OPERATING DATA REPORT DOCKET N0 50-341

. UNIT FERMI-2 DATE 03-12-86 COMPLETED BY L.P. Bregni TELEPHONE (313) 586-5313 OPERATING STATUS

1. REPORTING PERIOD Februarv GROSS HOURS IN REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED POWER LEVEL (E't)165 MAX DEPEND CAPACITY (&'eNet)

DESIGN ELECTRICAL RATING (E'e Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (5'e Net) 57.5
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR 1D DATE CUMULATIVE

5. NUMBER OF HOURS REACIOR WAS CRITICAL 0 0 1912.5
6. REACIOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE O O O
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (&'H) 0 0 105,861.6
10. GROSS ELECTRICAL ENERGY GENERATED (5'H) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (m'H) 0 0 0
12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A j N/A N/A N/A l
16. UNIT CAPACITY FACTOR (Using MDC) .
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 WNTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 04/01/86
21. UNITS IN TESI STATUS (PRIOR 1D COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/RA l

INITIAL ELECTRICITY 05/01/86 COMMERCIAL OPERATION 07/01/86 ,

8605140148 860312 PDR ADOCK 05000341 'h h R PDR U- 1 Lt

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI-2 DATE 03/12/86 '

COMPLETED BY L.P. Bregni TELEPHONE (313) 586- 5313 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 o 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 0 25 0 9

10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 N/A 14 0 30 N/A 15 0 31 ufa 16 0 1

1

DOCKET NO. 50-341 .

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Fermi - 2 DATE 03/12/86 COMPLETED BY L.P. Bregni REPORT MONTH February TELEPHONE (313) 586-5313 w immow  !

m m el o i 9lO5"9!uel s e a

!- I' e

i 9

mome 2 5l 2"l o@.i m wnza2. E"!  !.

. *

  • om i c .-s no .o m a noe E CORRECTIVE ACTIONS / COMMENTS l S

NO  ! DATE  ! l $o l CZ l @ 8 $ li!

G l QP  !

2  !  ! 9" l ** l l  !

;  ;  ; i  ; i j 1 j 860201 l S l 672.0 l H l 4 l Plant has been shut down since  !

3 l l l l l

  • October 11, 1985 for a scheduled I .

l ' maintenance outage and is still in l f l l l l '

l l l l the outage at this time l l e i e e i

i i e e

. i. e i e

e a

i e i e

e

.i . .i e i i . i. i e i.

a

. i e

e. . .e e a.

e e a.

i

. i. i. . . . i s

i

. i . .

e e e i

. i i a i e e a a

. i. e. i. i e

i a

e e

a e e e i e

e i i e e e i e e i a e

e i e i i.

i e i e i e. i.

s s

a

. . e i e a

. . i. . i e i e i e e

e. e. .

i .i . e i i e e e a

i i . e. . i e i

!  ! l l l e

. .i i *

. . e

. e i i i

l_  !  !  !  !

(1) RZASONS OPERATOR TRAINING AND LICENSE EXAMINATION A. EQUIPMENT FAILURE (EXPLAIN) E.

NAINT OR TEST F. ADMINISTRATIVE B.

REFUELING C. OPERATIONAL ERn0?. (EXPLAIN)

C.

RECULATORY RESTRICTION H. OTHER (EXPLAIN)