Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda MondayApril19, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Une Supervisors Agenda
- 1.
Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Work Activity Risk-Manager Assignment (SOM)
- 10. Management Expectations (SSM)
- 11. ACEMAN Assessment Results (SOM)
- 12. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Work Activity Risk Assignment Information in this record was deleted n accordance with tpe Freedom of Information Act, exe/ Ptions 4(
01 A.
Site Communication Revised 4/12/04 Priorities:
- The Safe Operation of Unit 2
- Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1It Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities
- SG Eddy Current and Sludge Lancing
-Main Turbine and Generator Work
-Rx Vessel Head Inspection
-Hx Hydro Lance and Eddy Current 3Pt Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
Outage Briefing Schedule - NSB Cafeteria:
Day Shift Night Shift Activity 0600-0640 1800- 1840 OCC Turnover"**
I0645 - 0725 l 1845 - 1925 Supervisor Communication of 0CC Turnover to Work Force 0730 - 0800 l 1930 - 2000 l Supervisor Feedback to OCC of Turnover to Work Force
- Outage Briefing Schedule Notes:
The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.
Attendance will be taken at the OCC turnover meeting.
It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
- Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.
Additional Changes:
- Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
- A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
2
Management Expectations (4/19/04)
Avoid calls to the Work Control Center (WCC) during the 0645 - 0715 and 1845 - 1915 timeframes to allow for an uninterrupted briefing of WCC staff.
A "Daily Turnover Expectations" file drawer has been established in the Outage Control Center. The file contains folders for. each day of the week. Each folder contains the ACEMAN results, expectations, and other pertinent communications for that day.
3
Date: April 19, 2004 From: Shift Outage Manager - Days q
The stations current outage priority is to perform tasks that directly support returning the station to "Green" condition for"Core Cooling" and "Inventory."
The station recently placed a hold on release of additional outage activities until such time as we have exited yellow conditions on Unit 1 and have an approved outage schedule. This hold was put into effect to ensure that outage planning resources could be devoted to outage schedule development and review activities.
While the general hold on the release of additional activities remains In effect, it would be prudent to continue releasing activities on a case-by-case basis. OCC will control the release of those activities using the "Process for Commencing Scheduled Outage Work Activities on Unit 1 and Common Systems (Revision 2 - 4/111/04)" checklist. This memo describes the process for work release methodology going forward. This memo does not affect previously released activities nor the Unit I R28 Turbine activity release process.
Approved:
13 41% XL:
1 4
10 Date: __
Senior Management Representative 4
To:
U1R28 Shift Outage Managers From: Senior Management Representative Date:
April 19, 2004
Subject:
Work Prior to and During Outage Briefing The following change is being made to improve efficiency on long duration jobs and critical path activities.
For crews that have a shift turnover before the scheduled OCC interactive turnover it is acceptable for the crews to begin work before receiving the OCC turnover brief provided the following conditions are met:
- The on-coming supervisor has received a Senior Management interview for the job.
- The on-coming individuals have been pre-job briefed on the scope of the job and performance expectations.
- If the job is being worked both shifts the on-coming crew has received a turnover brief from the previous shift.
- The crew would break at 0645 (1845) to receive the OCC interactive turnover briefing. For critical path jobs this briefing can be scheduled at a convenient time by the supervisor.
Application of these guidelines specifically for the ongoing activities to repair the polar crane has been discussed with Senior Plant Management.
Approval is granted for application of these guidelines to the ongoing activities to repair the polar crane, which is critical path to exit the existing yellow Shutdown Safety condition. Additional discussion will occur on day shift today to obtain consensus for general application of these guidelines.
Approved:
pC %AJ S-A Datee:
Print Sign.
Senior Management Representative J/SharedData/Common/OCC/RI 28 5
Nii Comnmitted to Nuclcar Ercellcnca r BEIrTH
.useM Point Beach Nuclear Plant U1R28 Refueling Outage
',g4$"5~
~I';
1(-w.t af.nW"h~bifA;iI I 24 A+ s-.
Theme for the week This week's theme Is Outage Reminders. An outage puts tremendous stress on all individuals Involved.
This stress Is an accumulation of several factors Including long work hours, poor nutrition habits, schedule adherence, unanticipated events and other Items to numerous to mention. We must all remember to take care of each other, our families and ourselves during this time.
Dally Safety Snippets Sunday "Remember to use STAR and you will shine" STAR is an acronym we can rely on to keep us on track for a successful outage. Stop - Think - Act and Review It Is as simple as that.
Monday "Three way communication is a key communication tool" "I understand Three way communication Is a key communication tool" "That is correct" Three way communication is not just a good idea It Is a great process that we can use to clearly define the message sent was in fact the message heard. Hold each other accountable for the use of this practice and soon It will become standard.
Tuesday "Avoid and recognize error likely situations Distractions and Unfamiliar tasks are just two of the 6error likely situations that we could encounter of a daily basis. As an example of the consequences of this error situation, consider what happened at Calvert Cliffs in January 2004. Three workers, one being a student employee, were sent to empty salt from a dump truck. The two experienced workers were called away, leaving the student to finish. He brushed salt off an auger with his hand when his hand was caught a pulled Into the machine.
Wednesday "Follow the schedule or risk dancing with the devil (or Shift Outage Director)"
OE17554-October 2003 Quad Cities -Whie performing scheduled cleaning in the condensate demineralizer, the crew noticed the atmosphere had become hazy. Upon exiting the space they found out welding was going on In a nearby heat exchanger and the turbine building ventilation was shut off for work.
Following the schedule helps to prevent such competing activities.
Thursday
'Be educated-not medicated' Is the outage giving you a headache? Remember many people suffer serious side effects from the use of aspirin, laxatives, cold remedies, vitamins, herbals and diet aids. Misusing the product - like using too much, often causes reactions. More Is not necessarily better. Recommended dosages are determined by the amount needed to achieve the desired effect without causing other problems.
Friday "If the heat is making you sick, get out of the area quick."
OE1 7082 - September 2003 Fort Calhoun - RP technician working the In the lower cavity started experiencing heat stress symptoms. Rather than stopping the job and exiting the area, he decided to continue. The result was an ambulance ride to the local hospital of a contaminated worker. Do we all remember the signs of heat stress?
Saturday
'Only fools would not use their error reduction tools" A reminder to use your error reduction tools for every job and every task, these include: Co-worker coaching, challenging Information, peer checking, place keeping and procedure use and adherence to name lust a few.
6
Y Point Beach Nuclear Plant Outage I R28 DAY Supporting Operational Excellence Outaie Radiation Performance Path Ni,_
1 Picture Meets 15 Doesn't Meet Exceeds II 3-_
Nom3l SI ES 11 This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
25.017 Rem IDay 15 -April 18 Actual = 0.507 Cumulative = 25.017 Cumulative Forecast = 51.394 Meets: <=18 Exceeds: <= 12 Actual PCE's:
5 11-4 SI6 M
.6-0 Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 16 i 14 12 i; 10 U0 t5s8 286 7
4 2
0 i
.I
,I
.1 I.
. I I. l
---+Actual
--Forecast Goal E
S U)0 0
0 I
s-o-60 4D 0
2 4
6 8
10 12 14 18 18 20 22 24 26 AActual Goal 0 2 4 6 8 10121416182022242628303234
NMC Commimted lo Nuclear Excellence
^P
.7 Outage Status Report Plant:
Point Beach Unit I Day:
Monday Today's Date/Time:
4/19/04 1600 Outage Duration: Day 16 of 28 Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage 1
- Summary.
- Pending OSHA Injury-Back Strain Radiological Dose outage to date 25.017 Projected to date 51.394 Outage Goal S75 R Difference
-26.377 Number of PCEs S
Summary Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Mode:
] Hot Standby (Mode 3) 0 Hot Shutdown (Mode 4) 0 Cold Shutdown (Mode5) s Refueling Shutdown (Mode 6)
RCS:
Temperature:
97 Pressure:
Vented to Atmosphere RV Level:
75%
Time to Boll:
46 Minutes r
' _R'
i
-Z 7.4,-: hu ow Sit4
- '
.. !..el ":
V Al
f'." " -.'
IS I
A-14a "I I "'
U gs
.45
- .'.' I Reactivity
Green Core Cooling:
Containment:
Green Inventory:
Yellow Power Availability:
Green Yellow Spent Fuel Pool Cooling:
e nfProte IedEc p
i-t:i
.f:,
t -,';
I
- Z-13 Polar Crane Main Hoist Retum to Service Schedule:
Activities Required to Exit Yellow Risk Conditions
- IT-300B "B" SG Main Feed Check Valve Testing
- 1) Reactor Vessel Head Stud Rack Removal Portion
- 2) B RCP Motor Move
- 'A" SG Hand Hole Removal
- 3) Install Cavity Seal Ring
- 4) Reactor Vessel Head Lift
.1..
it2' t..
~S,'-,4
_:t5,;^:fi'"r A'
'c'
-. 'tsta n' s'u "9W fi'"4
- '¢
- t j
Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4n20/04 Scott Manthei 4/04/04 iP2A Charging Pump Troubleshooting 4/23/04 Clay Hill 4/08104 Incorporate Lessons Learned from Is Reduced Inventory Orange Path 4/20/04 Dave Dyzak
.1.
I I
t4_er. :
I- t
-."t"
.;- -!,z '.'-
A
-1 :'
''!
" '4 1
M4 ;.Wt
- SrhAt t
...-"r __
.... _... I ~.+.
r....
I -... -
rv-
..--' '. v -.. w-__-S_-
v---... -.-..
.....-... -. I...... -
Schedfuled l
Aciual
=... Scheduled 7
Actual Date I Time Date 7 Time
]
- Date, n ime 7 Date
. Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup>200 0 4/2 5 /0 4 09 00 Head Lift 4/09/04 0900 Initial 4/28/04 r 7r Refueled 414/04 0300 On-Line 4/30/04 0100 7 8
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 19, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EOUIPMENT:
CŽOMMENTS:
Fire Protection Condition III: Crediting existing'fire rounds as fire prevention contingency RCS Time to Boil is 46 minutes RCS is at 75% Reactor Vessel level Hot leg vent path Is the removed Pressurizer manway PBr-1562 Revision 2 10/30/02 Page% of 9 Rcfeences: NP 103.6 NP 10.2.1
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 19APR04 12:00 U
I RESP WO WO EQID I
DESCRIPTION RD ES EF RISK APR 15_1_21_Q l
11 0,2110,3
__9 12115.18_210_
__3_Q.
0_
_2_1_
1 q
I NG26TFC2ND NOE 77 0301897 IST-SISI NDE FOR FAC PROG -
TUR8 HALL 26 FT GEN AREA 20 05APR04 07:00A 20APR04 11:59 DR-Y ML-Y ORT3-Y R-L gg O F PROfl
- SECON, I
NG08TFC2ND NOE 77 0301897 IST-SISI NDE FOR FAC PROG -
5 07APR04 19APR04 DR-YML-Y TURS HALL 8 FT GEN 08:0OA 16:59 ORT3-Y R-L AREA G08 ND19DE F 8ONDARY I NDNDE F
PECTIONC TUR8 HA 26 FT GE?
ICE INSPE 8FTGEN 1897 26 FT OVI
-REA
_ j1N030181 JEA D
17 1
NG26TFCIND NOE 77 0301897 IST-SISI NDE FOR FAC PROG -
TURB HALL 26 FT OVERHD 30 08APR04 21:OOA 20APR04 23:59 DR-Y ML-Y ORT3-Y R-L I -
I -
I 4
_ _^ n,^nvsBr ICE INSPEoN03018' I
104.25N36 ICS 76 0300838 ICP-04.025 ICP4.25NIIRN-36CAL 4 09APR04 19APR04 DR-Y ML-Y 05:OOA 15:59 ORT3-N R-L t
WIN mwo ICP4.25H LEAR INS 3SCs66e I N-36 CAL UMENTATl IALVE LE SYSTEM NG BY, R rNU rERMEDIA AIR RANG03DU
~1 IS18 Is 1
MM0303383 MMV 76 0303383 SC-00966B SC-966B - VALVE LEAKING BY. REPAIR 20 09APR04 I 1:00A 22APR04 10:59 DR-Y ML-Y ORT3-N R-L G994! ICI2I4Pi-RE 311ACE EXTF
- ON BEL IWS (NIGh
-- 4.
+-4.-I 4
.4.
-4 4
4 I
TG9949102N TGG 76 9949102 TG-01-T1 LP1-REPLACE EXTRACTION BELLOWS (NIGHTS) 48 13APR04 00:OOA 24APR04 00:59 DR-Y ML-Y ORT3-Y R-L A
I!
A i I-_
-I.
4-4.-4.
4
.4.
4.-I
.2ANERGtZ kND CAL U ERHEADI PECTION IUIPMENT L
CE-1600-20 CE8 76 0213472 R-1 ENERGIZE AND CAL UNDERHEAD INSPECTION EQUIPMENT 26 13APR04 02:OOA 22APR04 03:59 DR-Y ML-Y ORT3-Y R-L I-I I
4inn(1 bCTOR VES I__.
C'ERFORM *il' SPINDLE 1
TG-30470 TGG 76 0302153 TG-01-T PERFORM HP SPINDLE ROTOR BORE INSPECTION-PT2 15 13APR04 09:OOA 20APR04 16:59 DR-Y ML-Y ORT3-Y R-L ITOR BOR H PRESSI m1ON BEL NSPECTIC TURBINI MWS (DAY!
PT2 02153 nT2 S9941 It
-I
.4.-I-------I 4
.4.
L.....-L
£
TG9949102D TGG 76 9949102 TG-01-T1 LP-REPLACE EXTRACTION BELLOWS (DAYS)PT2 45 13APR04 09:OOA 23APR04 16:59 DR-Y ML-Y ORT3-Y R-L
+
II
+
+I I
aSUP IRiPROVII E CRANE. RI
.ER. AND rcOLROOM it PPORT(PT
-
4 4
4.-I 4
4 1
TGSUPPORT ITGG TG-O1.T PROVIDE CRANE.
RIGGER. AND TOOLROOM SUPPORT(PT2) 237 13APR04 09:00A 03MAY04 08:59 DR-Y ML-Y ORT3-Y R-L I
1 TG0302134 TGG 76 0302134 MS-02027 MS-2027 - OVERHAUL 5
13APRW4 19APR04 DR-YML-Y RH STOP VALVE-2 12:OOA 16:59 ORT3-Y R-L 4US-2027 TURBINE IAERVICI VERHAUL 3HT HAND IAINT SUPI ISTOP VA OP030213 RT.E VEI
!EPT2 YING 1
IC0400553A IC1 76 0400553 SERVICE SERVICE MAINT SUPPORT-EQ VERIFYING 34 14APR04 09:OOA 23APR04 13:59 DR-Y ML-Y ORT3-Y R-L
_l Y
_or I
- 4.
3
.4.
L.......L 3
1 I
EM0407780 EM 76 0407780 Z-013 Z-013 PERFORM TROUBLESHOOTING AND REPAIR 5
14APR04 19APR04
.DR-Y ML-Y 13:OOA 16:59 ORT3-N R-L re-ap rdl red tech sp
-Z013 PE NTAINMEP ST-Resta ORM TROI CRANE040
'I
- L not recd
..ESHOO11
'AND REF R
l I
I I
l Run Date 19APR04 13:35l LT-51 PRIORITY PUBLICATION-ES Shoot 1 of 19 C Prlmavera Systems, Inc.
FL-50 Priority Working PublIcatlon l
after 19APR04 12:00 U1R28 WORKING SCHEDULE after 19APR04 12:00 U
ID RESP SO WO EQID DESCRIPTON RD ES EF RISK 2
APR.
ST I
I
_-192.15.18.21l 0.*3Q.
