ML20202E451
Jump to navigation
Jump to search
| ML20202E451 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/27/1999 |
| From: | Ashe F NRC |
| To: | Stephen Dembek NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20202E441 | List: |
| References | |
| TAC-MA4361, NUDOCS 9902030027 | |
| Download: ML20202E451 (1) | |
Text
-
~ - - - - -
- [ Stephen Dembek - Millstona Unit 2 Electrical Modifications TAC No~ MA4361 Pigf1]
I
[
From:
Frank Ashe To:
OWFN_DO.owf4_po.SXD i
Date:
Wed, Jan 27,1999 4:28 PM
Subject:
Millstone Unit 2 Electrical Modifications TAC No. MA4361 To: S. Dembek Regarding the Millstone Unit 2 plant electrical modifications (additions), please arrange for a conference call with the licensee to discuss the following items.
i
- 1. Flowpaths for the primary and backup methods for simultaneous hot and cold leg injection ( Refer to Figures 1 and 2 provided in the submittal. ).
- 2. Calculations performed that demonstrate increased loading of attemate power sources has no impact on the ability of these sources to suppy the required loads.
- 3. Design criteria used for the electrical modifications and verification that the design criteria used is consistent with and conforms to that provided in the UFSAR.
P Please arrange the conference call as sonn as you can. Thanks i F. Ashe 1/27/99 CC:
ASG,OPC
-l t
l 9902030027 990128 PDR ADOCK 05000336 P
>