ML22152A196

From kanterella
Jump to navigation Jump to search
Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis
ML22152A196
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/18/2022
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22152A025 List: ... further results
References
WO 22-0006 CCN No. XX-E-013, Rev 4
Download: ML22152A196 (29)


Text

FORM APF-05D-001-02, REV. 12 Page 1 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 - 004 - CN007 Base Calc No. Rev No. Sequence No.

CALCULATION TITLE - From CALCULATION TITLE field in EIS:

Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: VERSION:

Administrative? YES NO ASSOCIATED ENGINEERING CHANGE #: 020021 REGULATORY Attached Evaluation #

REVIEWS:

Attached to: CP 020021 R/1 Not Applicable N/A Only if Administrative USAR STATEMENT: Requires a change to the USAR:

Does NOT require a change to the USAR ANY DOCUMENTS YES If yes, enter: SWO #, or Condition Report #, if applicable.

IMPACTED?

NO Status: COMMITTED FINAL VOID SUPERSEDED DigsigOrg 2.8, 0.7 ORIG NA-Vendor Calculation ORIG Printed Name Printed Name Date Date NA Signature Signature QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED: ES9280479 DigsigVer 2.8, 0.7 VERF William M. Wilkins 05/19/2020 VERF Printed Name Date Printed Name Date Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 Signature QUALIFICATION REQUIRED:

DigsigApp 2.8, 0.7 APP Jeff Suter 05/19/2020 APP Printed Name Date Printed Name Date Signature Signature DigsigCert 3.5 1.75 DigsigCert 3.5 1.75 Vendor supplied document - WCNOC PE Stamping is not required per WCNOC-162 Rev. 05, Section 8.1.13.

RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP 05D-001 for qualification requirements)

CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:

CP 020021 XNB01 replacement impact to revise relay designations for transformer protection features. Additionally, discussion

FORM APF-05D-001-02, REV. 12 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 - 004 - CN007 Base Calc No. Rev No. Sequence No.

of load tap changer feature of new transformer included with clarification it is not PFSSD. XX-E-013-004-CN007 supersedes XX-E-013-004-CN005 in its entirety.

FORM APF-05D-001-02, REV. 12 Page 3 CALCULATION DATABASE INPUT CCN NO. XX-E-013 - 004 - CN007 Base Calc No. Rev No. Sequence No.

Link new systems to the calculation/CCN in EIS.

Systems NB, MA Affected:

Develop relationships between interdependent calculations in EIS.

Additional Calculations None Providing Input to this calculation:

Additional Calculations None Impacted by this calculation:

Develop relationships between the calculation/CCN and controlled reference documents in EIS.

Additional None Controlled Documents Inputs to this calculation:

Additional None Controlled Documents Impacted by this calculation:

The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.

Additional Other CP 020021, Enercon Calc. WCN-025-CALC-010 R/1 Reference Documents:

Link new components to the calculation/CCN in EIS.

Additional Components: None REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS

FORM APF-05D-001-02, REV. 12 Page 4 ATTACHMENT 1 CCN NO. XX-E-013 - 004 - CN007 Base Calc No. Rev No. Sequence No CCN Calc. CCN Calc. CCN Calc. CCN Calc.

Page No. Page Page Page Page Page Page Page Affected No. Affected No. Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other 1-4 None 5(Att. Appendix

1) 1; p63 Appendix 2; p7 Appendix 4; p4,24 OAR None

FORM APF-05D-001-02, REV. 12 Page 5 ATTACHMENT 1 CCN NO. XX-E-013 - 004 - CN007 Base Calc No. Rev No. Sequence No Vendor calculation WCN-025-CALC-010, Rev 1

CALC NO. WCN-025-CALC-010 CALCULATION COVER SHEET REV. 1 PAGE NO. 1 of 8 Client: WCNOC UPDATE TO WCNOC CALCULATION XX-E-

Title:

013, PFSSD ANALYSIS Project Identifier: WCN-025 Item Cover Sheet Items Yes No 1 Does this calculation contain any open assumptions, including preliminary information, that require confirmation? (If YES, identify the assumptions.)

2 Does this calculation serve as an Alternate Calculation? (If YES, identify the design verified calculation.)

Design Verified Calculation No.

3 Does this calculation supersede an existing Calculation? (If YES, identify the design verified calculation.)

Superseded Calculation No. WCN-025-CALC-010 Rev. 0 Scope of Revision:

Revised Section 1.0, 3.0, and 5.0 and Appendix A for DCP 20021 Rev. 1 Revision Impact on Results:

This calculation documents the changes for the replacement of transformer XNB01.

Study Calculation Final Calculation Safety-Related Non-Safety-Related (Print Name and Sign)

Digitally signed by Alex Wurtz DN: cn=Alex Wurtz, c=US, See Originator: Alex Wurtz Alex Wurtz email=awurtz@enercon.com Date: 2020.05.06 15:21:20 -

Date: Electronic 05'00' Signature Digitally signed by Stacey Graybeal See 1

Design Verifier (Reviewer if NSR): Stacey Graybeal Date: 2020.05.06 Date: Electronic 16:09:59 -05'00' Signature Digitally signed by Austin Tran See DN: cn=Austin Tran, ou=Enercon Services, Approver: Austin Tran Inc., email=atran@enercon.com, c=US Date: Electronic Date: 2020.05.12 14:21:57 -05'00' Signature Digitally signed by Austin Note 1: For non-safety-related calculation, design verification can be substituted bstituted by review.revie evie ev ew.

w.

