Similar Documents at Fermi |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0049, Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included ML20209C1081999-06-29029 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 30 NRC-99-0050, Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included1999-06-24024 June 1999 Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included NRC-99-0075, Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld1999-06-22022 June 1999 Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld ML20212J3861999-06-18018 June 1999 Forwards Rev 29 to Approved UFSAR LCR That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0047, Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl1999-06-0909 June 1999 Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl ML20195G2001999-06-0808 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 28 ML20195E7391999-06-0303 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 27 NRC-99-0046, Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 11999-06-0202 June 1999 Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 1 ML20207D9631999-05-26026 May 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) ML20195B3381999-05-19019 May 1999 Forwards Rev 25 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative1999-05-14014 May 1999 Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative NRC-99-0039, Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl NRC-99-0041, Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl NRC-99-0038, Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii)1999-05-14014 May 1999 Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii) NRC-99-0045, Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl1999-05-0707 May 1999 Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl NRC-99-0044, Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses1999-04-30030 April 1999 Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses NRC-99-0059, Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate1999-04-29029 April 1999 Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate ML20206E2941999-04-28028 April 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 24 NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl1999-04-26026 April 1999 Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARNRC-90-0142, Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request1990-09-0707 September 1990 Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request NRC-90-0152, Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl1990-09-0505 September 1990 Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl NRC-90-0139, Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs1990-08-31031 August 1990 Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs NRC-90-0116, Forwards Semiannual Fitness for Duty Rept1990-08-29029 August 1990 Forwards Semiannual Fitness for Duty Rept NRC-90-0117, Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred1990-08-28028 August 1990 Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred NRC-90-0118, Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-921990-08-24024 August 1990 Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-92 NRC-90-0135, Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found1990-08-17017 August 1990 Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found NRC-90-0137, Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting1990-08-17017 August 1990 Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting NRC-90-0136, Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam1990-08-17017 August 1990 Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam NRC-90-0133, Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld1990-08-0909 August 1990 Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld NRC-90-0112, Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted1990-08-0303 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted NRC-90-0111, Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 19901990-08-0303 August 1990 Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 1990 ML20055H8921990-07-26026 July 1990 Forwards Certification of Financial Assurance for Decommissioning of Facility,Per 10CFR50.33(k) & 50.75. Util Intends to Retain Unit 1 in Safe Storage Status Until Unit 2 Shut Down & Decommissioned NRC-90-0131, Forwards Rev 15 to Physical Security Plan.Rev Withheld1990-07-24024 July 1990 Forwards Rev 15 to Physical Security Plan.Rev Withheld NRC-90-0108, Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-021990-07-18018 July 1990 Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-02 NRC-90-0093, Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits1990-07-18018 July 1990 Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits NRC-90-0091, Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items1990-07-0202 July 1990 Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items NRC-90-0101, Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl1990-06-29029 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl NRC-90-0100, Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason1990-06-27027 June 1990 Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason NRC-90-0088, Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use1990-06-14014 June 1990 Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use NRC-90-0095, Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request1990-06-0606 June 1990 Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request NRC-90-0089, Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel1990-06-0404 June 1990 Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel NRC-90-0085, Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-051990-05-29029 May 1990 Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-05 NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members1990-05-18018 May 1990 Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members NRC-90-0083, Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 9005251990-05-18018 May 1990 Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 900525 NRC-90-0082, Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections1990-05-11011 May 1990 Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections NRC-90-0068, Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc1990-05-0101 May 1990 Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc NRC-90-0071, Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training1990-04-30030 April 1990 Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training NRC-90-0078, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime1990-04-25025 April 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime NRC-90-0051, Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement1990-04-12012 April 1990 Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement NRC-90-0060, Responds to 900104 Request for Supplemental Station Blackout Submittal1990-03-29029 March 1990 Responds to 900104 Request for Supplemental Station Blackout Submittal NRC-90-0061, Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened1990-03-27027 March 1990 Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened NRC-90-0055, Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys1990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys NRC-90-0024, Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded1990-03-16016 March 1990 Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded NRC-90-0045, Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant.1990-03-13013 March 1990 Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant. NRC-90-0054, Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc1990-03-0909 March 1990 Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc NRC-90-0043, Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 9002021990-03-0909 March 1990 Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 900202 NRC-90-0037, Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey.1990-03-0505 March 1990 Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey. NRC-90-0029, Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event1990-03-0505 March 1990 Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event NRC-90-0028, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses1990-03-0101 March 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses NRC-90-0034, Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results1990-02-26026 February 1990 Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results NRC-90-0036, Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request1990-02-26026 February 1990 Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request NRC-90-0026, Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure1990-02-15015 February 1990 Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure NRC-90-0020, Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21)1990-02-12012 February 1990 Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21) NRC-90-0010, Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised1990-02-0101 February 1990 Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised NRC-90-0012, Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 19911990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 1991 NRC-90-0016, Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 9001031990-01-26026 January 1990 Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 900103 NRC-90-0013, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util1990-01-26026 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util NRC-89-0297, Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp1990-01-12012 January 1990 Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp NRC-89-0240, Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches1990-01-11011 January 1990 Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches 1990-09-07
[Table view] |
Text
.
