November 1, 2022 Mr. Christopher P. Domingos Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

ISSUANCE OF AMENDMENTS 241 AND 229 RE: TSTF-577 REVISED FREQUENCIES FOR STEAM GENERATOR TUBE INSPECTIONS (EPID L-2022-LLA-0084)

Dear Mr. Domingos:

The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 241 to Renewed Facility Operating License No. DPR-42 and Amendment No. 229 to Renewed Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2, respectively. The amendments consist of changes to the technical specifications(TSs) in response to your application dated June 7, 2022, as supplemented by letter dated October 6, 2022.

The amendments revise the Steam Generator (SG) Program and the Steam Generator Tube Inspection Report TSs requirements based on TS Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections.

C. Domingos A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions monthly Federal Register notice.

Sincerely,

/RA/

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosures:

1. Amendment No. 241 to DPR-42
2. Amendment No. 229 to DPR-60
3. Safety Evaluation cc: Listserv

NORTHERN STATES POWER COMPANY DOCKET NO. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 241 Renewed License No. DPR-42

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated June 7, 2022, as supplemented by letter dated October 6, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

Enclosure 1

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-42 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 241, are hereby incorporated in the renewed operating license. NSPM shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Scott Scott P. Wall P.Date:

Wall 2022.11.01 17:31:15 -04'00' Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance:

NORTHERN STATES POWER COMPANY DOCKET NO. 50-306 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 229 Renewed License No. DPR-60

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated June 7, 2022, as supplemented by letter dated October 6, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

Enclosure 2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-60 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license. NSPM shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Scott Scott P. Wall P.Date:

Wall 2022.11.01 17:31:40 -04'00' Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance:

ATTACHMENT TO LICENSE AMENDMENT NOS. 241 AND 229 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 RENEWED FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 DOCKET NOS. 50-282 AND 50-306 Replace the following pages of the Renewed Facility Operating License Nos. DPR-42 and DPR-60 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicate the areas of change.

Renewed Facility Operating License No. DPR-42 REMOVE INSERT Page 3 Page 3 Renewed Facility Operating License No. DPR-60 REMOVE INSERT Page 3 Page 3 Technical Specifications Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 5.5-7 5.5-7 5.5-9 5.5-9 5.5-10 5.5-10 5.6-8 5.6-8

(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NSPM to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, NSPM to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to transfer byproduct materials from other job sites owned by NSPM for the purpose of volume reduction and decontamination.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l:

Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level NSPM is authorized to operate the facility at steady state reactor core power levels not in excess of 1677 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 241, are hereby incorporated in the renewed operating license.

NSPM shall operate the facility in accordance with the Technical Specifications.

(3) Physical Protection NSPM shall fully implement and maintain in effect all provisions of the Commission -approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Renewed Operating License No. DPR-42 Amendment No. 241

(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NSPM to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, NSPM to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to transfer byproduct materials from other job sites owned by NSPM for the purposes of volume reduction and decontamination.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l:

Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level NSPM is authorized to operate the facility at steady state reactor core power levels not in excess of 1677 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license.

NSPM shall operate the facility in accordance with the Technical Specifications.

(3) Physical Protection NSPM shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Renewed Operating License No. DPR-60 Amendment No. 229

Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.8 Steam Generator (SG) Program An SG Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the SG Program shall include the following:

a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the as found condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The as found condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.
b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
1. Structural integrity performance criterion: All in-service SG tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down), all anticipated transients included in the design specification, and design basis accidents.

This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse.

Prairie Island Unit 1 - Amendment No. 241 Units 1 and 2 5.5-7 Unit 2 - Amendment No. 229

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.8 Steam Generator (SG) Program (continued) performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.

1. Inspect 100% of the tubes in each SG during the first refueling outage following SG installation.
2. After the first refueling outage following SG installation, inspect 100% of the tubes in each SG at least every 96 effective full power months, which defines the inspection period.
3. If crack indications are found in any SG tube, then the next inspection for each affected and potentially affected SG for the degradation mechanism that caused the crack indication shall be at the next refueling outage. If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
e. Provisions for monitoring operational primary to secondary LEAKAGE.