Tran DN: cn=Austin Tran, ou=Enercon Services, Inc.,

email=atran@enercon.com

, c=US Page 1 of 8 Date: 2020.05.12 14:22:48

-05'00'

CALC NO. WCN-025-CALC-010 CALCULATION REV. 1 REVISION STATUS SHEET PAGE NO. 2 of 8 CALCULATION REVISION STATUS REVISION DATE DESCRIPTION 0 09/20/2018 Initial Issue 1 04/16/2020 Revised section 1.0, 3.0, and 5.0 and Appendix A PAGE REVISION STATUS PAGE NO. REVISION PAGE NO. REVISION 3,7,8 0 1,2,4-5 1 APPENDIX/ATTACHMENT REVISION STATUS APPENDIX NO. NO. OF REVISION ATTACHMENT NO. OF REVISION PAGES NO. NO. PAGES NO.

A 4 1 Page 2 of 8

CALC NO. WCN-025-CALC-010 TABLE OF REV. 1 CONTENTS PAGE NO. 3 of 8 Section Page No.

1.0 Purpose and Scope

4 2.0 Summary of Results and Conclusions 4 3.0 References 5 4.0 Assumptions 5 5.0 Design Inputs 5 6.0 Methodology 7 7.0 Calculations 8 8.0 Computer Software 8

  1. of List of Appendices Pages A - Markup Updates to XX-E-013 4 Page 3 of 8

CALC NO. WCN-025-CALC-010 UPDATE TO WCNOC CALCULATION XX-E-013, REV. 1 PFSSD ANALYSIS PAGE NO. 4 of 8

1.0 Purpose and Scope

Wolf Creek is performing a systematic replacement of their large oil-filled transformers to address aging concerns and to implement design improvements in support of long-term station operation. ESF Transformer XNB02 is to be replaced prior to the replacement of ESF transformer XNB01.

DCP 020021 is replacing XNB01 and the new transformer will have a Load Tap Changer (LTC) to control the voltage supplied to 4.16kV bus NB01 even if the 13.8 kV input voltage level changes. The DCP is also replacing/deleting relays in the MA104F panel and the relays are addressed by XX-E-013. The purpose of this calculation is to document the impact on Wolf Creek calculation XX-E-013 due to these changes. This calculation is non-safety related per the ENERCON requirements. The Wolf Creek update will be considered special scope per the site requirements.

2.0 Summary of Results and Conclusions Wolf Creek calculation XX-E-013 does not have any computations. It is a document used to identify the components required to support the Post Fire Safe Shutdown (PFSSD) functions. Based on the results of this calculation the addition of the LTC controls will not impact the PFSSD function of XNB01. Two differential current relays (287/T1 Phase B and Phase C) are removed from the calculation (287/T1 Phase A is replaced with one new relay 287/T1 (A,B,C) to monitor all three phases). Also, components 263-1/T1, 263X-1/T1, 263-2/T1 and 263X-2/T1 are removed from the calculation.

New fault pressure trip relays 263FP K4A and 263FP K4B are added because they provide a trip input for breaker NB00112 (XNB01 input breaker to NB01). Cable 15NBK16AA supplies 125VDC to the sudden pressure monitor that contains the two relays at XNB01. Failure of this cable does not cause the relays to change state and cause a loss of power to XNB01.

Therefore, cable 15NBK16AA is not a PSFFD related cable. Drawing E-1F9425 impacted by this change and will be revised by DCP 020021 via WIP-E-1F9425-002-A-1. The proposed changes to XX-E-013 as a result of DCP 020021 are acceptable.

CSP 3.03 Attachment C Page 4 of 8 Revision 2

CALC NO. WCN-025-CALC-010 UPDATE TO WCNOC CALCULATION XX-E-013, REV. 1 PFSSD ANALYSIS PAGE NO. 5 of 8 3.0 References 3.1 Wolf Creek Calculation XX-E-013, PFSSD Analysis, Rev. 4 3.2 E-074-00007, Outline (Trans-Sealed), Rev. W09 3.3 DCP 020021, XNB01 Replacement, Rev. 0 3.4 E-1F9425, Post Fire Safe Shutdown Logic Diagram Support Function

- Electrical, NB001 Off-Site Power Availability, Rev. 2 3.5 E-1F9910, Post Fire Safe Shutdown Fire Area Analysis, Rev. 15 3.6 E-022-00029, Relay Panels and Fabrication Details, (related to MA104F), Rev. W12 3.7 E-022-00043, Transformer Feeder Wiring (related to XNB01), Rev.

W09 3.8 E-15000, Electrical Cable and Raceway List, Rev. 67 3.9 E-1R4431, Raceway Plan Turbine Building Area-3 EL. 2033-0, Rev.

2 3.10 E-1R4331, Raceway Plan Turbine Building Area-3 EL. 2000-0, Rev.

1 3.11 E-1R4321, Raceway Plan Turbine Building Area-2 EL. 2000-0, Rev.

2 3.12 E-1R4322, Exposed Conduit Turbine Building Area-2 EL. 2000-0, Rev. 5 3.13 E-13NB10, Schematic Diagram 13.8kv XNB01 Breaker Rev. 3 3.14 E-13NB16, ESF Transformers Auxiliary Power and Control Schematic Diagram, Rev. 1 4.0 Assumptions There are no assumptions used in the calculation.

5.0 Design Inputs Reviews of existing change notices against XX-E-013 were performed to determine if any of the documents impact the changes being performed by DCP 020021. Results are as follows:

  • XX-E-013-004-CN001 - VOID
  • XX-E-013-004-CN002 - FINAL - DCP 14209 removes the HMCP breakers from MCC cubicles NG03DBF6 and NG04DBF6, which were CSP 3.03 Attachment C Page 5 of 8 Revision 2

CALC NO. WCN-025-CALC-010 UPDATE TO WCNOC CALCULATION XX-E-013, REV. 1 PFSSD ANALYSIS PAGE NO. 6 of 8 added as PFSSD components in CCN XX-E-013-002-CN014 per DCP 13800. These breaker cubicles provide power and control functions for Train A and B emergency diesel generator room supply fan motors DCGM01A and DCGM01B, respectively. Due to breaker coordination issues, DCP 14209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01B directly from new load center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG03DBF6 and NG04DBF6, respectively. Therefore, MCC cubicles NG03DBF6 and NG04DBF6 will remain as PFSSD components. The changes per this update do not impact the evaluation performed by this calculation.

