Other: ML20076E880, ML20079M106, ML20080E109, ML20100G880, ML20100G888, ML20100H212, ML20112G667, ML20127J807, ML20135B301, ML20135D754, ML20137H372, ML20137S741, ML20141P181, ML20154K144, ML20197C598, ML20197G513, ML20205C845, ML20206B459, ML20207K470, ML20211P495, ML20215E408, ML20215G100, ML20235G758
|
MONTHYEARML20076E8801983-05-17017 May 1983 Responds to NRC 830413 Order Re Environ Qualification of safety-related Electrical Equipment,Per 10CFR50.49.Environ Qualification Records Audit Will Be Completed by 831231 Project stage: Other ML20080E1091983-08-15015 August 1983 Provides Followup to Util Re Environ Qualification of safety-related Electrical Equipment. Justification for Continued Operation W/Components Not Fully Qualified Provided Project stage: Other ML20079M1061984-01-0909 January 1984 Advises NRC Re Status of Three Commitments Made in Util Concerning Environ Qualification of safety-related Electrical Equipment.Valve Actuators Tested & Successfully Passed HELB Tests Project stage: Other ML20100G8881984-09-11011 September 1984 Four-Minute Isolation of Postulated Steam Line Breaks at Fort St Vrain Nuclear Generating Station Project stage: Other ML20112G6671984-12-27027 December 1984 Informs of Efforts to Environmentally Qualify Certain post-accident Monitoring Equipment Per 10CFR50.49.Equipment Identified in Reg Guide 1.97 & Existing in Harsh Environ Will Be Qualified by 850331 Project stage: Other ML20108A2121985-02-0404 February 1985 Informs of Receipt of Generic Ltr 84-24 on 850121 & Request for Addl Info on Environ Qualification of Electrical Equipment on 850128.Responses to Both Ltrs Will Be Provided by 850328 Project stage: Request ML20100H2121985-03-25025 March 1985 Forwards Response to NRC 841227 Order Re Certification of Compliance w/10CFR50.49 (Generic Ltr 84-24).Util Previously Submitted Ltrs Re Environ Qualification of safety-related Equipment in Response to IE Bulletin 79-01B Project stage: Other ML20100G8801985-03-28028 March 1985 Forwards Addl Info Re Environ Qualification Program. Response to NRC 850128 Concerns & Summary of Completion Schedule for Outstanding Items Encl Project stage: Other ML20237L1731985-03-29029 March 1985 Notification of 850403 Meeting W/Util in Bethesda,Md to Discuss Equipment Qualification Project stage: Meeting ML20127J8071985-06-11011 June 1985 Maintains Util Position of Full Compliance w/10CFR50.49 in Response to Eh Johnson 850611 Inquiry Re Environ Qualifications of Electrical Equipment Important to Safety. Responses to Each Concern Presented in Encl Project stage: Other ML20237L1551985-06-25025 June 1985 Submits Daily Highlight.Notifies of 850702 Meeting W/Util in Bethesda,Md to Discuss State of Compliance of Plant W/ Equipment Qualification Rule 10CFR50.49 Project stage: Meeting ML20244D4841985-07-10010 July 1985 Provides Feedback on Current NRR Conclusions Re Facility Compliance W/Equipment Qualification Rule & Operator Action Needed to Terminate Design Basis Events.Summary of 850702 Meeting W/Util in Bethesda,Md Encl Project stage: Meeting ML20132B9171985-07-11011 July 1985 Discusses Resolution of Technical Issues of Aging & Operability Times Per 850702 Meeting Re Environ Qualification Program.Hold on Reactor Power to 15% Proposed as Initial Limitation Project stage: Meeting ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20134M0161985-08-20020 August 1985 Submits Discussion of Technical Issues Re Environ Qualification Program Raised During Meetings W/Nrc.Aging & Operability Time Program Operator Response Time,Temp Profiles & Shutdown Cooling Paths & Equipment Evaluated Project stage: Meeting ML20135D7541985-08-30030 August 1985 Advises That Rev of Emergency Procedures Committed to in Deferred to Coincide W/Final Environ Qualification Program Documentation.Procedure Revs at This Time Will Cause More Confusion than Clarity for Operators Project stage: Other ML20135B3011985-08-30030 August 1985 Forwards Justification to Operate Facility at Reduced Power Level.Requests That NRC Provide Concurrence for Facility to Be Operated at 8% Power Level for Period of Time Not to Exceed 45 Days.Operation Does Not Pose Undue Safety Risk Project stage: Other ML20205C8451985-09-10010 September 1985 Forwards Info Supporting 850830 Request to Operate at 8% Power to Facilitate Core Dryout for 45 Days,Per 850826,0903 & 04 Telcons.Moisture Removal Needed to Maintain Conditions Prescribed in FSAR & Tech Specs Project stage: Other ML20205C4811985-09-11011 September 1985 Provides Commitment That Operating Procedures & Operator Training Described in Providing Addl Info in Support of Request to Operate at Up to 8% Power Will Be Complete Prior to Withdrawal of Control Rods Project stage: Withdrawal ML20137S7411985-09-23023 September 1985 Forwards Addl Calculations,Clarifying Util Re Predicted Fuel/Pcrv Liner Temps Resulting from Design Basis Event from 8% Power & Subsequent Reactor Cooling Utilizing Liner Cooling Sys.Calculations Confirm Original Position Project stage: Other ML20137H3721985-11-26026 November 1985 Memorandum & Order Granting Extension of 851130 Deadline for Environ Qualification of Electrical Equipment to 860531 & Approving Proposal to Allow Operation w/35% Reactor Power Limit During Interim.Served on 851127 Project stage: Other ML20151N7211985-12-27027 December 1985 Forwards Response to 851105 Request for Addl Info Needed to Determine If Environ Qualification Program Complies W/ Requirements of 10CFR50.49.Sys Description & Temp Profiles Used in Environ Qualification Program Also Encl Project stage: Request ML20141P1811986-01-29029 January 1986 Rev 00 to Justification/Analysis:Environ Qualification of Square D Pressure & Temp Switches Project stage: Other ML20141M8081986-02-14014 February 1986 Advises That DBAs Re Permanent Loss of Forced Circulation & Rapid Depressurization of Reactor Vessel Must Be Addressed in Equipment Qualification Program.Util Cooperation W/Program Mods Confirmed During 851029 Meeting Project stage: Meeting ML20154K1441986-02-28028 February 1986 Forwards Addl Info Re Environ Qualification,Per 851105 Request.Encl Info for Three Line Break Scenarios in Reactor Bldg Will Allow Independent Verification of Temp Profiles Obtained from Ga Technologies Using Computer Programs Project stage: Other ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys Project stage: Meeting ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl Project stage: Meeting ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl Project stage: Meeting ML20204A3181986-05-0101 May 1986 Provides Status Summary of Environ Qualification Program. Addl Details on Program Contained in 860501 Draft Environ Qualification Submittal.Major Equipment Replacements Listed Project stage: Draft Other ML20197G5131986-05-12012 May 1986 Requests Concurrence Re Inclusion of DBA in Environ Qualification Program Per Berkow .Util Will Not Environmentally Qualify Electric Equipment to Mitigate DBA-1 & DBA-2 Since Equipment Not Exposed to Harsh Environ Project stage: Other ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program Project stage: Meeting ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl Project stage: Meeting ML20206R6241986-06-20020 June 1986 Forwards Environ Qualification Submittal Re Activities to Assure Compliance w/10CFR50.49 & Incorporating Comments on Draft 860502 Submittal.Evaluations Will Be Available for Review Before Request for Release to Full Power Project stage: Draft Request ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl Project stage: Meeting ML20204H6531986-07-31031 July 1986 Responds to 860724 Request for Documentation Re Use of Thermal Lag Analysis in Environ Qualification of Electrical Equipment in Plant.Thermal Analysis Will Be Performed Per Rev 3 to CENPD-255-A Project stage: Request ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl IR 05000267/19860251986-10-30030 October 1986 Insp Rept 50-267/86-25 on 860816-0930.Violations Noted: Failure to Follow Procedures,To Review Mod Control Procedures & to Sufficiently Document Design Verification Project stage: Request ML20197C5631986-10-30030 October 1986 Forwards Draft FATE-86-117, Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept (Ter).Ter Addresses Details Used in Temp Profile Calculations Project stage: Draft Approval ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept Project stage: Other ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl Project stage: Meeting ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl Project stage: Meeting ML20215E4081986-12-12012 December 1986 Forwards Analyses of Three Steam Line Break Scenarios for Reactor Bldg & Three Scenarios for Turbine Bldg Using Convective Heat Transfer Coefficient of 1.0,per NRC 861120 Request Project stage: Other ML20215G1001986-12-19019 December 1986 Forwards Second Formal Submittal Re Turbine Bldg Temp Profiles Resulting from Steam Line Breaks,Per 861120 Request.Composite Temp Profile Curves Originally Submitted as Basis for Environ Qualification Program Appropriate Project stage: Other ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept Project stage: Other ML20207K4021987-01-0202 January 1987 Forwards Final FATE-86-117, Review of Convection Heat Transfer Coefficient Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept,For Info Project stage: Approval ML20207Q4431987-01-16016 January 1987 Confirms 870126-30 Equipment Qualification Insp,Per 870113 Meeting at Region IV Ofcs.Mgt Entrance Meeting Scheduled for 870126 at Site Visitors Ctr & Exit Meeting Tentatively Scheduled for 870130 at Plant Site Project stage: Meeting ML20210P5241987-01-29029 January 1987 Forwards Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept,In Response to Util 861212 & 19 Submittals Project stage: Draft Other ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept Project stage: Draft Other ML20211P4951987-02-25025 February 1987 Informs of Present Status & Plans Re Completion of Environ Qualification Program,Per Open Items Identified During 870130 Site Insp.Program & Implementing Procedures to Assure Environ Qualification in Place.Status of Open Items Encl Project stage: Other 1986-10-31
[Table View] |
Text
.-
O Public Service-m_,.
P.o. Box 840 Denver, Co 80201-0840 February 25, 1987 R.O. W!LLIAMS, JR.
Fort St. Vrain ME$
R S
Unit No. 1 P-87077 t*
\\
U.S. Nuclear Regulatory Commission Attn: Document Control C'erk i
Washington, D.C.
20555 Attention: Mr. H. N. Berkow, Director Standardization and Special r
Projects Directorate Docket No. 50-267
SUBJECT:
FSV Environmental Qualification Program Compliance Status
REFERENCE:
- 1) NRC Letter, Heitner to Wili u mt.,
dated September 10, 1986 (G-86494)
Dear Mr. Berkow:
The NRC site inspection of the Environmental Qualification (EQ)
Program for Fort St. Vrain was completed on January 30, 1987.
The verbal feedback received from tha NRC Inspection Team during the exit meeting indicated that Public Service Company's (PSC's)
EQ Program utilized to environmentally qualify equipment as well as the program in place for maintaining.the qualification met the requirements of 10CFR50.49.
Certain open items were identified tc the NRC at that time which Public Service Company (PSC) was in t,% process of completing.
From the inspection, certain additiond items were identified that required action by PSC. This letter. is written to apprise you cf the present status and plans regarding completion of the EQ Progran,
e'703020gg $U$
67 hD D
g PDH AU PDR
~
=
i.
P-87077 February 25, 1987 At the present time, all equipment within the scope of 10CFR50.49 has
.y'
('
been -identified and the environmental qualification is nearing completion.
The program and implementing procedures are in place to assure that equipment qualification is maintained for the life of the plant and that the associated documentation is maintained up to date and in an auditable form.
Status Attachments for the remaining open items are provided in tabular format. The projected completion date for the final item to finish in each category is also shown.
All items have been planned and scheduled and are being tracked along with our other outage activities.
Status of Action Items Identified at NRC EQ Inspection Exit.
Status of Miscellaneous Open Items and Confirmatory Reviews Status of Physical Work and Testing Activities In addition, Reference 1 required the resolution of the Fort St.
