ML22152A203

From kanterella
Jump to navigation Jump to search
Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis
ML22152A203
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/18/2022
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22152A025 List: ... further results
References
WO 22-0006 CCN No. XX-E-013, Rev 4
Download: ML22152A203 (20)


Text

FORM APF-05D-001-02, REV. 12 Page 2 CALCULATION DATABASE INPUT CCN NO. XX-E-013 - 004 - CN005 Base Calc No. Rev No. Sequence No.

Link new systems to the calculation/CCN in EIS.

Systems NB, MA Affected:

Develop relationships between interdependent calculations in EIS.

Additional Calculations Providing None Input to this calculation:

Additional Calculations None Impacted by this calculation:

Develop relationships between the calculation/CCN and controlled reference documents in EIS.

Additional None Controlled Documents Inputs to this calculation:

Additional None Controlled Documents Impacted by this calculation:

The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.

Additional Other CP 020021, Enercon Calc. WCN-025-CALC-010 Reference Documents:

Link new components to the calculation/CCN in EIS.

Additional Components: None REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS

FORM APF-05D-001-02, REV. 12 Page 3 LIST OF EFFECTIVE PAGES CCN NO. XX-E-013 - 004 - CN005 Base Calc No. Rev No. Sequence No CCN Calc. CCN Calc. CCN Calc. CCN Calc.

Page Page Page Page Page Page Page Page No.

Affected No. Affected No. Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other 1-3 None 4(Att. Appendix

1) 1; p63 Appendix 2; p7 Appendix 4; p4,24 OAR None

FORM APF-05D-001-02, REV. 12 Page 4 ATTACHMENT 1 CCN NO. XX-E-013 - 004 - CN005 Base Calc No. Rev No. Sequence No Vendor calculation WCN-025-CALC-010, Rev 0

FORM AIF 05C-002-02, REV. 3 WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 1 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN005 ECDE: Enercon INITIATING DOCUMENT and revision: CP 020021 R/0 (e.g., PO, CR, SWO)

CHANGE TYPE: X Calculation Specification SAFETY CLASS: SR X SS NSR DigsigVer 5, 0.45 WCNOC Date:

Reviewer signature: 09/26/18 DigsigVer 5, 0.45 WCNOC Date:

Approver:

10/02/2018 Prepared By: Init / Date William M. Wilkins WMW 9/26/18

FORM AIF 05C-002-02, REV. 3 WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 2 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN005 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 1 Do assumptions have All Assumptions should be stated in clear sufficient documented terms with enough justification to confirm X rationale? that the assumption is conservative:

For example, 1) the exact value of a particular parameter may not be known or that parameter may be known to vary over the range of conditions covered by the Calculation. It is appropriate to represent or bound the parameter with an assumed value.

2) The predicted performance of a specific piece of equipment in lieu of actual test data. It is appropriate to use the documented opinion/position of a recognized expert on that equipment to represent predicted equipment performance.

Consideration should also be given as to any qualification testing that may be needed to validate the Assumptions. Ask yourself, would you provide more justification if you were performing this analysis? If yes, the rationale is likely incomplete.

2 Are assumptions Ensure the documentation for source and compatible with the rationale for the assumption supports the way X way the plant is the plant is currently or will be operated post operated and with the change and they are not in conflict with any licensing basis? design parameters. If the Analysis purpose is to establish a new licensing basis, this question can be answered yes, if the assumption supports that new basis.

FORM AIF 05C-002-02, REV. 3 WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 3 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN005 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 3 Do all unverified If there are unverified assumptions without a assumptions have a tracking mechanism indicated, then create the X tracking and closure tracking item either through an ATI or a work mechanism in place? order attached to the implementing WO. Due dates for these actions need to support verification prior to the analysis becoming operational or the resultant plant change being op authorized.

4 Do the design inputs The origin of the input, or the source should have sufficient be identified and be readily retrievable within X rationale? WCNOC's documentation system.

