Discusses Review of Status of Inputs to Sser Re Plant Shielding,Per Hl Thompson 850328 Memo.Encl Sser Identifies & Indicates Acceptability of Util Submittals Re NUREG-0737, TMI Item II.B.2.No Further Info Required
ML20209E234
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 04/03/1985
From: Muller D
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.2, TASK-TM NUDOCS 8504160498
Download: ML20209E234 (3)


Text

_ _.. _

[(l, 2 fpowy

[

UNITED STATES 4

g NUCLEAR REGULATORY COMMISSION 3

j Docket Nos: 50-275 and 50-323 APR 0 31985 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, DL FROM:

Daniel R. Muller, Assistant Director for Radiation Protection, DSI

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION REPORT RELATED TO PLANT SHIELDING (NUREG-0737, ITEM II.B.2)

PLANT NAME: Diablo Canyon Units 1 and 2 LICENSING STAGE: 0L(Unit 2)

DOCKET NUMBERS: 50-275/323 RESPONSIBLE BRANCH: LB #3; H. Schierling, LPM; B. Buckley The Radiation Protection Section of the Radiological Assessment Branch has reviewed the status of inputs as requested in the H. L. Thompson to Division Directors memorandum of March 28, 1985. The attached SSER identifies and indicates the acceptability of the Pacific Gas & Electric (PG&E) submittals related to Item II.B.2 of NUREG-0737 " Plant Shielding." As indicated in our Congel to Knighton memo of March 14, 1985, PG&E has fulfilled all information commitments to RAB and no further infonnation is required.

This review was performed by R. J. Serbu, RPS/RAB.

hN

/

Daniel R. Muller, Assistant Director for Radiation Protection Division of Systems Integration

Attachment:

As stated cc: See next page l

Y

@ W 1 4)( [#

p\\

a c

3

e.

m e v em,+m

.e.e w

, emmemg acwream.m-

'O l

T. Novak 2-cc:

w, attachment R. Bernero H. Schierling B. Buckley G. Knighton e

i

o e

e 4.15 Plant Shielding (NUREG-0737 Item II.B.2)

In SSER 14 (April 1981) the staff reported on its evaluation of the PG&E Diablo Canyon Unit I radiation shielding review. The staff identified the need for additional information regarding projected post accident dose rates for occupied areas, potentially occupied areas and travel routes. These were to be submitted prior to the issuance of a full power license. Further information was provided by PG&E on June 12, 1981 (Ref. 100) and the Unit I low power license was issued in September 1981.

By letter July 12, 1984 PG&E submitted " Radiation Shielding Review, Rev. 3" which provided further j

information for Diablo Canyon Unit 2 (Ref.101). The report refines and I

expands the information previously submitted for Unit 1.

The staff has l

l reviewed the information and found it acceptable. The staff concludes that this item has been resolved for Unit 1 and Unit 2.