Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092K5471995-09-20020 September 1995 Revised Tech Spec Pages 4-31,4-32 & 4-33,incorporating Change in TS Section 4.4.1.5 ML20091L2911995-08-23023 August 1995 Proposed Tech Specs Page 6-11a,incorporating Ref to 10CFR20.1302 ML20087F4921995-08-11011 August 1995 Proposed TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements ML20085N1601995-06-22022 June 1995 Proposed Tech Specs Revising Replacement Pages in Package & Remove Outdated Pages,In Response to NRC Request for Addl Info ML20084L4351995-06-0101 June 1995 Proposed TS 5.3.1.1,describing Use of Advanced Clad Assemblies ML20084N3501995-06-0101 June 1995 Proposed Tech Specs,Deleting RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084B3361995-05-24024 May 1995 Proposed Tech Specs Re Change in Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7841995-05-17017 May 1995 Proposed Tech Specs,Consisting of Change Requests 252, Removing Chemical Addition Sys Requirements from TS to COLR ML20079A7811994-12-23023 December 1994 Proposed Tech Specs Page 3-32a ML20069A6781994-05-20020 May 1994 Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing ML20065M6831994-04-19019 April 1994 Proposed Tech Specs,Reflecting Deletion of Audit Program Frequency Requirements ML20065K0451994-04-11011 April 1994 Proposed Tech Specs Reflecting Relocation of Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR & Providing Direct Ref to Existing Tendon Surveillance Program ML20073C7731994-03-22022 March 1994 Proposed Tech Specs Re Control Rod Trip Insertion Time Testing 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01
[Table view] |
Text
.
4 4.6 - EMERGENCY POWER SYSTEM PERIODIC TESTS Anolicability: Applies to periodic testing and surveillance requirement of the emergency power system.
Obiebtive: To verify that the emergency power system will respond promptly and properly when required. t Specification:
The following tests and surveillance shall be performed as stated:
4.6.1 Diesel Generators
- a. Manually-initiate start of the diesel generator, followed by manual synchronization with other power sources and assumption of load by the diesel g,e nerator up to the .
name-plate rating (3000 kw). This test will be conducted every month on each diesel generator. Normal plant operation will not be effected.
- b. Automatically start and loading the emergency diesel generator in accordance with Specification 4.5.1.1.b/c including the following. This test will be conducted every refueling interval on each diesel generator.
(1) Verify that the diesel generator starts from ambient condition upon receipt of the ES signal and is ready to load in s 10 seconds.
(2) Verify that the diesel block loads upon simulated loss of offsite power in s30 seconds.
(3) The diesel operates with the permanently connected and auto connected load for 25 minutes.
(4) The diesel engine does not trip when the generator breaker is opened while carrying emergency loads.
(5) The diesel generator block loads and operates for 25 minutes upon reclosure of the diesel generator breaker,
- c. Each diesel generator shall be given an inspection at least annually in accordance with the manufacturer's recommendations for this class of stand-by service. j 4.6.2 Station Batteries
- a. The voltage, specific gravity, and liquid level of each cell will be measured and recorded every 92 days and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery discharge < 105 V and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery overcharge > 150 V.
- b. The voltage and specific gravity of a pilot cell will be measured and recorded weekly.
- c. Each time data is recorded, new data shall be compared with old to detect signs of abuse or deterioration.
4-46 Amendment No. 70, 149. 157
, 9512270010 951221 PDR ADOCK 05000289 P PDR
C311-95-2277
. Page 3 D. Battery Cell Surveillance Requirements The current TMI-l Technical Specifications contain a SR (4.6.2.a) that requires that the voltage, specific gravity, and liquid level of each cell will be measured and recorded monthly. The proposed change would extend the surveillance interval to three months and add checks following battery discharge or battery overcharge events. The quarterly checks of liquid level, specific gravity, and voltage are consistent with IEEE-450 and the RSTS. In addition to quarterly checks there are requirements to check, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of a severe battery discharge < 105 V cr a battery overcharge > 150 V, the battery voltage, specific gravity, and liquid level. The checks following a severe battery discharge or overcharge are also consistent with IEEE-450, which recommends such checks i following a severe discharge or overcharge, to ensure that no significant degradation of the battery occurs as a consequence. Based on discussions with a l
C&D Batteries representative (the Station Battery Vendor) and our review, these changes would provide additional assurance of long term battery reliability.
Thus, revision of the surveillance frequency for Battery Cell voltage, specific )
gravity, and liquid level to that specified by RSTS is justified. l 1
IV. NO SIGNIFICANT HAZARDS CONSIDERATION GPU Nuclear has determined that this Technical Specification Change Request involves no significant hazards consideration as defined by NRC in 10 CFR 50.92 because: j
- 1. Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability of occurrence or the consequences of an accident previously evaluated. The proposed amendment involves changes to the TMI-1 Technical Specifications which are consistent with the B&W Standard Technical Specifications (STS), NUREG-1430. This change does not involve any change to system or equipment configuration. The proposed amendment revises certain surveillance requirements, or extends certain surveillance intervals. The reliability of systems and components relied upon to
. prevent or mitigate the consequences of accidents previously evaluated is not l degraded by the proposed changes. Therefore, this change does not involve a significant increase in the probability of occurrence or the consequences of an accident previously evaluated, f
1 f
l I
b t
e l
1
UNITED STATES OF AMERICA l ,
NUCLEAR REGULATORY COMMISSION IN THE MATTER OF DOCKET NO. 50489 GPTT NUCLEAR CORPORATION LICENSE NO. DPR-50 1
CERTIFICATE OF SERVICE
. This is to certify that a revised page to Technical Specification Change Request No. 254, to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with executives of Londonderry Township, Dauphin County, .
' Pennsylvania; Dauphin County, Pennsylvania; and the Pennsylvania Department of Environmental Resources, Bureau of Radiation Protection, by deposit in the United States mail, addressed as follows:
Mr. Jay H. Kopp, Chairman Mr. Russell L. Sheaffer, Chairman Board of Supervisors of Board of County Commissioners.
Londonderry Township of Dauphin County R.D. #1, Geyers Church Road P.O. Box 1295 Middletown, PA 17057 Harrisburg, PA 17108 Director, Bureau of Radiation Protection PA Department of Environmental Resources P.O. Box 2063 Harrisburg, PA 17120 ATIN: Mr. Stan P. Maingi GPU NUCLEAR CORPORATION BY- u e Pmsident and Director, TMI DATE: /b, 2-/ , / fh~
- l GPU Nuclear Corporation u eM .
Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 f (717)944-7621
- Wnter's D. rect Dial Number:
(717) 948-8005 December 21, 1995 C311-95-2531 1
Mr. Jay H. Kopp, Chaincan Board of Supervisors of 4
Iondonderry Township
- R.D. #1, Geyers Church Road Middletown, PA 17057
Dear Mr. Kopp:
)
l Enclosed please find a revised page to Technical Specification Change Request No. 254, to the Operating License for Three Mile Island Nuclear Station, Unit 1.
This request was filed with the U. S. Nuclear Regulatory Commission on the above date.
Sincerely,
/
J. Knubel Vice President and Director, TMI aWm l
Enclosure j i
l
4 s'
I GPU Nuclear Corporation NUCIear sovte 44' soutn P.O. Box 480
' Middletown, Pennsylvania 17057-0480 (717)944 7621 Water's Direct Dial Numbec (717) 948-8005 December 21, 1995 C311-95-2531 d
i Mr. Russell L. Sheaffer, Chairman Board of County Commissioners of
- Dauphin County
- P.O. Box 1295 Harrisburg, PA 17108 l 1
Dear Mr. Sheaffer:
Enclosed please find a revised page to Technical Specification Change Request No. 254, to the Operating License for 'Ihree Mile Islam Nuclear Station, Unit 1.
This request was filed with the U. S. Nuclear Regulatory Commission on the above date, ,
1 Sincerely,
. / /
4
%{
J. Knubel
/, Vice President and Director, TMI awm l
l l
i
, , 1 r .
' GPU Nuclear Corporation Nuclear ;n::',gvt" Middletown, Pennsylvania 17057-0480 (717) 944 7621 Writer's Direct Dial Nurnber:
j (717) 948-8005 i
i December 21, 1995 4
C311-95-2531 Director, Bureau of Radiation Protection PA Department of Environmental Resources P.O. Box 2063 I Harrisburg, PA 17120 ATIN: Mr. Stan P. Maingi .,
1
Dear Mr. .Maingi:
j Encl'osed please find a revised page to Technical Specification Change Request No. 254, to
~
the Operating License for Three Mile Island Nuclear Station, Unit 1.
This document was filed with the U. S. Nuclear Regulatory Commission on the above date.
J. Knubel Vice President and Director, TMI awm Enclosure j
.