tvi A 4 n$e4 DISTRIBUTION Docket File 50-275/323 PRC System MEMORANDUM FOR: Darrell G. Eisenhut, Director LB#3 Reading Division of Licensing JLee
-M THRU:
Thomas M. Novak, Assistant Director-LChandler for. Licensing TMNovak Division of Licensing George W. Knighton, Chief Licensing Branch No. 3
- i I
Division of Licensing FROM:
Hans Schierling, Project Manager
-)
Licensing Branch No. 3
't Division of Licensing 1
SUBJECT:
DIABLO CANYON UNIT 2 SCHEDULE
]
l This is to advise you of a potential slip in the Diablo Canyon Unit 2 schedule.
The latest fuel load date from PG&E is late November, as also reflected in the current Bevill Schedule. We believe the date is overly optimistic. NRR review and evaluation is underway with DE being the most involved. DE does not expect to complete their effort before mid December of 10/10/84, (see enclosed memo R. Vollmer to D. Eisenhut).
In my opinion an SSER issue date of mid January is more realistic.
i Hans Schierling, Project Manager Licensing Branch No. 3 i
Division of Licensing i
Enclosure:
As stated cc:
H. Denton R. Vollmer R. Bernero T. Speis H. Thompson T. Bishop J. P. Knight l(
l
/
DL:LBf3 E DL$h3 D0 l
HSchi rlin /yt GW1 hhton TMN ak
-10/% /84 10//p84 10
/84 -
/
4 J O P4/ @ 3 0 3 2 n.
h k8 V
,.