ML23220A005
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/07/2023
From: Coleman J
Southern Nuclear Operating Co
To: Andrea Veil
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23220A004 List:
References
ND-23-0669
Download: ML23220A005 (1)


Text

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, Georgia 30830 706 848 6926 tel August 7, 2023 ND-23-0669 10 CFR 52.99(a) 10 CFR 52.103(a)

Docket No.:

52-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant (VEGP) - Unit 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule Ladies and Gentlemen:

The U.S. Nuclear Regulatory Commission (NRC) issued Combined License (COL) NPF-92 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012.

Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following:

A schedule for implementation of the operational programs listed in the Final Safety Analysis Report Table 13.4-201, including the associated estimated date for initial loading of fuel (COL section 2.D.(11))

A schedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedules shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented.

U.S. Nuclear Regulatory Commission ND-23-0669 Page 2 of 3 On July 20, 2023, SNC submitted the Unit 4 notification of completion of all ITAAC in accordance with 10 CFR 52.99(c)(4) and License Condition 2.D.(2)(d), Agencywide Documents Access and Management System (ADAMS) Accession Number ML23201A266. On July 28, 2023, NRC issued the 10 CFR 52.103(g) finding for Unit 4, ADAMS Accession Number ML22348A093. Therefore, a schedule submittal per 10 CFR 52.99(a) is not required.

On November 11, 2021, SNC submitted the scheduled date for initial loading of fuel at VEGP Unit 4, Agencywide Documents Access and Management System (ADAMS) Accession Number ML21315A011.

This submittal stated updates to the scheduled date for initial loading of fuel would be made every 30 days in accordance with 10 CFR 52.103(a). The scheduled date for initial loading of fuel at VEGP Unit 4 is provided in the enclosure.

The enclosure contains the Unit 4 COL Operational Programs and Other License Conditions Implementation Schedule and the scheduled date for initial loading of fuel at VEGP Unit 4. As is typical with a construction project, the schedule information is dynamic in nature.

The schedule information provided in the enclosure is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the schedule updates provided to the NRC on February 8, 2019, ADAMS Accession Number ML19039A264, and on October 6, 2017, ADAMS Accession Number ML17279A661.

Accordingly, the enclosure to this letter should be withheld from public disclosure.

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Will Garrett at (706) 848-7154.

Respectfully submitted, Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company JMC/KJD/sfr

Enclosure:

COL Operational Programs and Other License Conditions Implementation Schedule

{Withhold from Public Disclosure}

U.S. Nuclear Regulatory Commission ND-23-0669 Page 3 of 3 CC: