_ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

1

??? h?5w

\

l :. :

Detroi.t ~~

m. , t . , o m e
d! son = " es -" Res cuide i.is  ::',: m April 15, 1992 NRC-92-0030 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for March, 1992 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March, 1992. This report includes the Operating Data Report, Average Daily Unit Power Levsl, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc: T. G. Colburn A. B. Davis D. R. Hahn R. V. DeFayette S. Stasek P. L. Torpey l

c.cc i ' '

,, +

i ,I

'oh0kdiOO'01 920331 PDR ADOCK 0500 1

. j [v ( l R /

, -_ . .. .. .- . .~ . - - . - - -. . --. . . - _ . . . . - _ . - -

,' .c

- OPERATING DATA REFORT l

DOCKET NO. 50-341 COMPLETED BY B. J. Storie ,

DATE. April 15, 1992 TELEPHONE (313) 586-5148 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using l
2. REPORTING PERIOD: March , 1992 ,

I weighted averages to rcuect l

. 3 LICENSED THERMAL POWER (MWL): ..... 3293 l variations in MDC. I

4. NAMEPLATE RATING (GROSS MWe): 1154 I I 5 DESIGN ELECT RATING (Net MWe):JO,93 l l
6. MAI DEPENDABLE CAP.(GROSS MWe):1110 l l 7 MAI DEPENDABLE CAP (Net MWe):1060 l l
8. IF CRANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): N/A
10. REASONS FOR RESTRICTION, IF ANY:

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 2,184 36,710
12. HRS REACTOR WAS CRITICAL 708.1 2,148.1 27,411.8
13. REACTOR PESERVE SHUTDOWN HRS O O O
14. HOURS GENERATOR ON-LINE 698.4 2,138.4 26,165.2
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. nROSS THERMAL ENERGY GEN (MWH) 2,226,624 6,948,504 78,429,695.4
17. GROSS ELECT ENERGY GEN (MWH) 756,520 2,386,300 26,034,337
18. NET ELECT ENERGY. GEN (MWH) 725.908 2,293,825 24,886,061
19. UNIT SERVICE FACTOR 93 9 97.9 71.3 -
20. UNIT AVAILABILITY FACTOR 93.9 97.9 71.3
21. UNIT CAP FACTOR (USING MDC NET) 92.0 ,_

99.1 63.2

22. UNIT CAP FACTOR (USING DER NET) 89 3 96.1 62.0(1)

, 23. UNIT FORCED OUTAGE RATE 6.1 2.1 8.6 l 24. SHUTDOWNS THEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):

Refueling- Starts September 12, 1992: Duration 50 days.

' 25. IF SHUT TOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

26. UNITS IN TEST STATUS (PRIOR TG COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A  ;

INITIAL ELECTRICITY N/A ,

N/A ,

j

! COMMERCIAL OPERATION N/A N/A i l-

- - = __-___________ - -___ - - - . , , _ _ _ , , -

. . - . - . . . - - . - - . . . . ~ . . . - - . . .- _ _ - . . ~ . . - - . ..

J.-

AVERAGE D&ILY UdlT POWER LEVEL DOCKET NO. 50-341 UNIT' FERMI 2 DATE April 15. 1992 COMPLETED BY E. Dawson TELEiHONE (313) 586-5027 1

Month March, 1992- _

Dt.Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER' LEVEL ,

e (MWe-Net) (MWe-Net) j 1 1070 17 0 i

2 1083 18 85

)

.3 1085 19 628 4 -1084 20 805 5 1080 21 1088 6 1077__ 22 1081

i. 7- 1070' 23 1086 8 1071 2'l 1081
9. . _ 1070 25 1072 10 1081 26 1073 11- 1093 27 1072 3 L12 1091- 28 1080
13. 1089 29 1078 14 1005 30 1077 c

15 1087 31 1075 I- 16 -791 i

?

.c .-

UNIT SHUlsOWNS AND POWER REDUCTIONS ,

DOCMET NO. 50-341 DATE April 15. 1992 UNIT NAME Fermi 2 COMPLETED BV B,J.

2 5 tone TELEPHONE (313) 586-S'48 REPCRT MONTH March, 1392 I I I 1 METHOD CF LER SYS COMP CAUSE & CCERECTIVE NO. DATE TYPE DUR REASON SHUTTING DOWN  ; NO. CODE CODE ACTION TO PREVENT (1) (HRS). (2) THE REACTOR l l (4) (S) PECURRENCE i (6) i (3) l I  !

I I S92-01 03/16/92 0 45.6 a 2 92-002 - --- Manual Aeactor Scram due to opera-tion in region of insteoility (High I i Power to Flow) folioning inadver-

{ l i tent actuation of safety systems

} l 1 { du-ing surveillance test. Safety I l l i system actuation occurred when I l i i i test meter shorted internally.

I I f I  ! 1 (1) F: FORCED (2) REASONr (3) METHOD: (4) EXHIBIT G- INSTRUCTIONS

! S: SCHEDULED A - EQdIPMENT FAILURE (EXPLAIN) 1 - MANVAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-016?)

E - CPERATOR TRAINING & LICENSE EXAMINATION 5- REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EMPLAIN) l H - OTHEG (EXPLAIN) (5) ExHISIT 1 - SAME SOURCE l

I (6) R - PRFFIA INDICATES POWER REDUCTION-5 - DREFIX INDICATES PLANT SHUTDOWN x - n