FILL CAVITY FOR ROD U
3 21APR04 21APR04 OFILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A)
ORT3-N R-M UNLATCH 15:00 17:59 1280P 1
OP0305155A 76 OPS DR-N ML-N P-010A ENSURE 1P-i1A & IP-11A 1
1 21APR04 21APR04 OTRAIN B 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M ARE OPERATING 21:00 21:59 0305155 - BOSAI 1
RP4A-020 OPS DR-N ML-N O-RP-004A UNLATCH CONTROL RODS U
4 21APR04 22APR04
[UNLATCH CONTROL RODS (RP-4A)
ORT3-N R-M 22:00 01:59 1280P NMC IWE LT-81 HUMAN ERROR RISK BARCHART P S I PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL O Prlmfavera Systems, Inc.