NRC-90-0064, Monthly Operating Rept for Mar 1990 for Fermi 2.W/900416 Ltr

From kanterella
(Redirected from NRC-90-0064)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1990 for Fermi 2.W/900416 Ltr
ML20042E538
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/31/1990
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0064, CON-NRC-90-64, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9004230559
Download: ML20042E538 (4)


Text

.. - -. . . .. . - . . - - -. ._ . - - .

.i L j. .  :. ;, . .

V b PS dCn

. Nuclear Opetahons . .

Reg Guide 1.16 L MO.l.l

=

r.rme r 6400 North Dime H . Nuclear .

-C ISOn arrawa*"ghway '" o-"a"

! April 16, 1990 i

! NRC-90-0064 ,

i l

J U. S. Nuclear Regulatory Commission .

! Attention: Document Control Desk  ;

Washington, D.C. 20555 l

Reference:

Fermi 2

NRC Docket No. 50-341

! NRC Operating License No. NPF-43  ;

r  !

Subject:

Monthly Operating Status Report for. 6 March. 1990  ;

Enclosed for your information and-use is the Ferai2 Monthly Operating Status Report for March,-1990.; This report includes the Operating. Data Report, Average' Daily Unit Power Level, and-the Summary of Unit Shutdowns and Power Reductions identified in  :

NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification , 6.9.1.6.

If you have any questions, please contact Patricia Anthony at. ,

(313) 586-1617. ,

Sincerely,

{

1 l

W. S. Orser Vice President U Nuclear Operations l

r Enclosure cc: A. B. Davis U l J. R. Eckert r L

D. R. Hahn i= R. W. DeFayette/W. L. Axelson T.'R. Quay-W. G. Rogers l'

ci

.q

~

9004230559 900331

]

DR ADOCK05000,gi .

]. ;s OPERATING DATA REPORT e

DOCKET NO. 50-341' COMPLETED BY P. M. Anthony DATE April-16, 1990 TELEPHONE (313) 586-1617 OPERATING STATUS Fermi 2 l Notes: l .

1. UNIT NAME:
2. REPORTING PERIOD:' March, 1990 l -l 1 LICENSED THERMAL POWER (MWt): 3293 l l.

3

-l

4. NAMEPLATE RATING (GROSS MWe): 1154 l l l
5. DESIGN ELSCT RATING (Net MWe): 1067 l
6. MAX DEPENDABLE CAP (GROSS MWe): 1134 l 1-
7. MAX DEPENDABLE CAP (Net MWE): 1047 l -l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Lines 5 through 7 revised based on ECAR I testing, j
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):- None 10.~ REASONS FOR RESTRICTION, IF,ANY: None  ;

THIS MONTH YR TO DATE CUMULATIVE .

11. HRS IN REPORTING PERIOD 744 2160 19,166
12. HRS REACTOR WAS CRITICAL 744 2160 13,256.9
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 744- 2160 12.456.8
15. UNIT RESERVE SHUTDCWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 2,413,032 6.895,800 36,257,762
17. GROSS ELECT ENERGY GEN (MWH) 815,670 2.330,000 12,074,357'
18. NET ELECT ENERGY GEN (MWH). 782,916 2,235,906 .11,548,757 100 100 65 0. -
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR 100 100 65.0
21. UNIT CAP FACTOR (USING MDC NET) 100.5 101.4 57.6-

.22. UNIT CAP FACTOR (USING DER NET) 98.6 97.6 55.3 l i 23. UNIT FORCED OUTAGE RATE O O 15 1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) f None.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A I
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A- N/A 1

'i

I o! t AVERAGE DAILY , WIT POWER LEVEL l DOCKET NO. 50-341 e

UNIT FERMI 2 DATE April 16, 1990 .

00NPLETED BY E. Dawson--

TELEPHONE (313) 586-5027 .

Month March, 1990 ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE'I)AILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1074 17 '1059 2 1038 18 1067 3 1076 19 1074 -

4 1080 20 1074 q 5 1076 21 1070 ,

6 1078 22 1063~-

7 1071 23 1049 8 1069 24 --1080  :

1 9 1039 25 1075' 10 1066' 26 1077 J 11 1068 27 1078 12 1046 28- 1077 13 - 1048 29. 1072 1

14 1048 30 1062 15 1040 31 -731  ;

1 16 1030 l

UNIT SHUTDOWNS AND POWEst REDUCTIONS p DOCKET NO. 50-341 DATE April 16. 1990 UNIT NAME Fermi 2 COMPLETED BV P. M. Anthony TELEPHONE (313)586-1617 REPORT MONTH March. 1990 L .l METHOD OF LER SYS COMP CAUS$ & CORRECTIVE l NO. DATE TYPE DUR REASON SHUTTING DOWN NO. CODE CODE ACTION TO PREVENT l (1) (HRS) (2) THE REACTOR (4) (5) RECURRENCE (3)90-003 03/31/90 5 8 5 --

Reduced power to perform weekly' l Turbine Steam valve surveillance and then continued to approximately

) 60% power for control rod sequence l exchange and scram timing.

I (1) F: FORCED (2) REASON: (3) METHOD: (4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL' FOR PREPARATION OF DATA B - MAINTENANCE OR TEST. 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING &' LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) (5) EXHIBIT 1 - SAME SOURCE o

,- - .~.v - - - . . . . . . , . , , _, .._n ,_ , -

n&