Forwards Safety Evaluation & Bnwl Evaluation of Confinement Environ Temps Following High Energy Line Breaks... Re Util 861212 & 19 Submittals of Temp & Pressure Profiles.Certified Compliance W/Equipment Qualification Rule Requested
ML20207S228
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/13/1987
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20207S229 List:
References
TAC-42527, NUDOCS 8703190154
Download: ML20207S228 (3)


Text

_ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

7 March 13, 1987 I

Docket No. 50-267 Mr. R. O. Williams, Jr.

r Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. W1111ars:

SUBJECT:

APPROVAL OF FORT ST. VRAIN TEMPERATURE AND PRESSURE PROFILES A review of the Fort St. Vrain (FSV) temperature and pressure profiles was performed by the staff with the assistance of our contractor, Pacific Northwest Laboratories (PNL). The staff and PNL have reviewed submittals dated December 12 and 19,1986 (P-86664 and P-86673)your . PNL's Technical Evaluation Report (TER) finds that the calculated temperature profiles for certain high energy line breaks are within the Sargent and Lundy composite profile to which the FSV equipment is qualified. We have reviewed the PNL TER, and find that it provides the basis for concluding that the FSV temperature profiles are acceptable. Our Safety Evaluation and the PNL TER are Enclosures 1 and 2, respectively.

By letter dated February 25, 1987 (P-87077), you provided a report of FSV's compliance with the equipment qualification rule. Your report indicated 15 areas where PSC was completing work or closing out identified deficiencies. In this letter you committed to issue a letter certifying completion of these items as delineated in our letter of September 10, 1986 We request that you provide certification that FSV is in compliance with 10 CFR 50.49 in order that we may complete approval of your program.

The reporting and/or recordkeeping requirements contained in this letter affect fewe" than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Original signed by 0703190154 870313 Kenneth L. Heitner, Project Manager PDR ADOCK 05000267 Standardization and Special P PDR '

Projects Directorate Division of PWR I.icensing-B Office of Nuclear Reactor Regulation

Enclosures:

DISTRIBUTION:

As stated l Docket Fu e PNoonan FMiraglia JPartlow NRC POR KHeitner OGC-Beth HThompson cc w/ enclosures: Local POR 0 Lynch EJordan ACRS (10)

See next page PDSS Reading HBerkow BGrimes PBSD PBSS b PB PRIG

[JNbonanXHeitner:ac 0 Lynch E kow 03/$/87 03/o/87 03]87 /

03/)/87

, [OKfCg#%, UNITED STATES y 7, NUCLEAR REGULATORY COMMISSION

y WASHINGTON D C. 20555 g a

% ,,,,.* March 13, 1987 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Pest Office Box P40 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

APPROVAL OF FORT ST. VRAIN TEMPERATUPE AND PRESSURE PROFILES A review of the Fort St. Vrain (FSV) temperature and pressure profiles s was performed by the staff with the assistance of our contractor, Pacific Northwest Laboratories (PNL). The staff and PNL have reviewed submittals dated December 12 and 19, 1986 (P-86664 and P-86673)your

. PNL's Technical Evaluation Report (TER) finds that the calculated temperature profiles for certain high energy line breaks are within the Sargent and Lundy composite profile to which the FSV equipment is qualified. We have reviewed the PNL TER, and find that it provides the basis for concluding that the FSV temperature profiles are acceptable. Our Safety Evaluation and the PNL TER are Enclosures 1 and 2, respectively.

By letter dated February 25,1987 (P-87077), you provided a report of FSV's compliance with the equipment qualification rule. Your report indicated 15 areas where PSC was completing work or closing out identified deficiencies. In this letter you committed to issue a letter certifying completion of these items as delineated in our letter of September 10, 1986.

We reouest that you provide certification that FSV is in compliance with 10 CFR 50.49 in order that we may complete approval of your program. ,

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, b bkNw Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-8 Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures:

See next page

Mr. R. O. Williams Fuhlic Service Company of Colorado Fort St. Vrain s

CC:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engir.eering Division Radiation Control Division Public Service Compar,y Department of Health of Colcrado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorade 00201 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Coloru'o San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Marager Nuclear Licensing and Fuel Division Pr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado .80651 Post Office Bcx 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Progran Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite IOC-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413