H 2,°215,18,21i 0 3. 6. 912.lt.1581211 0.*31 p
.*902.1-2 0
EM0304877 EM 76 0304877 A52-DHVR-1 BREAKER MAINTENANCE 1200-14 8
14APR04 19:00A 20APR04 22:59 DR-Y ML-Y ORT3-N R-L 10304"REAKE qoAINTENAt 4
q p ;
.q L~ 12 0-14
_-_.16 K\\ '1 Inn AILRD UtFH i
i
- p 42-1 RC
ACTOR CC
'14 IUM BREi ANT FLO%
K ER0304877 RANSMITT 1
IC42-1-1 IC2 76 0300959 11CP-04.00 ICP 4.2-1 RCS FLOW XMTR CAL RESTART (INC F&V) 10 14APR04 22:OOA 21APR04 04:59 DR-Y ML-Y ORT3-Y R-L
.2.1l FLOW XM
__ -.- I 414 0302 t ;T5-2134 R OCATE SVni CH 1
IC0302376 IC2 76 0302376 TS-02134 TS-2134 RELOCATE SWITCH 40 14APR04 22:OOA 24APR04 04:59 DR-N ML-Y ORT3-Y R-L 5.52-'
P5.52 SE(
-i 4-4-4 4
4
-t I I IC5.52-1 1C2 76 0300872 ICP-05.052 ICP 5.52 SECONDARY TEMPERATURE INST 40 14APR04 23:OOA 22APR04 20:59 DR-Y ML-Y ORT3-Y R-L II
___*1 I -
I
I I -'
ii -
III -
iii U ffi 1
MM0301145 MMI 76 0301145 HX-015B5 HX-15B5, CFC COIL 10 15APR04 20APR04 DR-Y ML-Y INTERNAL 02:OOA 02:59 ORT3N R-L INSPICLEANING 1
MM0301146 MMI 76 0301146 HX-015B6 HX-015B6-CFCCOIL 10 15APR04 20APR04 DR-Y ML-Y INTERNAL 02:OOA 02:59 ORT3-N R-L INSP/CLEANING 1,MM031148 MM1 76 0301148 HX-015B8 HX-1588, CFC COIL 10 15APR04 20APR04 DR-V ML-Y C
INTERNAL 0200A 02:59 ORT3-N R-L INSP/CLEANING MO3 M02t eV15H5B5
_~C 16".0158 Cc 8ew.1SB8 Cc F1w1lB1@
I FC COIL I AINMENT CFC COIL AINMENT1 FC COIL Il AINMENT PECT ANC S
'RNAL INS
- CIDENT R TERNAL I
,CIDENT R
- RNAL INS CIDENT R LU8RICATI
'LEANING IRC HEAT
'/CLEANIN IRC HEAT
'LEANING IRC HEAT kN BEARII NMENT At FRNAL IN' TOR COO
.SIDE) 09
-1 SHIFT
- CHANGEF
- CHANGEF
- CHANGEF S
[DENT RE(
ECTION 1G COILD2
_r m
101145 101146 101148 CULATION D84 1
MM0214171 MMI 76 0214171 W-001BI W-IBI. INSPECT AND LUBRICATE FAN BEARINGS 20 15APR04 02:OOA 21APR04 00:59 DR-V ML-Y ORT3-N R-L u.
_I 1_.
_CON.
1 MM0214064 MM1 76 0214064 HX-0158 HX-15B, MOTOR 10 15APR04 19APR04 DR-Y ML-Y COOUNG COIL 10:OOA 23:59 ORT3-N R-L INTERNAL INSPECTION I
TGHX22BRP TGG 76 0302109 HX-022B MSR B INTERNALS 5
16APR04 19APR04 DR-Y ML-Y REPAIRS (SHELL SIDE) 08:OOA 16:59 ORT3-Y R-L
~
a "I
mo
- M.15B, NW.1B' RPMSR B I ISTURE Si 6EDDYCC OTOR COC CCIDENT F ERNALS F ARATOR R LENT TEST 4G COIL I!
'IRC FAN I
'AIRS (SHI EATER03O TEAM GEN 1
EP0301956 EPT 76 0301956 HX-001A EDDY CURRENT TEST STEAM GEN A - 1 SHIFT 54 17APR04 07:WOA 24APRo4 15:59 DR-N ML-Y ORT3-N R-L
_:LL l l l nL_
P0301 7EDDY CL C.ENT TEST EAM GEN B -t SHIFT
_ =
=
1 EP0301957 EPT 76 0301957 HX-001 B EDDY CURRENT TEST STEAM GEN B - I SHIFT r _
54 17APR04 07:OOA 24APR04 15:59 DR-N ML-Y ORT3-N R-L
- I.
I I
l
-4 4-4 4
1-1 MM0301147 I MMI 76-1 0301147 HX-01 5B7 HX-015B7 - CFC COIL INTERNAL INSPICLEANING 4
17APR04 19APRO4 I DR-N ML-N 13:00A 15:59 ORT3-N R-L i7HX-0153 ITAINMEN CFC COIL CCIDENT I rERNAL.It
'IRC HEA is 'ICLEAND XCHANGE aI I ~301147 Run Date 19APRo4 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 2 of 19 O Prlmavera Syhstem. Inc.
I FL-50 Priority Working Publication I
after 19APR04 12:00 U1R28 WORKING SCHEDULE j
after 19APR04 12:00 U
ID RESP WO WO EQID DESCRIPTION
_RD ES EF IRISK A
21 22 E._I j_-
__S RS
=
1 TG-30540R TGG 76 0302153 TG-01-T PERFORM REPAIRS TO HP BLADE RINGS 10 17APR04 14:OOA 20APR04 11:59 DR-Y ML-Y ORT3-Y R-L jaqWPERFOR'IEPAIRS T?,VP BLADE,RrGS ldHIGHPRIl_
.__t l
t r
i P0311 gHX-21 B - _t
_.=
A____A 1
EP0311889 EPT 76 0311889 HX-021B HX-21B - EDDY CURRENT INSPECT 55 LP FW HEATER 22
_A 17APR04 14:00A 20APR04 13:59 DR-Y ML-Y ORT3-Y R-L DY CURRE 1HPI EDDY CUR rINSPECT
'DWATER NT REVIE UKUIN-UJUKil
-r I UFW H ATER 5BI RERUN P0381 s^H01)
-4.
4-+-
+
4 4---4 1
EP0301963A EPT 76 0301963 HX-021A I HX-021A-EDDY CURRENT REVIEW/RERUN 24 17APR04 14:OOA 20APRD4 15:59 DR-Y ML-Y ORT3-Y R-L TER 1889 301963 ION U302148 3
le 1*1 1E
_H
_HT WEEDWATS IHEATER 58 r
.E,
- r._.. _.. _
1 TG0302148 TGG 76 0302148 T-029 T-029 - H2 DRAIN REG 14 17APR04 20APR04 DR-Y ML-Y TANK INTERNALS 21:00A 01:59 ORT3-Y R-L.
_INSPECTION I10 T-029 - H WHYI 4P-028A -
RAIN REG
- GEN SIDE
)NTINUE C LNK INTES RAIN REG RHAUL M LS INSPE ATOR TA I FEED PL 1
MM0306054 MM2 76 0306054 P-028A P-028A - CONTINUE OVERHAUL MAIN FEED PUMP 85 18APR04 11:OOA 27APR04 16:59 DR-Y ML-Y ORT3-N R-L
]
_r
I -
I iiim ii. -
i a mm
_r r _
1 CE300872SI
- CE4 78 0300872 ICP-05.052 BUILD SCAFFOLDING 2
18APR04 19APR04 FOR DTS-2282A SOUTH 22:WOA 22:59 t.
01124-20 OPS HX-001B DRAIN B SIG 16 19APR04 20APR04 DR-N ML-N COMPLETELY 04:OOA 03:59 ORT3-N R-L E300E
- 1124v 4-4 iLSBUILD S MNSECO?`
RAIN B S/
IDPS-593 LFFOLDINC kRY PLANT OMPLETE 4STALL St 3R DTS-Z
=MPERATI 3BERS w __
A SOUTH E INSTRUI ENTS03008 2
1 IC9944161 IC5 76 9944161 DPS-05933 IDPS-5933 INSTALL SNUBBERS 71 19APR04 07:OOA 26APR04 12:59 DR-Y ML-Y ORT3-Y R-L I - I i
- i I -
aIm
I I I 1
TG-30615 TGG 78 0302153 TG-01-T PERFROM REPAIRS TO 6 19APR04 19APR04 DR-YML-Y CYLINDER BASED ON.
09:OOA 17:59 ORT3-Y R-L INSPECTION I
I
_ 1.
'ERFROM GH PRES' Sg1CS-COO
.PAIRS TO IE TURBIN ki.
F22MYc
'LNDERE 302153 ONNETLE 4
_ l l
- ED ON IN F
- CTION 1
MM0213109 MMV 76 0213109 CS-00038C 1 CS-00038C BODY TO BONNET LEAK 17 19APR04 09:OOA 21APR04 14:59 DR-Y ML-Y ORT3-N R-L
.n m1 U
.i r
4RAIR.C CK CLG FLC I
TGHX2ZARP TGG 76 0302108 HX-022A MSR A INTERNALS 3
19APR04 19APR04 DR-Y ML-Y REPAIRS (SHELL 10:WOA 14:59 ORT3-Y R-L
- M030, jpMSR A I TLURE SEP rIMS-203 ERNALS F ATOR REI VALVE LE
'AIRS (SHI kTER0302 S BY, RE!
SIDE)PTn ID VALVE 1
MM0304279 MMV 78 0304279 MS-02037 1 MS-2037 - VALVE LEAKS BY. REBUILD VALVE 28 19APR04 10:OOA 23APR04 11:59 DR-N ML-N ORT3-N R-L I *I I
II
- 4.
4 4-4
+
4 I
IC5.73A-1 IC1 76 0300878 ICP-05.073 ICP-5.73 T-34A ACCUMULATOR LEVEL XMTR'S RESTART 4
19APR04 I 19APR04 I DR-Y ML-Y 11:OOA 15:59 ORT3-Y R-L
- P-5.7
- AI WPI;C
-34A ACCI UMULATO taknment G ULATORI
.EVEL TRI 5ral Area IV
'EL XMTR MITTERS tenance IESTART Run Date 19APR04 13:35 LT-51 PRIORITY PUBLICATION-ES Sheet 3 of 19 C Prlmavera Systems, Inc.
I FL-50 Priority Working Publication
after 19APR04 12:00 UlR28 WORKING SCHEDULE after 19APR04 12:00 I._
APR U
ID RESPl WO WO EQID DESCRIPTION RD ES EF RISK ST 20 21 1.211 0.3 lq.Q9 12.l5,81021 1. 3 &6.92 12.15_.81.2 1 0. 3 gq. 9d121 1
MM0214147 MMV 76 0214147 STEAM-TRAP INSPECT ANO REPAIR 9
19APR04 20APR04 DR-N ML-N IP-29 STEAMTRAPS 11:OOA 13:59 ORT3-N R-L 1
IC5.54-1 IC5 76 0300874 ICP-05.054 lCP 5.54 SECONDARY 70 19APR04 26APR04 DR-Y ML-Y LOW RANGE 11:OOA 11:59 ORT3-Y R-L PRESSURE RESTART 1
IC5.47-1 ICI 76 0300867 ICP-05.047 SECONDARY LEVEL 178 19APR04 07MAY04 DR-Y ML-Y CONTROLLERS AND 1 1:OOA 09:59 ORT3-Y R-L SWIT 1
IC0302099 IC1 76 0302099 LC-02514 LC-2514 REFURBISH 150 19APR04 07MAY04 DR-Y ML-Y 11:OOA 11:59 ORT3-Y R-L 1
IC0305085 IC1 76 0305085 LS-02376 1LS-2376 SMALL 150 19APR04 07MAY04 DR-Y ML-Y STEAM LEAKON LVL 11:00A 11:59 ORT3-Y R-L SW 1
ICLS3579 IC1 76 0300898 LS-03579 DISASSEMBLE, CLEAN 150 19APR04 07MAY04 DR-Y ML-Y AND INSPECT LEVEL 11:W0A 11:59 ORT3-Y R-L INSTRU 1ICLS3580 IC1 76 0300899 LS-03580 DISASSEMBLE, CLEAN 150 19APR04 07MAY04 DR-Y ML-Y AND INSPECT LEVEL 11:00A 11:59 ORT3-Y R-L INSTRU 7
ICLS3581 IC1 76 0300900 LS-03581 DISASSEMBLE, CLEAN 150 19APR04 07MAY04 DR-Y ML-Y AND INSPECT LEVEL 11:C0A 11:59 ORT3-Y R-L INSTRU 1
ICLS3582 IC1 76 0300901 LS-03582 DISASSEMBLE. CLEAN 150 19APR04 07MAY04 DR-Y ML-Y AND INSPECT LEVEL I 1:95A 11:59 ORT3-Y R-L INSTRU 1
OP0300934 OPS 82 0300934 RC-00508-O RC-508 PMT STROKE I
19APR04 19APR04 DR-Y ML-Y PER IT20 12:00-12:59 ORT3-N R-L I
OP0403304 OPS 82 0403304 CC-007548-CC-754B PMT STROKE I
19APR04 19APR04 DR-Y ML-Y PER IT-250 12:00 12:59 ORT3-N R-L 1
T-8321-R WCC 0018321 KEYWAY 1 FM KEYWAY VBE-448 I
19APR04 19APR04 IC REVID1 12:00 12:59 JSPE ANDREPA*
=In.
MmNr IP 5.5 ECONDAI LOW RANI IE FTRAPS STEAM Tl PRESSUF PS RESTART 9
§ I
1_I_
II
=
~
I I
ECON DkRY LEVEI ONTROLLI.F S AND SVW t
_L 14I-I§~I 1_
e I
C-251 'I tEFURBISI
-
9 11' i-
4-Hm LS-23 !6 AM LEAK 0 VL SW SMALL SI 1+
1 1-1-.. I I 11 C,
i
. I
,A ISAS!
ABLE, Cu 4 AND INSI
.T LEVEL NPTRU r I, I,, I I.
ISAS! EINBLE, CLE 4 AND INSI T LEVEL I ITmU I_
_~I ISAS' ABeLE, CUJ 4 AND INSI
.T LEVEL N 3TU I
7 i
I i !
i FAM 11M
[SAS' e ABLE CcU 4 AND INSI BT LEVEL N3TRU
_I II II IJ U
P0301 8321-1iFM 8380.
4RC-508 F ACTOR M?
?VWAY VB CW RMP UP 9155-2 STROKEI EUP WATE IT STROKI MOV OPE VBE-4481 481C REV 5-2 CE RE REVO-1 oc i =s R IT 20 UPPLY 0 ER IT-2S0 TOR0403:
REV0N1 0018321
.1 380 i
il RATOR03I
'34 1
T-8380-R WCC 0018380 RMP 1 CW RMP 9155-2 CE REVO-1 I
19APR04 I 19APR04 I DR-Y ML-Y 12:00 12:59 lORT3-Y R-L
A I.=J.L
.2.1 Run Date 19APR04 13:35 LT-51 PRIORiTY PUBLICATION-ES l
Shoot4of19 a Pdrfmera Systems, Inc.
I FL-50 Priority Working Publication
after 19APRO4 12:00 l
U1R28WORKING SCHEDULE after 19APR04 12:00 ID RES WO EQID DESCRIPTION RD ES EF RISK I2APR ST
_____I_22 0. 3 9_.
,__0 2
WP2004-20 OPS PPCS INMATE OPS WORK PLAN 2002-020 TO MONITOR PPCS 1
19APR04 12:00 19APR04 12:59
. 01-1 OP0306893 OPS 82 0306893 MS-02082-M IMS-2082-M PMT 2
19APR04 19APR04 DR-N ML-N STROKE PER IT-8A 12:00 13:59 ORT3-N R-L 1
OP0306895 OPS 82 0306895 AF-04001-M IAF-4001-M PMT 2
19APR04 19APR04 DR-Y ML-Y STROKE PER IT-8A 12:00 13:S9 ORT3-N R-L 1
T-7712-R WCC 0017712 HX-046A 1 CS HX-46AIB MM 2
19APR04 19APR04 DR-Y ML-Y REV0-1 12:00' 13:59 ORT3-N R-L I
T-8447-R WCC 0018447 TG-01-T 1 TU TG-01-T REV6.03-1 2 19APR04 19APR04 DR-Y ML-Y 12:00 13:59 ORT3-Y R-L 1 EM-BMFP-W1 EM 76 0312035 P-028B-M P288 WALK-DOWN 3
19APR04 19APR04 DR-Y ML-Y TAGS 1 CS P-28B EM 12:00 14:59 ORT3-N R-M REVi-l I
T-6556-R WCC 0016556 HX-21A 1 CS HX-21A EPT 3
19APR04 19APR04 DR-Y ML-Y REV0-1 1200 14:59 ORT3-Y R-L 1
CE3008695I CE4 76 0300869 ICP-05.049 BUILD SCAFFOLDING 8
19APR04 19APR04 DR-Y ML-Y ICP 5.49 SEC CONTROL 12:00' 21:59 ORT3-Y R-L VALVES 1
T-6829-H WCC 0016829 HX-001B 1 CS FEEDLINE B 8
19APR04 19APR04 DR-Y ML-Y DRAIN OPS REV0-1 12:00 21:59 ORT3-V R-L 1 NG-SGX-ASL EPT 78 0301939 HX-W1B OFFLOAD S/G SLUDGE 10 19APR04 19APR04 DR-Y ML-Y LANCE EQUIPMENT 12W00 23:59 ORT3-Y R-L i
MM0306449 MM1 76 0306449 HX-015B1 HX-015B1, CFC COIL 12 19APR04 20APR04 DR-N ML-N INTERNAL 12:00 01:59 ORT3-N R-L INSP/CLEANING 30 IP-2 r304 iP-:
12.