  • XX-E-013-004-CN003 - COMMITTED - Change Package 14658 is replacing cable from EDGs speed signal generators to the EDGs speed switches. Appendices 1, 2 and 3 are updated to reflect these changes. The changes per this update do not impact the evaluation performed by this calculation.
  • XX-E-013-004-CN004 - FINAL - CP 15070 is changing the 120VAC source from system NG to NN for the control room a/c unit inlet and exhaust dampers GKHZ0029A/B (Train A) & GKHZ0040A/B (Train B).

The changes per this update do not impact the evaluation performed by this calculation.

  • XX-E-013-004-CN005 - COMMITTED - CP 20021 is replacing XNB01 and the change impacts the PFSSD components for XNB01. This revision (revision 1) of this calculation will be accepted by Wolf Creek as a new CCN that supersedes XX-E-013-004-CN005
  • XX-E-013-004-CN006 - COMMITTED - CP 12513 is replacing XNB02 and the change impacts the PFSSD components for XNB02. The changes per this update do not impact the evaluation performed by this calculation.

CSP 3.03 Attachment C Page 6 of 8 Revision 2

CALC NO. WCN-025-CALC-010 UPDATE TO WCNOC CALCULATION XX-E-013, REV. 1 PFSSD ANALYSIS PAGE NO. 7 of 8 6.0 Methodology This calculation is a tabulation of cables and components that are required to support the PFSSD power sources and functions. XNB01 is a power source that is required to support the PFSSD functions. The impact of the LTC controls on the PFSSD power supply function was reviewed and determined to not impact the PFSSD power supply function of XNB01. PFSSD components associated with XNB01 are listed in calculation XX-E-013. Some of the components are being removed by DCP 020021. The calculation was reviewed and components 287/T1(B) and 287/T1(C) are removed from the plant and will be removed from the calculation. Relay 287/T1(A) is changed to 287/T1(A,B,C) because the new digital relay monitors all three phases. Fault pressure monitors 263-1/T1 and 263-2/T1 are being removed from the plant and will be removed from the calculation. Auxiliary relays 263X-1/T1 and 263X-2/T1 are being disconnected/

abandoned-in-place and will be removed from the calculation. A new sudden pressure monitor at XNB01 contains trip relays that are used to trip the NB00112 breaker on a fault pressure signal, 263FP relays K4A and K4B. These relays will be added to the calculation. The changes to the relays also impact drawing E-1F9425. This drawing update will be addressed in DCP 020021 via WIP-E-1F9425-002-A-1. PK4115 via cable 15NBK16AA supplies 125VDC to the sudden pressure monitor. Failure of this power source or cable does not cause the relays to change state and loss of XNB01. Therefore, PK4115 and cable 15NBK16AA are not required for PFSSD.

CSP 3.03 Attachment C Page 7 of 8 Revision 2

CALC NO. WCN-025-CALC-010 UPDATE TO WCNOC CALCULATION XX-E-013, REV. 1 PFSSD ANALYSIS PAGE NO. 8 of 8 7.0 Calculations N/A 8.0 Computer Software NONE APPENDIX A - Markups to Calculation XX-E-013 Rev. 4 (4 pages)

CSP 3.03 Attachment C Page 8 of 8 Revision 2

CALC NO. WCN-025-CALC-010 REV. 1

)250$3)'5(9 APPENDIX A PAGE 1 OF 4 APPENDIX 1 CALCULATION NO. XX-E-013 PFSSD FUNCTION EVALUATIONS REVISION NO. 4 (PFSSD SUPPORT) Page 63



