ML20206R653
| ML20206R653 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/13/1999 |
| From: | GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20206R651 | List: |
| References | |
| 1290-99-2060, PROC-990513, NUDOCS 9905200170 | |
| Download: ML20206R653 (1) | |
Text
!.
,4 1290-99-2060 Page1of1 TMI MODIFIED AMENDED PHYSICAL SECURITY PLAN REV 39 The changes made to the TMI Modified Amended Physical Security Plan, Rev 39, do not represent any decrease in effectiveness. The change reflects the addition of one SPO. All actual changes are described below.
0_L Specific Change Page 12.0, para 4.4.7, the minimum shift number is increased by one and the armed requirement isincreased by one.
Reason farChange The change is to reflect the current configuration of security personnel numbers due to previous OSRE evaluation.
I lustification j
The change represents an increase in plan commitment and response requirements.
o2 Specirac Cimnce Pag-47.0, Exhibit 1.2, the minimum shift number is increased by one.
Reason for Change The change is to reflect the current configuration of security personnel numbers due to previous OSRE evaluation i
Justification i
The change represents an increase in plan commitment and response requirements.
9905200170 990513 PDR ADOCK 05000289 F
PDR I.