NRC-92-0055, Monthly Operating Rept for April 1992 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for April 1992 for Fermi 2
ML20096E050
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/30/1992
From: Orser W, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-0055, CON-NRC-92-55 NUDOCS 9205190041
Download: ML20096E050 (4)


Text

.

) - .

Ul,l*M , l'L -t , .,

. v.y Detroit u-Eclison is!BF" Reg Cuide i.is ut.

May 15, 1992 NRC-92-0055 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 )

l i l

Reference:

Fermi 2 i NRC Docket No. 50-341 l NRC Operating License No. NPF-43 Subject; Honthly Operating Status Report for April, j 1992 i Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for April, 1992. This report includes

, the Operatint; Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Sperification 6.9 1.6.

If you have any questions, please contact Brian Stone, at (313) 536-5148.

Sincerely, f)

! Enclosure cc: T. G. Colburn A. B. Davis D. R. Hahn H. P. Phillips 3 S. Stasek P. L. Torpey

1) ,

,annso -

9205190041-920430 PDR ADDCK 05000341 [

l- R PDR

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE May 15, 1992 TELEPHONE (313) 586-5148 OPERATING STATUJ

1. UNIT NAME: Fermi 2 , __ _ l Notes (1) Calculated using l P. REPORTING PERIOD: April,1372 l weighted av3 rages to reflect l 3 LICENSED THERMAL POWER (HWt) ,. 3293 l variations in MDC. I
4. NAMEPLATE RATING (GROSS MWe): 1854 l- l
5. DESIGN ELECT RATING (Net MWe) _JQ23 l l
6. MAX DEPENDABLE CAP (GROSS MWe):1110 l l
7. MAX DEPENDABLE CAP (Net MWe):1060 l ,j,
8. IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 TilROUGil 7)_ SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WilICll RESTRICTED, IF ANY (MWe Net): N/A
10. REASONS FOR RESTRICTION, IF / Y:

Tills MONTil YR TO DATE CUMULATIVE

11. IIRS IN REPORTING PER10D 719 2,903- 37,429
12. HRS REACTOR WAS CRITICAL 649.1 2,797.2 28,060 9
13. REACTOR RESERVE SHUTDOWN HRS 0 _ 0 0 1
14. Il0VR' GENERATOR ON-LINE 626.2 2,764.6 26,791.4
15. UNIT RESERVE SIIUTDOWN HOURS 0 0- 0
16. GROSS TilERMAL ENERGY GEN (MWil) 2,018,808 __8,967,312 80.448,503.4
17. GROSS ELECT. ENERGY GEN (MW11) 691,840 3,078,140 26,726,177
18. NET ELECT ENERGY GEN (MWH) 662,198 2,956,023__ 25,548,259
19. UNIT SERVICE FACTOR 87.1 95.2 71.6
20. UNIT AVAILABILITY FACTOR 87.1 95.2 71.6
21. UNIT CAP FACTOR (USING MDC ' NET) 86.9 96.1 63 7(1)
22. UNIT CAP FACTOR (USING DER NET) 84.3 93.2 62.5
23. UNIT FORCED OUTAGE RATE 12.9- 4.8 8.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6' MONTHS (TYPE, DATE,. DURATION OF EACil):

Refueling: Starts September 12, 1992: Duration 50 days.-

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A

-3 COMMERCIAL OPERATION N/A N/A

cVERAGE DAILY UNIT POWEH LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE Hay 15. 1992 COMPLETED BY E. Dawson TELEPHONE (313) 586-5027 Honth April, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEI.

(HWe-Net) (HWe-Net) 1 1091 17 1087 2 1094 18 1081___

3 1091 19 1083 4 1091 20 1074 5 1092 21 1069 6 1088 22 1081 7 1008 23 1083 8 0 24 1082 9 0 25

__. 1085 __

10 0 26 1084 11 '48 27 1084

~

l 12 670 28 1088 13 1096 29 1080 It! 1095 30 1081 1 15 1091 31 N/A l

l 16 1079

19

<e UNIT SHUTDOWNS AND PCwER REDUCTIONS DOCAET NO. 50-341 DATE rav 15. 1992 UNIT NAMI Fermi 2 COMPLETED BV B. J. Ston.

T E'.E PHON E (3t3) 586-51A8 REPORT MONTH Aprit. 1992 1 I i 1 i

1 j i .i j l NETHOD OF j LER SYS COwp CAUSE & CORRECTIVE I CODE ACTION TO pnEVENT f NO. I DATE I TYPE DUR l REASOM l SHUTTING DOWN I NO. CODE l l (1) (HRS) (2) THE DEACTOR i (4) I (5) l RECURRENCE I l

(6) i (3) l (

I I f

i . i i 592-02 04/07/92 F 92.8 A t l 92-003 NH VACB l During performance of a routine 1 l l sue veillance on drywell and j I I suppression cha=cer vacuum breamer 8

{ l j l operabi l i t y . a vacuum breater did

]

} , j l l not close after being opeaed.

I- l l (he vacuum breaker actuator

} ,

i (utilizad during testing enly) j l l l l l l j j  ! l ,

I bound in the cpen position. l 1 1 I i f i f (1) Fr FORCED (2) REASON: (3) METHOD: (4) EXHIBIT G - INSTRUCTIONS S: SCwEDULED A - EQUIPWENT FAILURE 'EXPLAINf t - WANUAL FOR PREPARATION 08 DATA B - WAINTENANCE OR TEST 2 - MANUAL SCRAW ENTRY SHEETS FCR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAW EVENT R F PORT (LER) F*LE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-Otst)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ATMINISTRATIVE 9 - OTHER G.- ODERATIONAL ERROR (EXPLAIN)

M - OTHER (EXPLAIN) (5) EXHIBIT 1 - SAME SOURCE (6) 4 - PREFIX INDICATES POWER REDUCTION.

5 - PREFIX INDICATES PLANT SHUTDOaN. i I

1 J

q

- .ma