Prairie Island Unit 1 - Amendment No. 241 Units 1 and 2 5.5-9 Unit 2 - Amendment No. 229

Programs and Manuals 5.5 5.5 Programs and Manuals (continued)

This page retained for page numbering Prairie Island Unit 1 - Amendment No. 241 Units 1 and 2 5.5-10 Unit 2 - Amendment No. 229

Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.7 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:

a. The scope of inspections performed on each SG;
b. The nondestructive examination techniques utilized for tubes with increased degradation susceptibility;
c. For each degradation mechanism found:
1. The nondestructive examination techniques utilized;
2. The location, orientation (if linear), measured size (if available),

and voltage response for each indication. For tube wear at support structures less than 20 percent through-wall, only the total number of indications needs to be reported;

3. A description of the condition monitoring assessment and results, including the margin to the tube integrity performance criteria and comparison with the margin predicted to exist at the inspection by the previous forward-looking tube integrity assessment; and
4. The number of tubes plugged during the inspection outage.
d. An analysis summary of the tube integrity conditions predicted to exist at the next scheduled inspection (the forward-looking tube integrity assessment) relative to the applicable performance criteria, including the analysis methodology, inputs, and results;
e. The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG; and
f. The results of any SG secondary side inspections.

Prairie Island Unit 1 - Amendment No. 241 Units 1 and 2 5.6-8 Unit 2 - Amendment No. 229

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 241 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-42 AND AMENDMENT NO. 229 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-60 NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306

1.0 INTRODUCTION

By application dated June 7, 20222 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22158A090), as supplemented by letter dated October 6, 2022 (ML22279B046), Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (NSPM, the licensee), requested changes to the technical specifications (TSs) for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island).

The proposed changes would revise the Steam Generator (SG) Program and the Steam Generator Tube Inspection Report TSs based on Technical Specifications Task Force (TSTF)

Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections (TSTF-577) (No. ML21060B434), and the associated NRC staff safety evaluation (SE) of TSTF-577 (ML21098A188).

The supplemental letter dated October 6, 2022, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC or Commission) staffs original proposed no significant hazards consideration determination as published in the Federal Register on July 15, 2022 (87 FR 42505).

2.0 REGULATORY EVALUATION

2.1 Background

The tubes within an SG function as an integral part of the reactor coolant pressure boundary and, in addition, isolate fission products in the primary coolant from the secondary coolant and the environment. SG tube integrity means that the tubes are capable of performing this safety function in accordance with the plant design and licensing basis.

Enclosure 3

The Prairie Island SGs have Alloy 690 thermally treated tubes.

2.2 Proposed Changes 2.2.1 Proposed TS Changes to Adopt TSTF 577 In accordance with NRC staff-approved TSTF-577, the licensee proposed changes that would revise PINGP TS 5.5.8, Steam Generator (SG) Program, and TS 5.6.7, Steam Generator Tube Inspection Report. Specifically, the licensee proposed the following changes to adopt TSTF-577:

TS 5.5.8, Steam Generator (SG) Program:

TS 5.5.8 introductory paragraph and paragraph b.1 would be revised by replacing steam generator with SG in two instances.

TS 5.5.8.d.2 would be revised by deleting the requirement to base inspection frequency on the more restrictive metric between either the effective full power months (EFPM) or refueling outage and to use just the EFPM metric.

TS 5.5.8.d.2 would be revised by deleting the requirement to inspect 100 percent of the tubes during each period in paragraphs d.2.a, d.2.b, d.2.c, and d.2.d (144, 120, 96, and 72 EFPM, respectively) and by adding the requirement to inspect 100 percent of the tubes every 96 EFPM.

TS 5.5.8.d.2 would be revised by deleting the allowance to extend the inspection period by 3 effective full power months and by deleting the discussion of prorating inspections.

TS 5.5.8.d.3 would be revised by replacing shall not exceed 24 effective full power months or one refueling outage (whichever results in more frequent inspections) with shall be at the next refueling outage.

TS 5.6.7, Steam Generator Tube Inspection Report:

Existing reporting requirement a. would be revised to change the colon at the end of the requirement with a semicolon.

Existing reporting requirement b. would be renumbered as c. and be revised by editorial and punctuation changes.

New reporting requirement b. would be added to require the nondestructive examination (NDE) techniques utilized for tubes with increased degradation susceptibility be reported.

Existing reporting requirement c. would be renumbered as c.1. and be revised by editorial and punctuation changes.

Existing reporting requirement d. would be renumbered as c.2. and be revised to note that the location, orientation (if linear), measured size (if available), and voltage response do not need to be reported for tube wear indications at support structures that are less than 20 percent through-wall. However, the total number of tube wear indications at support structures that are less than 20 percent through-wall would be reported.

New reporting requirement d. would be added to require an analysis summary of the tube integrity conditions predicted to exist at the next scheduled inspection relative to the applicable performance criteria, including the analysis methodology, inputs, and results.

Existing reporting requirement e. would be renumbered as c.4 and be revised by editorial and punctuation changes.

Existing reporting requirement f. would be renumbered as e. and be revised by editorial and punctuation changes.

New reporting requirement f. would be added to require the results of any SG secondary side inspections be reported.

