ML20209E383
Text
"!
wf[
'o UNITED STATES g
NUCLEAR REGULATORY COMMISSION 3
o 3.
j WASHINGTON, D. C. 20555 APR 2 61985 MEMORANDUM FOR:
icens ng Branch No. 3 Division of Licensing FROM:
William H. Regan, Jr., Acting Chief Human Factors Engineering Branch Division of Human Factor: Safety
SUBJECT:
DIABLO CANYON NUCLEAR POWER PLANT UNITS 1 AND 2, NUREG-0737 STATUS
SUMMARY
REFERENCE:
PG&E Letter No.: DCL-85-145, dated April 10, 1985; Re:
Docket No. 50-323, Diablo Canyon Unit 2, Status of NUREG-0737 Requirements.
The referenced letter states that the requirements of NUREG-0737. TMI task Action Item I.D.1, " Control Room Design Review," are in a " closed" Status.
This item is not " closed."
The status of this NUREG-0/37, Supplement I requirement is pending PG&E's submittal, and NRC's review and evaluation, of a DCRDR Supplemental Sumary Report. The DCRDR was found to be incomplete after review of the DCRDR Sumary Report and a Pre-Implementation Audit.
SER input for Diablo Canyon Nuclear Power Station Units 1 and 2 Detailed Control Room Design Review should be received by D0L within the next few days.
N Will am H. Rega J
, Acting Chief Human Factors gine ring Branch Division of Human Factors Safety cc:
H. Shierling f gSbajoyoo -8 I
a b
i
_