Vrain Environmental Qualification Profiles and the approval of the Technical Specifications associated with the Steam Line Rupture
\\
Detection / Isolation System. These items have been submitted to the
[
NRC Staff and are in the final stages of review.
As a confirmatory action prior to startup, PSC will issue a letter certifying the closeout of those items delineated in Reference 1.
c-Any exceptions which could arise from unforeseen delays in the resolution of the environmental profiles, in the SLRDIS Technical
. Specification or in final closure of our confirmatory reviews would be identified at that time. Resolution of such exceptions would then be ' pursued with the NRC Staff under the provisions of 10CFR50.49 If have any questions or comments, please call Mr. M. H. Holmes at (you303)480-6960.
Very truly y.urs,
/
R. O. Williams, Jr.
Vice President Nuclear Operations R0W/JW:pa
/
Attachments l
I m
ATTACIMENT 1-2 to P-87077-STATUS OF ACTION ITEMS RESULTING FROM NRC EQ INSPECTION xx.
CHANGE
- NOTICE CATEGORY ACTIVITY DESCRIPTION ITEMS PREPARATION APPROVAL APPROVAL 1
REVISE EQ BINDERS 8
02/25/87 02/27/87 03/03/87 2
REVISE CABLE LOOP ACCURACY 1
COMPLETE COMPLETE N/A REPORT 3
UPGRADE CABLE BINDERS 5
02/25/87 02/27/87 03/03/87 Following completion of the above items, the EQ Binder activities specified in Attachment 2, and resolution of tiie FSV EQ Profiles with the NRC Staff, PSC will be able to certify that all EQ Binders are in place and that they meet the requirements of 10CFR50.49.
All completion dates represent the presently scheduled critical path completion for the longest lead item in that category, c,
v.
~
ATTACHMENT 2 to P-87077.
STATUS OF MISCELLANE0US OPEN ITEMS AND CONFIRMATORY REVIEWS NUMBER OF SCHEDULED
- WORK COMPLETION CATEGORY ACTIVITY DESCRIPTION ITEMS -
DATE 1
ISSUE 2 REMAINING EQ CABLE 6 BINDERS 03/03/87 AND 4 EQUIPMENT BINDERS 2
REVISE BINDERS ON PSC OPEN 8 CHANGE NOTICES 03/10/87 ITEM LIST 3
MODIFY MEL TO REFLECT BINDER 2 CHANGE NOTICES 03/10/87 UPGRADES AND RECENTLY COMPLETED TESTING 4
ISSUE EQ EMERGENCY PROCEDURES 2 PROCEDURES DEPENDENT ON NRC APPROVAL OF SLRDIS TECH SPEC 5
COMPLETE CONFIRMATORY REVIEWS 4 CATEGORIES 03/17/87
All completion dates represent the presently scheduled critical path completion for the largest lead item in that category.
ATTACHMENT 3 to P-87077' STATUS OF PHYSICAL WORK AND TESTING ACTIVITIES NUMBER OF PHYSICAL WORK
- WORK COMPLETION COMPLETION CATEGORY ACTIVITY DESCRIPTION ACTIVITIES DATE DATE 1
MCC/ THERMAL OVERLOADS / RELAYS 2
03/02/87 03/06/87 2
INSTRUMENTATION /TEmil?!ATIONS 4
03/12/87 03/17/87 3
TAGGING / LABELING 3
03/10/87 N/A 4
MOTOR OPERATED VALVES 4
03/04/87 03/15/87 5
MISCELLANE0US MODIFICATIONS 7
03/07/87 03/12/87 l
6 FUNCTIONAL TESTING 13 COMPLETE 03/17/87 7
MAINTENANCE ACTIVITIES 20 03/06/87 03/15/87 All the necessary planned maintenance activities supporting Environmental Qualification (approximately 1000 i
separate work items) are nearing completion. Approximately 98% of the plant modification construction and testing activities supporting Environmental Qualification has been completed.
Follcwing completion of the above construction activities, PSC will be able to certify that all equipment on the Master Equipment List is environmentally qualified.
All completion dates represent the presently scheduled critical path completion for the longest lead item in that category.