IR 05000440/1989013

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Rept 50-440/89-13 on 890424-28 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Protected & Vital Area Physical Barriers & Aids
ML20247C915
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/17/1989
From: Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20247C888 List:
References
50-440-89-13, NUDOCS 8905250079
Download: ML20247C915 (2)


Text

_.

-___.

_- - -. - - _ -

- _ - - _ - _ - _ - _ _ - - _ _ - _ - _ - _ _

y

.:

-t j

,

'

'

,1

'

'

,

.

i j

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

,

Report No.'50-440/89013(DRSS)

Docket No. 50-440-License No..NPF-58 Licensee: Cleveland Electric Illuminating Company P. O. Box 5000-Cleveland, OH 44101 Facility Name: Perry Nuclear Power Plant, Unit 1

Inspection.At: Plant Site-Inspection Conducted: April 24-28, 19S9 Date of Last Physical Security Inspection: April 4-13, 1988 Type,of Inspection: Unannounced Physical Security

. Inspector:

M

/4[ff T. J/ f(adeda Date

'

Physical Security Inspector Approved By:

/ 07 mes R. Creed, Chief Date feguards.Section Inspection Summary Inspection on April 24-28, 1989'(Report No. 50-440/89013(DRSS))

Areas Inspected: Management Support, Security Program Plans, and Audits; Protected and Vital Area Physical Barriers, Detection and Assessment Aids; Protected and Vital Access Control of Personnel, Packages and Vehicles; Alarm Stations and Communications; Power Supply; Testing, Maintenance, and Compensatory Measures; Security Training / Qualification; and licensee actions on previous inspection findings.

I Results: The licensee was found to be in compliance.with NRC requirements

within the areas examined, except as noted below:

L L

Enclosure Contains I 8905250079 890517 Upon Separation This PDR-ADOCK 0500044o Page is Decontrolled

-

O PDC

_ _ _ _ _ _ _ _. _ _ _ _

_ _ _.

-

_

_

._

-

- -. _

__

.- _

l

\\-

t l.

..

l-

~

.

.-

,

Physical Security Program for Power Reactors:

,

!

a.

Protected and Vital Areas Access Control of Personnel:

Failure to adequately search security personnel as required.

b.

Protected and Vital Area Barriers: Three penetrations of a vital area barrier had not been adequately protected.

The licensee's site security program is being impleinented in an adequate and i

safe manner.

Senior plant management support is excellent.