3$LVLQFOXGHGLQWKH3)66'GHVLJQEHFDXVH3$FRQWUROVHFWLRQSURYLGHVFRQWUROSRZHUIRU3$1R

3)66'ORDGVRWKHUWKDQ3$FRQWUROSRZHUDUHVXSSOLHGE\3$



2IIVLWHSRZHUDYDLODELOLW\UHTXLUHVWKDWRIIVLWHSRZHUFDEOHVDQGFDEOHVDVVRFLDWHGZLWK;1%DQG;1%

SURWHFWLYHUHOD\VUHPDLQIUHHRIILUHGDPDJH7KHSRZHUFDEOHVDUHDVVRFLDWHGZLWKWKHFLUFXLWEUHDNHUVLQWKH

SUHFHGLQJWDEOH2IIVLWHSURWHFWLYHUHOD\VDQGSRWHQWLDOWUDQVIRUPHUVUHTXLUHGIRU3)66'DUHLGHQWLILHGLQ

$SSHQGL[DQG$SSHQGL[ XMA02



7KHDERYHGLVFXVVLRQDGGUHVVHVVDIHW\UHODWHGSRZHUUHTXLUHGIRUSRVWILUHVDIHVKXWGRZQ$OLPLWHGQXPEHURI

FRPSRQHQWVGHULYHWKHLUSRZHUIURPQRQVDIHW\UHODWHGEXVVHV 3$DQG3$ 7KHQRQVDIHW\UHODWHGSRZHULV

QRUPDOO\VXSSOLHGIURPWKHXQLWDX[LOLDU\WUDQVIRUPHU ;05 2QDIDLOXUHRI;05RUWKHSRZHUWR;05D

IDVWEXVWUDQVIHUWRWKHVWDUWXSWUDQVIRUPHU ;05 RFFXUV7KHSRZHUSDWKIURP;05LVQRWLQFOXGHGLQWKH

3)66'GHVLJQEHFDXVHWKH;05SRZHUSDWKLVLQWKH3)66'GHVLJQ2WKHUWKDQ90&&VWKHUHDUHQR

RWKHUQRQVDIHW\UHODWHG3)66'ORDGVSRZHUHGIURP3$DQG3$&RQWUROVUHTXLUHGIRURIIVLWHDQGRQVLWH

SRZHUDUHLGHQWLILHGLQ$SSHQGL[



)RUFHGFRROLQJRI(6)WUDQVIRUPHUV;1%DQG;1%LVQRWUHTXLUHGIRU3)66'(DFKWUDQVIRUPHUKDVDVHOI

FRROHGUDWLQJRI09$DQGDIRUFHGDLUFRROHGUDWLQJRI09$7KHPD[LPXPGHVLJQEDVLVDFFLGHQW '%$ 

ORDGLVDSSUR[LPDWHO\0:ZKLFKHTXDWHVWR09$DVVXPLQJDSRZHUIDFWRURI DFWXDOSRZHUIDFWRULV

EHWZHHQDQG 7KHUHIRUHWKHUHLVDPDUJLQIRUWKH'%$ORDGLQJIRUWKHVHOIFRROHGUDWLQJ3)66'

ORDGLQJZRXOGEHHTXDOWRRUOHVVWKDQWKH'%$UDWLQJVLQFHVRPHRIWKH'%$ORDGVDUHQRWFUHGLWHGIRU3)66'

HJFRQWDLQPHQWVSUD\SXPSVDQGVDIHW\LQMHFWLRQSXPSV 7KHUHIRUHWKHUHLVDGHTXDWHMXVWLILFDWLRQIRUQRW

LQFOXGLQJ(6)WUDQVIRUPHUFRROLQJLQWKH3)66'DQDO\VLV



/RZHUPHGLXPYROWDJH+/-.9FRPSRQHQWVDQGUHOD\VUHTXLUHGIRU3)66'DUHLGHQWLILHGLQ$SSHQGL[DQG

$SSHQGL[



$QHYDOXDWLRQRIWKHSRWHQWLDOIRUDILUHLQGXFHGORVVRIRIIVLWHSRZHULVFRQWDLQHGLQ$SSHQGL[7KLVHYDOXDWLRQ

LGHQWLILHGWKHSODQWORFDWLRQVZKHUHDILUHLQLWLDWHGORVVRIRIIVLWHSRZHU ORVVRIQRQVDIHW\UHODWHGSRZHU FRXOG

RFFXU



/RZ9ROWDJH6\VWHP+/-9



XNB017KHORZYROWDJHV\VWHPLVGLYLGHGLQWRWZRORDGJURXSVWKDWDUHUHGXQGDQWDQGLQGHSHQGHQWORDGJURXSDQGORDG

has a Load Tap Changer (LTC) that is used to maintain a set voltage level on the NB01 JURXS(LWKHURQHRIWKHDVVRFLDWHGORDGJURXSVLVFDSDEOHRIDFKLHYLQJ3)66'

bus even though voltage level changes on the 13.8kV switchyard supply voltage may occur. This function is local to the transformer. The power for the LTC and transformer auxiliary loads is sup-7KH&ODVV(9V\VWHPFRQVLVWVRIORDGFHQWHUXQLWVXEVWDWLRQVDQGPRWRUFRQWUROFHQWHUV6XSSOLHGIURPWKH

plied.9EXVHV

from either1%DQG1% WKHORDGFHQWHUVWUDQVIRUPSRZHUIURP.9WR97KHORDGFHQWHUVVXSSO\

the auxiliary winding local to the transformer or an external 480VAC power sup-ply.SRZHUDW9GLUHFWO\WRPRWRUVDERYHKSDQGOHVVWKDQKS0RWRUVKSDQGEHORZWZRVSHHGRU

When operated in a "fixed tap" position (fixed tap setting by Operations) the transformer func-tionsUHYHUVLEOHPRWRUVDQGPRWRUVVXEMHFWWRUHSHDWHGF\FOLQJDUHVXSSOLHGIURPPRWRUFRQWUROFHQWHUV

as a standard step down transformer and there are no new failure modes. When placed in



the 3RVWILUHVDIHVKXWGRZQFRPSRQHQWVSRZHUHGE\QRQVDIHW\UHODWHGSRZHUZHUHHYDOXDWHGWRGHWHUPLQHWKH

"automatic" mode of operation, the LTC controller monitors the 4.16 kV output and adjusts the tap FRPSRQHQWVWKDWUHTXLUHGSRZHU

changer position to maintainSRZHUUHTXLUHGWRUHSRVLWLRQWKHFRPSRQHQW the NB bus voltage level at a set level. A failure of the main LTC

IRUSRVWILUHVDIHVKXWGRZQ7KH

UHYLHZGHWHUPLQHGWKDWVRPHRIWKHFRPSRQHQWVXVHGWRLVRODWHVWHDPIORZGRZQVWUHDPRIWKH06,9VUHTXLUH

controller would result in the LTC controls being shifted to the backup LTC controller and the Con-trol SRZHUWRLVRODWHVWHDPIORZ$SSHQGL[GHWHUPLQHGWKDWWKHVHFRPSRQHQWVZHUHRQO\UHTXLUHGIRUDILUHLQILUH

Room being informed of the change via an alarm. The backup LTC controller has limited con-trol DUHDV$DQG$1RQHRIWKHSUHIHUUHGSRZHUFDEOHVDUHURXWHGLQILUHDUHDV$DQG$7KHUHIRUHWKH

function and prevents the transformer from being in an undesirable position. A loss of 480VAC QRQVDIHW\UHODWHGSRZHUZRXOGEHDYDLODEOHZKHQUHTXLUHG

power feeding the LTC/auxiliary load for XNB01 will result in loss of power to the main and backup LTC7UDQVIRUPHUVHPSOR\HGLQWKH3)66'GHVLJQWRWUDQVIRUP.9WR9DUHLGHQWLILHGLQ$SSHQGL[

controllers. This would keep the tap setting at a fixed position (the same as the "fixed tap" op-



eration) and the transformer functions as a standard step down transformer. Therefore, a loss of power9ORDGFHQWHUDQGPRWRUFRQWUROFHQWHUFRPSRQHQWVXVHGLQWKH3)66'GHVLJQDUHLGHQWLILHGLQ$SSHQGL[

to the LTC controllers will not impact the PFSSD function of XNB01.





CALC NO. WCN-025-CALC-010 REV. 1 FORM APF 05D-001-01, REV. 10 APPENDIX A PAGE 2 OF 4 APPENDIX 2 CALCULATION NO. XX-E-013 LOSS OF OFF-SITE POWER REVISION NO. 4 EVALUATION Page 7 7$%/($

2))6,7(32:(5$1'(0(5*(1&<',(6(/*(1(5$725&$%/(6

 

$662&,$7('%86',(6(/

&$%/( '(6&5,37,21

  • (1(5$725

1% '*$ 1% '*%

1(%$+     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$-     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$/  ; (PHUJHQF\'LHVHO*HQHUDWRU%

1(%$0     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$1     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$3     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$4     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$5     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$6     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$8     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$9     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$$     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$%     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$&     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$'  ; (PHUJHQF\'LHVHO*HQHUDWRU%

1(%$)     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$*     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(%$-     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(.$$     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(.$'     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(.$(     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(.$+     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

1(.$-     ; (PHUJHQF\'LHVHO*HQHUDWRU% 

05.$$    ;  ;05IDXOWSUHVVXUHVZLWFK7 

05IDXOWSUHVVXUHVZLWFK7
05IDXOWSUHVVXUHUHOD\;7
05IDXOWSUHVVXUHUHOD\;7

05.$(    ;  ;05'HOXJH5HOD\$5 

05.$)    ;  ;057ULS2Q3$3KDVH2YHUFXUUHQW 

050$$ XNB01  Fault   ;  ;057UDQVIRUPHU&RROLQJ 

050$&    ;  ;05/RFNRXW5HOD\&RROLQJDQG2LO/HYHO 

Pressure Trip 7ULSV

05;$* Monitor  relays   ;  ;053KDVH'LIIHUHQWLDO5HOD\7 

05;$/ 263FP K4A and   ;  ;051HXWUDO*URXQG5HOD\17 

K4B ;051HXWUDO*URXQG5HOD\17

05;$1    ;  ;05)HHGHUWR3$ 

1%$$$  ;    1%/RFNRXW5HOD\7 

1%/RFNRXW5HOD\7

1%$$&  ;    ;1%)DXOW3UHVVXUH6ZLWFK7

1%)DXOW3UHVVXUH6ZLWFK7 
1%)DXOW3UHVVXUH5HOD\;7
1%)DXOW3UHVVXUH5HOD\;7
1%)DXOW3UHVVXUH6ZLWFK7
1%)DXOW3UHVVXUH6ZLWFK 7
1%)DXOW3UHVVXUH5HOD\;7

CALC NO. WCN-025-CALC-010 REV. 1 APPENDIX A PAGE 3 OF 4

$33(1',; &$/&8/$7,2112;;(

3)66'5(/$</,67 5(9,6,2112

6RUWHGE\5HOD\/RFDWLRQ5HOD\,' 3DJH

Logic R Fire Relay SSD Sprtd Hot Cold Normal Alt Schematic / Power Feeder Relay ID S/G Relay Name Room Other Drawing Notes Diagram E Area Location Fun Fun Stdby Shdwn Shdwn Shdwn One Line Breaker (E-1F) V TSR 4 Test Start Relay 5201 D-2 KJ122 S R, M, H X X X X E-13KJ03A M-018-00105 NK5414 --- 9411B 0 M-018-00106 9412B 286/T1 6 Lockout Relay These 4401W relays are TURBtwoMA104D S no R, M, H X X X --- E-11MR01 --- PK6204 --- 9426 0 These E-13MR10 two relays arePK6216 longer inservice and can E-13NB11 removed from the plant.

be removed.

486/T1 5 Lockout Relay 4401W TURB MA104E S R, M, H X X X --- E-11MR01 --- PK6204 --- 9426 0 E-13MR10 PK6106 E-13NB11 151N/T1 5 Ground Over Current Relayy 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 263X-1/T1 5 Fault Pressure Switch Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 263X-2/T1 5 Fault Pressure Switch Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 287/T1(A) 6 P Phase A Differential Current Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 287/T1(B) 6 Phase B Differential Current Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 287/T1(C) 6 Phase C Differential Current Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 94-1/T 6 Switchyard Trip Relay 4401W TURB MA104F S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 127-1/DG 1 NB01 Undervoltage Relay 3301 C-9 NB0101 S R, M, H X X X --- E-12NF01 --- NB0101 --- 9411A 0 E-13NB01 9412A E-13NF01 152 STA 1 AC Circuit Breaker Stationary 3301 C-9 NB0104 S R, M, H X X X --- E-13EG01A --- NK4101 --- 9401A 0 Contact 9401B 152 STA 287/T1 Breaker Stationary 1 AC Circuit(A,B,C) Phase 3301 C-9 A,B,C NB0107 Differential S R, M, HCurrent X Relay X X --- E-13EG01A --- NK4101 --- 9401A 0 Contact E-13EG01B 9401B 186/M 1 Lockout Relay 3301 C-9 NB0107 S R, M, H X X X --- E-13EG01A --- NK4101 --- 9401A 0 152 STA 1 AC Circuit Breaker Stationary 3301 C-9 NB0108 S R, M, H X X X --- E-13EG01A --- NK4101 --- 9401A 0 Contact E-13EG01B 9401B 186/M 1 Lockout Relay 3301 C-9 NB0108 S R, M, H X X X --- E-13EG01B --- NK4101 --- 9401A 0 125/F 1 Synchronizing Check Relay 3301 C-9 NB0109 S R, M, H X X X --- E-13NB02 --- NK4101 --- 9425 0 E-13NB13 152 STA 1 AC Circuit Breaker Stationary 3301 C-9 NB0109 S R, M, H X X X --- E-13NE10 --- NK4101 --- 9423 0 Contact 186/F 1 Lockout Relay 3301 C-9 NB0109 S R, M, H X X X --- E-13NB13 --- NK4101 --- 9423 0 E-13NE10 9425 286-2/T2 1 Lockout Relay 3301 C-9 NB0109 S R, M, H X X X --- E-13NB13 --- NK4101 --- 9425 0

