Rev 1 to Sys Description SD 3510-013, Div Sys Description for Reactor Bldg Sump Recirculation Sys
ML20244C296
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/30/1989
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20244C283 List:
References
SD-3510-013, SD-3510-13, NUDOCS 8906140203
Download: ML20244C296 (14)


Text

- _ _ - _ _ _ _ _ _ _

Nu2Isar S D 3 slo-013 REv 1 ISSUE DATE June 1989 O ITS' D wsn O NITS l DIVISION SYSTEM DESCRIPTION FOR Reactor Building Sump Recirculation System (RRS)

(GPUN Drawing No. 2E-3510-1024)

COG ENG

  • DATE f/ 9 RTR S' DATE #/5/ /if COG ENG MGR. DATE (fQ!

u -

l E

E 2

l $

e DOCUMENT PAGE 1 OF 14 e90611%$$db eU ,

PDR P

o_

  • e 3510-013 Page 2 of 14 System Description for Reactor Building Sump Recirculation System Rev.

SUMMARY

OF CHANGE Approval Date 0 Initial issue, I General update. 6/89 1

l l

e l i

=

l 7 j

- E. I O

N i

2 -

T l 8 '

8 l

3510-013 TABLE OF CONTENTS SECTION Page 1.0 SYSTEM DESCRIPTION 3 1.1 Summary 3 1.2 References 3 1.3 Detailed System Description 4 1.4 System Performance Characteristics 6 1.5 System Arrangement 6 1.6 Instrumentation and Controls 7 1.7 System Interfaces 7 2.0 SYSTEM LIMITATIONS, SETPOINTS, AND PRECAUTIONS 8 3.0 OPERATIONS 8 3.1 Operation in the Turbine Building (Technical 8 Specifications Surveillance) 3.2 Operation in the Reactor Building 9 4.0 CASUALTY EVENTS AND RECOVERY PROCEDURES 10 4.1 Casualty Events 10 4.2 Design Features to Mitigate Effects of Casualty Events 11 4.3 Recovery Procedures 11 5.0 MAINTENANCE 11 5.1 Corrective Maintenance 11 5.2 Preventive Maintenance 12 5.3 Surveillance 12 ,

5.4 In-Service Inspection 12 6.0 TESTING 12 7.0 HUMAN FACTORS 12 Table 1 Ret 1or Building Sump Recirculation Pumps (RRS-P-1A, RRS-E-18, Spare) 13 Figure 1 Reactor Building Sump Recirculation Pumps (RRS-P-1A, RRS-P-1B, Spare) 14 Rev. 1/0190P

~

3510-013 1.0 SYSTEM DESCRIPTION 1.1 Summary The Reactor Building Sump Recirculation System (RRS) is a non-seismic contingency system ready for installation in the event of an unisolable leak from the Reactor Vessel. The system uses two 200 gpm submersible pump *, associated hoses and controls to transfer water from the Reactor Bullaing basement to the Reactor Vessel. The RRS is designed to main-tain sufficient water in the Reactor Vessel to keep the core covered for leak rates up to 400 gpm. The system components are staged in a clean, dedicated area of TMI-2. Electrical connections for each pump are reinstalled in the Reactor Building with breakers and remote starters located in the relay room.

1.2 References 1.2.1 General Arrangement, Reactor Building Sump Recirculation System General Arrangement and Control Manifold Details, Drawing 2E-3510-1025.

1.2.2 GPU Nuclear Letter, 4410-84-L-0154 Technical Specification Change l Request No. 46, November 6, 1984.

1.2.3 THI-2 Technical Specifications.

~

1.2.4 Instruction Manual, HEDA Pump Model # L707.

1.2.5 P and ID, Reactor Building Sump Recirculation System, Drawing 2E-3510-1024. ,

1.3 Detailed System Description 1.3.1 Design Requirements The RRS is an emergency system designed to transfer Water from the Reactor Building basement to the Reactor Vessel. Its objective is to keep the core covered during an unisolable Reactor Vessel leak. The system is staged in a radiologically clean area of TMI-2 and is required by the Technical Specifications.

The system design is based on the following requirements and assumptions per Reference 1.2.2: l o The most probable Reactor Vessel leak is a corrosion type l failure of an incore tube. The corresponding leak rate is 17 gpm. An additional tube fails each month increasing the vessel leak rate to 200 gpm one year after the first failure.

o Access to the Reactor Building is permitted during the leak. l o The Reactor Building sump must be borated to 4350 ppm minimum, recirculated, and sampled prior to injection into the Reactor Vessel.