1l C
- 1447, 1 T1 S1 NWP:
1i NINmATE 31MS-208; FP OVERS 51AF-4001 AFP DISC CS HX-4&
X-46A/B M TU TG-01 G-01-T RE W1P28B V
~M
El Loop I P; 5g1 -0158 COl
IGE 1HX-1 I MM REVC REVO-1 001 IEVS.03-1 03-1 00184 LK-DOWN CR FEED F
- PT REVO.0 IEV0-1 001 FFOLDINC lY PLANT E B DRAIN LINE B DR l G SLUD
- ENERATC General IV CFC COIL UNMENT,
REPACKI L WN 2002-02,by (E PER IT.
lOR03068
,E PER IT-8 3G INLET I 12 GS I CS F AP MOTOF
- P 5A9 SE iNTROL V/
PS REV0-1 I OPS RE%
! LANCE E 1301939 itenance rERNAL 1?
'IDENT RE MVE SR LC-251
'RESS CAI
.2 6
! MONIT ILATION M, 1B EM REV 412035
'ONTROL1 PES030086 10016829 NPMENT
'ICLEANIN RC HEAT E PPCS
)4306895 1i+
16449 3 RACKS P Fj I
'LVES HANGERI KON0216 Ln M
JI x
I MM0216659 MMV 76 0216659 FD-00288D 1FD-288D -REPACK VALVE 6
19APR04 12.00 20APRC4 10:59 DR-N ML-N ORT3-N R-L N
pm* HX-2211 I
.OWER IS0L
=
l
^
LVL AND F :ST STAGI I
IC4.IJ IC1 76 0300831 ICP-04.001 PZR LVL AND FIRST STAGE PRESS CAL 16I 19APR041 21APR04 12:00 07:59 DR-N ML-Y ORT3-N R-L I.,
W I
1 "RPISAFEGU q nua jUmm
-JJ J
J__
~.
I.J.....
L.L_
_JL__
IL_
Ii Run Date 19APR04 13:351
. LT-51. PRIORITY PUBLICATION-ES
.Shoet 5 of 19 O Prlmavera Systems. Inc I
FL-50 Priority Working Publication
after 19APR04 12:00 U1R28 WORKING SCHEDULE I
after 19APR04 12:00 Uf RESP WOI WO EQID T DESCRIPTION IRD ES EF RISK A R 20 2122 Fl~~~~~102.15j1p 21T 0 *310 *9 15121 0.31 912,151P1O.3
.9125 I
1C5.49C
'CV 76 0300869 ICP-05,049 ICP 5A9 CS-2273 11401 19APR04 103MAY04 DR-Y ML-Y ORT3-Y R-L 5.4.g~PS9 CS42t'3 HEATE" OYPASS I
HEATER BYPASS 12:00-11:59
- i.
4 4-I CE300872SA CE4 76 0300872 IC&P--05.052-BUILD SCAFFOLDING FOR DTS-2282A NORTH 10 19APR04 13:00-20APR04 00:59 I
I __
UDl C
.FFOLDIN I -OR DTS NO g SEC DARY PLA t TEMPERA IRE INSTR ENTS030 8'2 G030 TUR IE CRAWL nIROUGH I S ECTION E
UULP2 LW PRESS l 'E TURBINE 5
__A 1
TGO302155 TGG 76 0302155 TG-01-T2 LP2 TURBINE CRAWL-THROUGH INSPECTION 40 19APR04 14:00-21APR04 13:59
=
DR-Y ML-Y ORT3-Y R-L
-r t
4-4 4-I 1C5.19-1 ICI 76 0300857 ICP-05.019 COND STEAM DUMP CNTL SYS CAL RESTART 32 19APR04 14:00 23APR04 15:59 DR-Y ML-Y ORT3-N R-L 1
MM0306450 MM1 76 0306450 HX-015B2 HX-015B2, CFC COIL 12 19APR04 20APR04 DR-N ML-N INTERNAL 16:00 05:59 ORT3-N R-L INSPICLEANING 1
01100-40 OPS T-034A DRAIN SI 12 19APR04 20APR04 DR-Y ML-Y ACCUMULATOR T-34A 16:00 05:59 ORT3-N R-L IL.
IC0307357 IC1 76 0307357 RDC-1iBD RDC-1BD REPAIR 12 19APR04 22APR04 DR-Y ML-Y SUPRESSION CIRCUIT 16:00 07:59 ORT3-Y R-L 1
IC5.74 ICI 76 0300879 ICP-05.074 RDC BLOCKING DIODE 12 19APR04 22APR04 DR-Y ML-Y CHECK 16:00 07:59 ORT3-Y R-L 1
T-8436-R WCC 0018436 Z-013 1 ZZ-13TBLREV2-1 T
19APR04 19APR04 DR-Y ML-Y 17:00 17:59 ORT3-N R-L 1
MM-8480C3 MM1 76 0214134 R-1 REMOVE REMAINING 4
19APR04 19APR04 DR-Y ML-Y STUDS / CLOSE STUD 17.00 20:59 ORT3-N R-L HOLES 1
IC0213738A IC2 78 0213738 FT-00416 IFT-416 DRY BA 8
19APR04 20APR04 DR-Y ML-Y BUILDUP ON XMITTER 17:00 00:59 ORT3-Y R-L RESTART 1
IC0306468A IC2 76 0306468 FT-00413 1FT-413 BA BUILDUP 8
19APR04 20APR04 DR-Y ML-Y ON MANIFOLD 17:00 00:59 ORT3-Y R-L RESTART 1M03 1100 01
.030'
-5.741 4431 M-84
.021:
.0301 5.49 I
I 7,
)NTAINME UMULATO
,PAIR SUPI rERNAL It ACCIDEN r-34A SSION CIF S
'II
'ICLEANIt, ECIRC HE EXCHAN(
10306450 nIT
'4I-I I -
I I BLOCKII. GDIODE CH
~K I,
II____
iRO--
~
U C BLOCf S.
II 3,
It1 ZZ-13 TB ZZ-13 TBL IREACTO riICP 54A tEV2-1 A REV2-1 i EMAINING
'ESSEL AN Y BA BUIL
)P 8 FLOW BUILDUP
)P A FLOW c CONTRC 1436 UDS/ CL kSSEMBL' P ON XHII tANSMITT I MANIFOI ZANSMI7T VALVES E STUD Hi
!14134 ER RESTA 0213738 RESTART 0306468 ES 1
IC5.49NGTI ICV 76 1 0300869 I ICP-05.049 ICP 5.49 SEC CONTROL VALVES 180 19APR04 04MAY041 DR-YML-Y 17:00-04:59 ORT3-Y R-L D869 I
1__
L 5
I
-I
+/-Z....
___JL___Ji_
_Ii Run Date 19APR04 13:35l LT-51 PRIORITY PUBLICATION-ES l
Sheet 6 of 19 0 Prilmavera Systems, Inc.
I FL-50 Priority Working Publication
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 19APR04 12:00 U I I
RESPI WO I I
EQID DESCRIPTION RD ES I
EF RjSK I
APR
. ST _
1112.15110,211 0.31 q. 9112.1511.2110. 3 l q 9 11 215,18.211 0.3 lQ.9112,1S 1
PM-BRIEF1 ADM ADMIN OCC INTERACTIVE TURNOVER and FOLLOWUP 2
19APR04 18:00' 19APR04 19:59 1
TG-30600 TGG 76 0302153 TG-01-T INSPECT HP TURBINE 4
19APR04 19APR04 DR-Y ML-Y EXHAUST PIPING 18:00 21:59 ORT3-Y R-L 1
MM0301046 MM2 76 0301046 LG-02561 lLG-2561 LEVEL 6
19APR04 20APR04 DR-N ML-N GAUGE STUCK 19:00-00:59 ORT3-N R-L 1
MM0301048 MM2 76 0301048 LG-02563 LG-2563 LEVEL GAUGE 6 19APR04 20APR04 DR-N ML-N STUCK 19:00' 00:59 OR13-N R-L 1
MM0304206 MM2 76 0304206 FD400249A FD-00249A-INLET 6
19APR04 20APR04 DR-N ML-N.
PLUGGED 19:00-00:59 ORT3-N R-L 1
MM0400290 MM2 76 0400290 LG-02564 1LG-2564 LEVEL 8
19APR04 20APR04 DR-N ML-N GAUGE STUCK 19:00' 02:59 ORT3-N R-L WBRI 3-3061 M030' 30104 M030 30104 M030~
30420 M0401 40029 M030C 10CC INTl
!SPECT H EHIGH PF
_HX-2
_HX-2 ACTIVE TL rURBINE E ISURETUI EVEL GAL MSR LEVI VEL GAUC MSR LEVI 4OVER ani lAUST PIP INE03021!
. STUCK GAUGE STUCK GAUGE OLLOWUF 3
Al-INLET PLlbIGED C
U LP FWH 3A IG-2536 LChIER ISOLAT
`ILG 256 "H) y6tLG 269' EVEL GAU ZB MSR LE LUSH LEV 1l MM0309696
'STUCK L GAUGE INDICATC
-25A MSR IIONER Al MM2 76 0309696 LG-02697 I
LG-2697 FLUSH LEVEL INDICATOR 12 19APR04 19:00-20APRC4 18:59 DR-N ML-N ORT3-N R-L 30969 i U k
r11iULING UAWI~
I !T I
tt4 4
4
.1-4 gCLEAN L riE O"IL C0 ~Di
.c REPLACE Fr
- OLD LEVI LTERS 1
TG03021 19 TGG 76 0302119 Z-026 CLEAN LUBE OIL CONDmONER AND REPLACE FILTERS 24 19APR04 19:00*
20APR04 20:59 DR-Y ML-Y ORT3-Y R-L 10211-IIBE OILICbNDITION GAUGE URE TRAN!
I I4-AA-1I.I:P-04.004-ItCS PRES! U`lE XMTR (
- RESTARI 1
IC4.4-1-1 IC2 76 0300964 IICP-04.00 ICP-04.004-1 RCS PRESSURE XMTR CAL RESTART 22 19APR04 19:00 21APR04 20:59 DR-Y ML-Y ORT3-N R-L 31009*
1 I I I
-iR C PREH l
l l
IC5 EEDWATE t CONTROL STEM CA]
I IC5.22 IC2 76 0300860 ICP-05.022 FEEDWATER CONTROL SYSTEM CAL 60 19APR04 19:00 26APR04 04:59 DR-N ML-Y ORT3-N R-L io o
s-l
-_.d I
I I
I I
.030 1ILM-463A ULEDISHO 'v1tEPAIR I
A-A __
l A...
1 IC0307309 IC2 76 0307309 LM-00463A LM463A FAILED/SHOP REPAIR 75 19APR04 19:00 27APR04 23:59 DR-N ML-Y ORT3-N R-L n7" I
I LinI I ____--_
0". )^
l 1
EZMRCP-K2 EM 76 0215205 P-001B-M P-lB PRE-JOB BRIEF I
19APR04 19APR04 DR-Y ML-Y j
FOR MOTOR MOVE 20:00 20:59 CR13-N R-L CMRC 0215 0-6501 0018.1 r -1B PF REACTO RWP: RCF I ZZ-13R IIZZ-131 JOB BRIEF
,OOLANTF 3I1 Malnten EM REVO-P EM REV(
lOVE I
T-59-H IWCC 0018509 Z-13 1 ZZ-13 RCP EM REVO-1 I
19APR04 I 19APR04 I DR-Y ML-Y 20:00 20:59 ORT3-N R-L
,I II
_F I
I Run Date 19APR04 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 7 of 19 0 Prlmavera Systems,. Inc.
I FL-50 Priority Working Publication T
after 19APR04 12:00 U1R28 WORKING SCHEDULE I
after 19APR04 12:00 t
REIW IWO I
EQID I
ESCRIPTION RD ES I
EF I
RISK IAPR 9
IST I
1 D1 ES11 20 91 2
-1j 1o j2W1__
_1__
_3 1__
_2_
_j__
1 TG-30580 TGG 76 0302153 TG-01-T MEASURE HP OUTER STIM GLD CLEARANCES 2
19APR04 20:00-19APR04 21:59 DR.Y ML-Y ORT3-Y R-L 0G3 031 1
EM0215153 EM 76 0215153 P-030B-M P-030E MCE ANALYZE 3
19APR04 19APR04 DR-N ML-N 0
MOTOR (1A52-1211A-02) 20:00-22:59 ORT3-Y R-L 02' I
EM0407696 EM 77 0407696 SERVICE ISERVICE OBTAIN 3
19APR04 19APR04 DR-N ML-N 0M GREASE SAMPLE 20:00' 22:59 ORT3-N R-M 4
1 IC0300766 ICV 76 0300766 CC-00769-0 CC-769 DIAGNOSTIC 4
19APR04 19APR04 DR-Y ML-Y 03 CHECK 20:00' 23:59 ORT3-N R-L 031 I
O-RT-035A OPS 77 0215973 O-RT-035 PRE O-RT-035, HOT 4
19APR04 19APR04 DR-N ML-N LEG SAMPLE LINE 20:00' 23:59 ORT3-N R-L 02 I
O-RT-068A OPS 77 0216001 O-RT-068 PERFORM PRE LLRT 4
19APR04 19APR04 DR-N ML-N bR1 ON P-1A CCW LINES 20:00-23:59 ORT3-N R-L 02' L EM0403299 EMV 75 0403299 RC-00515-O RC-515-0 PERFORM 10 19APR04 20APR04 DR-N ML-N MOG STEM LUBE AND FBJ 20:00 05:59 ORT3-N R-L 0
INSPECTION 0
01150-30 OPS T-024A RESTORE HOSES &
24 19APR04 20APR04 DR-N ML-N Oi CST PER 01-150 20:00-23:59 ORT3-N R-L I
CE407588TB CE4 76 0407588 T-026 REMOVE REMAINING 4
19APR04 20APR04 DR-Y ML-Y E4 INSULATION FOR IT-26 21:00 00:59 ORT3-Y R-L OA I
IC9937787 ICV 76 9937787 FD-02543A 1FD-2543A POST MTN 4
19APR04 20APR04 DR-Y ML-Y V
9 DIAGNOSTIC 21:00' 00:59 ORT3-Y R-L 94 1
MM0214041 MMV 75 0214041 FD-02401 FD-2401 - REPLACE 4
19APR04 20APR04 DR-Y ML-Y 0
WITH PRETESTED 21:00 00:59 ORT3-Y R-L a:
VALVE 1
MM0407186 MMV 76 0407188 CW-00045 1CW-46 LEAK BY.
4 19APR04 20APR04 MO REPLACE VALVE 21:00 00:59 30!
021 21!
151 401 t71 0011 307 r-0:
15S r-oi Z16 40 t32 SO.
MEASURE EHIGH PF P-030B N h CIRCUI ISERVIC kMISCE CC-769 DI
- 1HX-4 h RE 0-Ri WHOTIL gRC-ST1C RESTORE OUTER!
'SURE TUI ANALYZI nNG WATI EiTAIN GI IIPMENTF NOSTICC JHX SHEL 5,. NOTL SAMPLE RE LLRT C AND FROI
'ERFORM I PZR RC-
)SES & CS A GLD CLE NE IOYOR (IA PUMP MO kSESAMP
'AIR/SERV CK OE OUTLE SAMPLE I IE (P-28A)
C POWER
'ER 01-1 SC LANCES 12M1A-02)
R
)PERATOI E
NES 7) 3 FBJ INSI
'ERATED C7TON LIEF ISOLOPER g
I f
I I
a WREST RE FROM W*ARIM UP OF (4 TO 110 DI t75 107
)37 137 21, H14 407 t07 5RC HS1 y"REMOV MSLOI yIFD-2543 mHX-1 6IB RW4P: RCI tEMAININg OWN TAN OST MTN UP FWH 3 EPLACEV LP FWH I kK BY, RE CUUM CO ROTOR FR TOR COO eat Malntet 4SULATIO1 AGNOSTIc RAIN TO f H PRETES B CHANNE ACE VALU ROLTANK 4PUMPITt NIT PUMP iCe I
'OR IT-26 178 CONT D VALVE lEAD RELI I DRAIN Tj YAND TOR 1
EZMRCP-K IEM 76 0215205 P-OO1B-M P1B MOVE MOTOR FROM PUMP TO STANI 6
19APR04 21:00 20APR04 02;59 DR-Y ML-Y ORT3-N R-H EI 01,
. II
_I 1
1.1 Run Date 19APR04 13:35l LT-51 PRIORITY PUBLICATION-ES Sheet 8 of 19 Primavera Systems, Inc.
I FL-50 Priority Working Publication
affer19APR0412:00 U1R28 WORKING SCHEDULE I
after 19APR04 12:00 U
ID 1RESPj WO WO EQID I
DESCRIPTION RD ES EF RISK 4 A I
20 APR 22
_ST I.
