ITAAC Closure Notification on Completion of ITAAC 3.2.00.07 (Index Number 756)
ML22118B141
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/28/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.2.00.07, ND-22-0229
Download: ML22118B141 (6)


Text

Jamie M. Co leman 7825 River Road A Southern Nuclear R egu latory Affairs Way n esbo ro, GA 30830 Vo gtle 3 & 4 70 6-848-6926 tel

APR 2 8 2022

Docket No.: 52-025

ND-22-0229 1 O CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.2.00.07 (Index Number 7561

Ladies and Gentlemen:

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.2.00.07 (Index Number 7561.

This ITAAC confirms that the Human-System Interface (HSI) resources available at the Remote Shutdown Workstation (RSW) include alarm system displays, the plant information system, and the controls. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

~m ~

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.07 (Index Number 7561 JMC/GCS/sfr U.S. Nuclear Regulatory Commission ND-22-0229 Page 2 of 3

To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND. LI.L06 File AR.01.02.06

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22 -0229 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0229 Enclosure Page 1 of 3

Southern Nuclear Operating Company ND-22-0229 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.0?[lndex Number 756]

U.S. Nuclear Regulatory Commission ND-22-0229 Enclosure Page 2 of 3

ITAAC Statemen t

Design Comm itment

7. The HSI resou rces available at the RSW include the alarm system displays, the plant information system, and the controls.

Inspections/Tests/ Analyses

An inspection of the HSI resources available at the RSW will be performed.

Acceptance Criteria

The as -built HSI at the RSW includes the alarm system displays, the plant information system,

and the controls.

ITAAC Determina tion Basis

An inspection of the Human-System Interface (HSI) resources available at the remote shutdown workstation (RSW) was performed to verify that the as-built HSI at the RSW includes alarm system displays, the plant information system, and the controls.

The inspection utilized approved construction d rawings and RSW console and panel design specifications to perform walkdown inspections of Unit 3 RSW. The walkdown inspections compared the as -built alarm system displays, plant information system, and controls with References 1 through 4 to confirm that the HSI resources available at the RSW include the alarm system displays, the plant information system, and the controls.

The inspection results are documented in Unit 3 Principal Closure Document (Reference 5) which confirm that the HSI resources available at the RSW includes the alarm system displays, the plant information system, and the controls.

Reference 5 is available fo r NRC inspection as part of Unit 3 ITAAC 3.2.00.07 Completion Package (Reference 6).

ITAAC Finding Review

In accordance with plant procedu res for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated cor rective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

IT AAC Completion Statement

Based on the above information, SNC hereby notifies the NRC that ITAAC 3.2.00.07 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

U.S. Nuclear Regulatory Commission ND-22-0229 Enclosure Page 3 of 3

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-JC01-V1-100 Rev 0, "AP1000 Remote Shutdown Room Layout Top View "
2. SV3-JC01-V1-120 Rev 3, "AP1000 Remote Shutdown Workstation Panel Layout "
3. SV3-JC01-V1-130 Rev 2, "AP1000 Remote Shutdown Workstation Console Outline"
4. SV3 -JC01-Z0-001 Rev 2, "AP1000 Design Specification for Control Room Consoles and Panels" 5. SV3-HSI-ITR-800756 Rev 0, "Unit 3 HFE Remote Shutdown Room Resources Available:

ITAAC 3.2.00.07 NRC Index Number 756"

6. 3.2.00.07-U3-CP-Rev0, ITAAC Completion Package