August 24, 2019 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - CORRECTION LETTER FOR AMENDMENT NOS. 228 AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 (EPID L-2018-LLA-0147)
Dear Mr. Sharp:
On July 30, 2019, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Amendment No. 228 to Renewed Facility Operating License No. DPR-42 and Amendment No. 216 to Renewed Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP), respectively (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19140A447). The amendments revised the licenses for PINGP, Units 1 and 2, to modify the fire protection program. Specifically, the amendments deleted several modifications which are required as part of PINGPs implementation of its risk-informed, performance-based, fire protection program in accordance with paragraph 50.48(c) of Title 10 of the Code of Federal Regulations, National Fire Protection Association Standard 805.
This letter corrects the issuance of Amendment No. 228 for PINGP, Unit 1, and Amendment No. 216 for PINGP, Unit 2, to issue revised license pages. As discussed in the NRC staffs safety evaluation issued with the amendments, the NRC staff reviewed, and found acceptable, the licensees proposed modifications to license conditions 2.C(4) and 2.C(4)(c)2. The letter dated July 30, 2019, should have included revised license pages to reflect these modified conditions. In addition, the July 30, 2019, amendment noted a change to 2.C(2) for each license to note a change to the technical specifications; however, Amendments No. 228 for PINGP, Unit1, and Amendment No. 216 for PINPG, Unit 2, did not modify the technical specifictions. Therefore, enclosed are revised amendment pages to reflect the proper license changes, and pages 4 and 6 of the PINGP, Units 1 and 2, to reflect all the modifications to Renewed Facility Operating License DPR-42 for Amendment No. 228 for PINGP, Unit 1, and Renewed Facility Operating Licnse DPR-60 for Amendment No. 216 for PINGP, Unit 2.
If you have any questions regarding this matter, please call me at (301) 415-3733.
Sincerely,
/RA/
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 80- 282 and 50-306
Enclosure:
- 1. Revised Amendment No. 228 to DPR-28
- 2. Revised Amendment No. 216 to DPR-60 cc: via Listserv
NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE DOCKET NO. 50-282 Amendment No. 228 License No. DPR-42
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated May 18, 2018, as supplemented by letters dated July 10, 2018, December 6, 2018, and April 8, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to paragraphs 2.C(4) and 2.C(4)(c)2 of Renewed Facility Operating License No. DPR-42 is hereby amended as shown in the attached revised license pages.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Lisa M. Regner, Acting Branch Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License Date of Issuance: July 30, 2019
NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE DOCKET NO. 50-306 Amendment No. 216 License No. DPR-60
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated May 18, 2018, as supplemented by letters dated July 10, 2018, December 6, 2018, and April 8, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to paragraphs 2.C(4) and 2.C(4)(c)2 of Renewed Facility Operating License No. DPR-60 is hereby amended as shown in the attached revised license pages.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Lisa M. Regner, Acting Branch Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License Date of Issuance: July 30, 2019
ATTACHMENT TO LICENSE AMENDMENT NOS. 228 AND 216 RENEWED FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 AND 50-306 Replace the following pages of the Renewed Facility Operating License Nos. DPR-42 and DPR-60 with the attached revised pages. The changed areas are identified by a marginal line.
REMOVE INSERT DPR-42 Page 4 Page 4 Page 6 Page 6 DPR-60 Page 4 Page 4 Page 6 Page 6 Renewed Operating License No. DPR-42 Amendment No. 228 Safeguards Information protected under 10 CFR 73.21, is entitled: Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, submitted by letters dated October 18, 2006, and January 10, 2007, and as supplemented by letters dated March 18 and June 2, 2011, and approved by NRC Safety Evaluation dated August 16, 2011.
NSPM shall fully implement and maintain in effect all provisions of the Commission-approved Northern States Power Company - Minnesota (NSPM)
Cyber Security Plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NSPM CSP was approved by License Amendment No. 202 and supplemented by License Amendment No. 212.
(4) Fire Protection Northern States Power Company, shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensee amendment requests dated September 28, 2012 and May 18, 2018 (and supplements dated November 8, 2012, December 18, 2012, May 3, 2013, October 17, 2013, April 30, 2014, May 28, 2015, June 19, 2015, October 6, 2015, October 22, 2015, January 20, 2016, May 24, 2016, August 17, 2016, December 14, 2016, March 6, 2017, July 10, 2018, December 6, 2018, and April 8, 2019), and as approved in the safety evaluations dated August 8, 2017 and July 30, 2019.
Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
(a)
Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as-operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
Renewed Operating License No. DPR-42 Amendment No. 228 Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);
Gaseous Fire Suppression Systems (Section 3.10); and Passive Fire Protection Features (Section 3.11).
This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
- 2.
Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensees fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated August 8, 2017, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
(c)
Transition License Conditions
- 1.
Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. and 3. below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
- 2.
The licensee shall implement the modifications to its facility as described in Attachment S, Table S-2, Plant Modifications Committed, in Northern States Power - Minnesota letter L-PI-18-005, dated May 18, 2018, to complete the transition to full compliance with 10 CFR 50.48(c), before the end of the second full operating cycle for each unit after approval of the NFPA 805 License Amendment dated August 18, 2017. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
- 3.
The licensee shall implement the items listed in Attachment S, Table S-3, Implementation Items, of Northern States Power -
Minnesota letter L-PI-18-005, dated December 14, 2016, within twelve months after NRC approval, with the exception of Implementation Item 20, 66 and 70 which are associated with modifications and will be completed 180 days after modifications are complete.
Renewed Operating License No. DPR-60 Amendment No. 216 Safeguards Information protected under 10 CFR 73.21, is entitled: Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, submitted by letters dated October 18, 2006 and January 10, 2007, and as supplemented by letters dated March 18 and June 2, 2011, and approved by NRC Safety Evaluation dated August 16, 2011.
NSPM shall fully implement and maintain in effect all provisions of the Commission-approved Northern States Power Company - Minnesota (NSPM)
Cyber Security Plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NSPM CSP was approved by License Amendment No. 189 and supplemented by License Amendment No. 200.
(4) Fire Protection Northern States Power Company, shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensee amendment requests dated September 28, 2012 and May 18, 2018 (and supplements dated November 8, 2012, December 18, 2012, May 3, 2013, October 17, 2013, April 30, 2014, May 28, 2015, June 19, 2015, October 6, 2015, October 22, 2015, January 20, 2016, May 24, 2016, August 17, 2016, December 14, 2016, March 6, 2017, July 10, 2018, December 6, 2018, and April 8, 2019), and as approved in the safety evaluations dated August 8, 2017 and July 30, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
(a)
Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as-operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
- 1.
Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must Renewed Operating License No. DPR-60 Amendment No. 216 This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
- 2.
Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensees fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated August 8, 2017, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
(c)
Transition License Conditions
- 1.
Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. and 3. below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
- 2.
The licensee shall implement the modifications to its facility as described in Attachment S, Table S-2, Plant Modifications Committed, in Northern States Power - Minnesota letter L-PI-18-005, dated May 18, 2018, to complete the transition to full compliance with 10 CFR 50.48(c), before the end of the second full operating cycle for each unit after approval of the NFPA 805 License Amendment dated August 8, 2017. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
- 3.
The licensee shall implement the items listed in Attachment S, Table S-3, Implementation Items, of Northern States Power -
Minnesota letter L-PI-16-090, dated December 14, 2016, within twelve months after NRC approval, with the exception of Implementation Item 20, 66 and 70 which are associated with modifications and will be completed 180 days after modifications are complete.
(5) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated into this license. NSPM shall operate the facility in accordance with the Additional Conditions.
ML19225D217 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC(A)
DORL/LPL3/PM NAME RKuntz SRohrer LRegner RKuntz DATE 8/15/19 8/14/19 8/27/19 8/24/19