.E ]
B. Rdph Sylvis Gernor Vice President 6400 North Date Nghwa, Edison ~te:;'= --
i March 9, 1990 NRC-90-0054 Director, Office of Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Nashington, D. C. 20555 x
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) NRC Order Modifying License and Notice of Violation (NRC Investigation Report Nos.
3-85-019, 3-86-002, 3-86-006, and 3-86-015),
dated February 12, 1990
- 3) NRC-Inspection Report No. 50-341/86012, dated July 25, 1986
Subject:
' Response to Notice of Violation (NRC Investigation Report Nos. 3-85-019, 3-86-002, 3-86-006. and 3-86-015)
- Attached is the response to the subject Notice'of Violation dealing with accuracy of information provided to the Nuclear Regulatory Commission. Detroit Edison considers it important that' complete and truthful information be provided to the NRC and has taken extensive L actions since these violations occurred to create an atmosphere
. supportive of-accurate and candid information exchange.
Actions.taken to improve communications with the Nuclear Regulatory Commission are' contained in Attachment 1. Specific responses to=the violations are included in Attachment'2. Detroit Edison is pleased that-the NRC has recognized the aggressive self-review program that has been implemented to ensure regulations are being followed and that recent communications have been candid and complete. '
Detroit Edison management has discussed the Order modifying Fermi 2's i\
license with the affected inoividual. He is aware of the provisions fg(jf in the Order,
[k
\
9003150399 900309 PnR ADOCK 05000341 3
e \
Q PDC
.7; l . .
.. ; =, ; .., ,
X. ~USNRC- ,
-March 9,-1990 .i L:U :NRC-90-0054 j Page 2 If there are any questions concerning this response, please contact Lynne Goodman at (313) 586-4211.
Sincerely,.
Enclosure
?
oc: A. B. Davis !
R. W. DeFayette W. G. Rogers J. F. Stang 1 6
e t
?
L_' ,
. c;7 :,-
re USNRC-
- "'f, March 9;1990 NRC-90-0054 Page 3'
[
F I, B. RALPH SYLVIA, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to
- the best of my knowledge and belief.
YA/>
B.RALfHSYpIA 1
Senior Vice President 1
i On this day of i ,-1990, before me personally' appeared-B. Ralph Sylvih, being first duly sworn and says that he executed the foregoing as his free act and deed.
I t.
1 ;
i t
- /W'O h, f/ W Notary Public f
i ROU11E A. ARME1TA Notary PubCc, Morvoo County.Mi MyComminionExpirasJon.11.1992
. : i
. i r Attachment 1 J NRC-90-0054 ,
Page 1 L ,
COMMUNICATIONS WITH THE NRC Detroit Edison has censitted itself to provide an atmosphere conducive to complete and accurate communications with the NRC through efforts in the areas of new management personnel, communications, training, an enhanced corrective action system, improvement programs and self-assessment.
Since 1986 when the most recent of these violations occurred, Detroit Edison has added experienced senior management and management personnel in the security and nuclear engineering departments. These people are ,
experienced in the demands of a nuclear culture in addition to the i technical aspects of their positions.
One of the first actions that was taken to improve communications was establishment of a Candor Committee in 1986. It's objective was to focus the sensitivity of employes at all levels on the need for candor in communication and encourage the free flow of accurate and complete information among employes and to the NRC.
Another action was to present training to Ferri management personnel on understanding'and optimizing relationships with the Nuclear Regulatory Commission. This was conducted by the Management Analysis Corporation (HAC) in 1986.
An action recommended by the Candor Committee was to develop a Fermi creed to be included in the. forward to the Business Plan. Since the Fermi Business Plan was first developed in 1987, two of the targeted l areas were regulatory compliance and communication with the NRC. The 1990-94 Nuclear Generation Business Plan forward states in part:
"......our communications both inside the Nuclear Generation organization and with all external agencies are characterized by candor, accuracy and completeness."
l In addition, the procedure governing communications with the Nuclear Regulatory Commission was revised with the issuance of new Fermi Management Directive (FMD) RA1, " Interfacing with Regulatory Agencies and Industry Organizations" in 1987 FMD RA1 establishes the need for l accurate information to be presented to the NRC and the methods for doing l
- 'so. Included in FMD RA1 is the need for management review of all formal communications with the NRC. Each letter is reviewed by senior l p~ ' management in addition to personnel providing information in the letter. I Each involved individual is required to sign that the information in the letter covering their area of responsibility is based on facts and y
l l
y .. .
-e' i
' Attachment-1 NRC-90-0054-Page 2 circumstances which are true and accurate to the best of tneir knowledge and responsibility.
Over the years, letters and memorandums have been sent to all site personnel reminding them of the need for complete and accurate information exchange with the NRC. Such letters have been issued as a reminder specifically before major NRC team evaluations, such as the
. Diagnostic Evaluation Team, to ensure site personnel are knowledgeable of their communication responsibilities. Additionally, the Moderator, the site newsletter, has had articles addressing this topic.
To foster complete and current communications with the NRC, weekly 3 meetings were established between the Plant Manager and Senior Resident Inspector in late 1987 The weekly meetings have expanded.to include additional personnel to improve communication exchange. Periodic meetings are also held between Detroit Edison and NRC management, which j provide a forum for updates on specific areas of interest and on plant i performance. These meetings will continue as long as they continue to be effective.
'Together these' communication actions serve to promote frequent, complete l and accurate information exchange with the NRC. ;
Actions are being taken in the training area which will improve communications with the NRC. The Technical Staff and Managers Training Program will improve the knowledge of all engineering people on site.
Knowledge is'a key to providing accurate information. The STEPS (Steps to Effective Plant Supervision) program emphasizes ten nuclear supervisory principles. One of the purposes of the STEPS program is'to o improve performance of supervisors by exposing them to the requirements i of_the nuclear environment. Groups of_ plant supervisors are being given this trair'ng program. Other training such as root cause and HPES (Human i Performance Evaluation System) training will help better determine causes l of-problems and so enable communications of accurate root causes to the L NRC.
1 L The corrective action system was revamped in early 1988. It established b a low threshold for identifying problems. A copy of each Deviation Event Report (DER) initiated is provided to the NRC Resident Inspector (with
~
the exception of'INPO-related DERs). Thus the inspector is provided information on all significant concerns.
An Accountability Program was initiated in 1988. In this program a meeting is held following selected personnel error events in which the cause of the problem is discussed and personnel accountability identified. In the few cases where inaccurate information was provided
~,
.. u, j i
Attachment,1 t NRC-90-0054 Page 3 ,
n 4.
to the NRC necessitating correction letters, accountability meetings were held and the review process has been improved as a result.
Detroit Edison has also instituted improvement programs and ;
self-assessment programs to improve performance and enhance internal .
communications, . Some of these programs are the Technical Specification Improvement Program, Security Improvement Program, Self-SALP Program and Performance Based Quality. Assurance. The better the internal .
-communications and more knowledgeable personnel are on performance, the better.and more accurately information can be communicated to the NRC.