I l102,1511211 0,e3 1 Q.9 112.15,18,211 0.93.l6.@9 11215.18211-0 9,3 1 q.9 1l2,l5 1
MM0213009 MMV 76 0213009 SI-00830B 1SI-830B REMOVE TMtREPLACE VALVE 7
19APR04 21:00 20APR04 03:59 DR-Y ML-Y ORT3-N R-L 0213~T F 'MOVE TJ B St ACCU i EPLACE V JLATOR REt.LEF 1
MM0212471 MMV 76 0212471 SI-00858B 1Si-8588. BODY TO 20 19APR04 22APR04 DR-Y ML-Y BONNET LEAK 21:00 02:59 ORT3-Y R-L 1
MM0214035 MMV 76 0214035 CW FLUSH CW SYSTEM 28 19APR04 23APR04 DR-N ML-N AND CLEANIINSPECT 21:00' 03:59 ORT3-N R-L NASH FLOAT VAL 1
IC4.1D IC2 76 0300825 ICP-04.001 DELTAT SP2 & F(T 35 19APR04 24APR04 DR-N ML-Y AVG)CAL-4.1D 21:00'
- 01:59 ORT3-N R-L I
IT-590 OPS 77 0215923 O-IT-0590 PACV LRPM LEAKAGE 4
19APR04 20APR04 DR-N ML-N TEST 22:00 01:59 ORT3-N R-L 1
MM0306451 MM1 76 0306451 HX-Ot5B3 HX-015B3. CFC COIL 12 19APR04 20APR04 DR-N ML-N INTERNAL 22:00 11:59 ORT3-N R-L INSPICLEANING k
TG-30620 TGG 76 0302153 TG-01-T FINAL CLEAN NOZZLE 15 19APR04 20APR04 DR-Y ML-Y C
BLOCK IN-PLACE 22:00 16:59 ORT3-Y R-L 1
TG-30590 TGG 76 0302153 TG-01-T BLUE CHECK LOWER 16 19APR04 20APR04 DR-Y ML-Y HALF OUTER STEAM 22:00 17:59 ORT3-Y R-L GLAND CASINGS I
EM02t208 EM 76 0215208 P-025A-M P-025A MCE ANALYZE 3
19APR04 20APR04 DR-Y ML-Y MOTOR (1A52-07/1A-01) 23:00 01:59 ORT3-N R-L 1
T-7368-H WCC 0017368 5-YR I CW 5-YR DIVER CE 3
20APRo4 20APR04 REVO-1 00:00' 02.59 1
MM-8480RA MM1 76 0214134 R-1 JIT INFO SHARING.
1 20APR04 20APR04 CAVITY SEAL RING &
01:00' 01:59 TOP HAT I
CE93778?T CE4 75 9937787 FD-02543A INSTALL INSULATION 5
20APRo4 20APR04 DR-Y ML-Y FOR IFD-2543A 01:00 11:59 ORT3-Y R-L M021 A1= 1 S4S D0y TO OI4NET LE4A
-CONT SPF
_ =
l I
I I
021=11 I I 111111111111Pm14 CLEAN/11 4 -LOAT VA
- M021, 1FLUSH C SYSTEM 1tPECT NAS I I t -
I I I r
ICA.~ DDELTA T 9.12 & F(T cCAL -4.1 H 030(
.I.
~
021
!M030 nMUNI' 51HX-015E ALEAKAC PACV LEl CFC COIL rEST
%GE REDU TERNAL II ION/PM PF PICLEANII, lRAM TEjT 03I l51 CONTil MENT AC IpENT RECI.I TG 3 6 2&INAL C 1 AN NOZp LOCK IN I ACE 030 t 3 1I H PRESS R_ TURBINEL TG-3 UCl KLOWE4 ALFOUTEl Gt I Alit I
_u d
lbI H
RF too
'HEAT EX ID CASINdS EMO2 02 MM CES MM WENUCO?
'36'U C 8ORpAdIT II 141 34RE/A I787TIINS 4O47F7.J IlE ANALY ENSATE Pi
'R DIVER C 5-YR DIVE b SHARINC MOTOR (1 P MOTOR REVO-1 CE REVO-1 2-97/IA-O1 )
ANGER tELIEF CAVITY SEMA)
RING & h1oP HAT C 'OR VESSIWAND ASSEIMDLY L INSULAl EHX-19
- REPLAC le 3'1 N FOR IFI PFWH 3E tlTH PRE IHX-19P3 lU3A 7AIN TO H STED VAL:
FWH 3B3C I
7B CONTF NNELHEAI I
MM0214040 IMMV 76 0214040 FD-02400 FD-2400 - REPLACE WITH PRETESTED VALVE 4
20APR04 I 20APR04 I DR-N ML-N 01:00 21:59 ORT3-N R-L 4a04 I 1 IaI J. _________
A.
.5.
.LJ JL U
Run Date 19APR04 13:35 LT-51 PRIORITY PUBLICATION-ES Shoat 9 of 19 C PIrmavera Systems, Inc.
I FL-50 Priority Working Publication l
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 19APR04 12:00 U
I AD U IOID RES Wo EQID DESCRIPTION ES EF RISK
_9 20 APR 22__
_ _ _ __ ST rl12,11,21l 0 3 lQi *9021 811
.211 0.*3 l6.
112.15l113.2110 *31
,@91112,15 1
MM-8480RB MM1 76 0214134 R-1 IPTE BRIEF. INSTALL CAVITY SEAL RING &
TOP HAT I
20APR04 02:00 20APR04 02:59 DR-Y ML-Y ORT3-N R-L 1
EM0215209 EM 76 0215209 P-0258-M P-0258 MCE ANALYZE 3
20APR04 20APR04 DR-Y ML-Y MOTOR (1A52-11I1A-02) 02:00-04:59 ORT3-N R-L 1
O-RT-066A OPS 77 0215997 O-RT-6A LLRT CONT PRESSURE 3
20APR04 20APR04 DR-N ML-N TRANSMITTER UNE 02:00' 04:59 ORT3-N R-t 1
O-RT-033 OPS 77 0215971 O-RT-033 LLRT PACVS - RETURN 4
20APR04 20APR04 DR-N ML-N 02:00 05:59 ORT3-N R-L 1
RP1D-005 OPS O-RP-001D ESTABUSH RP ID 4
20APRo4 20APR04 DR-Y ML-Y INIAL CONDITIONS 02:00 05:59 ORT3-N R-L I
MM0306452 MM1 76 0306452 HX-015B4 HX-015B4. CFC COIL 12 20APR04 21APR04 DR-N ML-N INTERNAL 02:00 01:59 ORT3-N R-L INSPICLEANING T-8509-R WCC 0018509 Z-13 1 Z Z-13 RCP EM I
20APR04 20APR04 DR-Y ML-Y REVO-1 03:00 03:59 ORT3-N R-L I
T-8510-R WCC 0018510 Z-24A 1 RC Z-24A RMP-9002 I
20APR04 20APR04 DR-Y ML-Y EM REVO-1 03:00 03:59 ORT3-N R-L 1
MM-8480R1 MM1 76 0214134 R-1 INSTALL CAVITY SEAL 4
20APR04 20APR04 DR-Y ML-Y RING 03:00 06:59 ORT3-N R-L 1
T-0477-R WCC 0010477 T-034B I St T-34B MMV REV0-1 2
20APR04 20APR04 04:00 05:59 1
T-2660-H WCC 0012660 HX-001B I MS HX-tB AF-101 3
20APR04 20APR04 MMV REVO-1 04:00 08:59 1
EM0301758 EM 76 0301758 P-037D-M 1P-037D-M PERFORM 3
20APR04 20APR04 DR-N ML-N MCE TESTING 05:00 09:59 ORT3-N R-L El C
Il 480RBIP 21 41 34RE 2152OWI-0:
- Z1520SM, T-066P5 Z15997in1 RT.0331-LF Z159T7M*
1D-O05ESI 306452,HX-RIEF, INS
,TOR VES1 3MCE AN NDENSATI ONT PRE NTAINMEN
'ACVS - RI 3ST-ACCIC 3USH RP I 5i4, CFC I LL CAVIr
- AND ASS ZE MOTO UMP MOT URE TRAt
'RESSURI JRN fT CONTAI NmAL CC EAL RING 41BLY 1A5241I1i)
AITTER Ll~
1-3lA)
IENT VEN1
)MONS
, INSPICLE~
,12) rOP HAT I
'STEM (P.
C)
L INTERNN i4ING
. X.
Z *.__
G.0452"""
4 C
2
~~ntTiNMENT PlechormT RrIch2 HEAT E
-8509-RI 2
)0185041
-851 IRI
)oiaSI CII
.841R11N!
121413.4 T-04T77-Ril 00104771 T-2660-1 001285tU
-13 RCPE
!-24ARMF Z-24A RM T LL CAVIT I EACTOR r -34B MMI I IT-34MB HX-I B AF 1 MS HX-7.M P DC EME L
CONT P CONTAII EV01 REV0-1
)02 EM RE 1002 EM R EAL RING 2SEL AND EVO-1 REVO-1 1 MMVRI AF-101 MI
- ORM MCI ENCY WE SSURETF ENT PRET 0-1
- SEMBLY 1-I REVO-1 ESTING OIL PUMP 4SMITTER
)RE (P-14E
)TOR SE I
O-RT-066B OPS 77 0215998 O-RT-066B LLRT CONT PRESSURE TRANSMITTER UNE 20APR04 20APR04 05:00 09:59 DR-N ML-N ORT3-N R-L Run Date 19APR04 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 10 of 19 C Pdlmavera Systems. Inc.
I FL-50 Priority Working Publication l
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE after 19APR04 12:00 U
ID RESPWO WO EQID I
DESCRIPTION RI I E
E RISK I
APR
_O I
I I__
I ST l,l.51lF.2l1 0 *3 IQ *9 11 la21511,2110*3 IQ *9 l.!,821.,.112.151,21O*3I
- 912S' I
AM-BRIEFi ADM ADMIN OCC INTERACTIVE TURNOVER and FOU.OWUP 2
20APR04 06:00 20APR04 07:59 1
MM-8480R2 MM1 76 0214134 R-1 CHECK SANDBOX &
1 20APR04 20APR04 DR-Y ML-Y TOP HAT COVER BOLT 07:00 07:59 ORT3-N R-L TORQUE 1 TGHX22CVIS TGG 76 0302110 HX-022C MSR C INTERNALS 10 20APR04 20APR04 DR-Y ML-Y INSPECTION (SHELL 07:00 16:59 ORT3-Y R-L SIDE) 1 IC4.26N41 ICI 76 0300839 ICP-04.026 ICP 4.26 NIS PR 19 20APR04 21APR04 DR-Y ML-Y CALIBRATION 07:00' 15:59 ORT3-N R-L I
CEDMNSP CE1 76 0214520 CW UNDERWATER 50 20APR04 28APR04 DR-Y ML-Y INSPECTION OF CIRC 07:00 08:59 ORT3-N R-L WATER 1
IC5.7-1 ICS 76 0300849 ICP-05.007 ICP 5.7 EH CNTL CAL 112 20APR04 02MAY04 DR-Y ML-Y THRU STEP 4A9.11 07:00-08:59 ORT3-Y R-L RESTART IC5.49DAY1 ICV 76 0300869 ICP-05.049 ICP 5.49 SEC CONTROL 160 20APR04 05MAY04 DR-Y ML-Y VALVES 07:00' 16:59 ORT3-Y R-L I
MM-848003 MM1 76 0214134 R-1 JIT INFO SHARING 2
20APR04 20APR04 DR-Y ML-Y PRIOR TO HEAD UFT 08:00 09:59 ORT3-Y R-L I
O-RT-030 OPS 77 0215968 O-RT-030 LLRT RCDT VENT 4
20APR04 20APR04 DR-Y ML-Y HEADER 08:00.
11:59 ORT3-N R-L 1
RPID-010 OPS O-RP-001D FILL LOWERCAVITY 5
20APR04 20APR04 DR-Y ML-Y PER RP-lD 08:00 12:59 ORT3-N R-L 1
MM0306061 MM2 76 0306061 T-052A OPENICLEAN AND 10 20APR04 21APR04 DR-N ML-N INSPECT LO 08:00-07:59 ORT3-N R-L RESERVOIR 1
IC0304451 ICV 76 0304451 CC-00761B-ICC-7618-O CK IA SY 1
20APRo4 20APR04 DR-Y ML-Y FOR FOREIGN MATL 09:00' 09:59 ORT3-Y R-L kM-BRIEF MM-84801 02141:
03021' 1C4.26?4 C INTERA~h
- P 4.26 NI!
WE TURN 3OX & TOI
'SSEL ANI IALS INSF ISTURE Si R CALIBR
'ER and F4L(OWUP LAT COVE SSEMBLY nON (SHM kRATOR S
[ON IOLT TORC
.SIDE)
EATER CE IC5 03008
_ a LEAR INS IMENTATIL DMN NDERWA INSPEC N OF CIRCJ 4ATER 0214! I-E
-W IC5.7 ji P 5.7 EH fNTL. CAL nSTEP 4A ) I RESTA 030081 A9DA
- P S.49 SE l:ONTROL
.l L
03008q.
.. I=
mmMM-4 0214' O-RT4*
0215!
RP10.4 MM0306(
0306(
1C0304 0304 1C0304 0304
.IT INFO S EIREACTC LLRT RCD' MRCDT FILL LOWI
_FILL I OPENICLE RING PRII JESSEL A
'ENT HEAl iVENTHE CAVITY Pi lWER CAVI I AND INSI TO HEAD ASSEMBI ER (P-12C RP-1D
& VERIFY
l l l
1,11
.Ii 4p 1
,g,
.wr z nurr E tl' --
l O. P l
l jicc-7619 1U1P-113 R(
21CC-781A 211P-1A R(
CK IA SY THERMAL CK IA SY THERMAL
'R FOREIG kRRIER Ct lR FOREIG pRRIER Cc WAIN FLAN tVOIR
.UBE OIL I lUATL lUNG RETI hAATL LING RETI
'LEAKAGE SERVOIR N OPERATC N OPERATC 1
IC0304452 ICV 1 76 0304452 CC-00761A-ICC-761A-0 CK IA SY FOR FOREIGN MATL I
20APR04 I 20APR04 I DR-Y ML-Y 09:00 I 09:59 ORT3-V R-L I __
I
.I....
E I.
II.
IJI I
.L Run Date 19APR04 3:35 LT-51 PRIORITY PUBLICATION-ES I
Sheet 11 of 19 O Primavera Systems. Inc.
I FL-50 Priority Working Publication
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 19APR04 12:00 U
ID RESP WO WOI EQUD DESCRIPTION IRDI ES EF RISK
[PR ST
'121 1p2 120 1ls1 2
- 22 q*912 WCC0
,W
-10 3 § 9 2,5
,`1 11.1,1,`1 0,5 1
T-6829-R wCc 0016829 HX-M01 1 CS FEEDLINE B DRAIN OPS REVO-1 1
20APR04 09.00 20APR04 09:59 1
EM0309955 EM 76 0309955 G-06 1G-06 REMOVE 2
20APR04 20APR04 DR-N ML-N VOLTAGE REG.
09:00' 10:59 ORT3-N R-L 1 EM-BMFP-PJ EM 76 0312035 P-028B-M P28B PRE-JOB 3
20APR04 20APR04 DR-Y ML-Y BREIFING FOR MOTOR 09:00 11:59 ORT3-N R-M WORK I
T-8243-H WCC 0018243 T-26 I MS T-26 CE REVI-1 3
20APR04 20APR04 09:00 11:59 I
T-6596-H WCC 0016596 HX-1 B 1 MS HX-1B MT EPT 4
20APR04 20APR04 REV0-1 09:00 12:59 1
T-9695-H WCC 0009695 HX-0019
.1 MS HX-1B MT MM 4
20APR04 20APR04 REV0-1 09:00 12:59 EM0215183A EMV 76 0215183 SI-00860A-SI-860A-O MOV 10 20APR04 20APR04 DR-Y MIL-Y ACTUATOR 09:00-20:59 ORT3-N R-L CHECK-OUT (RESTART) 1 IC040m6 IC 76 040M6 N-00031 1N-31 NOISE SPIKES 10 20APR04 20APR04 DR-Y ML-Y 09:00-20:59 ORT3-N R-L 1
CE0309006 CE5 76 0309006 MS-00231 1MS-231 - REPLACE 20 20APR04 21APR04 DR-Y ML-Y VALVE-PT2 09:00-08:59 ORT3-Y R-L 0
MM0214237 MMV 76 0214237 SW-00135A SW-135A - INSPECT 8
20APR04 21APR04 DR-Y ML-Y CHECK VALVE PER 09:00 09:59 ORT3-Y R-L RMP 9326 0
MM0214247 MMV 76 0214247 FP-00304A FP-00304A, 8
20APR04 21APR04 DR-N MIL-N ENnNSPECT/MAINTAI 09:00-09:59 ORT3-N R-L CHECK VALVE 1
AP0215130 APM 76 0215130 X-02 INSPECT CALAND SET 10 20APR04 21APR04 DR-N ML-N X-02 09:00' 10:59 ORT3-N R-L 001 3 EM0309 030 EM-BM-FI 031 T-82 001 T-65 6.
001 T-9 5-000 EM02151 K 021 I
IC040 r 040' r CE030 CS FEE 9Ii CS FE s1G40 RE 4ROD Cl JP28B PRi zSTEAI
~1 MS T-21 H1 MS CM1 MS HMS HX-
!=I MS AS1 860A C 6,1N31 NO 11 61MS 231
[NE B DRl LINE B DR IVE VOLTO TROL MG OBREIF ENERATC E REVI-1 BCE REV MTEPTR
-SPIKES INl SOURI EPLACEV OPS REVt lOPS REV E REG.
T FOR MO1 FEED PUN 0.1 REVO-1 14 REV0-1 2R CHECK SPRAY Pi RANGE Ct VE-PT2 A
WORK MOTOR UT (REST)
IP DISCHF NNEL E
P
=
HX-1A S EADEF 1021 SW7-135A I SPECT C CK VALVEP ER RM 021 Z1 1P-29 A PNLET 1021 4FP-003 OPENIINS CT/MAINT J CHE(
021 F11
- IP-29 AFl EMER P021 d1 CNSPECT.U.AND SE
-: 02 021
- EUNIT Al ILIARY
!0301 :IFD20
' EPLACE LV 0301 N
HX-H4P FMh RST P93 CHE
'CK BEA NH
)UNDANT I 29 INLET lVE 4G COOLIN SFORMER
.S-2637 LO%
I CE0301623 CE5 76 0301623 FD-00208A 1 FD-208A - REPLACE VALVE 24 20APR04 I 21APR04 I DR-Y MIL-Y 09:00 12 59 ORT3-Y R-L I-Run Date 19APR04 13:351 LT.51 PRIORITY PUBLICATION-ES-Sheet 12 of 19 Primavera Systems, Inc.
FL-50 Priority Working Publication S
after 19APR04 12:00 U1R28 WORKING SCHEDULE after 19APR04 12:00 U
RESF WO WO EQID DESCRIPON RDI ES EFI RISK 9
APR ST 1
20 E2Q R
STW I___
I 0,1~p21, lZ51,103#6
.90,5 I
CE0305003 CE5 76 0305003 FD-00210A FD-210A - STEAM LEAK.
REPLACE VALVE 24 20APR04 09:00' 21APR04 12:59 DR-Y ML-Y ORT3-Y R-L 1
EM0203130 EM 76 0203130 W-001D2-M 1W-1D2-M CLEAN 16 20APR04 21APR04 DR-N ML-N CONNECTIONS 09:00 16:59 ORT3-N R-L 1
CEO8TOHTI CE4 77 0303636 IST-SISI REINSULATE - FAC 60 20APR04 23APR04 DR-Y ML-Y PROG - TIJRB HALL 8 09:00 22:59 ORT3-Y R-L FT OVERHD I
MM0406916 MMV 76 0406916 MS-02016 lMS-2016 VALVE 40 20APR04 26APR04 DR-Y ML-Y LEAKS BY 09:00 13:59 ORT3-N R-L 1
TG0302140 TGG 76 0302140 PIPING CRO CROSSUNDER PIPING 60 20APR04 27APR04 DR-Y ML-Y INSPECTION I 09:00 08:59 ORT3-Y R-L REPAIRS(PT2)
I CAVFILLJIT OPS 77 0215926 0-IT-0760 JIT INFO SHARING FOR I
20APR04 20APR04 DR-Y ML-Y CAVITY FILL & IT-760 10:00 10:59 ORT3-N R-L
_ MM-8480D MMI 76 0214134 R-1 IPTE BRIEF FOR HEAD 2
20APR04 20APR04 DR-Y ML-Y 4UFT 10:00 11:59 ORT3-Y R-L 1
O-RT-066C OPS 77 0215999 O-RT-066C LLRT CONT PRESSURE 3
20APR04 20APR04 DR-N ML-N TRANSMITTER LINE 10:00 12:59 ORT3-N R-L 1
O-RT-079 OPS 77 0215883 O-RT-079 LLRT FUEL TRANSFER 3
20APR04 20APR04 DR-N ML-N TUBE PENETRATION 10:00 12:59 ORT3-N R-L I
0123A-10 OPS01-23A INSTALL PORTABLE 3
20APR04 20APR04 DR-N ML-Y CAVITY FILTER UNIT 10:00 12:59 ORT3-N R-L (TRI-NUKE) 1 0123A-15 EM 01-23A PHASE CHECK AND 3
20APR04 20APR04 DR-Y ML-Y START TRI NUKE 10:00 12:59 ORT3-N R-L FILTRATION UNIT 1
IT760-BRF OPS 77 0215926 O-T-0760 BRIEF PRIOR TO HH SI I
20APR04 20APR04 DR-Y MLmY CHECK FULL FLOW 11:00 11:59 ORT3-N R-L TEST PREPS CE EM CEII MM TG 0305 0305 0203 0203 08TC 04 x
IHX-214 HP FM4 5~
I: Dl Wi 024 CLEAN COI NECTIONSl jd3FD-210OA.1 S"IM LEAKI REPLACM VIALVE
.S-237B UP]
COOLING F tHD 3i _
NTAINMEIt#
IREINSUL E - FAC P cS -TURB I1A.L a FT oi I, __
I ~
003 1
040C 61MSS-2016.
VE LEA BY 0406 I
a 030 1CRCESSU R PIPINGI SPECTIO IREPAIRS(
)
0302 I
i i
CAVFI 021 MM-a 021 O-RT-4 021 0-R 021 0123 0123 rrJIT INFO e6UNIT 1 DIPTE BR I4REAC
- CLLRT CC IgmCON 79LLRT F L1MMECI ICINSTALL
- INST I1PHASEI
- INST RFBRIEFI 12IUNIT 561G07 F 154ROD
-ARING F1 SH HEAD FOR HEA R VESSEL rPRESSU NMENT PI TRANSFR NICAL PEI ORTABLE JCONNEC ECK AND JCONNEC OR TO HI IGH HEAD ROVE VOL INTROL M CAVITY F
-HECK VA LFT 4D ASSEN TRANSMI SSURE (P.
TUBE PEh rRATION I VliY Fil 7AVITY FIt kRT TRI N
~AVITY Fit I CHECK F
- CHECKV, GE REG.
3ET
& IT-760 ES FLOW I ER UNE 4)
RATION K TEST UNIT (TRI
.R UNIT E FILTRA1 ER UNIT L FLOWTI
/ES FLOW IT (RF)
JKE)
N UNIT r PREPS ST (RF) r176 02 EMO3 03 1
EM0309956 EM 76 0309956 G-07
. 1G-07 REMOVE VOLTAGE REG.
2 20APR04 I20APR04I DR-N ML-N I 11:00 12:59 ORT3-N R-L Run Date 19APR04 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 13 of 19 C Prmavera Systems, Inc.
I FL-50 Priority Working Publication I
after 19APR04 12:00
.I U1R28 WORKING SCHEDULE I
after 19APR04 12:00 UI ID IRESPI WOI wO EQID f DESCRIPTION IRDI ES EF I
RSK APR
_ST II_
I 02 1,118211 0.3 fi 0 9 112,15,18,21l0. 3. 6. 9 112.1.9l18.21l 0,3 Q.3 9 21&1 I
MM0306045 MM2 76 0306045 CS-02291 INSPECT & MAINTAIN 1P-28A SEAL WATER PCV 3
20APR04 11:00-20APR04 13:59 DR-N ML-N ORT3-N R-L 1
IT-760-A OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 6
20APR04 20APR04 DR-Y ML-Y FULL FLOW TEST 2ZX0 17:59 ORT3-N R-L PREPS 1
CE0407673 CE6 76 0407673 T-026 OPEN BD TANK TO 10 20APR04 20APR04 DR-Y ML-Y SUPPORT INTERNAL 12:00 21:59 ORT3-Y R-L INSPECTION 1
T-0711-H WCC 0010711 Z-024A 1 RC Z-24A RMP-9096 I
20APR04 20APR04 DR-Y ML-Y MM REV0-1 13:00 13:59 ORThY R-L 1
RP1A-052 OPS O-RP-OO1IA SET CLOSURE FOR 3
20APR04 20APR04 DR-Y ML-Y REACTOR HEAD LIFT 13:00 15:59 ORT3-N R-L 1
EM0306569 EM 76 0306569 G52-07-AM 1G52-7-AM REPLACE 4
20APR04 20APR04 DR-N ML-N AMMETER 13:00 16:59 ORT3-N R-L MM0214054 MM1 76 0214054 HX-001B HX-1B, OPEN SG 10 20APR04 21APR04 DR-N ML-N HANDHOLES 13:00 00:59 ORT3-N R-M 1
TG9919338 TGG 76 9919338 PIPING EB-MS-2751 - REALIGN 14 20APR04 21APR04 DR-Y ML-Y PIPING DOWNSTREAM 13:00 16:59 ORT3-Y R-L OF VALVE-PT2 I
MM0306051 MM2 76 0306051 CS-02292 INSPECT & MAINTAIN 3
20APR04 20APR04 DR-N ML-N IP-28A SEALWATER 14:00 16:59 ORT3-N R-L PCV 1 NG-SC1BNEC EPT 76 0301980 SC-1B EDDY CURRENT 24 20APR04 21APR04 DR-Y MLY INSPECT COND (1BN) 14:00 17:59 ORT3-Y R-L I
CE08TOHSR CE4 77 0303636 IST-SISI REMOVE SCAFF - FAC 32 20APR04 22APR04 DR-Y ML-Y PROG - TURB HALL 8 14:00 03:59 ORT3-Y R-L FT OVERHD 1
EP0311889A EPT 76 0311889 HX-021B HX-21 B - EDDY 24 20APR04 23APR04 OR-Y ML-Y CURRENT 14:00 07:59 ORT3-Y R-L REVIEW/RERUN MM03 03 r
0 CEO 0
CEI EPI
)45NSPE(
XMIUP--
6o4~IlH S92 sT73PLEN ill-H 1 RC 1071111 RI 4-052SET' MP
)65691IG52
)6569m, 14054HX-1 14054=
lga~aS-2 LMAINTAI SGFP SE, AD SI CHE IT 1 HIGH TANK TC IBLOWD(
4A RMP-9
- 24A RMP-
)SURE FO PARATION AM REPLJ 2-07 GENI OPEN SG WSTEA
- REALIG 1P-28A SE WATER IN1 C FULL FL(
- AD SI CHI UPPORT it N TANK 5 MM REVI
)6 MM RE)
REACTOR
)R REFUE
- AMMETE ATOR OU
.NDHOLEE GENERAT
'IPING DC WATER P ID LEAKO
'TEST PRI K VALVES
'RNAL IN!
1
!AD UFT IG fT BREAKI NISTREAM PRESSURE
.OW TEST (I
- CTION AMMETER R
4 VALVE-PTJ 935 IN STEAM §tPPLY TO T 10 060511NS E T & MAIN N N IP-28A ALWATE ICV 0 06051m1 R 28A SGFP AL WATEF I D LEA PFF PRESSt csNECE URRENT PECTCO (1BN)
I 0198 NDENSEF (pEAERATIN HSE SCAFF, ACPROG.RB HAU 6lFT OVERHI 03636 NDARY IN
~3 I889A~
1
-EDDYC ENR REU r118 1
EM-84800 I EM 76 0214134 R-1 DISCONNECT PATCH CABLES FOR DEDICATED TtCS I
20APR04 20APR04 15:00 15:59 DR-Y MLY ORT3-N R-L 1-84801301!
1214134IR 3NNECT P5 CTOR VES
S FOR DEDl' IABLY 1 TED TIC'S a-j-A.
.4 JAL.5.
LA.
-5.-A LA.
U--I. ______
.5.1 Run Date 19APR04 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 14 of 19 C Primavera Systems, Inc.
FL-50 Priority Working Publication I
after 19APR04 12:00 l
UlR28 WORKING SCHEDULE I
after 19APR04 12:00 U
ID RESP WO I O
I.
EQID DESCRIPTION LRD ES EF I
RISK APR
_IS 102,15, l.211o. 3 1q.
,9112,15,18.21 10.
3 61 q.9
,521511.S.21 o. 3 l§.9 112.1 1
MM-848581 MM3 76 0214119 P-0O113 PLACE BACKSEAT COLLECTION SYS IN SERVICE (8 FT.)
1 20APR04 15:00 20APR04 15:59 DR-Y ML-Y ORT3-Y R-M N
NF I
NRC-CALL-7 ADM ADMIN O.D. CALL NRC TO 1
20APR04 20APR04 DR-Y ML-Y WITNESS REACTOR 15:00 15:59 ORT3-Y R-L HEAD LIFT 1
T-3426-H WCC 0013426 P-001B 1 RC P-1B RMP 2
20APR04 20APR04 DR-Y ML-Y 9002-8/19 MM REVO-1 16:00 17:59 ORT3-Y R-L I
MM-84801D MM1 76 0214134 R-1 MOVE REACTOR 4
20APRD4 20APR04 DR-N ML-N VESSEL HEAD TO 16:00 19:59 ORT3-Y R.H RHLDA 1
TG-30625 TGG 76 0302153 TG-01-T OBTAIN TIGHT-WIRE 20 20APR04 21APR04 DR-Y ML-Y MEASUREMENTS OF 17:00 16:59 ORT3-Y R-L HP CYLINDER I
HEADLIFT PPG MILESTONE REACTORVESSEL 0
20APR04 DR-N ML-N HEAD LIFr 18:00 ORT3-N R-L PM-BRIEF2 ADM ADMIN OCC INTERACTIVE 2
20APR04 20APR04 a
TURNOVER and 18:00-19:59 FOLLOWUP 1
TG-30520 TGG 76 0302153 TG-01-T MEASURE HP INNER 16 20APR04 21APR04 DR-Y ML-Y STEAM GLAND 18:00 13:59 ORT3-Y R-L CASINGS 1
MM0214128 MM2 76 0214128 P-029-T P-29-T. INSPECT IB & 20 20APR04 22APR04 DR-N ML-N 0 BEARING OIL 19:00
- 02:59 ORT3-N R-L COOLERS 1
RP4A-030 EM O-RP-004A CLEAR WALKWAY FOR 2
20APR04 20APR04 DR-N ML-N MANIPULATOR 20:00 21:59 ORT3-N R-L I
RP1A-060 OPS O-RP-001A FILL CAVITY FOR ROD 3
20APR04 20APR04 DR-N ML-N UNLATCH 20:00 22:59 ORT3-N R-M 1
IC0300801 ICV 76 0300801 IA-03047-O IA-3047 DIAGNOSTIC 4
20APR04 20APR04 DR-Y ML-Y CHECK 20:00*
23:59 ORT3-N R-N 84 8 5B1P 214119R cALL-O.
r-3426P1' 001342 14980D 02141 TG-30E2 IE BACKS OTOR CO
- ALL NRC P tBRM 0C P-1B R
'E REACTC REACTOR 1: Reactor 1i rAiN-nGH1 r COLLECI kNT PUMP
)WITNESS 302-8119 M
'9002-819 VESSEL H
- SSEL AN[
id Lift PRE MEAS N SYS IN $E EACTOR `E IEV0-1 A REVO-1 EDMTORHL lSSEMBLVl
'SMENTS dF RVICE (8 F D LIFT HP CYUNDE IE
'I N
030215 2
iI-. -H PRESSt TURBINE ADUFT ACTORVI SELHEAD L FT mAFEm mbrITOR PL~lr OPERATI STATE MILI M41RIE CINTERA VE TURN and F OWUP TG-3052 URE H NNER GLAND C iANGS 030215
'NWHIGH RESSURE iTJRBINE IM02141
-29.T, INS IB & 0 EARING L COOLERS 02141 1F 1 AUX FEED' RP4A-0 RPIA-0 IC03008 03008 IT-760
. 02159 CLEARY.W?
