Monthly Operating Rept for May 1994 for Fermi 2
ML20069M394
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/31/1994
From: Gipson D, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-94-0044, CON-NRC-94-44 NUDOCS 9406210334
Download: ML20069M394 (4)


Text

. _ . . . - - - -. - . . -- . . ._ . . -. . - ..

.A s -t U ..

Douglas R. Cipson Sernor Vice Presdent

' Nuclear Generanon

^

DOITOil rennu

'"o

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for May, 1994 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May, 1994. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact, Brian Stone, at (313) 586-5148.

Sincerely, .

Enclosure cc: T. G. Colburn-D. R. Hahn J. B. Martin M. P. Phillips K. R. Riemer P. L. Torpey ,

9406210334 940531 j PDR R

ADOCK 05000341 PDR J [/ 1 l

. s L

A OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE June 15, 1994 TELEP110NE (313) 586-5148 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using weight-l
2. REPORTING PERIOD: May, 1994 i ed averages to reflect variations l 3 LICENSED TilERMAL POWER (MWL): 3430 l in rating (MDC and DER). l
4. NAMEPLATE RATING (GROSS MWe): 1179 i (2) Currently limiting power to l
5. DESIGN ELECT RATING (Net HWe): 1116 I 93 5% CTP maximum to limit turbine I ;
6. MAX DEPENDABLE CAP (GROSS MWe):1135 I component vibration. All ratings l
7. MAX DEPENDABLE CAP (Net MWe):1085 l reflect 98% CTP due to turbine I i throttle valve limitations. I
8. IF CllANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 Tl!HOUGli 7) SINCE ,

LAST REPORT, GIVE REASONS: N/A l

9. POWER LEVEL TO WilICil RESTRICTED, IF ANY (MWe Net): (2)
10. REASONS FOR RESTRICTION, IF ANY: (2)

TilIS MONTil YH TO DATE CUMULATIVE j

11. liRS IN REPORTING PERIOD 744 3,623 55,693
12. liRS REACTOR WAS CRITICAL 0 0 40,545
13. REACTOR RESERVE SilVTDOWN llRS 0 0 0 l l
14. Il0URS GENERATOR ON-LINE 0 0 39,124.4
15. UNIT RESERVE SMUTDOWN 110URS _ 0 0 0
16. GROSS TilERMAL ENERGY GEN (MWil) 0 0 119,702,687
17. GROSS ELECT ENERGY GEN (MWil) 0 0 39,973,957
18. NET ELECT ENERGY GEN (MWil) 0 0 38,233,715
19. UNIT SERVICE FACTOR 0 0 70.3
20. UNIT AVAILABILITY FACTOR 0 0 70.3
21. UNIT CAP FACTOR (USING MDC NET) 0 0 64.0 (1)
22. UNIT CAP FACTOR (USING DER NET) 0 0 62.5 (1)
23. UNIT FORCED OUTAGE RATE 100.0 100.0 11.9
24. SIIUTDOWNS SCIIEDULED OVER NEXT 6 MONTIIS (TYPE, DATE, DURATION OF EACil):
25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

October 1, 1994.

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

l.

AVEllAGE DAILY UNIT POWER LEVEL l -

DOCKET NO. 50-341 UNIT FEftMI 2 DATE June 15, 1994 _

COMPLETED BY R. Pirkle

)

TELEP110NE (313) 586-5027 Month May, 1994

)

1 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) (MWe-Net) i 1

1 0 17 0 2 0 18 0 3 0 19 0 l

4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-341 DATE June 15. 1994 UNIT NAVE Fermi 2 COMPLETED By B. J. Stone TELEPHONE (313) 586-5148 REDORT MONTH Uav. 1994 i i ) i  ! i METMOD 05 .  ! i

! l , I l l SHUTTING DOwN LER I SYS l COVC i CAUSE & CORRECTIVr '

NC. l DATE l TYPE i DUR l REASON i THE REACTOG . NO.  ! CODE I CODE i ACTION TO PREVENT l l l t (1) 1 (MRS){ (2) i OR REDUCING 1 l (4) ! (5) l PECURRENCE I (6) I I I (7) 1 I PCwER (3) 1 l j j l

!  ! l  ! (8) I i 1 i i  !  !

i i i t i i  ! l  !

l S33-06 1 931225 i F l 600 l A I 3 193-014 l TA I TRB lReacto- trippec following trip o*

!  !  !  ! l i  ! I imain turbine. Estensive camage to i l l  !  ! I 1 l l1o. oressure turbine number 3. tne

!  ! l  ;

i < i imain generator, anc the main

! I l 1 i  ! igene ato- e= citer occu-rec caring i i I  ! i ,

I t itnis event. Causes o+ this  !

! I l  ! i , i iecuioment aamage are unce"

' linvestigatioc.

! I l 1  !  !  !

l l  ! .

l I l i 2

!  ! i t i 593-Ot i 940312 i S i 144 l C , 4 1 i i IScneouleo outage nou-s refiect i l  ! i i  ! l l l loriginal re*ueling outage 4 enc i

! l  !  ! i i ,1  ! !cate.  !

(5 ) F: FORCED (2) REASON: (0) METHOD: (4) INSTRUCTIONS FOR 5: SCHEDumED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAV EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-iC22)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5- REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G - ODERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) -

(5) SAME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER REDUCTION.

S - FREFIX INDICATES PLANT Sm;TDOmN.

(7) DURATION OF REDUCTION 5 REDORTED AS ZERO PER REG.

GUIDE '.16 REN. 4 (8) Outage nours are a continuation of the outage

=nich Degan on 12/25/93.