The Security Improvement Program specifically included an objective on
, , information accuracy. During 1986, IE Information' Notice 85-97 " Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records" was reviewed with all security personnel. The purpose of this action was to emphasize the seriousness of material false statements to the security organization. ,
Together, these actions in the areas of communications, training, .
corrective action system, improvement programs, self-assessment and key personnel have built an atmosphere that supports regulatory compliance and candid and complete communications with the NRC.
L l
L l
.. . ~
. . -l
-Attachment 2 NRC-90-0054 i Page 1 RESPONSE TO SPECIFIC VIOLATIONS L
Violation I.A-1 Section 186 of the Atomic Energy Act of 1954, as amended, requires licensees to ensure that all submissions to the NRC are complete and -
accurate in all material respects. .
As part of a special physical security inspection conducted between November 12 and December 27, 1985, a violation of 10 CFR 73 21 and Section ;
6.14.4 of the Fermi 2 Nuclear. Operations Interfacing Procedure 11.00.114 titled " Protection of Safeguards Information" was cited by an NRC inspector. Specifically, a document containing Safeguards Information was entered into an unsecured Data Processing (DP) system. The licensee's senior security manager (Director of Nuclear Security), when questioned on or about November 13, 1985, told the inspector that he (DNS) was not aware that the DP system had an offsite transmitting capability, that made it unsuitable for storing safeguards information, when he directed such information to be entered into the DP system.
The statement made by the Director of Nuclear Security was a material false statement within the meaning of Section 186. It was false in that it was determined through investigation that the Director of Nuclear Security had.been informed both in writing and verbally by his staff that 1 the data processing system was not secure and that Safeguards Information should not be entered into it. The DNS staff. notifications took place within about two months before-the information was entered into the system and before his statement to the NRC inspector. One such notification was immediately before the information was entered into the system. It was ,
material in that, had the NRC known the information was false, further
- enforcement action would have been taken at that time.
Detroit Edison Response
- 1. Detroit Edison does not deny the above.
- 2. Reasons for Violation Detroit Edison believes this violation was due to a serious personnel error on the part of the former Director, Nuclear Security.
Additionally, the need for accurate information exchange with the NRC was apparently not fully appreciated by the individual.
j' ,
t t.
Attachment 2 NRC-90-0054 Page 2
- 3. Corrective Actions Taken and Results Achieved The former Director, Nuclear Security involved in this violation no longer works at Fermi 2 nor has any responsibility for safety-related activities authorized under License No. NPF-43
- 4. Corrective Actions Taken to Avoid Further Violations Detroit Edison has taken extensive actions to improve the accuracy and completeness of communications with the NRC. These actions are c discussed in Attachment 1 and will help prevent future violations of this type. Additionally, a special edition of the daily Fermi Management Update newsletter was issued on February 16, 1990 describing these violations to current personnel. The February 1990 Moderator also contained an article on the violations and order. The severity of this violation serves as a reminder to plant personnel of the importance of providing accurate information to the NRC.
- 5. Date Full Compliance Will be Achieved Detroit Edison is currently in full compliance.
I i
. l Attachment 2 WRC-90-0054 i Page 3 i i
i Violation I.B !
1 I-Section 186 of the Atomic Energy Act of 1954, as amended, requires l licensees to ensure that all submissions to the NRC are complete and l accurate in all material respects.
A special physical security inspection was conducted between April 16-18, 1986, because the licensee reported an event of April 11, 1986, that involved documents containing Safeguards Information being discovered by a contractor supervisor in an unlocked file cabinet in the owner controlled area. When asked about the Safeguards Information documents he allegedly j found, the contractor supervisor provided written and verbal statenents to i the NRC inspector asserting that the documents were discovered by him (the supervisor) outside of the plant protected area, and he denied prior )
knowledge or possession of the documents. l 2
The statements made by the contractor supervisor were material false I statements within the meaning of Section 186. They were false in that it was determined through investigation that the Safeguards Information documents were in the posseasion of the contracter supervisor prior to the l incident and the supervisor took the documents outside of the plant's prctected area. )!e then falsely reported the document as being discovered in the file cabir.et and nevar possessed by the abpervisor. They weru materid in that enforce. ment action might have been pursued had the NRC known the trubb. ,
DetroitEdisonMesponse
- 1. Detroit Edison believes that the violetion or. curred as described above, but was not privy to the information provided by the '
contrac%v to the ERC. ;
- 2. gator.t for thn Violation This violation occurred because the contractor employe acted in !