LLCAVII FLLUF A-047 DIi IC 1CI 1IHHEAl
=UNIT' CWAY FOF FOR ROD FR CAVITY NOSTIC C EADER IN I CHECK I IGH HEAD ANIPULAI ILATCH
)R UNlATI CK T CONTRC LL FLOW1 CHECK V ING RODS bPERATOR IT JES FLOW' 1
IT-760-B OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK FULL FLOWTEST 4
20APR04 I 20APR04 DR-N ML-N 20:00 23:S9 ORT3-N R-L Run Date 19APR0413:351 LT-51 PRIORITY PUBLICATION-ES SheotI5of19 I
iiavera Systems Inc l
FL-50 Priority Working Publicatlon I
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE after 19APR04 12:00 U
ID RESI WO IWO I
ED I
DSCPTO RDI ES I E I
RSKAPR S1{
1 T
J CD DSRPINE F
RS 9
20 2122 1.2 L15.
1___211 0
~j (9
112A i.5.1821i0.3 Q. 9 112ii15, 1
CESH81-SI CE4 PACKAGE 81 BUILD SCAFFOLDING FOR SHIELDING -
RHLDA SHADOW 6
20APR04 21:00-21APR04 02:59 DR-Y ML-Y ORT3-Y R-L 1
CE-1600-05 CE4 76 0213472 R-1 BUILD SCAFFOLDING 12 20APR04 21APR04 DR-Y ML-Y TO SUPPORT 1600 21:00 10:59 ORT3-Y R-L INSPECTION 1
TG0302116A TGG 76 0302116 T-036 T-036 -CLEAN LUBE 20 20APR04 21APR04 DR-Y ML-Y OIL RESERVOIR 21:00 18:59 ORT3-Y R-L I
RP4A-050 OPS O-RP-004A JIT INFO SHARING FOR I 20APR04 20APR04 ROD UNLATCH 22:00 22:59 1
MM-8485K MM3 76 0214119 P-001B P-1B; ALIGN SEAL I
20APR04 20APR04 DR-N ML-N COLLECTION TO 23:00 23:59 ORT3-N R-M CAVITY RMP9002-8 1
0123A-20 OPS01-23A INMATE CAVITY 1
20APR04 20APR04 DR-N ML-N PURIFICATION 23:00 23:S ORT3-N R-L RP1A-054 OPS O-RP-001A RELAX CONTAINMENT 1
20APR04 20APR04 DR-N ML-N CLOSURE AFTER HEAD 23:00 23:59 ORT3-N R-L LUFT 1
RP4A-060 OPS O-RP-004A BRIEF FOR ROD I
20APR04 20APR04 UNLATCH 23:00 23:59 I
EM0302132A EM 76 0302132 LO-00291 P-0598 - DE-TERM 2
20APR04 21APR04 DR-Y ML-Y AIRSIDE SEAL OIL BtU 23:00-00:59 ORT3-Y R-L PUMP MOTOR 1 EM9927045A EMV 76 9927045 CC-W759B-1CC-759B-O REMOVE 2
20APR04 21APR04 DR-N ML-N AND REPLACE LS 23:00-00:59 ORT3-N R-L COVER I
MM0214170 MMt 76 0214170 W-OOIB1 W-IB1 REPLACE 2
20APR04 21APR04 DR-N ML-N AUTOMATIC 23:00 00:59 ORT3-N R-L LUBRICATOR 1
RPSH078-1 RP1 PACKAGE 78 NSTALL SHIELDING ON 3 20APR04 21APR04 DR-Y ML-Y REGEN FOR CV-296 23:00 01:59 ORT3-Y R-L CESH8 CE-1601 -
IBUILD SC 5EUILD SC FOLDING I FOLDING 1 TOC 021i iii EAC1 13021 6 AT036 - C LUBE C win '
RP4/
MM-02 012 RPI RP4 EM030:
03 EM997 99 5OJIT INFC I
~51<-1B. 1 ISIREAC
-2CINMIAT EINM~A
)54ELAX NPREP
)60BRIEF I II 2A059B 3%TRI I44N1P-11
!70W-1Bi, 8-UNSTAL m
r&jCC-754 HARING F 3N SEAL C R COOLAl AVITY PL CAVITY P INTAINME ATION FO RRODUN E-TERM A rE OIL PRE
-O REMO%
CP CC OL R SHIELDII SUPPORT VESSEL RESERVC RBINE LI ROD UNL LECTON PUMP FICATION OIFICATION CLOSURE ZEFUELINC TCH IDE SEAL
. RHtDA SI
- INSPECT D ASSEMBI
= OIL RESE lCH CAVITY RM TER HEAD
.BAJ PUMP NG E LS COVE RATOR MM02 02 RPSI lEM02 02 FEPLACE AJOMATIC Ld4 RICATOR
[NMENTAl HIELDINC 3 MOV AC W1P-lAI IDENT RE(
N REGENI ATOR CHE P CC INLE CULATION R CV-296 I-OUTl IOV OPERA I
tm0T`15153 EMV 76 0215163 CC-00754A-CC-754A-O MOV ACTUATOR CHECK-OUT 10 I 20APR04 I 21APR04 DR-Y ML-Y ORT3-N R-L 23:00 10:59
_I Run Date 19APR04 13:35w LT-51 PRIORITY PUBLICATION-ES Sheet 16 of 19 O Primavera Systems, Inc.
I FL-50 Prlority Working Publicatlon I
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 19APR04 12:00 D
RES W
EID I DECPIN RD1 ES EF I
RISK 9
0APR 21 2
I _ _ _ _ _ E S
- RI f O N I-I.
I.I-J.
1..
1 TG0306774 TGG 76 0306774 LO-00254 LO-254 -
REPACKWGLAND FOLLOWER COCKED a
20APR04 23:00 21APR04 18:59 DR-Y ML-Y ORT3-Y R-L
.TG03i I6S'741L0-25j.j3EPACKIGqJ A7 a64} ~
li UJI Ics.1 tI t~lffjl1~
N!
ND FOLLC
- 59A AIR
- TRUMEN RCOCUKEL E SEAL OIL ALS 1
IC5.14RCP IC2 76 0300977 11CP-05.01 ICP 5.14 RCP SEAL 20 20APR04 22APR04 DR-Y ML-Y INSTRUMENT CALS 23:00 22:59 ORT3-Y R-L 1
EM0215168D EMV 76 0215168 CS-02189-0 CS-2189 MOV 32 20APR04 28APR04 DR-Y ML-Y ACTUATOR BENCH 23:00 00:59 ORT3-N R-L REBUILD(RESTART) 1 OP0300801 OPS 76 0300801 IA-03047-O IA-3047 PMT STROKE 1
21APR04 21APR04 DR-Y ML-Y PER IT 110 00:00' 00:59 ORT3-N R-N 1
IT-760-C OPS 77 0215926 04T-0760 HIGH HEAD St CHECK 3
21APR04 21APR04 DR-N ML-N FULL FLOW TEST 00:00 02:59 ORT3-N R-L RECOVERY 1
RP4A-020 OPS O-RP-004A UNLATCH CONTROL 4
21APR04 21APR04 DR-N ML-N
_RODS 00:00 03:59 ORT3-N R-M MM0305396 MM1 76 0305396 W-001B1 W-181 REPLACE 36 21APR04 24APR04 DR-N ML-N c
SPRING ISOLATORS 02:00 01:59 ORT3-N R-L 1
MM-8480E2 MMI 76 0214134 R-1 JIT INFO SHARING 2
21APR04 21APR04 PRIOR TO UPPER 03:00 04:59 INTERNALS LIFT I
I RPSH081-l RPI PACKAGE 81 INSTALL SHADOW 3
21APR04 21APR04 DR-Y ML-Y SHIELDING (FROM RX 03:00 05:59 ORT3-Y R-L HEAD) 1 RPIA-080 OPS O-RP-001A FILL CAVllY FOR 2
21APR04 21APR04 DR-N ML-N INTERNALS LIFT 04:00 05:59 ORT3-N R-L 1
RP4A-031 EM O-RP-04A RESTORE WALKWAY 2
21APR04 21APR04 DR-N ML-N POST ROD 04:00 05:59 ORT3-N R-L UNLATCHING I
MM-8480E1 MMI 76 0214134 R-1 UPPER INTERNALS I
21APR04 21APR04 DR-Y ML-Y LIFT IPTE BRIEF 05:00 05:59 ORT3-N R-L
- I CP SEAL I
'ii6i _. -
I I
. I I-
.
I EM02I! 1 SCS-:218i OV ACTUA I.
)R BENCH BU1LD(RES C
02 5 11111 P0o So1IA-304 MT STRO PER IT t1 0 0 801UIC EADER I I TCONTR, ) OPERATOF r
.CHIGH 1 SI CHE FULL FLO N TEST RECO 01 92 IN HIGH HEM St CHECP ALVES FLO RP
-020UNLATC H CONTR I RODS lJ; TCHlCO' 0L RODS (F
M 0539WI I REPLACE S NG ISO RS 0)539 _I..
i_
_i I
8480E2T 214131F 1H0814NS P1A-081I P4A-031RI I
M-8480E1 0214134 W8BRIEF.
CAVITY F IL CAVITY rOREWAL PRIOR TO EL AND A SHIELDIN(
INTERNAl R INTERN 4AY POST KLS UFTIf SEL AND d E TURNC
'PER INTER EMBLY FROM RX H UPFT S LIFT
'D UNLATCI EBRIEF EMBLY ER and FOL
'ER INTEF
- ACTOR V
'C INTERA 1
AM-BRIEF2 I ADM ADMIN OCC INTERACTIVE TURNOVER and FOLLOWUP 2
21APR04 06:00 21APR04 07:59 Run Date 19APR04 13:351 LT-51 PRIORITY PUBLICATION-ES Sheet 17 of 19 a Pdmavera Systems, Inc.
I FL-50 Priority Working Publication I
after 19APR04 12:00 I
U1R28 WORKING SCHEDULE after 19APR04 12:00 U
ID RESPI WO WO EQdD DESCRIPTION bRD ES EF RISKAPR I_ _.
ST S.
_RI_. _At...
I IC4.3-4 IC1 76 0300962 1 ItCP-04.00 ICP-04.003-4 CHARGING FLOW 6
21APR04 07:00 21APR04 12.59 DR-N ML-Y ORT3-N R-L I
TG0302136 TGG 76 0302136 P-037A P-037A - INSPECT MAIN 7
21APR04 21APR04 DR-Y ML-Y LUBE OIL PUMP 07:00 13:59 ORT3-Y R-L 1
NGNDE18X NDE NDE-18 MINI-SUB 3
21APR04 21APR04 DR-N ML-N SPECTIONS-ImNERNAL 08:00 10:59 ORT3-N R-M UFT (NDE-18)
I MM-8480E MM1 76 0214134 R-1 REMOVE UPPER 4
21APR04 21APR04 DR-N ML-N INTERNALS 08:00 11:59 ORT3-N R-H 1
O-RT-034A OPS 77 0215972 O-RT-034 PRE LLRT OF NORMAL 4
21APR04 21APR04 DR-N ML-N CHARGING 08:00 11:59 ORT3-N R-L I
TG0205499 TGG 76 0205499 LG-03951 lLG-3951 MINOR SEAL 8
21APR04 21APR04 DR-Y ML-Y OIL LEAKAGE 08:00 15:59 ORT3.Y R-L EM9927043A EMV 76 9927043 CC-00754A-1CC-754A-O REPLACE 2
21APR04 21APR04 DR-Y ML-Y LS COVER 09:00 10:59 ORT3-N R-L I
MM0214099 MM2 76 0214099 HX-056A HX.056A - OPEN SGFP 2
21APR04 21APR04 DR-Y ML-Y OIL COOLER 09:00-.
10:59 ORT3-N R-L 1
MM0214091 MM2 76 0214091 HX-027 HX-27, HYDROLANCE 4
21APR04 21APR04 DR-N ML-N CLEAN GENERATOR 09:00-12:59 ORT3-N R-L BUS 1
MM0214089 MM2 76 0214089 HX-024 HX-24. HYDROLANCE 10 21APR04 22APR04 DR-N ML-N CLEAN CONDENSATE 09:00' 08:59 ORT3-N R-L COOLER 1
NW0407673 NDE 76 0407673 T-026 T-026 - DETERMINE 10 21APR04 22APRG4 DR-Y ML-Y EXTENT OF REPAIRS 09:00-10:59 ORT3-Y R-L TO BD TANK 1
MM-1600'20 MM1 76 0213472 R-1 INSTALL CONOSEAL 3
21APR04 21APR04 DR-Y ML-Y COVERS 11:00 13:59 ORT3-N R-L IC4.3-030096 TG030213 030213 NGNDEl MM-84 02141 O-RT-03 02159 TG02054 02054 EM99270 9921 MM0214 0214 MMO214 0214 MM0214 0214 ND0407 040
. MM41 02 EM02 02
- P-04.003-
.037A -IN!
INTUS MMN-SUB Ii
- MINI-SI lEMOVEtL
-WREAC
- ZWP: Uppi
'RE LLIRT WNORIV ILG-3951 I I CC 754A UIlP-1A I
~HX-056A XNP-28A' IHX-27, WV MWG-0 X-_2 4. H'f HARGING iNG FLO
.CT MAIN E LUBE PECTIONS INSPECTI
'ER INTE R VESSEL ternais NORMAL CHARGIN EOR SEAL H2 SIDE I REPLACE CC INLE-PEN SGFP FP OIL COC tOLANCE (
G BUS CO qOLANCE
-ow lANSMrrrE 3E OIL PUMI PUMP (SW ITERNALS L IS PER NDE kLS qD ASSEMB Set IAROING INE (P-26)
L LEAKAGE 4UN REGUIJ COVER AOV OPERA IL COOLER gER AN GENER
[ING UNIT tN CONDE dd__
o^vekl
_-*r II 4
VrUUmI*
1.2 d~NSTAI 470URE/
js5CC7sg 16~
,ONOSEA
'OR VESSI 3 MOV ACI E 1P-1A 111UNlM140 lNT OF REP)
EBLOWDI
- OVERS AND ASSEI KTOR CHEC
'CC OUTLI 1
EM0215165 I EMV 76 0215165 CC-00759A-CC-759A-4 MOV ACTUATOR CHECK-OUT 10 21APR04 11:00 21APR04 DR-Y ML-Y 22:59 ORT3-N R-L
.. L
.. 4 Run Date 19APR04 13:3S1 LT-51 PRIORITY PUBLICATION-ES Sheet 18 of 19 0 Prmavera Systems. Inc.
