Letter Sequence Response to RAI |
---|
|
Results
Other: ML14195A221, ML14237A194, ML15030A229, ML15076A468, ML15092A224, ML15092A243, ML15098A175, ML15341A261, ML16005A399, ML16011A009, ML16011A011, ML16011A012, ML16011A013, ML16011A014, ML16011A032, ML16011A036, ML16187A173, ML16270A567, ML16330A117, NRC-16-0014, Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal, NRC-16-0061, DTE Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.
|
MONTHYEARML14195A2212014-07-24024 July 2014 Plan for Scoping and Screening Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other ML14237A1942014-09-0505 September 2014 Plan for the Aging Management Program Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other NRC-14-0070, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12014-10-24024 October 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 1 Project stage: Response to RAI ML14288A6802014-10-29029 October 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 3 Project stage: RAI NRC-14-0072, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22014-11-18018 November 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 Project stage: Response to RAI ML14322A1782014-11-26026 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 5 Project stage: RAI NRC-14-0076, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 32014-12-0101 December 2014 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 3 Project stage: Response to RAI NRC-14-0083, Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 62014-12-30030 December 2014 Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 6 Project stage: Response to RAI NRC-15-0001, Response to NRC Request for Additional Information for the Review License Renewal Application - Set 72015-01-0505 January 2015 Response to NRC Request for Additional Information for the Review License Renewal Application - Set 7 Project stage: Response to RAI NRC-15-0013, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives2015-01-0909 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives Project stage: Response to RAI NRC-15-0009, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 152015-01-15015 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 15 Project stage: Response to RAI NRC-15-0006, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 112015-01-20020 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Project stage: Response to RAI NRC-15-0012, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 182015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 18 Project stage: Response to RAI NRC-15-0022, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-12015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-1 Project stage: Response to RAI NRC-15-0010, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 162015-02-0505 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 16 Project stage: Response to RAI ML15030A2292015-02-11011 February 2015 AMP Audit Summary Report Enclosure Project stage: Other NRC-15-0011, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 172015-02-12012 February 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 17 Project stage: Response to RAI NRC-15-0029, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-12015-02-19019 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-1 Project stage: Response to RAI ML15051A3482015-02-24024 February 2015 Schedule Revision and Project Manager Change for the Review of the Fermi 2 License Renewal Application Project stage: Approval NRC-15-0020, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Sets 19, 20, and 212015-03-0505 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Sets 19, 20, and 21 Project stage: Response to RAI NRC-15-0023, Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 22015-03-0505 March 2015 Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 2 Project stage: Response to RAI ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 Project stage: RAI ML15051A3172015-03-11011 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 24 Project stage: RAI ML15051A4202015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 23 Project stage: RAI ML15062A3362015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 26 Project stage: RAI ML15054A1712015-03-13013 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15072A2132015-03-19019 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15072A0812015-03-19019 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 25 Project stage: RAI ML15070A1612015-03-19019 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15051A5072015-03-19019 March 2015 Summary of Telecom Drai Sets 4, 5 and 6 - November 14 2014 Project stage: RAI ML15077A1082015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 27 Project stage: RAI ML15082A0462015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 29, Project stage: RAI ML15078A3372015-03-26026 March 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 28 Project stage: RAI ML15085A5132015-04-0202 April 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 31 Project stage: RAI ML15099A0162015-04-22022 April 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application Set 32 Project stage: RAI ML15092A2432015-04-22022 April 2015 Summary of Telephone Conference Call Held on November 19, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Concerning Set 7 - November 19, 2014 Project stage: Other ML15076A4682015-04-22022 April 2015 Summary of Telephone Conference Call Held on February 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company Project stage: Other ML15099A6632015-04-23023 April 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15082A1882015-04-27027 April 2015 Summary of Conference Call Held on March 16, 2015, Between the U.S. NRC and DTE Electric Company, Concerning Requests for Additional Information, Set 27 Pertaining to the Fermi 2 License Renewal Application Project stage: RAI ML15072A2032015-04-27027 April 2015 Summary of Teleconference March 6, 2015 Between the U.S. NRC and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 License Renewal Application Project stage: RAI ML15104A5142015-05-0101 May 2015 Summary of Telephone Conference Call Held on November 25, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI NRC-15-0045, Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 32015-05-0808 May 2015 Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 3 Project stage: Response to RAI ML15117A5642015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 10, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15113A1982015-05-13013 May 2015 Summary of Telephone Conference Call Held on December 8, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15104A3882015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 25, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15098A3022015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 7,2015, Between the U.S.Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15098A1752015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 17,2015, Between the Us Nuclear Regulatory Commission Project stage: Other ML15126A0042015-05-15015 May 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 34 Project stage: RAI ML15104A6322015-05-15015 May 2015 Summary of Telephone Conference Call Held on November 17, 2014 Between NRC and DTE Electric Co Re Requests for Additional Information on Fermi 2 License Renewal Application Project stage: RAI ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 Project stage: RAI 2015-02-19
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] |
Text
Vito A. Kaminskas Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: kaminskasv@dteenergy.com DTE Energy-10 CFR 54 November 18, 2014 NRC-14-0072 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) DTE Electric Company Letter to NRC, "Fermi 2 License Renewal Application," NRC-14-0028, dated April 24, 2014 (ML14121A554)
- 3) NRC Letter, "Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 (TAC No.
