IR 05000440/1987011
| ML20215A421 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/10/1987 |
| From: | Creed J, Kniceley J, Madeda T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20215A378 | List: |
| References | |
| 50-440-87-11, NUDOCS 8706160652 | |
| Download: ML20215A421 (1) | |
Text
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
g.
.e
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-440/87011(DRSS)
Docket No. 50-440 Licensee:
Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, OH 44101 Facility Name:
Perry Nuclear Power Plant, Unit 1 Inspection At:
Plant Site Inspection Conducted:
June 1-4, 1987 Date of Last Physical Security Inspection:
November 17-20, 1986 Type of Inspection:
Unannounced Physical Security Inspectors: h u S-b M
' lI 8 7 Uames R. Knicele9 Date Physical Security Inspector kn L/a t;/ia /n Terry /@ Madeda Dat'e /'
Phys.ic61 Security Inspector Approved By: 9uo M% b E
James R. Creed,dChief Date Safeguards Section Inspection Summary Inspection on June 1-4, 1987 (Report No. 50-440/87011(DRSS))
Areas Inspected:
Included a review of Security Program Audit; Records and Reports; ocks, keys and Combinations, Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Detection Aids - Protected Areas, Communications, Personnel Training and Qualification - General Requirements; Safeguards Contingency Plan Implementation and Safeguards Information.
The inspection was begun during the day shift.
Results:
The licensee was found to be in compliance with NRC requirements in the areas inspected, Enclosure contafns g 61 g g 07 hgg440 PDR O
Upon separation this page is Decontrolled
.