violation of established policies.
t 3. Corrective Action Taken and Results Achieved Detroit Edison promptly reported the violation of storage of Safeguards material to the NRC. The contractor employe is no longer at Fermi nor will he be issued a badge in the future.
l l
I
( _ _ _ _ - _ _ _.
r
[
~
Attachment 2 NRC-90-0054 Page 4
- 4. Corrective Action Taken to Avoid Further Violations Detroit Edison has taken extensive actions to improve the accuracy and completeness of communications with the NRC. These actions are discussed in Attachment 1 and will help prevent future violations of this type. Additionally, a special edition of the dail Management Update newsletter was issued on February 1990 16,y Fermi describing these violations to current personnel. The February 1990 Moderator also contained an article on the violations and order. The severity of this violation serves as a reminder to plant personnel of the importance of providing truthful information to the NRC.
- 5. Date Full Compliance will be Achieved Detroit Edison is currently in full compliance.
+
4 t
3
( - ,
, j Attachment 2 :
NRC-90-0054 Page 5 1
)
?
Violation II.A.
10CFR Part 50, Appendix B, Criterion III, Design Control, requires the holder of a permit to construct a nuclear power plant to establish !
measures to verify or check the adequacy of the plant's design and to ensure that design changes, including field changes, are subject to design ,
control measures commensurate with those applied to the original design. :
Contrary to the above, beginning in January 1985 and continuing through ;
October 1985, licensee officials become aware of deficiencies in the ;
seismic qualification design program which could have resulted in deficiencies in the design and construction of the plant and failed to
- establish, in a timely manner, adequate measures to verify or check the adequacy of the plant's design. ,
Detroit Edison Response :
- 1. Detroit Edison admits the violation occurred with the following clarification. Licensee officials in early and mid-1985 were aware of apparent problems in the document.ation of seismic reviews rather ,
than in the design and construction of the plant. This was in part
- basad on review of some design changes which showed that thers uerc no design problems, but that a seiessic review wacn't documented. The extent and t.imeliness of the response were gered to a docusientation ;
pecblem. Action was taken Juring the sumaer of 1985 to ir. prove the documer.tution of seismic reviews. In October 1985 cction was teken to initiate a review of all change papar crisinatinF in Wuclear :
Eagineerir+g from August 1984 through August 1935. This act-len was taken es a result of the $hPPTEAM concean Mubmitted in late September 19$. .
r
- 2. R,eason for f.he Violation The importance of adequate documentation to demonstrate that seismic reviews were occurring was not appreciated at the time. Also, the importance of communicating this lack of documentation to the NRC was not recognized at the time.
- 3. Corrective Action Taken and Results Achieved A review of all change papers initiated between August 1984 and August 1985 was performed by an o"tside party. No modifications were determined to be necessary during the review which was completed in December 1985. A major design reverification program was conducted in 1986. All QA Level 1 design changes prepared by the onsite Nuclear Engineering organization prior to January 27, 1986 were
Attachment 2 -
NRC-90-0054 i Page 6 I,
reverified. The NRC review of this program is contained in Inspection Report No. 86-12. The NRC inspector concluded that the I review was adequate.
The turnover of engineering activities from the Detroit Edison ;
engineering group in Troy, Michigan to the onsite Nuclear Engineering !
organization was completed in 1985. Division of primary and support .
responsibilities between onsite engineering departments is currently specified in FIO-FMP-03 l
- 4. Corrective Action Taken to Avoid Further Violations ,
Several programs have been instituted in the past years which will help avoid further violations in this area, though some were developed for other reasons to improve performance. They include actions in the training, design verification, and corrective action program areas. Engineers are participating in the Technical Staff and Managers training program. This program is geared towarde ;
increasing the knowledge of the technicr.1 staff about the plant so that more informed decisions can be made. Sone of the 00als of the ongoing Design Basis Task Force training e.re to ine.till a questioning attitude in the enginaers, familiari::e them with sources of design bar.is information and requirements, and to train on and demonstrate the procems used to evklukte potential probleu. The STEPS program has introduced some of the Nucleer Enginecring supervisors to the ten r nuclear supervisory principles. ToEether these trairdng ;:rogress '
improets the engineers' know) edge of ite punt and how to profession 41y hau!n yrubleras 14 the nuclear crivirarunt. ;
The dr. sign verification prouess has evo)ved coas14c.rably. A detailed checklist is used to docummt geners). cnd specialty rev!ce of -
safety-related design changes. One of the envie8s spe;ificd on the ,
checklist is for an er.gineer knowledgeable in the seismic area. l The corrective action program was revamped in early 1988 and improvements are continuing to be made. -The program requires an assessment of a problem within an assigned period of no greater than 30 days. An action plan is required to be developed by that time. A root cause determination is required for significant conFitions adverse to quality. The program receives considerable management attention. Additionally, a copy of all Deviation Event Reports (with the exception of INPO-related items) is sent to the NRC Resident Inspector following initiation. This provides the NRC with a knowledge of all the significant problems on which Fermi personnel 4 are working.
9 i 4 l
i
'- Attachment 2 NRC-90-0054 -
Page 7 i-Together,.the training of the engineers and their supervisors, the ,
design verification process, and the enhanced corrective action system will serve to sensitize personnel to problems, provide a method of evaluating concerns, and will document engineering reviews i performed to support design changes. These actions will help prevent ,
future siailar violations.
- 5. Date Full Compliance Will be Achieved Detroit Edison is currently in full compliance. :
l i
v p
6 I
e f
r Attachment 2 L NRC-90-0054 Page 8 Violation II.B I
7 Contrary to the above, the licensee failed to establish adequate measures to ensure that design changes, including field changes, were subject to design control measures commensurate with those applied to the origina3 design in that the licensee did not, prior to obtaining the operating license, verify or check the adequacy of the final structural design of the embedment plates with the changed loads on those plates, including any changes in that design made between 1980 and 1985. Specifically, on January 3, 1986, the licensee submitted a License Event Report (LER) notifying NRC that a number of embedded support plates were potentially overloaded in both safety ar.d non-safety related systems. The LER revealed that these hanger loads had not been properly resolved prior to obtaining the operating license.
Detroit Edison Response
- 1. Detroit Edison adaits the violation occurred.
- 2. Reason fce the Vinlation la 1984 >: hen the question arose of performing a completo reverification of the design of embedment plates to factor in design changes made since the plates were initially designed, managemont decided that it nulo be sufficient to review tM deeign of those plates thought to be representative of tb6 uorst case conditions.
The supposition wss that if the derign reveriff. cation showed the worst casa Toaded plates were acceptablo, this wedid onrelepc all other embedment plates in the plant and eo would constitate on adequate review prior to fuel load with reverifjcattuu of the remaining plates being just a fc'llow-up action itam. Detroit 2dison did not communicate this supposition and justification to the NRC at the time.
- 3. Corrective Action Taken and Results Achieved The remaining embedment plates were analyzed and loads found to be acceptable. The NRC reviewed this issue in Inspection Report No.
86-12 and concluded that this program was acceptable and effectively implemented.
- 4. Corrective Action Taken to Avoid Further Violations The corrective actions discussed for Violation II.A will also help avoid future violations similar to this. Additionally, experience has been gained in the use of regulations and acceptability of
e
, 49 J
Attachment 2 NRC-90-00511 Page 9 I
i actions in meeting regulations. The addition of engineering i management personnel with other commercial nuclear experience will '
also help avoid future violations of this type.
- 5. Date Full Compliance Will be Achieved Detroit Edison is currently in full compliance.