Forwards Summary of Review Activities That Structural Team Plans to Undertake During Plant Reevaluation.Next Audit Scheduled for 841106-09
ML20209D541
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 11/07/1984
From: Kuo P
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197 NUDOCS 8411210063
Download: ML20209D541 (3)


Text

-

.y o

~

.{-

t j

  1. o
d.,

8' g

. UNITED STATES

"+

NUCLEAR REGULATORY. COMMISSION l

a j

WASHINGTON. D. C. 20555 k *** * / -

NOV 0 71984 l

, MEMORANDUM FOR:

James P. Knight, Assistant Director for l

Components & Structures Engineering Division of Engineering THRU:

George E. Lear, ChiSf

)

Structural & Geotechnical Engineering Branch Division of Engineering o

FROM:

P. T. Kuo, Leader l

Structural Engineering Section B

.l Division of Engineering Structural & Geotechnical Engineering Branch

{

1

SUBJECT:

STRUCTURAL, TEAM REVIEW PLAN FOR DIABLO CANYON UNIT 2 i

Enclosed is a sumary of review activities that the structural team plans j

to undertake during its Diablo Canyon Unit 2.re-evaluation. These review activtt.ies will primarily be in the technical area, but an effort will also be made to assure procer interfaces and documentations and timely implementation of resolut.ons reached during the re-evaluation process.

}

The Structural Team recently conducted two audits: one during the week of October 1-5, 1984 in San' Francisco and the other on October 18, 1984 at City College of New York. We are planning another audit for the week of November 6-9, 1984.

When the re-evaluation is complete, the Structural Team will prepare a report sumarizing the review activities and providing our conclusions.

i x

,. T.

uo, Leader Structural Engineering Section B Structural & Geotechnical Engineering Branch Division of Engineering

Enclosure:

i As stated cc:

R. Vollmer j

G. Lear N

I H. Polk M. Reich (BNL)

N. Chokshi g--

. s&#h c---

\\

e-

(,

1-d i-Structural Team Review Plan j

Diablo Canyon Unit 2

-l

. 1 The following are the review activities that the Structural-Team will undertake to complete the re-evaluation of Diablo Canyon Unit 2.

_l A.- Seismic Analysis 1

('i-1.

Verify the as-builts used in generating the seismic model.

2.

Verify the material properties used in the analysis.

j 3.

Assess the computer programs used in the analysis for proper verification.

4.

Review the results of the analysis.

<l B.

Annulus Structure Analysis t

c 1.

Assess the adequacy of response' spectra generation and documentation.

2.

Review the load combinations used in the design for compliance i

with the FSAR commitments.

i l 3.

Review the allowable stresses used for compliance with the i

building codes comitted in the FSAR.

+

i 4.

Verify if design calculations are properly signed and checked I {,

and any changes to the calculations are properly documented.

5.

Verify if calculations are properly filed and traceable.

4 C.

Turbine Building Differences Between Units 1 & 2 l

1.

Assess the effect of structural addition to the turbine building.

2.

Assess the effect of t..e differences in steel superstructures.

3.

Verify that the differences and structural additions are properly incorporated into the seismic model.

4.

Review the results from the seismic analysis.

5.

Review the member evaluations.

D.

Masonry Wall Evaluation

~

1.

Verify testing documentation on material strength.

2.

Verify the as-built documentations vs. design drawings.-

3.

Evaluate the criteria for allowable stresses used in the design.

4.

Evaluate the energy balance technique used in the analysis.

E.

Buried Conduits

~

1.

Review the' soil data and documentation.

2.

Review the design documentation.

3..

Review the as-built drawings.

~

4.

Verify' the manufat:tureFs specificati~ons pertinent to the flexible joints used in the construction.

h

.4,.

e -,e s e c.p-e= en

-4 p--g e.e *,

aqwameneseee- *-*-**-**-"...=*e-

. - -. _, ~,. ' - _e.

.r.

e.

- = = *

    • w-

- --- =

-e

  • = * *
  • m
-- ~.

l....

-,.g -

3-r

.u.

t i-

, l <,"

.l 2-

~

F., Transfer of Seismic Output to Update DCM-17 i

~ 1.

Verify if DCM-17 is updated with proper documentation.

2.

Verify if the updated DCM-17 is promptly transmitted to the -

-r users.

G.

Allegations

/.

1.

Assess if Unit I allegations are applicable to Unit 2.

2.

Assess Unit 2 specific allegations.

3.

Review resolution methods and documentations.-

H.

E0I's and OI's 3

1.

Assess if Unit l' E01's identified by the IDVP are applicable to Unit 2.

}

2.

Assess if Unit 1 OI's identified in SSER 18 are applicable to Unit 2.

3.

Review the resolution methods and documentations~.-

i }

I l l

~ <

{

i t

i i i I

I, 4

-= ===

e..

=,

e%

e e

e +h y

  • g g g e@@ p
  • $m***ePmmMSu 5

_P" 4

7*

'N

  • 'OO#

bW**M"-

O 8

P

-f sp-(

p g

wy y-y-'

=r---->-w wWe

-e-r-y

"