Text
s a_
t _ _. -
. r_,
>= ar g
- '8
[
4*)
UNITED STATES NUCLEAR REGULATORY COMMISSION j
WASHINGTON, D. C. 20555
\\
- * * * *,o$
i g
7 i
MEMORANDUM FOR: Hans E. Schierling, Project Manager Licensing Branch #3 Division of Licensing q~
FROM:
Robert J. Bosnak, Chief t
Mechanical Engineering Branch j
Division of Engineering
SUBJECT:
DIABLO CANYON UNIT NO. 2 REQUEST FOR ADDITIONAL 3
INFORMATION I
I During the week of October 22-26, 1984 the NRC staff personnel and consultants l
visited the PG&E/Bechtel offices to audit designs of piping and pipe supports at Diablo Canyon Unit No. 2.
Based on this audit, the staff has determined i
that the infonnation contained in the attached " Request for Additional Information" will be required before a satisfactory conclusion can be reached i
regarding the adequacy and qualification of Diablo Canyon Unit 2 piping and i
pipe supports.
i i
ob J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering l
Attachment:
As stated cc:
R. Vollmer, DE J. P. Knight, DE
(
G. Knighton, DL M. Hartzman, DE
.i CONTACT:
M. Hartzman, DE:MEB, X28445 t
5
%ueo 1
1
~.
n.
,t m
'h
_,..wm m
g-p.\\
i
- 1 Attachment No. 1 DIABLO CANYON UNIT N0. 2 REQUEST FOR ADDITIONAL INFORMATION i
1.
Provide the methodology used by W for piping support base plate analysis, including flexibility effects. Thow that this has been reviewed and
- accepted by the DCP, and that it corresponds to that used by PG&E and Bechtel.
2.
Provide the verification of the computer program PIPSAN used by W for analyzing piping supports. Show that this program has been reviewed, verified and approved by the DCP.
i 3.
Show that the DCP has verified that W has included in the W piping 4
i support design criteria all changes reflected in DCM-M9, Rev.11 l
" Guidelines for Design of Class 1 Supports."
4 I
4.
Provide the basis for specifying a tolerance of 10% on modulus of elasticity as stated in PG&E " Procedure for Piping Stress Analysis, Diablo Canyon Units 1 and 2," Procedure P-11, Rev. 7, and W document AM-SSA-2577, Vol. 1, Rev. 3, March 1983.
5.
Provide the procedures and design docunents used by Bechtel-Gaithersburg l
for the analysis of piping and piping supports at Diablo Canyon Unit No.
l 2, including the document " Project Instruction Manual for Piping
.l Stress Analysis-DC 2, Job. No. 15320-003, Rev. 1."
I 6.
Provide the following W documents:
- a. C0-107, Rev. 5 " Pipe Support and Evaluation Procedure" Diablo Canyon Unit 2
- b. PIPSAN (Pipe Support Analysis) Users Manual, Rev. O,1983.
1 9