ND-23-0609, Notification of Completion of All ITAAC

From kanterella
Jump to navigation Jump to search

Notification of Completion of All ITAAC
ML23201A266
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/20/2023
From: Coleman J
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
ND-23-0609
Download: ML23201A266 (2)


Text

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6926 tel July 20, 2023 Docket No.: 52-026 ND-23-0609 10 CFR 52.99(c)(4)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Andrea D. Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Notification of Completion of All ITAAC Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(4), and in accordance with Vogtle Electric Generating Plant (VEGP)

Unit 4 Combined License (COL) NPF-92 condition 2.D.(2)(d), Southern Nuclear Operating Company (SNC) hereby notifies the NRC that all of the inspections, tests, analyses and acceptance criteria (ITAAC) in VEGP Unit 4 COL Appendix C have been successfully completed and are being maintained.

ITAAC Closure Notifications have been submitted to the NRC for each ITAAC in VEGP Unit 4 COL Appendix C in accordance with 10 CFR 52.99(c)(1). All of the ITAAC Closure Notifications are substantiated by ITAAC Completion packages, which include the documentation (tests, reports, completed procedures, completed analyses, etc.) that support the ITAAC determination bases. The ITAAC completion packages are available for NRC inspection at the plant site.

SNC is not aware of any condition that warrants submittal of an ITAAC Post-Closure Notification (IPCN) under 10 CFR 52.99(c)(2) for which an IPCN has not been submitted and hereby affirms the completion of all ITAAC prescribed in the combined license for VEGP Unit 4. On this basis, SNC requests that NRC staff make a finding that the acceptance criteria in the combined license are met (10 CFR 52.103(g)).

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 JMC/CEM/sfr

U.S. Nuclear Regulatory Commission ND-23-0609 Page 2 of 2 cc:

Regional Administrator, Region ll Director, Office of Nuclear Reactor Regulation (NRR)

Director, Vogtle Project Office NRR Senior Resident Inspector - Vogtle 3 & 4