CALC NO. WCN-025-CALC-010 REV. 1 APPENDIX A PAGE 4 OF 4

$33(1',; &$/&8/$7,2112 ;;(

3)66'5(/$</,67 5(9,6,2112 

6RUWHGE\5HOD\/RFDWLRQ5HOD\,' 3DJH

Logic R Fire Relay SSD Sprtd Hot Cold Normal Alt Schematic / Power Feeder Relay ID S/G Relay Name Room Other Drawing Notes Diagram E Area Location Fun Fun Stdby Shdwn Shdwn Shdwn One Line Breaker (E-1F) V K526 4 Safety Injection Master Relay 3605 C-27 SB032D S R, M, H X X X --- --- M-767-00374 NK4416 --- 9432 0 M-767-00350 NN0412 K713 4 Pressurizer High Pressure Relay 3601 C-27 SB032D M --- X X X --- E-13BB40 M-767-00186 NK4421 BBPCV0456A opens if K713 is 9301 3 E-13SB05 M-767-00189 NN0412 energized. XX-E-013-002-NK4416 CN002 K726 4 Low-Low TAVG or 3605 C-27 SB032D R, H --- X --- X --- E-13AB08 M-767-00188 NK4416 --- 9103 0 ABHS0064 in 'OFF/RESET' Relay NN0412 K727 4 Low-Low TAVG or 3605 C-27 SB032D R, H --- X --- X --- E-13AB11A M-767-00188 NK4416 --- 9103 0 ABHS0064 in 'OFF/RESET' Relay E-13AB11B NN0412 E-13AB11C K728 4 Low-Low TAVG or 3605 C-27 SB032D R, H --- X --- X --- E-13AB11C M-767-00188 NK4416 --- 9103 0 ABHS0064 in 'OFF/RESET' Relay NN0412 K734 4 High-1 RCS Pressure Relay 3605 C-27 SB032D H --- --- X --- --- E-13BB12A M-767-00186 NG02BCF2 --- 9205 0 E-13BB12B M-767-00189 NG02BBF3 NN0412 263FP (K4A) NK4416 K740 4 Safety Injection Signal Relay 3605 C-27 SB032D H --- --- X --- --- E-13EJ06B M-767-00189 NG02BEF2 --- 9205 0 E-13SB05 NN0412 NK4416 K741 4 RWST Low-Low 1 Level Relay 3605 C-27 SB032D H --- --- X --- --- E-13EJ06B M-767-00189 NG02BEF2 --- 9205 0 E-13SB05 NN0412 PK4115 NK4416 K811 4 Block Test Relay 3605 C-27 SB033A M --- X X X X E-13BB40 --- NK4421 --- 9301 0 PK4115 263-1/T1 5 Fault Pressure Switch Relay Yard --- XNB01 S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 2

263-2/T1 5 Fault Pressure Switch Relay Yard --- XNB01 S R, M, H X X X --- E-13NB10 --- PK6108 --- 9425 0 263-1/T2 6 Fault Pressure Switch Relay Yard --- XNB02 S R, M, H X X X --- E-13NB11 --- PK6204 --- 9426 0 E-13NB16 E-13PA14 263-2/T2 6 Fault Pressure Switch Relay Yard --- XNB02 S R, M, H X X X --- E-13NB11 --- PK6204 --- 9426 0 E-13PA14 PK4115 is connected to cable 15NBK16AA. This supplies power to the monitor that houses relays at 263FP (K4B)

XNB01. PK4115 and associated cable 15NBK16AA are not required for PFSSD. Loss of power or cable failure will not cause a loss of XNB01.

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A GENERAL REQUIREMENTS

1. If the calculation is being performed to a client procedure, is the procedure being used the latest revision?

This calculation is not being performed per a client procedure.

2. Are the proper forms being used and are they the latest revision?
3. Have the appropriate client review forms/checklists been completed?

This calculation is not being performed per a client procedure.

4. Are all pages properly identified with a calculation number, calculation revision and page number consistent with the requirements of the clients procedure?
5. Is all information legible and reproducible?
6. Is the calculation presented in a logical and orderly manner?
7. Is there an existing calculation that should be revised or voided?

This is a revision

8. Is it possible to alter an existing calculation instead of preparing a new calculation for this situation?
9. If an existing calculation is being used for design inputs, are the key design inputs, assumptions and engineering judgments used in that calculation valid and do they apply to the calculation revision being performed.
10. Is the format of the calculation consistent with applicable procedures and expectations?
11. Were design input/output documents properly updated to reference this calculation?

This calculation will be made into a calculation change notice by Wolf Creek.

DCP 020021 will update any required documents associated with this calculation.

12. Can the calculation logic, methodology and presentation be properly understood without referring back to the originator for clarification?

OBJECTIVE AND SCOPE

13. Does the calculation provide a clear concise statement of the problem and objective of the calculation?

This revision does not impact these items CSP 3.03 Attachment C Page 1 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

14. Does the calculation provide a clear statement of quality classification?

This revision does not impact this item

15. Is the reason for performing and the end use of the calculation understood?

This revision does not impact this item

16. Does the calculation provide the basis for information found in the plants license basis?

This revision does not impact this item

17. If so, is this documented in the calculation?

This revision does not impact this item

18. Does the calculation provide the basis for information found in the plants design basis documentation?

This revision does not impact this item

19. If so, is this documented in the calculation?
20. This revision does not impact this item
21. Does the calculation otherwise support information found in the plants design basis documentation?

