ML20209E242

From kanterella
Jump to navigation Jump to search
Forwards Human Factors Engineering Branch Sser 31 Closing Out NUREG-0737,Item I.D.1 Re Control Room Design Review. Requirement for Detailed Control Room Design Review Will Be Made License Condition
ML20209E242
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 04/08/1985
From: Beckham D
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197, RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.1, TASK-TM NUDOCS 8504160590
Download: ML20209E242 (2)


Text

l S

((Qk o ur

/

4 UNITED STATES E

7 NUCLEAR REGULATORY COMMISSION gg 4 ti 5 j

WASHINGTON, D. C. 20555

%, +..../

APR 8 1985 w

MEMORANDUM FOR:

Assistant Director or 1 CenS$1 Division of Licensing FROM:

Don H. Beckham, Acting Deputy Director Division of Human Factors Safety

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT UNIT 2 SAFETY EVALUATION REPORT, SUPPLEMENT 31, SECTION 4.12, CONTROL ROOM DESIGN REVIEW Enclosed is an SER Supplement which closes out TMI Task Action Plan Item I.D.1, Control Room Design, as it relates to licensing Diablo Canyon Unit 2.

The staff's evaluation is based on its control room review conducted for Diablo Canyon Unit 1.

Post-licensing requirements for human factors engineering evaluation of the control room are contained in Supplement 1 to NUREG-0737. The requirement for a detailed control room design review in accordance with Supplement I to NUREG-0737 should be made a condition of the operating license. We propose the following:

Detailed Control Room Design Review The licensee shall comply with the requirements of Supplement I to NUREG-0737 for the conduct of a Detailed Control Room Design Review (DCRDR).

~

This report was prepared by W. N. Thompson. The author is not aware of iny professional opinions differing with the conclusions stated in the enclo' sed SER Supplement.

1 1

Don H. Beckham, Acting Deputy Director Division of Human Factors Safety

Enclosure:

HFEB SER Input, Diablo Canyon Unit 2 cc: See next page

Contact:

W. Thompson x24886 yp (1@Yd@QfN;

~-

1 Thomas M. Novak :

APR 8.1985 cc:

C. Grimes G. Knighton H. Shierling w

4

=

4 m

e h

.