Forwards non-proprietary Rev 0 to WCAP-14170, Phase Iva Wind Tunnel Testing for Westinghouse AP600 Reactor Suppl Rept & Proprietary LTCT-T2R-029, Quick Look Rept For.... Proprietary Portion of Document Sent to Westinghouse
ML20149F917
Person / Time
Site: 05200003
Issue date: 09/21/1994
From: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19304C547 List:
References
NTD-NRC-94-4300, NUDOCS 9409280212
Download: ML20149F917 (2)


Text

-

y ,

7 \

l c e-( ,

v i l

Westinghouse Energy Systems ea 355 Pittsbutgh Pennsylvania 15230 0355 Eleetric Corporation 1

NTD-NRC-94-4300 1 DCP/NRC0213 l Docket No.: STN-52-003 1 September 21,1994

? Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: MR. R. W. BORCHARDT

SUBJECT:

TEST DESCRIPTION FOR AP600 LONG TERM COOLING TESTS AT OREGON STATE UNIVERSITY: MATRIX TEST SB9 BLIND

Dear Mr. Borchardt:

Enclosed with this letter is a report describing the initial conditions and boundary conditions of a test performed at the AP600 l>>ng Term Cooling Test Facility at Oregon State University. This Test Description Report (TDR) summarizes the test initial and boundary conditions for test SB9.

The purpose of these data reports is to provide the NRC staff with information on AP600 matrix tests of sufficient depth to enable early evaluation and analysis of test results.

An electronic copy of the test data included in the TDR is provided as Enclosure 2 on a single 3.5" diskette. The test files are in ASCII format.

The TDR and diskette contain Westinghouse proprietary information and is identified as preliminary.

'Diis information will be incorporated in the Final Test Report. With the publication of the Final Test Report, the preliminary identification will be removed and a non-proprietary version of the Final Test Report will be prepared.

The Westinghouse Electric Corporation copyright notice, proprietary information notice, application for withholding and affidavit are attached.

This submittal contains Westinghouse proprietary information consisting of trade secrets, commercial information or financial information which we consider privileged or confidential pursuant to 10CFR2.790. Therefore, it is requested that the Westinghouse proprietary information attached hereto be handled on a confidential basis and be withheld from public disclosures.

o m . . ,. , ,

- s(s e g- / _

l I

9409280212 940921 Ak l PER ADOCK 05200003 OU 1

  1. 1 PDR l 2*^

(, f dddNy:#dHK) , ,p

\ /

NTD-NRC-94-4300 DCP/NRC0213 September 21,1994 This material is for your internal use only and may be used for the purpose for which it is submitted.  !

It should not be otherwise used, disclosed, duplicated, or disseminated, in whole or in part, to any ]

other person or organization outside the Commission, the Office of Nuclear Reactor Regulation, the J Office of Nuclear Regulatory Research and the necessary subcontractors that have signed a proprietary non-disclosure agreement with Westinghouse without the express written approval of Westinghouse, j Correspondence with respect to the application for withholding should reference AW-94-724, and should be addressed to N. J. Uparuto, Manager of Nuclear Safety Regulatory And Ucensing Activities, Westinghouse Electric Corporation, P.O. Box 355, Pittsburgh, Pennsylvania, 15230-0355.

Please contact Brian A. McIntyre on (412) 374-4334 if you have any questions concerning this transmittal.

Ox/p n N. J. Uparuto, n ger  ;

Nuclear Safety Regulatory And Ucensing Activities

/nja l Enclosures Attachments cc: T. Kenyon, NRC (w/o Enclosures)

R. Hasselberg, NRC (4 copies of Enclosure 1,1 copy of Enclosure 2)

G. D. McPherson, NRC (Enclosure 1) l A. levin, NRC (Enclosure 1)

L Shotkin (Enclosure 1)

P. Boehnert, ACRS (Enclosure 1)

B. A. McIntyre, Westinghouse (w/o enclosures / attachments) um

_ _ _ _ _ _ _ _ _ . - - - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - - . -