ML20211F378

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence
ML20211F378
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/24/1997
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20211F376 List:
References
NUDOCS 9710010040
Download: ML20211F378 (4)


Text

. _ _ _ ___

ENCL,OSIIRE I SUPPLEMENTAL TMI-l TECHNICAL SPECIFICATION REVISED PAGE l l

l l

9710010040 970a24 PDR ADOCK 03000289 P PDR

y TABLE 4.1-3 -

3

@ ' MINIMUM SAMPLING FREQUENCY a ~

B a item Check - Frecuency-g

.Z O

." 1. Reacer Coolant a. Specific Activity Determination to compare to At least once cach 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during POWER

. the 100/I pCi/gm limit OPERATION,110T STANDBY, START-UP, and IlOT

) S11UTDOWN.

b. Isotopic Analysis for DOSE EQUIVALENT i) I per 14 days during power operations.

1-131 Concentration ii) One Sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a TilERMAL POWER change exceeding 15% of the RATED TilERMAL POWER within a one hour period during power operation, start-up and hot standby.

iii) # Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, whenever the specific actisity exceeds _0.35 pCi/ gram DOSE EQUIVALENT I-131 1 P or 1001 E pCi/ gram during all modes but refueling.

o

c. Radiochemical for 5 Cetermination I per 6 months
  • during power operation
d. Chemistry (CI, F and 02 ) 5 timer / week when T., is greater than 200 F.
e. Boron concentration 2 times / week
f. Tritium Radioactivity Monthly
2. Borated Water Sto; age Boron concentration Weekly and after each makeup uhen reactor coolant Tank Water Sample system pressure is greater than 300 psig or T,, is greater than 200 F.
3. Core Flooding Tank Boron concentration Monthly and after each makeup when RCS pressure is Water Sample .,

greater than 700 psig.

ENCI.OStIRE II CERTIFICATE OF SERVICE FOR SUPPL %iF.NT TO

  • TMI-l LICENSE Aht.NDMENT REQUEST 269 c

ew - m avm .

UNITED STATES OF AMERICA NUCLEAR REGULATORY COhihilSSION IN THE MATTER OF DOCKET NO. 50-289 GPU NUCLEAR INC. LICENSE NO. DPR-50 CERTIFICATE OF SERVICE This is to certify that a copy of the Supplement to License Amendment Request No. 269 for Three hiile Island Nuclear Station Unit 1, has, on the date given below, been filed with executives of Londonderry Township, Dauphin County, Pennsylvania; Dauphin County, Pennsylvania; and the Pennsylvania Department of Environmental Resources, Bureau of Radiation Protection, by deposit in the United States mail, addressed as follows:

Mr. Darryl LeHew, Chairman Ms. Sally S. Klein, Chairman -

Goard of Supervisors of Board of County Commissioners I Londonderry Township of Dauphin County R. D. #1, Geyers Church Road Dauphin County Courthouse Middletown, PA 17057 Harrisbuir, PA 17120 Director, Bureau of Radiation Protection PA Dept. ofEnvironmental Resources Rachael Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Att:- Mr. Stan Maingi GPU NUCLEAR INC.

BY: Om k yic'e Piesident and D ctor, TMI DATE: 9 M'97

,