Existing reporting requirement g. would be renumbered as c.3. and be revised to add the requirements to report a description of the condition monitoring assessment, the margin to the tube integrity performance criteria, and a comparison with the margin predicted to exist at the inspection by the previous forward-looking tube integrity assessment. In addition, the requirement to report the results of tube pulls and in-situ testing would be deleted.

2.2.2 Additional Proposed TS Changes In addition to the changes proposed consistent with the traveler discussed in section 2.2.1 of this SE, the license amendment request (LAR), as supplemented, identified the following editorial variation.

The Prairie Island TSs use different numbering than standard technical specifications (STSs) on which TSTF-577 was based. Specifically, the Steam Generator (SG) Program is numbered 5.5.8 in Prairie Island TSs rather than 5.5.9 as stated in the TSTF.

The supplement proposed adding quotation marks in the introductory paragraph in 5.6.7 before and after SG program.

2.3 Regulatory Requirements and Guidance The regulations in Title 10 of the Code of Federal Regulations (10 CFR), paragraph 50.36(c)(5),

Administrative controls, state that [a]dministrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. Each licensee shall submit any reports to the Commission pursuant to approved technical specifications as specified in

[10 CFR] 50.4. TS, section 5.0, Administrative Controls, requires that an SG program be established and implemented to ensure that SG tube integrity is maintained.

Programs established by the licensee, including the SG program, are listed in the administrative controls section of the TS to operate the facility in a safe manner.

The NRC staffs guidance for the review of TSs is in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor]

Edition (SRP), Chapter 16.0, Technical Specifications, Revision 3, dated March 2010 (ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared STSs for each of the LWR nuclear designs. Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with NUREG-14311, as modified by NRC-approved travelers.

TSTF-577 revised the STSs related to SG tube inspections and SG tube inspection reporting requirements. The NRC approved traveler TSTF-577, under the consolidated line item improvement process (CLIIP) on April 14, 2021 (ML21099A086).

3.0 TECHNICAL EVALUATION

3.1 Proposed TS Changes to Adopt TSTF-577 The NRC staff compared the licensees proposed TS changes in section 2.2.1 of this SE against the changes approved in TSTF-577. In accordance with SRP Chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-577 are applicable because PINGP is a pressurized water reactor (PWR) design plant and the NRC staff approved the TSTF-577 changes for PWR designs. The NRC staff finds that the proposed changes to the Prairie Island TSs described in Section 2.2.1 of this SE are consistent with those found acceptable in TSTF-577.

In the SE of TSTF-577, the NRC staff concluded that the TSTF-577 changes to STS 5.5.9, Steam Generator (SG) Program, and STS 5.6.7, Steam Generator Tube Inspection Report, were acceptable because, as discussed in section 3.0 of that SE, they continued to ensure SG tube integrity and, therefore, protected the public health and safety. In particular, the structural integrity performance criterion and accident-induced leakage performance criterion (explained in STS 5.5.9.b, items 1 and 2, respectively) will continue to be met with the proposed revised SG inspection intervals (maximum allowable time between SG inspections) and inspection periods (maximum allowable time between 100 percent of SG tubes inspections). Additionally, the proposed changes to the reporting requirements will provide more detailed and consistent information to the NRC. Therefore, the NRC staff found that the proposed changes to the SG program and inspection reporting requirements were acceptable because they continued to meet the requirements of 10 CFR 50.36(c)(5) by providing administrative controls necessary to assure operation of the facility in a safe manner. For these same reasons, the NRC staff concludes that the corresponding proposed changes to the Prairie Island TSs described in section 2.2.1 of this SE continue to meet the requirements of 10 CFR 50.36(c)(5).

1 U.S. Nuclear Regulatory Commission, Standard Technical Specifications, Westinghouse Plants, NUREG-1431, Volume 1, Specifications, and Volume 2, Bases, Revision 5, September 2021 (ML21259A155 and ML21259A159, respectively).

3.2 Additional Proposed TS Changes 3.2.1 Editorial Variation The editorial variation is described in section 2.2.2 of this SE. The NRC staff finds the variation (i.e., different TS numbering, revised punctuation) acceptable because the variation does not substantively alter TS requirements.

3.3 TS Change Consistency The NRC staff reviewed the proposed TS changes for technical clarity and consistency with the existing requirements for customary terminology and formatting. The NRC staff finds that the proposed changes are consistent with Chapter 16.0 of the SRP and are, therefore, acceptable.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Minnesota State official was notified of the proposed issuance of the amendments on October 19, 2022. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration as published in the Federal Register on July 15, 2022 (87 FR 42505), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Clinton Ashley, NRR Date of Issuance: November 1, 2022