MF4222)," dated October 20, 2014 (ML14266A344)
Subject:
Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 In Reference 2, DTE Electric Company (DTE) submitted the License Renewal Application (LRA) for Fermi 2. In Reference 3, NRC staff requested additional information regarding the Fermi 2 LRA. The Enclosure to this letter provides the DTE response to the request for additional information.
No new commitments are being made in this submittal.
Should you have any questions or require additional information, please contact Lynne Goodman at 734-586-1205.
USNRC NRC-14-0072 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on N vemb 18, 2014 Vito A. Kaminskas Site Vice President Nuclear Generation
Enclosure:
DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 cc: NRC Project Manager NRC License Renewal Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission, Regulated Energy Division (kindschl @ michigan.gov)
Enclosure to NRC-14-0072 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2
Enclosure to NRC-14-0072 Page 1 RAI 2.1-1
Background
10 CFR 54.4, "Scope," states, in part:
(a) Plantsystems, structures and components [SSCs] within the scope of this part are -
(1) Safety-related systems, structures,and components which are those relied upon to remainfunctional during andfollowing design-basisevents (as defined in 10 CFR 50.49 (b)(1)) to ensure the following functions - (i) the integrity of the reactor coolant pressure boundary; (ii) the capability to shut down the reactorand maintain it in a safe shutdown condition; or (iii) the capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to those referred to in 10 CFR 50.34(a)(1), 10 CFR 50.67(b)(2), or 10 CFR 100.11, as applicable.
(2) All nonsafety-related systems, structuresand components whose failure could prevent satisfactoryaccomplishment of any of the functions identified in (a)(1)(i), (ii), or (iii) of this section.
LRA Section 2.1.1.2.2(1), "Nonsafety-Related SSCs Directly Connected to Safety-Related SSCs,"
states that nonsafety-relatedSSCs attached to safety-related SCs [structuresand components]
are in the scope of license renewal in accordancewith 10 CFR 54.4(a)(2) up to the first seismic (or equivalent)anchoror alternativebounding criteria,past the safety-related/
nonsafety-relatedinterface.
LRA Section 2.1.1.2.2(2)(c), "Spray or Leakage," states that a nonsafety-relatedSSC with the potentialfor spray or leakage that could prevent safety-related SSCs from performing their requiredsafety function is within the scope of license renewal in accordancewith the requirements of 10 CFR 54.4(a)(2) and is that portion of the nonsafety-relatedSSC contained in the same space as the safety-related SSC.
Issue During the on-site scoping and screeningmethodology audit the staff reviewed the implementing document used by the applicant to identify nonsafety-relatedSSCs with the potential to affect safety-relatedSSCs, for inclusion within the scope of license renewal. The applicant's implementing document states that only nonsafety-relatedSSCs that had not been included within the scope of license renewal based on the potentialfor spray or leakage needed to be reviewedfor nonsafety-relatedSSCs directly attached to safety-related SSCs to identify the portion of the nonsafety-relatedSSC up to the first anchor, equivalent anchor or bounding condition,past the safety-related/nonsafety-relatedinterface.
Enclosure to NRC-14-0072 Page 2 During the audit the applicantstated that the implementing document had been followed and thatfluid-filled, nonsafety-relatedSSCs located within the same space as safety-related SSCs, were included within the scope of license renewal. However,for fluid-filled nonsafety-related SSCs that were also attached to safety-related SSCs, the staff did not have sufficient information to determine how the applicanthad identified the portion of the nonsafety-relatedSSC past the safety-related/nonsafety-relatedinterface to be included within the scope of license renewal, up to and including an anchor, equivalent anchor or bounding condition.
Request The staff requests that the applicantprovide a basisfor identifying the portions of nonsafety-relatedSSCs attachedto safety-related SSCs up to and including an anchor,equivalent anchor or bounding condition, and including these portions within the scope of license renewal in accordance with 10 CFR 54.4(a)(2).
Response
License Renewal Application (LRA) Section 2.1.1.2.2(1) states that for nonsafety-related systems, structures or components (SSCs) directly connected to safety-related SSCs, components within the scope of license renewal include the connected piping and supports up to and including the first seismic or equivalent anchor beyond the safety-nonsafety interface, or up to a point determined by alternative bounding criteria. The methodology for implementing this statement is further discussed in LRA Section 2.1.2.1.2 which states that for directly connected components, appropriate piping and instrument diagrams for the systems were reviewed to identify safety-to-nonsafety interfaces. Piping isometrics were also used to identify seismic anchors and equivalent anchors when required to establish scope boundary. For each interface, the boundary was determined by one of the four criteria in LRA Section 2.1.2.1.2.
As indicated by this RAI (Set 2 RAI 2.1-1), there was discussion during the audit regarding the implementation of the method used to perform the scoping and screening of the nonsafety-related fluid-filled SSCs attached to safety-related SSCs. During the audit, it was discussed that previous license renewal applications have shown that the identification of nonsafety-related fluid-filled SSCs within scope due to spatial interaction per LRA Section 2.1.1.2.2(2) has typically enveloped the nonsafety-related SSCs meeting the criteria of LRA Section 2.1.1.2.2(1).
This is because the seismic boundary is typically within the same space as the nonsafety-to-safety interface and all of the fluid-filled, nonsafety-related SSCs in that space are already included due to potential for spray or leakage. In order to provide verification that the nonsafety-related fluid-filled SSCs necessary for seismic support of safety-related SSCs are included within scope and subject to aging management review, a review of the scoping and screening of the safety-to-nonsafety interfaces was performed. The review utilized the method described in detail below, consistent with the statements in LRA Sections 2.1.1.2.2(1) and 2.1.2.1.2.
Enclosure to NRC-14-0072 Page 3 The LRA drawings were reviewed to identify instances where nonsafety-related fluid-filled SSCs are directly connected to safety-related SSCs. For each instance, the seismic boundaries were identified as (1) a seismic anchor, (2) an equivalent anchor, (3) a flexible connection, end of piping run, or base-mounted component, or (4) the seismic boundaries used for the design calculation. The seismic or equivalent anchors or other components credited for providing the boundaries were then located on piping isometrics. The locations of these boundary points on the piping isometrics were used to identify the corresponding locations on the LRA drawings.
Then the LRA drawings were reviewed to determine if all the piping and components up to the boundary points were marked (highlighted) as subject to aging management review per 10 CFR 54.4(a)(2).
The results of the review confirmed that, for each safety-to-nonsafety interface, the connected fluid-filled piping and supports up to and including the first seismic or equivalent anchor (or up to a point determined by the alternative bounding criteria) were included as in scope and subject to aging management review in accordance with 10 CFR 54.4(a)(2). No new SSCs were identified as subject to aging management review as a result of this review. The review was performed consistent with the methodology described in LRA Sections 2.1.1.2.2(1) and 2.1.2.1.2. Therefore, no changes to the LRA are necessary.
LRA Revisions:
None.