Rev. 1/0190P

- = _ _ _ _ _ -

3510-013 o The Borated Water Storage Tank (BHST) can be used to makeup the leak until the sump is adequately borated and the RRS l installed.

o The RRS should be capable of delivering up to 400 gpm and have backup to cover postulated single active failures. Both the primary and backup system should be staged on site and be as simple as possible.

The RRS is intended as a temporary means of emergency makeup. If the vessel leak cannot be repaired or the fuel cannot be removed within 6 to 12 months after the initial leak, it is assumed that a '

permanent recirculation system will be designed and installed or an existing plant system reactivated.

1.3.2 System Operation The RRS consists of an "A" and "B" train, each capable of delivering up to 200 gpm. Each train is comprised of a 200 gpm submersible pump (RRS-P-iA and RRS-P-1B), a flow indicator (RRS-FI-1A and RRS-FI-1B), a throttle valve (RRS-V-1A and RRS-V-18), a sample valve (RRS-V-2A and RRS-V-2B), a check valve (RRS-V-3A and RRS-V-38), a pressure indicator (RRS-PI-1A and RRS-PI-18), and approximately 150 feet of 2 1/2" 10 rubber hose.

The valves and instrumentation are mounted on a mobile frame referred to as the control manifold. A spare pump and spare hose are also provided.

Submersible pumps RRS-P-1A and RRS-P-1B are used to either recirculate the Reactor Building sump water or to transfer sump water to the Reactor Vessel. The pumps take suction directly off the Reactor Building basement floor and are capable of pumping all solids that can pass through their inlet strainers. The pumps are connected to the inlets on the control manifold by separate 2 1/2" ID discharge hoses. The control manifold provides throttling, flow indication, and sampling capabilities for each pump.

If desirable, the pumps and hose can be used without the control manifold; flow could be controlled by starting and stopping the pumps as required.

Hoses are also connected to the two outlets on the control manifold. These hoses initially are routed back to the Reactor Building basement to provide for recirculation of the sump water.

Sump water is recirculated at a rate of up to 400 gpm using two trains. When the sump is adequately mixed, the hoses are rerouted to the Reactor Vessel to provide for continuous makeup of a Reactor Vessel leak.

Reactor Vessel leaks of less than 200 gpm require only the "A" l train for makeup. The "B" train serves as backup for single active failures. Leaks exceeding 200 gpm require both trains for makeup. The spare pump and spare hose provide backup for single dCtive failures.

Rev. 1/0190P

._________D

'3510-013-The system pumps are operated from remote starters located in the

. relay room. Each starter is supplied from a ClassLIE power source.

L

.11.3.3 System Components (See References 1.2.1 and 1.2.5) 1.3.3.1 Pumps (See Table 1 and Figure 1)

Two WEDA model no. L707 submersible pumps (RRS-P-1A and RRS-P-1B) provide the pumping power to recirculate-the Reactor Building sump water or to transfer sump water to the Reactor.

~

Vessel'. The pumps are single stage, top discharge, vertical shaft centrifugal type. Each pump weighs 210 poun'ds. : The pump motors and starters are contained.in the pump housing.

Built-in thermal motor protection automatically breaks the motor current if the motor temperature exceeds 105*F. The pumps are free standing and are provided with 66 feet of electrical' cord. The pump discharges'have female cam locking

. type quick couplings for connection to the system hoses. A third, identical pump is provided as a spare.

1.3.3.2 Hose Three hundred feet of Goodall N-2427 EPDM Agricultural hose is used to transport the sump water._ The hose has a rated-working pressure of 150 psig, a minimum bend radius of 10 inches, and is 2 1/2" ID. The hose is provided in two 50 foot and two 100 foot lengths. The ends of each hose are fitted with' male stainless steel cam locking type quick rouplings.

-Two additional 50 foot lengths and one 100 foot length are provided as spares.

