Partially Withheld Physical Security Insp Rept 50-440/87-11 on 870601-04 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected:Security Program Audit,Records,Repts,Locks, Keys & Combinations & Security Sys Power Supply
ML20215A421
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/10/1987
From: Creed J, Kniceley J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20215A378 List:
References
50-440-87-11, NUDOCS 8706160652
Download: ML20215A421 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

g. .e

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-440/87011(DRSS)

Docket No. 50-440 Licensee: Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, OH 44101 Facility Name: Perry Nuclear Power Plant, Unit 1 Inspection At: Plant Site Inspection Conducted: June 1-4, 1987 Date of Last Physical Security Inspection: November 17-20, 1986 Type of Inspection: Unannounced Physical Security Inspectors: h u S- b M ' lI 8 7 Uames R. Knicele9 Date Physical Security Inspector kn L/a t;/ia /n Terry /@ Madeda Dat'e /'

Phys.ic61 Security Inspector Approved By: 9uo M% b E James R. Creed,dChief Date Safeguards Section Inspection Summary Inspection on June 1-4, 1987 (Report No. 50-440/87011(DRSS))

Areas Inspected: Included a review of Security Program Audit; Records and Reports; ocks, keys and Combinations, Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Detection Aids - Protected Areas, Communications, Personnel Training and Qualification - General Requirements; Safeguards Contingency Plan Implementation and Safeguards Information. The inspection was begun during the day shif Results: The licensee was found to be in compliance with NRC requirements in the areas inspected, Enclosure contafns g 61 g g 07 hgg440 O PDR Upon separation this page is Decontrolled