FL-50 Priority Working PublIcatlon I
after 19APR04 12:00 U1R28 WORKING SCHEDULE after 19APR04 12:00 U
ID RESF WO WO EQID IDESCRIPON RD ES EF RISK 20 APR 2
____T__...__2.
p211o.3 Q 9 12.15.18,211
° 1 Q. 9 O2,15, OP030957 ~s 7 030057 W-0178-OW1788 MT SROKE 21APR4 21PR04DR-YML-Y0MT3SR REER21 1
0P0300957 OPS 76 0300957 IWG-01788-0 WG-1788 PMT STROKE PER IT 60 1
21APR04 12:00' 21APR04 12:59 OR-V ML-Y ORT3-N R-L OPo 0
RP 1
RP1A-090 OPS O-RP-001A FILL CAVITY TO 1
21APR04 21APR04 DR-N ML-N REFUEUNG HEIGHT 12:00 12:59 ORT3-N R-L 1
RHX90A PPG MILESTONE START REACTOR 0
21APR04 DR-N ML-N CAVITY FLOODED 13:00 ORT3-N R-L 1
O-RT-015B OPS Z-016 FUEL XFER CHECKS 2
21APR04 21APR04 DR-N ML-N OVER CORE 13:00 14:59 ORT3-N R-L 1
MM0214095 MM2 76 0214095 HX-053B HX-0538 -
3 21APR04 21APR04 DR-N ML-N HYDROLANCE CLEAN 13:00 15:59 ORT3-N R-L HYDROGEN SIDE SEAL 1
MM0213960 MM2 76 0213960 HX-053A HX-053A-4 21APR04 21APR04 DR-N ML-N HYDROLANCE CLEAN 13:00 16:59 ORT3-N R-L AIR SIDE SEAL OIL O-RT-046A OPS 77 0215981 O-RT-046 PRE LURT FOR AUX 4
21APR04 21APR04 DR-N ML-N CHARGING 13:00 16:59 ORT3-N R-L 1
RPJF-121B RPI 76 0213472 R-1 PERFORM UNDERHEAD 12 21APR04 22APR04 DR-Y ML-Y DECON IN 14:00 03:59 ORT3-Y R-L PREPARATION FOR 1N SP__
1 TG-30690 TGG 76 0302153 TG-01-T HAND CLEAN HP CYL 30 21APR04 22APR04 DR-Y ML-Y HORIZONTAL JOINT 14:00 23:59 ORT3-Y R-L 1 EM-BMFP-01 EM 76 0312035 P-028B-M P28B REMOVE OIL 6
21APR04 22APR04 DR-Y ML-Y LINES AND MOTOR 15:00 12:59 ORT3-N R-M COVERS 1
TGO215001 TGG 76 0215001 HX-053B HX-53B - REPLACE 8
21APR04 21APR04 DR-Y ML-Y BRASS RING 16:00*
23:59 ORT3-Y R-L 1
TG0303396 TGG 76 0303396 LO-00035 LO-35 VALVE STEM 8
21APR04 22APR04 DR-Y ML-Y.
BENT.
16:00 13:59 ORT3-Y R-L RI 0-4 MM MM RI EF 2957WG-V
)954-16i
-O9cFILL C IFILL GOA STAF
- SAI
.0150WUE1 EFU RWP I4095IX-0 I409!EH I396tMH4 I396(CU 4046*RE 159BINj L4210PET IPMT STRI
- DT SAMPI.
n7Y TO RE VITY AND REACTOR rY MONIT(
ER CHECI MANIPUW ontainment
.- HYDROI ROGEN SI
- HYDROI SIDE SEA RT FOR At KILIARY Ca RM UNDE1 E PER IT 6C rO Z-46 GA ELING HEI PUALIZE Wr VITY FLOOI PLANT OPI OVER COR
)R/FUELTF meral Area ICE CLEAN SEAL OIL I ICE CLEAN
)IL COOLEI CHARGING RGING LINE EAD DECO 134 R
CTOR VESc
-G3M6NAtD LEAN HP IL HORIZOh O0321 SM MFP.01 B REMOVE I LINES AND 31203I i
STEA.
TG0215001 38REP EBRASS RI 0215001 HYOR EN SIDE S T 0303396w-5VALVE!M BENT.
303394
- Z-2 1
TG-30640 TGG 76 0302153 TG-01-T FINAL INSPECT HP TURBINE CYLINDER BASE 2
21APR04 21APRO4 DR-Y ML-Y 17:00 18:59 ORT3.Y R-L TG.30g4I0IA!AL INSPEc1 030215*I~IGH PRES~,I F(P TURBINE IRE TURBIN I,
I,.,
Run Date 19APR04 13:35l LT-51 PRIORITY PUBLICATION-ESSheet 0 rnaer ytms n~I FL-50 Priority Working Publication
after 19APR04 12:00
.1 WORKWEEK SCHEDULE I
thru 21APR04 1700 to AP0303705 6M0300119 CE0306041 CE0210986 RESP T ADD WO JYJ ST APS 'P 77 EQID SWYD CTL B RE-PC 48.1 BMS WPI 77 DESCRIPTION SWITCHYARD EQUIPMENT INSPECTION VERIFY RTO AS CALCULATED BY PPCS INSPECT CRIB.
INSTALL BUOYS AND FISH SEC SUPPORT MR 99-11-B RD I
1 110 I
115 ES 19APR04 09 OOA 20APR04 01:00 05APR04 10:OOA 05APR04 07:OOA 19APR04 12:59 20APR04 01:59 01MAY04 1159 07MAY04 14:59 EF RISK DR-Y ML-Y ORT3-N R-L DR-Y ML-Y ORT3-Y R-L DR-N ML-N ORT3-N R-L ID I830 66,80012,145sla2(122i 0, 2, 4, 6, 8.1012.141 61 8,202210, 2. -
20 1
21 tkP03t WMICJYARD EQUIPME ESWITCHYARD CONTRC 4T INSPECTION I lL BUILDING0303705 am0300II9VERIl 030011MC-AL Pre-e Y RTO AS CAL.C4LATED BY PPCS
)RIMETRIC I
proved teh speC T-Restart CL no1 req'd CEI 'P 76 1 INTAKE CRI I06. 47IE-c~nivn~nAIINSPEtT CRIaB INSTALl! BUOYS AND FISH P
I I
I C -a SOECS4PPORT MR 99-0 1I13 I-t01 I
Re CE6 M 77 SEC 925
're-appro' 3d tech'spec STAL Restart AEC, II4STALL NEW EQI L not reqd IP MR 99-11 E CE0210989 0A3 CH0300358 7,I CE6 IIU 76 CEO IM 76 SEC HEM-SAMPL SEC, INSTALL NEW EQUIP MR 99-011-E RCS CL TSR 3.4.52 115 148 05APR04 107MAY04 07:OOA 14:59 I DR-N MI-N ORT3-N R-L DR-Y ML-Y ORT3-N R-L
. 9 6 926 Pre-appn techspec ST-Restart I not reqd CSCLTSR 3A.S.2 II
-OMM MM CH 18APR04 07:OOA 24APR04 09:59
'ro-appro'
!I403003l
.d techspec ST-Restart RCS DP TSR 3A.5.1
'L not req'd CH0300371 CH 77
- HEM-SAMPI RCS DO TSR 3.4.5.1 48 18APR04 07
- OOA 24APR04 09:59 DR-Y ML-Y ORT3-N R-L I
I
-~
're-apprcy t1
- t*
4 4-4
+
4 4--
3d techdspec ST - Restart RCS abRON SR 3.9.1.1
'1 not req'd CH0300401 CH T 77 HEM-SAMPI RCS BORON SR 3.9.1.1 48 15APR04 07:OOA 24APR04 09:59 DR-Y MLY ORT3-N R-L I
W I
l W
3're-approy
'H30304!
3d techdspec ST-Restart C
RC SCLTSR 3A.5.2
- L not mq'd
_-4
+-
4-
.4-_----____
CH03DD498 CH lp 77
>iEM-SAMPI RCS CL TSR 3.4.5.2 48 18APR04 07:OOA 24APR04 09:59 DR-Y ML-Y ORT3-N R-L I -
-S
're-appro' 1HO0=5
.d techspec ST - Restart RCS Dp TSR 3A.5.1 L not reqd t
I---
UH03OU511 CH p
77,HEM-SAMPt RCS DO TSR 3.4.5.1
._48 15APR04 07:00A 24APR04 09:59 DR-Y MI-Y ORT3-N R-L l
I sdtc'se T-etr
.t-1.
4 4
+
4-.
're-apprcy
'HO300 StOchOs N ST - Restart BASi BO'RON T-SR 3'.5.1 1 not reqd 2
CH0300195 CH P
77
,HEM-SAMPt BAST BORON TSR 3.5.1.2 35 19APR04 07:OOA 23APR04 14:59 DR-Y ML-Y ORT3-N R-L urn
~
I Piap4oved t4ch spec ST - Res4rt CL not req'd A
.1.
L
- L.*J.
S
+/-
£ J
Run Date 19APR04 13:381 LT-52 WORKWEEK ACTIVITIES DURING UIR28 Sheet I of 5 C Primavera Systems, Inc.
I FL-52 Workweek Activities during U R28 I
after 19APR04 12:00 I
WORKWEEK SCHEDULE I
thru 21APR04 1700 ID RESP T WO EQID DESCRIPTION RD ES EF RISK Resra9 APR Y
ST 19 20 2
I S I.6.8A.lal2,114,al20
.2..611Z214618,a2(221 0.2.4,'6.8.101214.lraI CH0300385 CH 77 EM-SAMPL SGBDFO GAMMA SCAN 35 19APR04 23APR04 DRY RML-Y H
GBDPO GAMMA SCAN 07:OOA 14:59 ORT3-RLI Pre-ap oved tech spec ST - ReSt Irt CL not req'd CH0300440 CH 77 HEM5AMPl RE-229 ISOTOPIC 35 19APR04 23APR04 DR-Y ML-Y H0 MRE-224 ISOTOPIC 07:OOA 14:59 ORT3-N R-L.
_u Pro-ap ved tch spec ST - Rest Irt CL not req d I
CH0300524 CH 77 HEM-SAMP SGBDFO GAMMA SCAN 35 19APR04 23APR04 DR-Y ML-Y SGBDFO GAMMA SCAN 07:00A 14:59 ORT3-N R-L CHj Pre-ap tdch spec ST - Rest rt CL not reqd CH0300550 CH
. 77 CHEM-SAMPI RE-229 ISOTOPIC 35 19APR04 23APR04 DR-Y ML-Y CH 3005 22 ISOTOPIC 07:OOA 14:59 ORT3-N R-L Pre-ap tJch spec ST - Rest Irt CL not reqd l
CH0300564 CH 77 M-SAMP RCS GROSS ACTIVITY 6
21APR04 21APR04 DR-Y ML-Y I
CH0300 54RCS GROSS A6T1 SR 3.04.16.01 07:00 12:59 ORT3-N R-L 0300 5BMISC Prm-approved tdch
,l U -
_I EM0305229 EM 76 D-23 MONTHLY SECURIlY I
19APR04 19APR04 DR-N ML-N M03 NTLY SECURITY S'STEM BATTERY SYSTEM BATTERY 09:00A 12:59 ORT3-N R-M 20.442 SECU)RY SYSTEM BA rERY0305229 Pre-ppro techspecST-R startCLnotreqd
-III EM0305233 EM 76 0-23 QUARTERLY SECURITY I
19APR04 19APR04 DR-N ML-N
- 160, M03 2' IUARTERLY SECURM SYSTEM BATTERY SYSTEM BATTERY 09:OOA 12:59 ORT3-N R-M 20.44 0jSECURTY SYSTEM BA iFKY0305233 i
Pre-pproved tech spec ST - R start CL not reqd &
EM0305237 EM 76 D-501 MONTHLY G-O5 GT 4
19APR04 19APR04 DR-N ML-N 420,442 EM0305S MON LY G-05 GT GE? ERATOR 120V D¢ GENERATOR 120V DC 13:00-16:59 ORT3-N R-M 03052 0G-05 GT GENERA TOR 120V DC BATTERY Pre-approved tech spec
- Restart CL notreq'd EM0305241 EM 76 D-501 QUARTERLY G-05 GT 4
19APR04 19APR04 DR-N ML-N 420.442 EM03052 jQUA4TERLY 0.05 GT ENERATOR 120V DC GENERATOR 120V DC 13:00' 16:59 ORT3-N R-M 03052 I=G-05 GT GENER& TOR 120V DC BAtTERY Pre-adproved tech spec
-T
- Restart CL nog reqd EM0305251 EM 77 D-503 MONTHLY G-05 BLACK 5
19APRo4 19APR04 DR-N ML-N 442420 EM 30525 MONTtLY 0-05 E LACK START DIEEL START DIESEL 17:00 23:59 ORT3-N R-L 0525iG 5 G r GEN AUXILIARJI POWER DIESEL NGINE BATTER Pre-approved tech spec ST - Restart CL not req'd EM0305150 EM S
76 U1A-UV REL TEST U1A-RELAYS 3
19APR04 19APR04 DR-N ML-N 420.
EM0306150TEST UIA41 I RELAYS 1RMO 9071.1 & 9075-1 1RMP 9071-1 & 9075-1 20:00-22:59 ORT3-N R-M
- J06, 030>15(inTRAINA 4.16 KVAND 480k SWITCHGEAR ELAY TEST RE44Y Pre-approved tech spec ST - Reltart CL riot req'd EM0305155 EM S
76 U1B-UV REL TEST UiB-UV RELAYS 3
19APR04 20APR04 DR-N ML-N 442.
Elf0305155TEST U1 3-UV RELAYS IRMP 9071-2 & 9g 2
1RMP 9071-2 & 9075-2 23:00 01:59 ORT3-N R-M
- 420, 030515 51TRA N B 4.16 KV AND 480 V SWITCHG RELAY TEST RELAY
.appn ed tec spec ST, Restart CL not
'd Run Date 19APRo4 13:38 LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet 2 of 5 0 PrImavera Systems, Inc.
I FL-52 Workweek Activities during U1 R28
after 19APR04 12:00 I
WORKWEEK SCHEDULE I
thmu 21APR04 1700 ID lRESPl T WO l EQID DESCRIPTION RD ES I
EF RISK ResrCs APR I
-1 20 2
YST ID.68.12.14.1a12f2210.2.4.6.8.1 1oZ14,1S1a222l0. 2.4.6.8.1al14.16 M*I9 m
m EM0305202 EM P
76 125V STATION TECH SPEC 3
20APR04 20APR04 DR-N ML-N 420,44, M030202PTI N TECH SPEC BATTERIES WEEKL BATTERIES WEEKLY 00:00 02:59 ORT3-N R-M
' 030520Z^12 SYSTEM MULTI AND/OR NON-M MBERED ECUIPMEI Pre-ap roved tech spec St - Restart CL not I 'd EM0305245 EM P
77 D-502 MONTHLY G-05 4
20APR04 20APR04 DR-N ML-N 420.44 EMO305245ON LY G-05 STARTING BATTERY INSF STARTING BATTERY 00:00 03:59 ORT3-N R-L 030524_
5 GT GEN STAFT NG DIESEL EN INE DEVICE BA17E INSP Pre-ap roved ech spec sT - Restart CL not I Md EM0309070 EM P
76 D-105 WEEKLY STATION 3
21APR04 21APR04 DR-Y ML-Y 420.44 2 EM030 O7IWEEKLY STA9I BATTERY INSPECTION 08:00 10:59 ORT3-N R-M 03 07W125VDCLSTI Pre-approved XeC EM0309134 EM P
76 D-106 WEEKLY STATION 3
21APR04 21APR04 DR-Y ML-Y 20,4 E 0309134 WEEKLYlSl BATTERY INSPECTION 11:00 13:59 ORT3-N R-M 030913125V D Pm-approve IC0213547 IC1 P
77 Z-107G EXPLOSIVE DETECTOR I
20APR04 20APR04 DR-Y ML-Y 330 IC021354 PLOSIVE DET4CTOR CLEANING CLEANING 05:00 05:59 ORT3-Y R-L 1
021354 PORTABLE EXPLOSIVES DETEC OR m-tapproved tchispec ST - Restart not reqd IC0300673 I10 77 Z-108C INSPECT AND CLEAN 4
20APR04 20APR04 DR-N ML-N 330 IC0300 NSPECT AND CLEAN X-RAY MAC INE X-RAY MACHINE 05:00-10:59 ORT3-N R-L 0300 GATEHCIUSE X-RAY MAC INE re-approved tech:spec ST - Restart I not req d IC132RUN I11 76 ICP 13.002 CONTAINMENT 3
21APR04 21APR04 DR-N ML-N 321 IC132RU ^TD HYDROGEN 05:00-09:59 ORT3-N R-L 030100 CONTAINMEI re-approved tech sp Ui=
l
~ M:2 l-i k 1:4 l V
- 1 kV EI MI Il V s EI]
Ille:E k_ _104 :
MM0213893 MM1 77 ELECT PENE INSPECT AND 4
20APR04 21APR04 DR-N ML-N 441 MlT02138931NSPEC AND MAINTAIN CP P MAINTAIN 03 AND 058 23:00 0259 ORT3-N R-L
- 021389 IT 2 ELECTRICALlPE Pre-appr ived tech spec ST R MM0304865 MM2 75 YS-03587 2YS-3587 REPLACE 36 19APR04 21APR04 DR-Y ML-Y
- 441, MM03048 sYS-3$87 REPLACE NER STRAINER 12:00 05:59 ORT3-Y R-L 430.91 030486 II
]Z-27-1 TRAVELING MM0310364 MM2 P 76 HX-055A-1 HX-55A-1.-OPEN.