1.3.3.3 Control Manifold i

A control manifold is provided for throttling, monitoring. and sampling the discharge of RRS-P-1A and 18. The manifold has an independent flow section for each. pump. Each flow section consists of a 0 to 200 gpm flow indicator (RRS-FI-1A and-RRS-FI-18), a 0 to 300 psig pressure indicator (RRS-PI-1A and RRS-PI-1B), a 2 1/2" globe valve (RRS-V-1A and RRS-V-1B), a 2 1/2" check valve (RRS-V-3A and RRS-V-3B), and a 1/2" sample valve (RRS-V-2A and RRS-V-2B). Female cam locking type quick couplings are provided on the inlet and outlet of each flow section for connecting to the system hoses. All components are stainless steel and are mounted on a mobile frame.

l 1.4 System Performance Characteristics 1 System performance characteristics are as follows:

l l a. design flow rate is 400 gpm (200 gpm per train)

I b. normal system operating pressure at the design flow rate is 70 psig maximum (see Figure 1 for pump head curves)

c. design pressure is 150 psig l
d. design temperature is 100*F.

Rev. 1/0190P I - - _ -

3510-013 1.5 System Arrangement 1 5.1 Staging Arrangement When the RRS is not required, the hoses, pumps, and control manifold are staged in a radiologically clean, dedicated area of THI-2. An electrical outlet for each pump is permanently installed in the Reactor Building near the 305' elevation hatch by the air coolers. Starters located in the relay room provide power to the electrical outlets.

1.5.2 Operating Arrangement (See References 1.2.1 and 1.2.5)

During a Reactor Vessel leak, the pumps are located on the 282' elevation of the Reactor Building, directly below the hatch at elevation 305'. The control manifold is located near the hatch on the 305' elevation. Two 50 foot hoses are routed between the pumps and the control manifold. Two 100 foot hoses are routed from the control manifold to either the seismic gap in the northwest portion of the Reactor Building to recirculate sump water or to the Internals Indexing Fixture (IIF) to transfer sump water to the Reactor Vessel. A spare pump and spare hoses are staged in the Turbine Building.

1.6 Instrumentation and Controls 1.6.1 Flow Indicators Flow indicators, RRS-FI-1A and RRS-FI-1B, are provided to monitor the flow rates of pumps RRS-P-1A and RRS-P-1B respectively. Their range is 0 to 200 gpm in increments of 20 gpm. Flow rates exceeding 200 gpm will not affect calibration nor damage the ficw indicators.

1.6.2 Pressure Indicators Pressure indicators, RRS-PI-1A and RRS-PI-1B, are provided for verification of pump head characteristics. Their range is 0 to 300 psig.

1.6,3 Electrical Power Electrical power for the pumps is provided through outlets installed near the 305' elevation hatchway. Each outlet is energized from a separate starter located in the relay room.

Power for each starter is obtained from a Class lE Power Distribution Panel. Class IE and non-Class lE isolation is provided at the panels by circuit breakers.

l Rev. 1/0190P l

l

p

~

3510-013 4 1.7 ' System Interfaces The RRS interfaces with the following systems:

1

3. Defueling Test Assembly (DTA) or other suitable tank.for testing ,
b. 'a temporary power. supply in the Turbine Building
c. Reactor Coolant System (RCS)
d. a Class 1E electrical system-l'7.1

. Interfaces with the DTA tank, or other suitable tank, and a temporary power supply occur only during performance of.the Technical Specification Surveillance. These interfaces allow for convenient testing of the pumps and instrumentation.

1.7.2 Interfaces with the RCS and the Class IE electrical' system is.

required if the RRS is placed in service. Plug type connectors are used to tie-in to previously. installed, dedicated electrical outlets. The power supply is controlled from starters located in

~

the relay room. The electrical connections ~will provide power.to operate RRS-P-1A and 18. Two hoses, placed in the IIF.. provide for transfer of. sump water to the Reactor Vessel and are the interface with the RCS.

2.0 SYSTEM LIMITATIONS. SETPOINTS. AND PRECAUTIONS 2.1 To ensure proper cooling, the system pumps should not be operated at less than 5 gpm. .

2.2 All hoses should be adequately' supported / anchored to prevent whip when the pumps are started.

2.3 Bends in hoses should be minimized.

) 2.4 The system pumps should not be operated unless they are at least 2/3 submerged in water.

2. 5 The' system pumps should be operated on a level surface in an upright-position.

2.6 Prior to installing the RRS, personnel should be aware of the radiation levels in the vicinity of the 305' elevation hatch and the IIF.

2.7 Prior to pumping Reactor Building sump water into the Reactor Vessel, the following sequence of events should be performed:

a. add an appropriate quantity of boron, as determined by a mass balance, to the sump water to raise the sump boron concentration above 4350 ppm.
b. mix the sump water by recirculating a minimum of 3 sump volumes.
c. obtain and analyze sump samples to verify that the sump water boron concentration is greater than 4350 ppm.