This revision does not impact this item

22. If so, is this documented in the calculation?

This revision does not impact this item

23. Has the appropriate design or license basis documentation been revised, or has the change notice or change request documents being prepared for submittal?

This revision does not impact this item DESIGN INPUTS CSP 3.03 Attachment C Page 2 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

24. Are design inputs clearly identified?

This revision does not impact this item

25. Are design inputs retrievable or have they been added as attachments?
26. If Attachments are used as design inputs or assumptions are the Attachments traceable and verifiable?

This revision does not impact this item

27. Are design inputs clearly distinguished from assumptions?

This revision does not impact this item

28. Does the calculation rely on Attachments for design inputs or assumptions? If yes, are the attachments properly referenced in the calculation?

This revision does not impact this item

29. Are input sources (including industry codes and standards) appropriately selected and are they consistent with the quality classification and objective of the calculation?

This revision does not impact this item

30. Are input sources (including industry codes and standards) consistent with the plants design and license basis?

This revision does not impact this item

31. If applicable, do design inputs adequately address actual plant conditions?

This revision does not impact this item

32. Are input values reasonable and correctly applied?

This revision does not impact this item

33. Are design input sources approved?

This revision does not impact this item CSP 3.03 Attachment C Page 3 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

34. Does the calculation reference the latest revision of the design input source?

This revision does not impact this item

35. Were all applicable plant operating modes considered?

This revision does not impact this item ASSUMPTIONS

36. Are assumptions reasonable/appropriate to the objective?

This revision does not impact this item.

37. Is adequate justification/basis for all assumptions provided?

This revision does not impact this item

38. Are any engineering judgments used?
39. Are engineering judgments clearly identified as such?

This revision does not impact this item

40. If engineering judgments are utilized as design inputs, are they reasonable and can they be quantified or substantiated by reference to site or industry standards, engineering principles, physical laws or other appropriate criteria?

This revision does not impact this item METHODOLOGY

41. Is the methodology used in the calculation described or implied in the plants licensing basis?

This revision does not impact this item

42. If the methodology used differs from that described in the plants licensing basis, has the appropriate license document change notice been initiated?

This revision does not impact this item CSP 3.03 Attachment C Page 4 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

43. Is the methodology used consistent with the stated objective?

This revision does not impact this item

44. Is the methodology used appropriate when considering the quality classification of the calculation and intended use of the results?

This revision does not impact this item BODY OF CALCULATION

45. Are equations used in the calculation consistent with recognized engineering practice and the plants design and license basis?

This calculation does not use any equations.

46. Is there reasonable justification provided for the use of equations not in common use?
47. Are the mathematical operations performed properly and documented in a logical fashion?.
48. Is the math performed correctly?
49. Have adjustment factors, uncertainties and empirical correlations used in the analysis been correctly applied?.
50. Has proper consideration been given to results that may be overly sensitive to very small changes in input?

This revision does not impact this item SOFTWARE/COMPUTER CODES

51. Are computer codes or software languages used in the preparation of the calculation?

No computer codes are used in this calculation update.

52. Have the requirements of CSP 3.09 for use of computer codes or software languages, including verification of accuracy and applicability been met?
53. Are the codes properly identified along with source vendor, organization, and revision level?
54. Is the computer code applicable for the analysis being performed?

CSP 3.03 Attachment C Page 5 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

55. If applicable, does the computer model adequately consider actual plant conditions?
56. Are the inputs to the computer code clearly identified and consistent with the inputs and assumptions documented in the calculation?
57. Is the computer output clearly identified?
58. Does the computer output clearly identify the appropriate units?
59. Are the computer outputs reasonable when compared to the inputs and what was expected?
60. Was the computer output reviewed for ERROR or WARNING messages that could invalidate the results?

RESULTS AND CONCLUSIONS

61. Is adequate acceptance criteria specified?

This revision does not impact this item

62. Are the stated acceptance criteria consistent with the purpose of the calculation, and intended use?

This document does not use acceptance criteria.

63. Are the stated acceptance criteria consistent with the plants design basis, applicable licensing commitments and industry codes, and standards?

This document does not use acceptance criteria.

64. Do the calculation results and conclusions meet the stated acceptance criteria?

This document does not use acceptance criteria.

65. Are the results represented in the proper units with an appropriate tolerance, if applicable?

This document does not use any units.

66. Are the calculation results and conclusions reasonable when considered against the stated inputs and objectives?
67. Is sufficient conservatism applied to the outputs and conclusions?

Conservatism is not required for this document.

CSP 3.03 Attachment C Page 6 of 7 Revision 2

WCN-025-CALC-CALC NO.

CALCULATION 010 PREPARATION CHECKLIST REV. 1 CHECKLIST ITEMS1 YES NO N/A

68. Do the calculation results and conclusions affect any other calculations?

This output of this calculation does not impact any other calculations.

69. If so, have the affected calculations been revised?

This output of this calculation does not impact any other calculations.

70. Does the calculation contain any conceptual, unconfirmed or open assumptions requiring later confirmation?

No assumptions are used in the calculation update.

71. If so, are they properly identified?

No assumptions are used in the calculation update.

DESIGN REVIEW

72. Have alternate calculation methods been used to verify calculation results?

No alternate calculations are used to support this document update.

Note:

1. Where required, provide clarification/justification for answers to the questions in the space provided below each question. An explanation is required for any questions answered as No or N/A.