6 19APR04 20APR04 DR-N ML-N 441 MM0310364HX-55A-1, OPEN, CLEAN AND CLOSE CLEAN AND CLOSE 22:00-03:59 ORT3-N R-L 031036i
-01 EMER DIESEI: GENERATOR CC OLANT HX (WESt)
Pr-appm ed tech spec ST - Festart CL not req' I MM0310374 MM2 P 76 HX-055A-2 HX-55A-2 OPEN.
6 19APR04 20APR04 DR-N ML-N 441 MMQ310374HX4SSA-Z OPEN, CLEAN AND CLOSE CLEAN AND CLOSE 22:00-03:59 ORT3-N R-L 031037
_C -01 EMER DIESEI; GENERATOR CC OLANT HX (EASTJ Pre-appm ed tech spec ST - hestart CL not req' Run Date 19APRo413:381 LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet 3 of5 o Primavera Systems, Inc.
FL-52 Workweek Activitles during U1 R28 I
after 19APR04 12:00 I
WORKWEEK SCHEDULE I
thru 21APR04 1700 I Ti APR ID RESPTj WO I EQID DESCRIPTION RD ES EF RISK Re1rc2
__Y ST l0
_,~l,41,a(21..,,8,0241i221,
~
ID t14 _
11f Nu, TM 1s11 l11:4
=VI
_ =N I ly MM0304864 MM2 75 YS-03588 2YS-3588 REPLACE 36 21APR04 23APR04 441. l MM03O 8642YS-588 REP STRAINER 08:00 01:59 30 91 030
.I
.1 OP0215264 OPO 77 O-PC-021A WEEKLY 5
20APR04 20APR04 DR-N ML-N I
OP02 g
2 4WEEKLY MISCELLANEOUS D TA READINGS MISCELLANEOUS DAT 08:00 12:59 ORT3-N R-L 021 26_NEEKLY MISCELLANE US DATA READING READINGS Pre-approvedltech spec ST-Re tart CI.not req'd OP0215323 OPO 77 O-PC-006.1 OPERATIONS 3
21APR04 21APR04 DR-Y ML-Y OP02' S23OPERATIONg M MONTHLY INVENTORY 08:00-10:59 ORT3-N R-Li, 021 23MONTHl,'Y REPORT OP0215287 OPO _
77 O-IT-0007B IT-07B;P-32B SERVICE 4
21APR04 21APR04 DR-N ML-N 010' OP021 287-07T3B P-325SE WATER PUMP 08:00-11:59 ORT3-N R-M
,521.
021 287_P-32B SEF 5K106 Pre-approved i OP0308015 OPO _
77 O-IT-0007A IT-07A. P-32A SERVICE 4
21APR04 21APR04 DR-N ML-N 510.
OPO0 otdT107A. P-32A'S WATER PUMP 08:00-11:59 ORT3-N R-M 010.
030 01 i
_P-32A SE 521.
Pre-approvedt OP0215288 OPO 77 O-IT-0007C IT-07C. P-32C SERVICE 4
21APR04 22APR04 DR-N ML-N 521.
P02ts21#T507C h WATER PUMP 12:00' 08:59 ORT3-N R-M 10 025
.K06 OP0215354 OPi 77 =-PC-MIDS OPERATIONS MID 2153 EWEEKLY ROUTIJE SHIFT WEEKLY l
00:OA 05:59 ORT3NR-LN ROUTINE....
re-app tech mpec ST_
OP0215433 OP2 77 0-PC-DAYS OPERATIONS DAY 38 19APRO4 24APR04 DR-Y ML-Y PERATIoNs DAY SHI WEEKLY ROUTINE SHIFTWEEKLY 08:00A 14:59 ORT3-N R-L ROUTINE
.pra p
tech spec ST - Re tart CL not req'd OP0215461 OP2 77 PT-FP-003 ELECTRIC I
19APR04 19APR04 DR-N ML-N 010 OP02 g1ELFCTRIC MOTOR4 RIVEN FIRE PUMPJ MOTOR-DRIVEN FIRE 15:00 15:59 ORT3-N R-L l
02 61ELECTRIC MOTOR DRIVEN FIRE PUMP FUNCTIONALTEST PUMP Pre-approved ted spcST - Restart CLw otreq'd AIM
!1 1;X1 OP0215548 OP3 77 0-PC-SWING OpS SWING SHIFT 10 14APR4 20APR4 DR-N ML-N P02 PSS NGSHIFTWEELYROUTINE WEEKLY ROUTINE 16:00A 18:59 ORT3-N R-L l
- OPERATIONS WING SHIFT WEFK Prn-apprm dtech spec ST - Restart L not mq'd OP0308217 OP3 S 77 O-PC-045.1 BLOW DOWN I
20APR04 20APR04 DR-N ML-N 528 0
lP 030821BLOW DOWN INSTRUMENT AIR SYSTE INSTRUMENTAIR 17:00-17:59 ORT3-N R-L 03082171,PERIODIC BLOV DOWN OF AIR RtC SYSTEM l
lre-approved techispec ST - Restart %ZL Run Date 19APR0413:381 LT-52 WORKWEEK ACTIVIES DURING UI R28 Sheet 4 of 5 OPrimavera Systems, Inc.
FL-52 Workweek Activities during UI R28 -
I
after 19APR04 12:00 WORKWEEK SCHEDULE thru 21APR04 1700 ID lRES I WO l EQD DESCRIPTION RD ES EF RISK src APR wo TIII e6. 8 *1012.14.11al2nn t0. 2 *4 §68*011,61 20 4268*01,4 At-IAl L--
i I
U2GNDROW4 OP3 O-PC-021.3 DRAIN U2 MAIN 1
20APR04 20APR04 DR-Y ML-Y 524 U2GNOR004DRAIN U2 MAIN E ECTRICAL GENEVA ELECTRICAL 17:00 17.59 ORT3-Y R-L GENERATOR PER PC
_dre-approved tech spec ST - Restart btL
_21.3 I___
OP0215860 OP3 77 O-PC-025A SECURE RECIRC OF 0
21APR04 20APRW4 DR-N ML-N OP0215860*C RWSTIRESTORE SFP 1600 2259 ORT3-N R-L 021 586dqE lPre OP0215558 OP3 77 T-132 SODIUM BISULFITE 1
21APR04 21APR04 DR-Y ML-Y rOP0215558SI STORAGE TANK LOOP 16:00-16:59 ORT3-N R-L 021555dlS Flre-OP0215869 OP3 77 O-PC-001.2 T81 MONTHLY 32 21APR04 25APR04 DR-N ML-N I
I21 gT9 HEATINNGAENTILATION 16:00-19:59 ORT3-N R-L.
02158 OP0215549 OP3 77 D-PC-SWING OPS SWING SHIFT 49 21APR04 27APR04 DR-Y ML-Y 5
WEEKLY ROUTINE 16:00.
22 59 ORT3-N R-L OP RATIONS SWING:SHIFT WEEKLY UTINE021554 1@.:-it U l U_ El I11 __
01-35WW OPS G-02 AUGN G-02 TO 0
19APR04 19APR04 DR-N ML-N 01 3" UGN G-02 0 1A-O05/2A-05 IAW 01-35A CI IA-05I2A-05 IAW 01-35A 20:00 19:59 ORT3-N R-M 01-35WWA OPS G-01 ALIGN G-01 TO 1A-05 1 20APR04 20APR04 DR-N ML-N 01-35W AALIGN 0-01 TO IA-05 IAW 01-31 IAW 01-35A 06:00 06:59 ORT3-N R-M l
T-6465-H WCC
-01 0DGG-1 HX-55A11r MM 2 19APR04 19APR04 DR-N ML-N 530.
T.45-O DG G-1 HX 55A112 MM REV 01 REV 0-1 20:00' 21:59 ORT3-N R-L 310364 001646M0 DG G-1 sX-55Ap SMM REVs -1
)310374 Pme-approved techi spec ST - Restart CI riot reqd T-6465-R WCC iT G-01 O DG G-1 HX-55A1i2 MM 2 20APR04 20APR04 DR-N ML-N 3310364 T-6465-R 0 DG G-1 HX-55A1I6 MM REV 01 REV 0-1 04:00 05:59 ORT3-N R-L 0310374 001646!M 10 DG G-1 HX-55*1/2 MM REV 0-1
_ "pproved tech spec ST - Restart C. not req'd Run Date 19APR04 13:38 LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet 5 of 5 0 Pfimavera Systems, Inc.
FL-52 Workweek Activities during Ul R28
Run Date 19APR04 13:41)
Work Activity Risk Assignment l
Sheet 1 of 2 U
ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH APR ID ST RISK DescriIpton ID.
11 T16 r121i 6n1 0i618$o 6
O EM0305229 76 EM DR-N ML-N D-23 MONTHLY SECURITY U
19APR04 19APR04 ECURITY SYSTEM BATTERY ORT3-N R-M SYSTEM BATTERY 09:OOA 12:59 05229 - 80SAI 0
EM0305233 76 EM DR-N ML-N D-23 QUARTERLY SECURITY U
1 19APRO4 19APR04 ECURITY SYSTEM BATTERY ORT3-N R-M SYSTEM BATTERY 09:OOA 12:59 5233 - BO5A1 I
EM-BMFP-Wi 76 EM DR-Y ML-Y P-028B-M P28B WALK-DOWN TAGS 1 8
3 19APR04 19APR04
]STEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M CS P-28B EM REV1-1 12:00 14:59 312035 - 128EM 0
EM0305237 76 EM DR-N ML-N 0-501 MONTHLY G-05 GT U
4 19APR04 19APR04
]G-05 GT GENERATOR 120V DC BATTERY ORT3-N R-M GENERATOR 120V DC 13:00 16:59 0305237 - BOSAI 0
EM0305241 76 EM DR-N ML-N D-501 QUARTERLY G-05 GT U
4 19APR04 19APR04
-G05 GT GENERATOR 120V DC BATTERY ORT3-N R-M GENERATOR 120V DC 13:00-16:59 305241 - BOSA1 I
EM0305150 76 EM DR-N ML-N U1A-UV TEST U1A-UV RELAYS U
3 19APR04 19APR04
[TRAIN A 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS 1RMP 9071-1 & 9075-1 20:00 22.59 0305150 - BO5A1 I
EM0407696 77 EM DR-N ML-N SERVICE ISERVICE OBTAIN GREASE U
3 19APR04 19APR04 OMISC EQUIPMENT REPAIRISERVICE ORT3-N R-M SAMPLE 20:00' 22:59 0407696 - 128EM I
EZMRCP-K 76 EM DR-Y ML-Y P-001B-M P18 MQVE MOTOR FROM 1
6 19APR04 20APR04 EREACTOR COOLANT PUMP MOTOR ORT3-N R-H PUMP TO STAND 21:00 02:59 0215205 - 128EM I
EM0305155 78 EM DR-N ML-N U1B-UV TEST U1B-UV RELAYS U
3 19APR04 20APR04 OTRAIN B 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS IRMP 9071-2 & 9075-2 23:00 01:59 0305155 - B05AI EM0305202 76 EM DR-N ML-N 125V STATION TECH SPEC U
3 20APR04 20APR04 0125V SYSTEM MULTI ANDIOR NON-NUMBERED EQUIPMENT ORT3-N R-M BATTERIES WEEKLY 00:00-02:59 0305202 - B05A1 I
EM-BMFP-PJ 76 EM DR-Y ML-Y P-028B-M P288 PRE-JOB BREIFING 1
3 20APRo4 20APR04
[STEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M FOR MOTOR WORK 09:00' 11:59 0312035 - 128EM 0
EM0309070 76 EM DR-Y ML-Y D-105 WEEKLY STATION BATTERY U
3 21APR04 21APR04 0125V DC STATION BATTERY ORT3-N R-M INSPECTION 08:00' 10:59 0309070 - B05A1 0
EM0309134 76 EM DR-Y ML-Y D-106 WEEKLY STATION BATTERY U
3 21APR04 21APR04
[125V DC STATION BATTERY I ORT3-N R-M INSPECTION 11:00-13:59 0309134 - BOSA1 1
EM-BMFP-01 76 EM DR-Y ML-Y P-028B-M P28B REMOVE OIL LINES 8
6 21APR04 22APR04 9T=4ISTEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M AND MOTOR COVERS 15:00 12:59 0312035 - 128EM nw -
U I
IC0300801 76 ICV DR-Y ML-Y IA-03047-0 IA-3047 DIAGNOSTIC CHECK U
4 20APR04 20APR04
[lUIC IA HEADER INLET CONTROL OPERATOR ORT3-N R-N 20:00r 23:59 0300801 - 128fC I
MM0214054 76 MM1 DR-N ML-N HX-001B HX-1B. OPEN SG U
10 20APR04 21APR04 OSTEm GENERATOR ORT3-N R-M HANDHOLES 13:00 00:59 0214054 - 128MM I
MM-8480D1 76 MMI DR-N ML-N R-1 MOVE REACTOR VESSEL 1
4 20APR04 20APR04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-H HEAD TO RHLDA 16:00 19.59 0214134 - 128MM 1
MM-8480E 76 MM1 DR-N ML-N R-1 REMOVE UPPER INTERNALS U 4
21APR04 21APR04 OREACTOR VESSEL AND ASSEMBLY ORT3-N R-H 008:00 11:59 0214134 - 128MM
,N-CWE LT-81 HUMAN ERROR RISK BARCHART NMC Dn l
I W E a#
I FL-81 HUMAN ERROR POTENTIAL
' Primavera Systems, Inc.
Vulm'r L a I
~ ~~ollw4 w.uiaqj I
Run Date 19APR0413:41l Work Activity Risk Assignment Sheet 2 of 2 U
ACT WO I GRP HPE EQUIPMENT ActIvIty Cal DUR START FINISH APR ID ST RISK Descrvptlon ID 11 2180 611Z180 %8 d
0 61121810 21 f
I MM-8485B1 76 MM3 DR-Y ML-Y P-001B PLACE BACKSEAT U
1 20APR04 20APR04 OREACTOR COOLANT PUMP ORT3-Y R-M COLLECTION SYS IN 15:00 15 59 0214119 - 128MM I
MM-8485K 76 MM3 DR-N ML-N P-001B P-1B, ALIGN SEAL U
1 20APR04 20APR04 llREACTOR COOLANT PUMP ORT3-N R-M COLLECaON TO CAVITY 23:00 23:59 0214119 - 128MM E
I NGNDE18X NDE DR-N ML-N NDE-18 MINI-SUB 1
3 21APR04 21APR04
[]MINI-SUB INSPECTIONS PER NDE-18 ORT3-N R-M INSPECTIONS4NTERNALS 08:00 10:59 226EN E~
U -M[]"Sq^
-N 0
OP0215287 77 OPO DR-N ML-N O-IT-0007B IT-07,. P-32B SERVICE 2
4 21APR04 21APR04 OP-32B SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 08:00' 11:59 0215287 - B05A1 0
OP0308015 77 OPO DR-N ML-N O-IT-0007A IT-07A. P-32A SERVICE U
4 21APR04 21APR04
[CP-32A SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 08:00' 11:59 0308015 - BOSA1 0
OP0215288 77 OPO DR-N ML-N O-IT-0007C IT-07C. P-32C SERVICE 2
4 21APR04 22APR04 C==P.32C SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 12:00' 08:59 0215288 - B05A1 E*
E*
0 01-35WW OPS DR-N ML N ALIGN G-02 TO 1A-05/2A-05 1
0 19APR04 19APR04 I
ORT3-N R-M IAW 01-35A 20:00 19:59 B05A1 0
01-35WWA OPS DR-N ML-N ALIGN G-01 TO IA-05 IAW 1
1 20APR04 20APR04 E
C.
ORT3-N R-M 01-35A 06:00 06:59 BOSAI I
RP1A-060 OPS DR-N ML-N O-RP-001A FILL CAVfTY FOR ROD U
3 20APR04 20APR04
[FILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A)
ORT3-N R-M UNLATCH 20:00 22:59 1280P I
OP0300801 76 OPS DR-Y ML-Y IA-03047-O IA-3047 PMT STROKE PER IT U 1
21APR04 21APR04 0UiC IA HEADER INLET CONTROL OPERATOR ORT3-N R-N 110 00:00 00:59 0300801 - 1280P 1
RP4A-020 OPS DR-N ML-N O-RP-004A UNLATCH CONTROL RODS U
4 21APR04 21APR04 0UNLATCH CONTROL RODS (RP-4A)
ORT3-N R-M 00:00 03:59 1280P
_I.
_..~
a-I NMC I WE PBNP U1 Refueling 28 Outage LT-81 HUMAN ERROR RISK BARCHART FL-W1 HUMAN ERROR POTENTIAL O Primavera Systems, Inc.