Rev. 1/0190P 1

~

3510-013 h

3.0 OPERATIONS

3.1 Operation in the Turbine Building-(Technical Specifications Surveillance)

.This section provides instructions for periodic surveillance testing of the RRS and is. intended only as a guide. If the DTA tank is unavailable for testing the RRS, another-setup will be used.

3.1.1 Setup

.RRS-P-1A and RRS-P-1B, hose, and control manifold are' removed from the staging area. All components are inspected for damage and replaced or repaired if required. A 100 foot section of the hose is connected to the discharge of each pump. Each pump is then rigged by its handle to the 1 ton gantry crane and lowered into the DTA tank until it rests on the bottom of the tank (elevation 282'). The opposite end of the discharge hoses and pump electrical cords are retained on the turbine deck. The discharge hoses are connected to the inlets on the control manifold. A 50 foot section of hose is connected to each outlet on the manifold and the other ends are placed in the DTA. The electrical _ cords are connected to a temporary power-supply.

3.1.2 Normal Operation Once the system is setup for testing, the breaker is closed for the temporary power supply to energize RRS-P-1A and RRS-P-18.

Discharge pressures are measured at RRS-PI-1A and RRS-PI-18 and recorded at a flow rate of 200 gpm. The data is corrected for elevation and compared to the pump head curves to verify proper pump performance. Flow rate indication is provided by RRS-FI-1A and 1B. During pump operation, hoses, fittings, and the control manifold are inspected for leakage. Repairs / Replacement of components is performed in the-time frame specified in Reference 1.2.3.

The electrical outlets, located in the Reactor Building, are tested by energizing them in the relay room and measuring'the voltage at the outlets.

3.1.3 Shutdown When testing is completed, the pumps are stopped and removed from the DTA tank and the hoses are uncoupled and drained. All components are returned to the staging area.

3.2 Operation in the Reactor Building This sect'>n provides guidance for setting up and operating the RRS during an unisolable Reactor Vessel leak.

Rev. 1/0190P

H* .

3510-013-

-3.2.1 Setup If an unisolabie Reactor Vessel leak occurs, RRS-P-1A, RRS-P-1B,- l the control manifold, and hose are removed from the staging area

-and. transported into the Reactor Building to the hatch on the 305' I.

elevation. A 50 foot-section of discharge hose is. connected to

the quick coupling on each pump. Using'the hoist provided for'.the H . robotics program, the pumps are lowered through the-305' elevation:

thatchway to.the basement where they rest in'a vertical,-

freestanding position. The other ends of'the discharge hoses and the electrical cords remain on .the 305': elevation. : AtLthis l c location, the discharge hoses are connected to the inlets on the control manifold and the. electrical cords are plugged into the

previously-installed dedicated electrical outlets. A'100 foot section'of hose is connected to each manifold outlet and routed to the northwest portion of the Reactor Building and placed in the' 'l.

seismic gap leading to the basement.

? .

3.2.2 Normal Operation 3.2.2.1 Reactor Building Sump Recirculation The starters, located in the. relay room, are. energized to-start the~ pumps. The flow rate is adjusted to approximately 200 gpm per pump at the control manifold. After.three sump volumes have been recirculated, sump samples are obtained and.

' analyzed for boron. When the sump boron concentration exceeds 4350 ppm, the pumps are stopped.

3.2.2.2- Reactor Vessel / Sump Recirculation

.Once the sump boron concentration is verified to be greater than 4350 ppm by a boron mass: balance calculation and a sample analysis, the two 100 foot hoses are removed from the seismic gap, routed to the Reactor Vessel, and placed into the IIF.- l One or two pumps are started and throttled as required to match-the Reactor Vessel leak. Periodic adjustments to'this l makeup rate are accomplished by starting and stopping the pumps'from the relay room starters or by entering the Reactor Building and adjusting the throttle positions.

3.2.3 Shutdown Makeup to the Reactor Vessel continues until the leak is l stopped or until a permanent recirculation system is installed.

4.0 CASUALTY EVENTS AND RECOVERY PROCEDURES 4.1 Casualty Events The possible system casualty events during Reactor Vessel sump l recirculation include the following:

Rev. 1/0190P

  • ~

3510-013'

'a. Ioss of power to'RRS-P-1A or.RRS-P-1B

.b. . failure of RRS-P-1A or RRS-P-1B

c. rupture'of a hose
d. transfer of out-of-specification water to the Reactor Vessel.

