13 W Docket No.:
50-445/446 MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Proiect FROM:
Chet Poslusny, Program Coordinator '
Comanche Peak Technical Review Team
SUBJECT:
FEEDBACK REPORT TO ALLEGER A-23 On October 31, 1984, Alleger A-23 was interviewed by telephone by D. Jeng, R.
Philleo, and R.C. Tang.
Mr. Philleo explained the TRT's dispcsition of issues AC-22 and AC-23.
For the TRT's investigation, 23 packages of concrete placement records were randomly selected and examined for any irregularities or nonconformance reports (NCR).
Fifteen NCRs were identified and adeouately disposed of according to established procedures. The TRT's took a field inspection trip that showed no degradation of concrete. During the field inspection trip, the TRT interviewed two QC inspectors who confirmed that necessary procedures were followed in placing concrete during the period they were directly involved.
The alleger felt the TRT correctly interpreted his concerns and had correctly resolved them.
(u Ksy
-Chet Poslusny, Program CooFdinator
~
Comanche Peak Technical Review Team cc:
D. Eisenhut B. Hayes J. Youngblood D. Jeng M,
es 50-445/446 t01A-65-59 8607110042 060624 PDR FOIA GARDE 85-59 PDR p
~
4
r
,~
ifCg
[
UNITED STATES
[]-
'}
NUCLEAR REGULATORY COMMISSION
/
WASHINGTON, D. C 20555
%; v*..../
A 13 19f6 Docket No.:
50-445/446
/
[
MEMORANDUM FOR:
Vincent S. Noonan irector Comanche Peak oject
[/
FROM:
Chet Pos ny, Program Coordinator Comanche Peak Technical Review Team
SUBJECT:
FEEDBACK REPORT TO ALLEGER A-23 On October 31, 1984, Alleger A-23 was interviewed by telephone by D. Jeng, R.
Philleo, and R.C. Tang.
Mr. Philleo explained the TRT's disposition of issues AC-22 and AC-23.
For the TRT's investigation, 23 packages of concrete placement records were randomly selected and examined for any irregularities or nonconformance reports (NCR).
Fifteen NCRs were identified and adeouately disposed of according to established procedures.
The TRT's took a field inspection trip that showed no degradation of concrete. During the field inspection trip, the TRT interviewed two QC inspectors who confirmed that necessary procedures were followed in placing concrete during the period they were directly involved.
The alleger felt the TRT correctly interpreted his concerns and had correctly resolved them.
(BKay Chet Poslusny, Program Coordinator Comanche Peak Technical Review Team cc:
D. Eisenhut B. Hayes J. Youngblood D. Jeng M. Kline Docket Files 50-445/446