Enclosure to NRC-14-0072 Page 4 RAI 2.1-2
Background:
10 CFR 54.4, "Scope," states, in part:
(a) Plantsystems, structuresand components [SSCs] within the scope of this partare -
(1) Safety-related systems, structures, and components which are those relied upon to remainfunctional during andfollowing design-basisevents (as defined in 10 CFR 50.49 (b)(1)) to ensure the following functions - (i) the integrity of the reactor coolantpressure boundary; (ii) the capability to shut down the reactorand maintain it in a safe shutdown condition; or (iii) the capability to prevent or mitigate the consequences of accidents which could result in potentialoffsite exposures comparableto those referred to in 10 CFR 50.34(a)(1), 10 CFR 50.67(b)(2), or 10 CFR 100.11, as applicable.
(2) All nonsafety-relatedsystems, structuresand components whose failure could prevent satisfactory accomplishment of any of the functions identified in (a)(1)(i), (ii), or (iii) of this section.
Issue:
Duringthe on-site scoping and screening methodology audit the staff reviewed the license renewal application,license renewal implementing documents, currentlicensing basis documentation and performed a walkdown of site structures. The staff determined that the outage building, immediately adjacent to, and in contact with, the reactorbuilding (included within the scope of license renewal in accordancewith 10 CFR 54.4(1)), in which personnel perform activities requiredprior to entry into the reactorbuilding andfollowing exit from the reactorbuilding, was not included within the scope of license renewal in accordance with 10 CFR 54.4(a)(2).
Request:
The staff requests that the applicantprovide a basisfor not including the outage building, which is located adjacent to, and in contact with, the reactorbuilding, within the scope of license renewal in accordance with 10 CFR 54.4(a)(2). If an analysis is cited as the basis for not including the outage building within the scope of license renewal, indicate how the analysis considers the effects of aging.
Enclosure to NRC-14-0072 Page 5
Response
The Outage Building (OB) is a nonsafety-related structure and is not included within the scope of license renewal because it has no intended function for 10 CFR 54.4(a)(1), (a)(2), or (a)(3).
The purpose of the OB is to provide personnel access to the radiologically restricted area, as well as restroom facilities. The OB is located south of the Reactor/Auxiliary Building (RAB) and east of the Railroad Bay Airlock. The Railroad Bay Airlock is discussed in License Renewal Application (LRA) Section 2.4.1 as part of the description of the Reactor Building. The Railroad Bay Airlock is considered part of the RAB.
The OB is a two-story, steel framed structure with non-load bearing, 8" masonry exterior walls.
The OB was designed for applicable wind and seismic loading in accordance with the provisions of the 1991 Uniform Building Code. The OB is structurally separated from the RAB by a 2" gap where the foundations meet and a 4" isolation gap on the upper portions. Non-structural flashing is attached to the RAB to cover the gap between the RAB and OB. The high-point roof elevation of the OB is lower than the roof elevation of the adjacent structures. However, the RAB Personnel Airlock on the south side of the RAB is completely enclosed by the OB such that the OB structure (second floor and roof) is framed over the top of the airlock.
The Fermi 2 Seismic Category I structures are designed and constructed in a manner that their intended function would not be affected by failure of adjacent non-seismic structures. The RAB, including the Personnel Airlock, is QA Level I, Seismic Category I, reinforced concrete structure designed in accordance with NRC "General Design Criteria For Nuclear Power Plants" as specified in Appendix A to 10 CFR Part 50. As such, it has been designed for impact loading attributable to tornado generated missiles. The RAB walls and the Personnel Airlock walls and roof are 18" thick, reinforced concrete. The relatively low-energy, impact loading imposed on any of these elements due to a postulated collapse of the OB is bounded by the loading from tornado generated missiles, as described in Updated Final Safety Analysis Report (UFSAR)
Section 3.5.2.1. Furthermore, as stated in UFSAR Section 9A.4.1.1 and 9A.4.11, the OB is of completely noncombustible construction and there is no safe shutdown equipment located in the OB. Should a failure of the OB occur (including failure due to the effects of aging), there would be no loss of a license renewal intended function per 10 CFR 54.4(a)(1) of the adjacent RAB.
Therefore, the OB does not fall within the scope of 10 CFR 54.4(a)(2).
LRA Revisions:
None.