'4.2 Design Features to Mitigate Effects of Casualty Events 4.2.1 Power is supplied to the starters from a Class 1E electrical system to meet the. single failure criterion.

4.2.2 for leak rates of less than 200 gpm, on~1y RRS-P-1A is required; RRS-P-1B provides the backup to meet the single failure criterion. For leak rates' exceeding 200 gpm, both pumps are required; the spare pump provides the backup to meet the single l failure criterion. l 1

4.2.3 . Spare hose is available to replace a ruptured or leaking hose.

4.2.4 Sampling capability exists in the system to prevent out-of-specification water from being discharged into the Reactor Vessel. In addition, the sump water will be mixed and borated as required prior to injection into the Reactor Vessel. .

i 4.3 Recovery Procedures 4.3.1 Recovery from a loss.of power to the pumps involves using the BHST for makeup until power is restored.  !

l 4.3.2 Recovery from a failed pump involves starting and throttling the -

remaining train'and using the BHST for additional makeup as i required until the failed pump is replaced.  ;

1 4.3.3 Recovery from a ruptured hose involves starting and throttling the -l L remaining train and using the BHST for additional makeup as )

l required until the failed hose is replaced.  !

4.3.4 Recovery from a casualty event in which out-of-specification water i is discharged into the Reactor Vessel involves stopping the pumps, 1 making up with the BWST, and adding boron to the sump. j 5.0 MAINTENANCE l

5.1 Corrective Maintenance 5.1.1 Pump repairs shall be performed in accordance with Reference 1.2.4.

5.1.2 If repair welding is required to any pressure retaining component of the system, it shall be performed in accordance with the UWI used for initial construction. Upon completion, the specific component shall be leak tested per ANSI B31.1, 1983.

Rev. 1/0190P

3510-013 5.2 Preventive Maintenance 5.2.1 Preventive maintenance on the pumps is performed per the requirements of Reference 1.2.4.

5.2.2 Periodic calibration of the system flow and pressure indicators is performed in accordance with existing plant procedures.

5.2.3 All components are routinely inspected to spot potential problems.

5.3 Surveillance Technical Specification Surveillance are performed as described in Section 3.1 and in the time interval required by Reference 1.2.3.

5.4 In-Service Inspection If the RRS is placed in operation per Section 3.2, all system components will be routinely inspected to spot potential problems.

6.0 TESTING All system components, including the spare pump and hoses, are hydrostatically and functionally tested in accordance with ANSI B31.1, 1983 and plant procedures.

7.0 HUMAN FACTORS 7.1 All system components are labeled to ensure proper identification.

7.2 Dollys are used to transport heavy equipment.

7.3 All components are appropriately tagged to ensure they are not inadvertently removed from the staging area.

1 l Rev. 1/0190P L___---_--_--------------____-____.___.-_ _ m -

l 3510-013 l' TABLE 1 REACTOR BUILDING SUMP RECIRCULATION PUMPS (RRS-P-1 A, RRS-P-1B, SPARE)

Pump Details (see Figure 1 for Pump Performance Curve)

Identification RRS-P-1A, RRS-P-18, SPARE Manufacturer Weda Model No. L707G Type single stage vertical shaft centrifugal, submersible

-Rated Speed, rpm 3500 Rated capacity, gpm 265 Rated total dynamic head, feet 100 (at rated capacity)

Shutoff head, feet 260 Shaft Seal Ball bearing and double mechanical seals Lubricant Oil Motor Details Manufacturer Weda Type 2-Pole, 3-Phase induction 440V/20A Enclosure Cast aluminum, AISI 17 HP 16.5 Rev. 1/0190P

~

3510-013 FIGURE 1 REACTOR BUILDING SUMP RECIRCULATION PUMPS (RRS-P-1A, RRS-P-18, SPARE)

T

, __ / A L6 '

l g ---

-s L ?iD

= Y X tt E E.

= \ ,

T

= ..

'\, ..

m ($~107 4*

~

~ \, -

  • mi

.e

- - - \

% m.

s B* 22 3

% L 713

. NL nu j -g

, e '

N is 3

-\

= = mo ao = .e ..

f . '" T . ",* , "? , *" , *," , *a . ? -

r

-14< Rev. 1/0190P