Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23356A00317 January 2024Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)Pressure and Temperature Limits Report
ML23215A16715 December 2023Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3
ML23115A40726 April 2023Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5BSurveillance Frequency Control Program
ML22357A10031 March 2023and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations FacilitySafe Shutdown
Health Physics Network
High winds
Minimum staff
Fire Protection Program
Siren
ML22300A2231 November 2022Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
ML22270A32530 September 2022(Prairie Island), Unit 2 - Authorization and Safety Evaluation for Alternative Request No. RR-08Incorporated by reference
ML22181A00017 August 2022Issuance of Amendments Reactor Trip System Power Range Instrumentation ChannelsSurveillance Frequency Control Program
ML22166A38928 July 2022Issuance of Amendments 239 and 227 24-Month Operating CycleSafe Shutdown
Offsite Dose Calculation Manual
Surveillance Frequency Control Program
Maintenance Rule Program
Grace period
ML22061A2061 April 2022Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Safeguards Contingency Plan
Deep Dose Equivalent
Power Uprate
ML21312A02123 November 2021Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply HeaderSafe Shutdown
ML21008A00119 March 2021Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection
ML20346A02015 March 2021Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Maintenance Rule Program
Offsite Circuit
Backfit
ML20356A0025 February 2021Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1Surveillance Frequency Control Program
ML20283A34218 November 2020Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position RequirementsShutdown Margin
Surveillance Frequency Control Program
ML20217L1852 October 2020Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test FrequencyInternal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
Maintenance Rule Program
Grace period
ML20276A0032 October 2020Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML20210M0148 September 2020and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application RulesTime of Discovery
ML20230A0513 September 2020Reactor Vessel Material Surveillance Capsule Withdrawal Schedules
ML20153A4011 June 2020and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME CodeLiquid penetrant
ML20135G99229 May 2020and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME CodeLiquid penetrant
ML20134H95829 May 2020and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME CodeWeld Overlay
Liquid penetrant
ML19276F68412 November 2019Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power ReactorsSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Earthquake
ML19232A1517 November 2019Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling EquipmentSafe Shutdown
Design basis earthquake
Earthquake
Fuel cladding
ML19140A44730 July 2019Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 ModificationsMission time
Probabilistic Risk Assessment
Multiple Spurious Operation
Fire Protection Program
Very Early Warning Fire Detection
ML19177A3803 July 2019Reactor Vessel Material Surveillance Capsule Withdrawal Schedules
ML19128A1336 June 2019Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOTime of Discovery
Surveillance Frequency Control Program
ML19045A48016 April 2019Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5BHigh winds
Shutdown Margin
High Radiation Area
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Backfit
Power change
ML19046A16625 February 2019Relief from the Requirements of the ASME Code
ML19029A09429 January 2019Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances)Safe Shutdown
Probabilistic Risk Assessment
FLEX
ML18270A01519 October 2018and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM CodeIncorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML18100A7881 May 2018Issuance of Amendment Special Heavy Lifting Device Nondestructive Examination Frequency (CAC Nos. MG0072 and MG0073; EPID L-2017-LLA-0280)Safe Shutdown
Non-Destructive Examination
Nondestructive Examination
Control of Heavy Loads
Liquid penetrant
ML17346A3616 March 2018Issuance of Amendment Nos. 224 and 211 to Adopt Changes to the Emergency PlanHigh winds
Ultimate heat sink
Operating Basis Earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
ML17362A2025 March 2018Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175)Minimum staff
ML17334A17830 November 2017Issuance of Amendment Request Related to Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121 and MF7122, EPID L-2015-LLA-0002) Non-ProprietaryProbabilistic Risk Assessment
Fuel cladding
ML17310B23928 November 2017and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195)
ML17163A0278 August 2017Issuance of Amendments Transition to NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating PlantsHot Short
Safe Shutdown
Shutdown Margin
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Cable Tray Ignition
License Renewal
Exemption Request
Power Operated Valves
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
ML17130A71620 June 2017Issuance of Amendments Technical Specification 3.8.7 Inverters-OperatingAnticipated operational occurrence
ML17110A2754 May 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
High Radiation Area
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Emergency Lighting
Locked High Radiation Area
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Frazil ice
Flood Hazard Mitigation Strategies Assessment
Earthquake
Fire Protection Program
ML16320A02128 November 2016and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Review of Changes to the Northern States Power Company Quality Assurance Topical Report
ML16256A51413 October 2016Issuance of Amendment One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources - OperatingAnticipated operational occurrence
ML16246A2004 October 2016Request for Relief 1RR-4-11 and 2-RR-4-11 Associated with Certain Inservice Inspection of Component Welds for the Fourth 10-Year IntervalVT-2
Incorporated by reference
Liquid penetrant
ML16133A40616 June 2016Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450)
ML15264A20930 November 2015Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating LicenseSafe Shutdown
Reactor Vessel Water Level
Cyber Security
Fire Protection Program
ML15229A17626 August 2015Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture
ML15196A21317 August 2015Requests 1-RR-4-9 and 2-RR-4-9 Associated with the Fourth Ten-Year Interval for the Inservice Inspection ProgramVT-2
Through-Wall Leak
ML15196A24112 August 2015Requests 1-RR-5-6 and 2-RR-5-6 Associated with the Fifth Ten-Year Interval for the Inservice Inspection ProgramVT-2
Through-Wall Leak
ML15196A22712 August 2015Requests 1-RR-5-3 and 2-RR-5-3 Associated with the Fifth Ten-Year Interval for the Inservice Inspection ProgramBoric Acid
Incorporated by reference
ML15196A22112 August 2015Requests 1-RR-5-1 and 2-RR-5-1 Associated with the Fifth Ten-Year Interval for the Inservice Inspection ProgramVT-2
Foreign Material Exclusion
Pressure Boundary Leakage
ML15196A4326 August 2015Requests 1-RR-4-11 and 2-RR-4-11 Associated with the Fourth Ten-Year Interval for the Inservice Inspection ProgramIncorporated by reference
ML15196A1956 August 2015Request 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection ProgramNondestructive Examination
Incorporated by reference