Digitally signed by Alex Wurtz DN: cn=Alex Wurtz, c=US, SEE ELECTRONIC Originator: Alex Wurtz Alex Wurtz email=awurtz@enercon.com Date: 2020.05.06 15:22:28 -

SIGNATURE 05'00' Print Name and Sign Date CSP 3.03 Attachment C Page 7 of 7 Revision 2

FORM AIF 05C-002-02, REV. 3A WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 1 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN007 ECDE: Enercon INITIATING DOCUMENT and revision: CP 020021 R/1 (e.g., PO, CR, SWO)

CHANGE TYPE: X Calculation Specification SAFETY CLASS: SR X SS NSR DigsigVer 5, 0.45 WCNOC Date:

Reviewer signature: 05/19/2020 DigsigVer 5, 0.45 5/20/2020 WCNOC Date:

Approver:

Prepared By: Init / Date William M. Wilkins WMW 05/19/2020

FORM AIF 05C-002-02, REV. 3A WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 2 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN007 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 1 Do assumptions have All Assumptions should be stated in clear X sufficient documented terms with enough justification to confirm rationale? that the assumption is conservative:

For example, 1) the exact value of a particular parameter may not be known or that parameter may be known to vary over the range of conditions covered by the Calculation. It is appropriate to represent or bound the parameter with an assumed value.

2) The predicted performance of a specific piece of equipment in lieu of actual test data. It is appropriate to use the documented opinion/position of a recognized expert on that equipment to represent predicted equipment performance.

Consideration should also be given as to any qualification testing that may be needed to validate the Assumptions. Ask yourself, would you provide more justification if you were performing this analysis? If yes, the rationale is likely incomplete.

2 Are assumptions Ensure the documentation for source and X compatible with the rationale for the assumption supports the way way the plant is the plant is currently or will be operated post operated and with the change and they are not in conflict with any licensing basis? design parameters. If the Analysis purpose is to establish a new licensing basis, this question can be answered yes, if the assumption supports that new basis.

FORM AIF 05C-002-02, REV. 3A WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 3 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN007 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 3 Do all unverified If there are unverified assumptions without a X assumptions have a tracking mechanism indicated, then create the tracking and closure tracking item either through an ATI or a work mechanism in place? order attached to the implementing WO. Due dates for these actions need to support verification prior to the analysis becoming operational or the resultant plant change being op authorized.

4 Do the design inputs The origin of the input, or the source should X have sufficient be identified and be readily retrievable within rationale? WCNOC's documentation system.

If not, then the source should be attached to the analysis. Ask yourself, would you provide more justification if you were performing this analysis? If yes, the rationale is likely incomplete.

5 Are design inputs The expectation is that an WCNOC Engineer X correct and reasonable should be able to clearly understand which with critical input parameters are critical to the outcome of parameters identified, the analysis. That is, what is the impact of a if appropriate? change in the parameter to the results of the analysis? If the impact is large, then that parameter is critical.

6 Are design inputs Ensure the documentation for source and X compatible with the rationale for the inputs supports the way the way the plant is plant is currently or will be operated post operated and with the change and they are not in conflict with any licensing basis? design parameters.

7 Are Engineering Ask yourself, would you provide more X Judgments clearly justification if you were performing this documented and analysis? If yes, the rationale is likely justified? incomplete.

FORM AIF 05C-002-02, REV. 3A WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 4 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN007 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 8 Are Engineering Ensure the justification for the engineering X Judgments compatible judgment supports the way the plant is with the way the plant currently or will be operated post change and is operated and with is not in conflict with any design parameters.

the licensing basis? If the Analysis purpose is to establish a new licensing basis, then this question can be answered yes, if the judgment supports that new basis.

9 Do the results and Why was the analysis being performed? X conclusions satisfy the Does the stated purpose match the purpose and objective expectation from WCNOC on the proposed of the Design application of the results? If yes, then the Analysis? analysis meets the needs of the contract.

10 Are the results and Make sure that the results support the USAR X conclusions defined system design and operating compatible with the conditions, or they support a proposed change way the plant is to those conditions. If the analysis supports a operated and with the change, are all of the other changing licensing basis? documents included on the cover sheet as impacted documents?

11 Have any limitations Does the analysis support a temporary X on the use of the condition or procedure change? Make sure results been identified that any other documents needing to be and transmitted to the updated are included and clearly delineated in appropriate the design analysis. Make sure that the cover organizations? sheet includes the other documents where the results of this analysis provide the input.

12 Have margin impacts Make sure that the impacts to margin are X been identified and clearly shown within the body of the analysis.

documented If the analysis results in reduced margins appropriately for any ensure that this has been appropriately negative impacts. dispositioned in the EC being used to issue the analysis.

FORM AIF 05C-002-02, REV. 3A WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 5 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN007 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 13 Does the Design Are there sufficient documents included to X Analysis include the support the sources of input, and other reference applicable design basis material that is not readily retrievable in WCNOC documentation? controlled Documents?

14 Have all affected design Determine if sufficient searches have been X analyses been performed to identify any related analyses that documented on the need to be revised along with the base analysis. It Affected Documents may be necessary to perform some basic searches List (ADL) for the to validate this.

associated Configuration Change?

15 Do the sources of Compare any referenced codes and standards to X inputs and analysis the current design basis and ensure that any methodology used differences are reconciled. If the input sources or meet committed analysis methodology are based on an out-of-date technical and methodology or code, additional reconciliation regulatory may be required if the site has since committed to requirements? a more recent code 16 Have vendor Based on the risk assessment performed during X supporting technical the pre-job brief for the analysis, ensure that documents and sufficient reviews of any supporting documents references (including GE DRFs) been not provided with the final analysis are performed.

reviewed when necessary?

17 If the design includes Ensure the design addresses and meets digital and X digital assets, does it cyber security requirements. Refer to AP 15D-008 adequately address and contact the Cyber Security Group to perform digital and cyber security requirements? additional reviews prior to approval. The CSAT is required to review modifications impacting Cyber Security.

- END -