If not, then the source should be attached to the analysis. Ask yourself, would you provide more justification if you were performing this analysis? If yes, the rationale is likely incomplete.

5 Are design inputs The expectation is that an WCNOC Engineer correct and reasonable should be able to clearly understand which X with critical input parameters are critical to the outcome of parameters identified, the analysis. That is, what is the impact of a if appropriate? change in the parameter to the results of the analysis? If the impact is large, then that parameter is critical.

6 Are design inputs Ensure the documentation for source and compatible with the rationale for the inputs supports the way the X way the plant is plant is currently or will be operated post operated and with the change and they are not in conflict with any licensing basis? design parameters.

7 Are Engineering Ask yourself, would you provide more Judgments clearly justification if you were performing this X documented and analysis? If yes, the rationale is likely justified? incomplete.

FORM AIF 05C-002-02, REV. 3 WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 4 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN005 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 8 Are Engineering Ensure the justification for the engineering Judgments compatible judgment supports the way the plant is X with the way the plant currently or will be operated post change and is operated and with is not in conflict with any design parameters.

the licensing basis? If the Analysis purpose is to establish a new licensing basis, then this question can be answered yes, if the judgment supports that new basis.

9 Do the results and Why was the analysis being performed?

conclusions satisfy the Does the stated purpose match the X purpose and objective expectation from WCNOC on the proposed of the Design application of the results? If yes, then the Analysis? analysis meets the needs of the contract.

10 Are the results and Make sure that the results support the USAR conclusions defined system design and operating X compatible with the conditions, or they support a proposed change way the plant is to those conditions. If the analysis supports a operated and with the change, are all of the other changing licensing basis? documents included on the cover sheet as impacted documents?

11 Have any limitations Does the analysis support a temporary on the use of the condition or procedure change? Make sure X results been identified that any other documents needing to be and transmitted to the updated are included and clearly delineated in appropriate the design analysis. Make sure that the cover organizations? sheet includes the other documents where the results of this analysis provide the input.

12 Have margin impacts Make sure that the impacts to margin are been identified and clearly shown within the body of the analysis. X documented If the analysis results in reduced margins appropriately for any ensure that this has been appropriately negative impacts. dispositioned in the EC being used to issue the analysis.

FORM AIF 05C-002-02, REV. 3 WCNOC OWNERS ACCEPTANCE REVIEW CHECKLIST FOR EXTERNAL CALCULATIONS AND SPECIFICATIONS PAGE 5 OF 5

Title:

Post Fire Safe Shutdown (PFSSD) Analysis Wolf Creek document #: XX-E-013-004- Revision #: N/A CN005 ECDE: Enercon No. Question Instructions and Guidance YES NO N/A 13 Does the Design Are there sufficient documents included to Analysis include the support the sources of input, and other reference X applicable design basis material that is not readily retrievable in WCNOC documentation? controlled Documents?

14 Have all affected design Determine if sufficient searches have been analyses been performed to identify any related analyses that X documented on the need to be revised along with the base analysis. It Affected Documents may be necessary to perform some basic searches List (ADL) for the to validate this.

associated ConfiQuration Change?

15 Do the sources of Compare any referenced codes and standards to inputs and analysis the current design basis and ensure that any X methodology used differences are reconciled. If the input sources or meet committed analysis methodology are based on an out-of-date technical and methodology or code, additional reconciliation regulatory may be required if the site has since committed to requirements? a more recent code 16 Have vendor Based on the risk assessment performed during supporting technical the pre-job brief for the analysis, ensure that X documents sufficient reviews of any supporting documents and references not provided with the final analysis are performed.

(including GE DRFs) been reviewed when necessary?

17 Does the design Ensure the design addresses and meets digital include any digital and cyber security requirements. Refer to AP X assets? If so, does it adequately address 15D-008 and contact the Cyber Security digital and cyber Group to perform additional reviews prior to security approval. The CSAT is required to review requirements? modifications impacting Cyber Security.

- END -